Amendment 0002

View the file

Other files

File Type Posted
SF30_0009.pdf PDF
SF30_0008.pdf PDF
SF30_0007.pdf PDF
SF30_0006.pdf PDF
SF30_0005.pdf PDF
SF30_0004.pdf PDF
0003_SF30.pdf PDF
F16_MTC_Site_Visit_of_18_March_2014_List_visitors.pdf PDF
VisitorPassRequestForm.xls XLS spreadsheet
F16_MTC_Pre-Proposal_Presentation.pdf PDF
Att_(A)_Exp_Proj_Data_Sht.docx DOCX document
Att_(B)_PPQ.docx DOCX document
SF30_0001.pdf PDF
Att_(E)_Piano_Sicurezza_e_Fascicolo_(Italian).pdf PDF
Att_(E)_SAFETY_PLAN_AND_PAMPHLET_(English).pdf PDF
Att_(B)_PPQ.pdf PDF
Att_(A)_Construction_Experience_Project_Data_Sheet.pdf PDF
Att_(F)_Schedule_B_Price_Proposal_Form.pdf PDF
Att_(D)_Drawings_and_Specifications.zip ZIP file
Solicitation.pdf PDF
Att_(C)_Pre_Preposal_Inquiry_Form.xlsx XLSX spreadsheet
REVISED_Synopsis.pdf PDF
Synopsis.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

F-16 Mission Training Center, Aviano Air Base, Aviano, Italy

Please see continuation page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Mar-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N62470-14-R-3003

X 9B. DATED (SEE ITEM 11)

05-Mar-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Mar-2014

CODE

COMMANDER NAVFAC ATLANTIC

6506 HAMPTON BLVD

NORFOLK VA 23508-1278

N62470 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N62470-14-R-3003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

Amendment 0002 is being issued for the following:

1. Convert the statutory cost limitation from dollars to euros (Page 5 of the Solicitation)

2. Provide responses to PPIs 1 – 12

3. Revise clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984).

4. Block 11 has been changed from “notice to proceed” to “award”. See block 11 for details.

5. Provide Word versions of the following attachments:

a. Attachment A - Construction Experience Project Data Sheet and Attachment C NAVFAC/USACE Past Performance Questionnaire (Form PPQ)

In Section 00100, A. GENERAL INFORMATION, item 5 (Page 5 of the Solicitation) has been changed

FROM:

This acquisition will result in a firm fixed price contract for construction services. The statutory cost limitation for F16 Mission Training Center, Aviano, Italy is $8,100,000

TO THE FOLLOWING:

This acquisition will result in a firm fixed price contract for construction services. The statutory cost limitation for F16 Mission Training Center, Aviano, Italy is €5,865,210.

Responses to PPIs 1 – 12

1. QUESTION: As the host country (Italy) belongs to the European Union, you may know that all the

Member States are in the Common European Market, so all the countries shall have the fair opportunity to compete for this effort.

Being said that, instead of the SOA Certification, which is only for italian companies, we would like to request the Navy to include the possibility of including in lieu of the SOA Certification, an equivalent document, issued by a competent authority of any member country of the European Union. A third competent party shall certify –IN ENGLISH- that the document is equivalent to the Italian SOA OG1, OS4, OG11 and OS3, just as we have been addressed to do in other projects within the US Department of Defense.

RESPONSE: The SOA Certification is required and no substitutions will be accepted.

2. QUESTION: Since the offers must be submitted in EUROS, could you please provide us a fixed exchange rate $/€.

RESPONSE: Amendment 0002 changes the Statutory Cost Limitation from U.S. dollars to Euros.

3. QUESTION: On all the electrical drawings there are 2 UPS (Uninterruptible Power Supply) that are part of the electrical installations but there is not any section on the Specs that mention them. Is the main contractor of this project supposed to provide them?

RESPONSE: In accordance with dwg E-601 Note 1, the UPS and PDU's are provided by the simulator manufacturer (Government Provided), while the circuits are to be provided by the construction contractor.

4. QUESTION: CENTRAL REFRIGERATION EQUIPMENT FOR AIR CONDITIONING, 2.1.2 Chiller (CH-1), is specified as follows: "Chiller modules shall incorporate two-stage centrifugal compressor with magnetic bearings." This type of chiller is normally 2-3 times as expensive as other chillers. We would kindly request to confirm that the chillers require a magnetic bearing compressor.

RESPONSE: The magnetic bearing compressors shall be as specified in the contract documents.

5. QUESTION: In the RFP it is clearly indicated that the Computer Rooms Air Conditioning Units must be UL listed and this would mean that all the CRAC units shall be imported from the United States. Would it be acceptable to use locally available products, as specified on DOCUMENT 00 73 04, SUPPLEMENTARY CONDITIONS FOR PROJECTS IN MEDITERRANEAN AREA, 1.12 PRODUCTS

SPECIFIED USING USA STANDARDS?

RESPONSE: Local products with an equivalent European third party testing certification can be used in lieu of UL listed equipment.

6. QUESTION: Given the transit time required of packages being delivered from Europe - will the Government accept ELECTRONIC proposal submissions?

RESPONSE: No.

7. QUESTION: Will the Government accept previously completed/submitted PPQs that are identical to the format of this solicitation's PPQ (Attachment C)?

RESPONSE: Yes, offerors may submit previously completed/submitted PPQs but only if they are identical to the format of this solicitation's PPQ. PPQs not identical in format will not be considered.

8. QUESTION: The Construction Experience Project Data Sheet is referenced as "Attachment F" - but

Attachment F is the Schedule and Price Form. Please clarify.

RESPONSE: The Construction Experience Project Data Sheet is Attachment A.

9. QUESTION: Is the Government requiring the following certifications from Offerors? (Please see comment.)

• Prevailing Work Category: OG-1 Classification (Between I to VIII)

• Additional Work Category: OG-11 Classification (Between I to VIII)

RESPONSE: Please see page 5 of the Solicitation for the SOA Certification requirements.

10. QUESTION: We would like to know if it would be possible to submit the bid proposal in A4 sheets format.

RESPONSE: Yes.

11. QUESTION: "Block 8" is missing from the form. Will the Government issue an updated Attachment A?

RESPONSE: Block 8 was intentionally left off the form. An updated Attachment A will not be issued.

12. QUESTION: To facilitate the completion of Attachment A - Construction Experience Project Data Sheet and Attachment C NAVFAC/USACE Past Performance Questionnaire (Form PPQ-) would it be possible to have files in word format?

RESPONSE: Word versions (.doc) have been provided in Amendment 0002.

SECTION 00010 - SOLICITATION CONTRACT FORM

The performance code has changed from Notice to Award.

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed (award of contract is the notice to proceed for this procurement), (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 630 days after contract award. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)