Conformed TDPC RFP N61340-11-R-0010 Amendment 2.doc

DOC document 1 MB Posted

Attached to
NAWCTSD Training Data Products Contract (TDPC) Federal contract opportunity
Solicitation number
N61340-11-R-0010
Issued by
Department of the Navy Naval Air Systems Command Naval Air Warfare Center

About this file

Conformed copy of the TDPC RFP with Amendment (2) changes incorporated.

View the file

Other files for this federal contract opportunity

Other files attached to NAWCTSD Training Data Products Contract (TDPC), newest first.
File Type Posted
TDPC Info Only Memo.doc DOC document
Amendment 4 to TDPC RFP N61340-11-R-0010.doc DOC document
Attachment —
Attachment_(12)_Oral Presentation Planning Sheet.xls XLS spreadsheet
Q-Rs_Amendment_4_Attch_Round_4.pdf PDF
Conformed TDPC RFP N61340-11-R-0010 Amendment 3.docx DOCX document
Attachment —
Attachment —
Q-Rs_Amendment_3_Attch_Round_3.pdf PDF
Attachment —
Attachment —
Q-Rs_Amendment_2_Attch_Round_2.pdf PDF
Amendment 2 to TDPC RFP N61340-11-R-0010.doc DOC document
Attachment —
Attachment —
Conformed TDPC RFP N61340-11-R-0010 Amendment 1.docx DOCX document
Amendment 1 to TDPC RFP N61340-11-R-0010.docx DOCX document
Attachment —
Q-Rs_Amendment_1_Attach_Roiund_1 —
Pre-Proposal_Conference_Attendee_List_4-26-11.xlsx XLSX spreadsheet
Final Pre-Proposal Conference - 26APR2011 Rev 3.ppt PPT presentation
Attachment —
Attachment —
Attachment —
Attachment —
N61340-11-R-0010_TDPC_RFP_11Apr11.docx DOCX document
Attachment —
Attachment —
Attachment —
Attachment —
Round 5 QAs.docx DOCX document
TDPC Schedule Change Notice 03-24-11.doc DOC document
TDPC DRAFT_SOW_Feb11.docx DOCX document
TDPC Schedule Change Notice 01-20-11.doc DOC document
Round_4_Q As_TDPC.doc DOC document
TDPC Schedule Change Notice 12-16-10.doc DOC document
TDPC Change-Update Notice.doc DOC document
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

B THE TRAINING DATA PRODUCTS CONTRACT (TDPC) IS BEING PROCURED AS A PARTIAL SMALL BUSINESS SET-ASIDE. THIS CONTRACT COVERS TWO SEPARATE LOTS. LOT I IS A FULL AND OPEN PROCUREMENT. LOT II IS A SMALL BUSINESS SET-ASIDE PROCUREMENT. NO PRICING FOR ANY CLINS WILL BE PROVIDED IN SECTION B BELOW.

Note: Section B consists of line items covering a sixty-month base ordering period and three twelve-month optional ordering periods. The Contract Line Item Number (CLIN) structure is designed to identify the applicable LOT, the ordering period, the contract type, and the Functional Area (The Functional Areas are defined within the Statement of Work). The information below provides a legend for the CLIN structure:

1st Digit : 1 = LOT I; 2 = LOT II

2nd Digit: 0 = Base Ordering Period; 1, 2, or 3 for each successive optional ordering period following the base ordering period.

3rd Digit: 1 = Firm-fixed-price; 2 = Fixed-price-incentive; 3 = Cost-plus-fixed-fee; 4 = Cost-plus-incentive-fee

4th Digit: 1, 2, or 3 for the applicable Functional Area.

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

FFP

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

FOB: Destination

PURCHASE REQUEST NUMBER: 1300153325

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

FPI

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

CPFF

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

CPIF

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1, LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1, LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT I

Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT I

Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT I

Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 1 - LOT II

Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 2 - LOT II

Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Each

TDPC - Functional Area 3 - LOT II

Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).

SECTION B NOTES:

NOTE 1: The minimum and maximum contract values for all orders issued against this contract shall not be less than the minimum or more than the maximum contract values stated below.

MINIMUM AMOUNT
MAXIMUM AMOUNT
$1,000.00
$780,000,000.00

The cumulative total of all DO/TO issued pursuant to all multiple award contracts issued under solicitation N61340-11-R-0010 shall not exceed $780,000,000.00 inclusive of LOTS I & II.

NOTE 2: The CLINs above represent the contract types for the Training Data Products requirements in accordance with the Statement of Work 110023. DO/TO issued may have additional CLINs/SLINs due to:

(a) Government accounting procedures; or

(b) Separately identifiable deliverables, which may include but are not limited to:

(1) Technical Data Information

(2) Provisioned Item Orders

(3) Conferences/Meetings

(4) Travel and Similar Reimbursable Expenses

Section C - Descriptions and Specifications

C.1

C.1 DESCRIPTION OF WORK STATEMENT

Statement of Work (SOW) #110023 defines and provides the basic requirements of the general tasks to be performed under this Training Data Products (TDP) Multiple Award Indefinite Delivery/Indefinite Quantity Contract (ID/IQC) (MAC). The Naval Air Warfare Center Training Systems Division (NAWCTSD) may procure a broad range of instructional training system products or services within the scope of this contract. The tasks and detailed requirements for instructional training system products will be defined in the SOW or Statement of Objectives (SOO) for each specific TDPC DO/TO. The Contract Line Item descriptions are as follows:

Items 1011, 1021, 1031, 1041, 1111, 1121, 1131, 1141, 1211, 1221, 1231, 1241, 1311, 1321, 1331, 1341, 2011, 2021, 2031, 2041, 2111, 2121, 2131, 2141, 2211, 2221, 2231, 2241, 2311, 2321, 2331, and 2341 – The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023.

Items 1012, 1022, 1032, 1042, 1112, 1122, 1132, 1142, 1212, 1222, 1232, 1242, 1312, 1322, 1332, 1342, 2012, 2022, 2032, 2042, 2112, 2122, 2132, 2142, 2212, 2222, 2232, 2242, 2312, 2322, 2332, and 2342 – The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023.

Items 1013, 1023, 1033, 1043, 1113, 1123, 1133, 1143, 1213, 1223, 1233, 1243, 1313, 1323, 1333, 1343, 2013, 2023, 2033, 2043, 2113, 2123, 2133, 2143, 2213, 2223, 2233, 2243, 2313, 2323, 2333, and 2343 – The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023.

C.2

C.2 DESCRIPTION OF LOT I AND LOT II

LOT I – The Non-set-aside portion consists of materialized requirements which are of greater complexity.

LOT II – The Set-aside portion consists of materialized requirements which are of lesser complexity.

(a) Assignment of materialized requirements to Functional Areas under LOT I or II is at the discretion of the DO/TO Contracting Officer. The assignment will be based on the Contracting Officer’s determination whether a reasonable expectation exists that offers from two or more responsible small business concerns would be received and those offers would be competitive in terms of market prices, quality, and delivery. In making this determination, the Government will use a standardized process to determine the complexity of the work and capabilities of small businesses. The definitions of complex and non-complex are identified in the Statement of Work paragraph 1.4 “Guidelines for Defining Work Complexity.” In cases where a requirement cuts across multiple Functional Areas (e.g. a requirement that includes Analysis and Design (Functional Area 1) and Development and Production (Functional Area 2)) the determination will be limited to only those contract holders awarded the right to compete for all the Functional Areas included in the requirement. In the example given, the determination would only include contractors awarded the right to compete for both Functional Areas 1 and 2.

(b) The following list identifies the respective Functional Areas for which the Contractor is qualified to compete at the DO/TO level as requirements materialize:

Functional Area 1
Functional Area 2
Functional Area 3
Analysis, Design, and Evaluation
Development, Production, and Implementation
Sustainment
X
X

Note: The Xs in the table above denote the Functional Area(s) the contractor is qualified to propose to as the DO/TO requirements materialize. The example is provided for illustration purposes only. The sample information shall be replaced with the successful Offerors’ information at award of the basic ID/IQCs.

CLAUSES INCORPORATED BY FULL TEXT

5252.204-9505 SYSTEM AUTHORIZATION ACCESS REQUEST NAVY (SAAR-N) REQUIREMENTS FOR INFORMATION TECHNOLOGY (IT) (NAVAIR) (JUN 2009 )

(a) Contractor personnel assigned to perform work under this contract may require access to Navy Information Technology (IT) resources (e.g., computers, laptops, personal electronic devices/personal digital assistants (PEDs/PDAs), NMCI, RDT&E networks, websites such as MyNAVAIR, and Navy Web servers requiring Common Access Card (CAC) Public Key Infrastructure (PKI)). Contractor personnel (prime, subcontractor, consultants, and temporary employees) requiring access to Navy IT resources (including those personnel who previously signed SAAR DD Form 2875) shall submit a completed System Authorization Access Request Navy (SAAR-N), OPNAV 5239/14 (Jul 2008) form or latest version thereof, and have initiated the requisite background investigation (or provide proof of a current background investigation) prior to accessing any Navy IT resources. Instructions for processing the SAAR-N forms are available at: NAVAIR Contractor Forms.

(b) SAAR-N forms will be submitted to the Contracting Officer’s Representative (COR) or Alternate COR, or to the government sponsor, if the contract does not name a COR or Alternate COR via the contractor’s Facility Security Officer (FSO). If the contract does not have an assigned COR or Alternate COR (ACOR), the designated SAAR-N Government Sponsor for contractor employees requiring IT access, [fill-in name] shall be responsible for signing and processing the SAAR-N forms. For those contractors that do not have a FSO, SAAR-N forms shall be submitted directly to the COR/ACOR or designated SAAR-N Government Sponsor. Copies of the approved SAAR-N forms may be obtained through the COR/ACOR or designated SAAR-N Government Sponsor. Requests for access should be routed through the NAVAIR_SAAR.fct@navy.mil mailbox.

(c) In order to maintain access to Navy IT resources, the contractor shall ensure completion of initial and annual IA training, monitor expiration of requisite background investigations, and initiate re-investigations as required. If requested, the contractor shall provide to the COR/ACOR or designated SAAR-N Government Sponsor documentation sufficient to prove that it is monitoring/tracking the SAAR-N requirements for its employees who are accessing Navy IT resources. For those contractor personnel not in compliance with the requirements of this clause, access to Navy IT resources will be denied/revoked.

(d) The SAAR-N form remains valid throughout contractual performance, inclusive of performance extensions and option exercises where the contract number does not change. Contractor personnel are required to submit a new SAAR-N form only when they begin work on a new or different contract.

5252.211-9509

INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL (NAVAIR)(OCT 2005)

The Contractor's Technical Proposal Number [INDIVIDUAL DO/TO WILL SPECIFY WHAT ELEMENTS OF THE CONTRACTOR’S TECHNICAL PROPOSAL, IF ANY, WILL BE INCORPORATED AT TIME OF DO/TO AWARD], dated [EFFECTIVE DATE OF PROPOSAL RECEIVED FOR INDIVIDUAL DO/TO], and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a “Specification” but the Government's Specification shall take precedence over the Contractor's technical proposal.

Section D - Packaging and Marking D Note that specific packaging and marking information shall be provided by Contract Line Item Number (CLIN) at the DO/TO level.

CLAUSES INCORPORATED BY FULL TEXT

5252.247-9502

UNPACKING INSTRUCTIONS: COMPLEX OR DELICATE EQUIPMENT (NAVAIR) (OCT 1994)

(a) Location on Container. When practical, one set of the unpacking instructions will be placed in a heavy water-proof envelope prominently marked “UNPACKING INFORMATION” and firmly affixed to the outside of the shipping container in a protected location, preferably between the cleats on the end of the container adjacent to the identification marking. If the instructions cover a set of equipment packed in multiple containers, the instructions will be affixed to the number one container of the set. When the unpacking instructions are too voluminous to be affixed to the exterior of the container, they will be placed inside and directions for locating them will be provided in the envelope marked “UNPACKING INFORMATION”.

(b) Marking Containers. When unpacking instructions are provided, shipping containers will be stenciled “CAUTION - THIS EQUIPMENT MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING INSTRUCTIONS ARE CAREFULLY FOLLOWED.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .