About this file
Conformed copy of the RFP with Amendment 1 changes incorporated.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N61340-11-R-0010
Section B - Supplies or Services and Prices
B THE TRAINING DATA PRODUCTS CONTRACT (TDPC) IS BEING PROCURED AS A PARTIAL SMALL BUSINESS SET-ASIDE. THIS CONTRACT COVERS TWO SEPARATE LOTS. LOT I IS A FULL AND OPEN PROCUREMENT. LOT II IS A SMALL BUSINESS SET-ASIDE PROCUREMENT. NO PRICING FOR ANY CLINS WILL BE PROVIDED IN SECTION B BELOW.
Note: Section B consists of line items covering a sixty-month base ordering period and three twelve-month optional ordering periods. The Contract Line Item Number (CLIN) structure is designed to identify the applicable LOT, the ordering period, the contract type, and the Functional Area (The Functional Areas are defined within the Statement of Work). The information below provides a legend for the CLIN structure:
1st Digit : 1 = LOT I; 2 = LOT II 2nd Digit: 0 = Base Ordering Period; 1, 2, or 3 for each successive optional ordering period following the base ordering period.
3rd Digit: 1 = Firm-fixed-price; 2 = Fixed-price-incentive; 3 = Cost-plus-fixed-fee; 4 = Cost-plus-incentive-fee 4th Digit: 1, 2, or 3 for the applicable Functional Area.
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
FFP
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
FOB: Destination
PURCHASE REQUEST NUMBER: 1300153325
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
FPI
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
CPFF
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
CPIF
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1, LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1, LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT I
Training Data Products, Functional Area 1, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT I
Training Data Products, Functional Area 2, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT I
Training Data Products, Functional Area 3, LOT I NON-SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. BASE ORDERING PERIOD (AWARD + 60 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 1 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 2 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 1 - LOT II
Training Data Products, Functional Area 1, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 2 - LOT II
Training Data Products, Functional Area 2, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Each
TDPC - Functional Area 3 - LOT II
Training Data Products, Functional Area 3, LOT II SET-ASIDE PORTION. The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023. OPTION ORDERING PERIOD 3 (12 MONTHS).
TARGET COST
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
SECTION B NOTES:
NOTE 1: The minimum and maximum contract values for all orders issued against this contract shall not be less than the minimum or more than the maximum contract values stated below.
| MINIMUM AMOUNT |
| MAXIMUM AMOUNT |
| $1,000.00 |
| $780,000,000.00 |
The cumulative total of all DO/TO issued pursuant to all multiple award contracts issued under solicitation N61340-11-R-0010 shall not exceed $780,000,000.00 inclusive of LOTS I & II.
NOTE 2: The CLINs above represent the contract types for the Training Data Products requirements in accordance with the Statement of Work 110023. DO/TO issued may have additional CLINs/SLINs due to:
(a) Government accounting procedures; or
(b) Separately identifiable deliverables, which may include but are not limited to:
(1) Technical Data Information
(2) Provisioned Item Orders
(3) Conferences/Meetings
(4) Travel and Similar Reimbursable Expenses
Section C - Descriptions and Specifications
C.1
C.1 DESCRIPTION OF WORK STATEMENT
Statement of Work (SOW) #110023 defines and provides the basic requirements of the general tasks to be performed under this Training Data Products (TDP) Multiple Award Indefinite Delivery/Indefinite Quantity Contract (ID/IQC) (MAC). The Naval Air Warfare Center Training Systems Division (NAWCTSD) may procure a broad range of instructional training system products or services within the scope of this contract. The tasks and detailed requirements for instructional training system products will be defined in the SOW or Statement of Objectives (SOO) for each specific TDPC DO/TO. The Contract Line Item descriptions are as follows:
Items 1011, 1021, 1031, 1041, 1111, 1121, 1131, 1141, 1211, 1221, 1231, 1241, 1311, 1321, 1331, 1341, 2011, 2021, 2031, 2041, 2111, 2121, 2131, 2141, 2211, 2221, 2231, 2241, 2311, 2321, 2331, and 2341 – The contractor shall deliver the Functional Area 1 (Analysis, Design, and Evaluation) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023.
Items 1012, 1022, 1032, 1042, 1112, 1122, 1132, 1142, 1212, 1222, 1232, 1242, 1312, 1322, 1332, 1342, 2012, 2022, 2032, 2042, 2112, 2122, 2132, 2142, 2212, 2222, 2232, 2242, 2312, 2322, 2332, and 2342 – The contractor shall deliver the Functional Area 2 (Development, Production and Implementation) Training Data Products requirement as specified in each individual DO in accordance with the Statement of Work # 110023.
Items 1013, 1023, 1033, 1043, 1113, 1123, 1133, 1143, 1213, 1223, 1233, 1243, 1313, 1323, 1333, 1343, 2013, 2023, 2033, 2043, 2113, 2123, 2133, 2143, 2213, 2223, 2233, 2243, 2313, 2323, 2333, and 2343 – The contractor shall deliver the Functional Area 3 (Sustainment) Training Data Products requirement as specified in each individual DO/TO in accordance with the Statement of Work # 110023.
C.2
C.2 DESCRIPTION OF LOT I AND LOT II
LOT I – The Non-set-aside portion consists of materialized requirements which are of greater complexity.
LOT II – The Set-aside portion consists of materialized requirements which are of lesser complexity.
(a) Assignment of materialized requirements to Functional Areas under LOT I or II is at the discretion of the DO/TO Contracting Officer. The assignment will be based on the Contracting Officer’s determination whether a reasonable expectation exists that offers from two or more responsible small business concerns would be received and those offers would be competitive in terms of market prices, quality, and delivery. In making this determination, the Government will use a standardized process to determine the complexity of the work and capabilities of small businesses. The definitions of complex and non-complex are identified in the Statement of Work paragraph 1.4 “Guidelines for Defining Work Complexity.” In cases where a requirement cuts across multiple Functional Areas (e.g.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .