Solicitation Amendment 0002.pdf
PDF 635 KB Posted
- Attached to
- Solicitation N5523626R0007 for Southwest Regional Maintenance Center HME FTA Follow On Engineering Services
- Solicitation number
- N5523626R0007
About this file
This is Amendment 0002 to solicitation N5523626R0007, issued by the Southwest Regional Maintenance Center (NSWC San Diego) on August 20, 2026, with an effective date of August 20, 2026. The amendment updates multiple sections of the original solicitation and is not extending the offer receipt deadline.
The amendment implements five key changes: (1) publishes questions and answers for Amendments 0001 and 0002 in a consolidated attachment with separate tabs; (2) updates FAR 52.222-42 Statement of Equivalent Rates for Federal Hires with revised government equivalent classifications and hourly wages based on San Diego, California locality pay, including increases ranging from $17.43 to $9.14 per hour across six labor categories (Administrative Assistant, Engineering Technician III through VI); (3) revises past performance recency requirements from current performance to experience within five years of solicitation release; (4) updates security and operations security sections in the Statement of Work (pages 4-5 of Attachment J-5); and (5) replaces the DD254 with an updated signed copy. The solicitation requires offerors to acknowledge receipt of this amendment prior to proposal submission deadline through completion of amendment items, acknowledgment on proposal copies, or separate written communication referencing solicitation and amendment numbers.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification):
1. Publish questions and answers for the subject solicitation under Section J - List of Attachments, Attachment - Question & Answers. Attachment contains both questions and answers for Amend 0001 and Amend 0002 on separate tabs.
2. Update Section I - Contract Clauses, FAR 52.222-42 Statement of Equivalent Rates for Federal Hires, to revise the Government Equivalent and Hourly Wage.
3 . Section L - Instructions, Conditions, & Notices to Offerors or Quoters, Section 3.2 VOLUME II - PAST PERFORMANCE (FACTOR 2), past performance recency is revised to five years.
4. Update Section J - List of Attachments, to revise Sections 1.5 Security and 1.5.7 Operations Security on pages 4-5 of Attachment J-5 - Statement of Work (SOW).
5. Update Section J - List of Attachments, to replace Attachment J-1 - DD254 with the updated signed copy.
Section I - Contract Clauses
Additional Information/Notes
The following clauses were added:
FAR Clauses Incorporated by Full Text
52.222-42 Statement of Equivalent Rates for Federal Hires. (Tailored) (May 2014)
Statement of Equivalent Rates for Federal Hires (May 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( ), this clause identifies 29 CFR Part 4 the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332.
This Statement is for Information Only: It is not a Wage Determination
CONTRACT LABOR
CATEGORY
DOL LABOR
CATEGORY
DOL EQUIV
CODE
GOV'T
EQUIV
HOURLY WAGE (Based on San Diego, CA locality pay)
Administrative Assistant Administrative Assistant
01020 GS-9 $39.73
Engineering Technician III Engineering Technician III
30084 GS-5 $26.26
Engineering Technician IV Engineering Technician IV
30085 GS-7 $32.53
Engineering Technician V Engineering Technician V
30086 GS-9 $39.78
Engineering Technician VI Engineering Technician VI
30087 GS-11 $48.13
N5523626R00070002
(End of clause)
The following clauses were deleted:
FAR Clauses Incorporated by Full Text
52.222-42 Statement of Equivalent Rates for Federal Hires. (May 2014)
Statement of Equivalent Rates for Federal Hires (May 2014)
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( ), this clause identifies 29 CFR Part 4 the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332.
This Statement is for Information Only: It is not a Wage Determination
CONTRACT LABOR
CATEGORY
DOL LABOR
CATEGORY
DOL EQUIV
CODE
GOV'T
EQUIV
HOURLY WAGE (Based on San Diego, CA locality pay)
Administrative Assistant Administrative Assistant
01020 GS-5 $22.30
Engineering Technician III Engineering Technician III
30084 GS-7 $27.62
Engineering Technician IV Engineering Technician IV
30085 GS-9 $33.45
Engineering Technician V Engineering Technician V
30086 GS-11 $40.88
Engineering Technician VI Engineering Technician VI
30087 GS-12 $48.99
(End of clause)
Section J - List of Attachments
The following attachments were added:
Attachment - Question & Answers Attachment J-1 - DD254 Attachment J-5 - Statement of Work (SOW)
The following attachments were deleted:
Attachment - Question & Answers # 1 Attachment J-1 - DD254 Attachment J-5 - Statement of Work (SOW)
Miscellaneous text in this section has been modified to:
Attachment J-1 - DD254
Attachment J-2 - Non-Disclosure Agreement
Attachment J-3 - WD 2015-5635 REV.30
Attachment J-4 - QASP
Attachment J-6 - GFP
Attachment S-1 - Cost Proposal Spreadsheet
Attachment S-2 - Past Performance Reference
Attachment S-3 - Personnel Qualifications
Attachment S-4 - Staffing Plan
Exhibit A - CDRLs A001-A004
Attachment - Question & Answers
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
1.0 INSTRUCTIONS FOR SUBMISSION OF OFFERS
Offeror shall comply with the detailed instructions for the format and content of the proposal. Proposals shall be clear and unambiguous. Proposals that do not comply with the detailed instructions for the format and content of the proposal may render the Offeror ineligible for award. The Government reserves the right to reject any proposal that does not comply with these proposal submission instructions.
Proposals shall be submitted through the PIEE Solicitation Module by the solicitation closing date and time specified on the cover page of this solicitation, block (9). Offers must be received via the PIEE Solicitation Module portal by the closing date and time in order to be considered for award. It is not permissible to upload a link to an internet-based data center (e.g. Google cloud or Dropbox).
Offeror shall submit all required proposal information as files uploaded directly in the PIEE Solicitation Module. In the rare event the PIEE system is down or inaccessible, Offeror shall immediately notify the cognizant Contracting Officer for the solicitation via e-mail prior to the solicitation closing date and time. In the rare event of a PIEE system malfunction, arrangements must be made with the Contracting Officer cognizant for the solicitation prior to the solicitation closing date and time in order to submit a proposal electronically outside the PIEE Solicitation Module. Failure to submit a complete proposal prior to the solicitation closing date and time will render the proposal late and unacceptable.
Offerors are responsible for submitting proposals and any in the PIEE Solicitation Module by the time specified proposal modifications in the solicitation. Any proposal modification not submitted in the odule by the exact time specified for PIEE Solicitation M receipt of offers is "late" and will not be considered. The solicitation will close at the exact date and time specified in the solicitation and Offerors will be to unable submit its proposal after that time. Each proposal submitted in the odule is time/date stamp PIEE Solicitation M recorded by the system at time of proposal upload. Proposals may be withdrawn by written notice to the Contracting Officer cognizant provided such notice is receivedfor the solicitation prior to Task Order award.
Resources on how to navigate the PIEE Solicitation Module are available at https://dodprocurementtoolbox.com/site-pages/solicitation-module.
2.0 PROPOSAL FORMAT
In order to maximize efficiency and minimize the time for proposal evaluation, all Offerors shall submit their proposals in accordance with the format and content specified below. The requirements below apply equally to subcontractors. Proposals that do not meet the below requirements may be deemed unresponsive and may not be eligible for award. The electronic proposal shall be prepared so that if printed, the proposal meets the following format requirements:
- 8.5 x 11 inch paper
- Single-spaced typed lines
- 1 inch margins
- Font text shall be 12-point Times New Roman, except for:
- Graphs, graphics, or charts used to supplement the proposal text shall use Times New Roman that is no smaller than 9-point font size.
- Microsoft Office Excel spreadsheets shall use Times New Roman that is no smaller than 9-point font size. These Excel spreadsheets shall be formatted for printing in landscape orientation such that all row and column headings appear on each printed page. All spreadsheets shall include calculations in the cells showing all formulas. Do not enter hard data where formulas were used to calculate the entered value. Excel spreadsheets can be formatted to print on 11x17 paper as needed.
N5523626R00070002 https://dodprocurementtoolbox.com/site-pages/solicitation-module.
https://dodprocurementtoolbox.com/site-pages/solicitation-module.
- No hyperlinks
- Proposals shall be in in U.S. English and dollars.
- Proposals shall be Microsoft Office (Word, Excel, PowerPoint) 2010 and newer versions or Adobe Acrobat (PDF) compatible. PDF files shall be searchable when reviewed electronically.
2.1 Cover Page and Table of Contents
Offeror shall include a cover page and table of contents for each proposal volume. The cover page shall identify the solicitation number, proposal volume and title, and the Offeror's name. The cover page and table of contents will not count against page limitations.
2.2 Glossary of Abbreviations and Acronyms
Offer shall include a glossary of abbreviations and acronyms for each proposal volume that provides corresponding definitions.
Glossaries will not count against page limitations.
2.3 Page Numbering System
Offeror shall use a standard page numbering system to facilitate proposal references. All pages shall be numbered consecutively for each section within a volume. Charts, graphs, and other inserted materials shall be included in the page numbering system.
2.4 Restriction on Disclosure and Use of Data
Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall mark the title page with the following legend:
"This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this Offeror as a result of, or in connection with, the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent inprovided the resulting contract. This restriction does not limit the Government s t o e n d n s a f t s ' righ t us informatio containe i thi dat i i i obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]";
Offerors shall also mark each sheet of it data wishes to restrict with the following legend:
"Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal."
2.5 File Naming Convention
All proposal files shall include the Offeror's company name, volume #, document name, and other useful identifying information. For example:
- Company_Volume_I _Technical Approach
- Company_Volume_I_Key Personnel Resume for Jane Doe
- Company_Volume_II _Past Performance Reference for N00024-##-X-####
- Company_Volume_III _Cost Proposal Narrative
- Company_Volume_IV_Cover Letter
3.0 PROPOSAL ORGANIZATION AND CONTENT
Offeror shall organize its proposal and include all proposal content exactly as described herein. Offeror shall organize its proposal into separate volumes and adhere to page limitations as delineated in the Proposal Organization Table below. Page limitations will be treated as maximums. If exceeded, excess pages may not be read or considered in proposal evaluation. When both sides of a sheet display printed material, it shall be counted as two pages.
Volume Proposal Content Page Limitation
Volume I - Technical (Factor 1) Element A: Technical Approach
40 pages
Element B: Management Approach
20 pages
Element C: Personnel Approach
Staffing Plan - No page limit. / Key Personnel - 2 pages per resume.
VOLUME II - Past Performance (Factor 2)
Past Performance References 3 pages per reference
Volume III - Cost Proposal (Factor 3) Cost Proposal Spreadsheet No page limit
Cost Proposal Narrative
Volume IV - Contract Documentation (Factor 4)
Cover letter No page limit
Solicitation Fill-ins No page limit
Small Business Participation No page limit
OCI Mitigation Plan No page limit
Pre-Award Survey (SF1408) No page limit
Security Requirements (DD 254)
No page limit
Government Furnished Property
No page limit
3.1 VOLUME I - TECHNICAL (FACTOR 1)
3.1.1 Element A - Technical Approach
The submission of an offer constitutes unconditional acceptance to perform all of the tasks described in the SOW/PWS; therefore, Offeror's proposal need not address every single aspect of the SOW/PWS. Offeror shall describe its specific understanding, capability, experience, and technical approach with regards to the following requirements:
Offeror should organize its technical approach by grouping together capability, understanding, experience, and approach by specific SOW/PWS requirements, and/or by sample problem if applicable. Offeror shall clearly demonstrate its ability to meet the requirements. Offeror shall provide explanatory details assuming that the Government has no prior knowledge of its facilities, capabilities, or experience. Offerors shall identify technical uncertainties and assumptions within the requirements and provide specific courses of action for their resolution. Offerors are encouraged to address any innovative approaches to meeting the requirements. Offeror shall not simply rephrase or restate the Government's requirements in the proposal. Proposals that merely reiterate the Government's own requirements shall be deemed unacceptable and thus ineligible for award. Offerors are cautioned that failure to provide the necessary information may result in its adjectival ratings being downgraded accordingly.
3.1.2 Element B - Management Approach
Offeror shall:
- Describe overall management approach including details about processes, tools, and other unique characteristics that demonstrate the ability to successfully manage this effort.
- Provide an organizational chart and describe the management structure addressing the roles and responsibilities of key personnel and the reporting lines of authority.
- Describe the approach to communication with Government and other stakeholders including details on status reports, meetings, and other forms of communication.
- Describe the quality control process including a discussion on how performance and deliverables will meet the Government's quality standards
- Describe the approach for monitoring and controlling costs during performance.
- Describe the approach for risk management including identification of risks and mitigation strategy.
- Describe the subcontractor team being proposed under this task order, the specific requirements anticipated to be subcontracted, the rationale for why these subcontractors were selected to perform this work, and the overall approach to subcontractor management.
- Describe a detailed plan of action addressing all required steps that need to be taken to fully assume responsibilities under this task order . This plan shall identify measurable milestones for when actions will within a proposed transition period be completed. This plan shall address hiring, onboarding, and training of new personnel.
3.1.3 Element C - Personnel Approach
Staffing Plan. Offeror shall provide a staffing plan using the format provided in . Offeror shall Attachment S-4 - Staffing Plan complete all of the information requested within the provided template. Offeror shall include all proposed personnel, including those of its subcontractors, necessary to perform all aspects of the SOW/PWS. Offeror shall propose staffing in accordance with the labor hours identified in Section B. Offeror shall propose staffing in accordance with .Attachment S-3 - Personnel Qualifications
Offeror shall preface the names of contingent hires with "Contingent -"; for example, "Contingent - Jane Doe." Offeror shall preface the names of key personnel with "Key -"; for example, "Key - Jane Doe." Offeror shall use "TBD" for non-key positions that do not have identified personnel. "TBD" may also be used for labor hours associated with surge or special study CLINs/SLINs, if such CLINs /SLINs are included in Section B.
Offeror shall provide a mapping of any company-specific labor categories it, or its subcontractors, proposes in the staffing plan to the corresponding Government Standard eCRAFT Labor Categories. Unless specified already by the Government, Offeror shall propose
Standard eCRAFT Labor Categories based on the descriptions listed at: http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC- Newport/Partnerships/Commercial-Contracts/Labor-Categories/. For labor categories that provide for various levels (I, II, III, IV), Offeror shall select the level that best matches the proposed individual and company-specific labor category. For Service Contract Act (SCA) labor categories (if applicable), Offerors may propose an SCA labor category listed in the SCA Directory of Occupations at:
http://www.dol.gov/whd/govcontracts/sca.htm.
Offeror shall propose a staffing plan in the technical volume that fully aligns with the staffing included in the cost proposal.
Discrepancies between the proposed staffing identified in the technical and cost proposal may result in an identification of risk, a lowering of the adjectival rating in the technical proposal, and/or an upward adjustment to the proposed cost.
Note: Offerors should attempt to minimize the number of proposed labor personnel for which candidates have not been identified.
From a U.S. Government proposal evaluation perspective, proposal risk may increase with high levels of individuals proposed as TBD or contingent. Nevertheless, in the Staffing Plan narrative, Offeror may describe actions it has taken to mitigate the impact of these risks to the Government. For example, higher levels of education and relevant experience in a proposed workforce demonstrate a richer labor mix. Proposing a richer labor mix, in appropriate tasks under this order, may reduce the performance risk that the Government bears in accepting an Offeror's proposal. In this example, the Offeror may discuss the potential benefits of the richness of its proposed labor mix in the Staffing Plan narrative but should clearly describe how a richer labor mix in a task reduces the performance risk to the Government.
Key Personnel. Offeror shall provide one resume for each individual proposed to fulfill the positions identified as key personnel in ll key personnel positions shall identify a current employee or accordance with Attachment S-3 - Personnel Qualifications. A contingent hire to fulfil the role. Each resume shall demonstrate the key personnel's qualifications to complete the tasking for which person has been proposed to perform.
Offeror shall submit a current "letter of intent" (with salary information redacted) with all resumes supplied for contingent key personnel hires. The letter of intent does not count against page limitations and must be signed by the contingent hire employee and the Offeror.
Key personnel resumes shall include the following information:
- Name
- Key personnel position
- Security clearance level
- Citizenship
- Summary indicating how personnel qualifications are met (e.g., years of relevant experience)
- Chronology of education, training, and degrees/certifications held
- Chronology of work experience with emphasis on PWS related experience
Key personnel are deemed essential to the performance of this effort and cannot be replaced without prior Government approval in accordance with The qualifications listed in each individual C-237-H002 SUBSTITUTION OF KEY PERSONNEL (OCT 2018).
proposed key personnel resume, not the specific individual, are the materially relevant aspects of the proposed key personnel partially forming the basis of award. Therefore, even if a proposed key personnel becomes unavailable to the Offeror between proposal submission and award, the Government will evaluate and make its award decision based on the qualifications listed on the proposed resume(s). When the Government awards a task order under those circumstances, the Government will require the awardee to use the qualifications listed on the relevant proposed key personnel resume as the basis for replacing the individual under C-237-H002 during task order performance. The Offeror shall make no substitution of key SUBSTITUTION OF KEY PERSONNEL (OCT 2018) personnel without prior notification to and concurrence of the Contracting Officer.
3.2 VOLUME II - PAST PERFORMANCE (FACTOR 2)
Offeror shall provide all past performance information in accordance with . Offeror Attachment S-2 - Past Performance Reference shall provide three past performance references, if available, which shall reflect recent experience performed within the last five years of the solicitation release date and that demonstrates experience relevant to the solicitation's PWS/SOW. In addition to these three past performance references, Offeror shall submit one additional past performance reference for each subcontractor proposed to perform more than of the total labor hours, if available. Offeror shall describe how the past performance references are relevant including 10% details about how it is similar in scope and complexity to this solicitation's SOW/PWS.
3.3 VOLUME III - COST PROPOSAL (FACTOR 3)
3.3.1 Section B Pricing
Offeror shall submit Section B pricing for each priced CLIN/SLIN in the cost proposal spreadsheet (Attachment S-1 - Cost Proposal Spreadsheet). The Section B pricing submitted in the completed solicitation (Volume IV) will take precedence should there be any discrepancies with any other pricing information submitted. As such, the resulting task order award will be made to the successful Offeror using their proposed Section B pricing.
3.3.2 Cost Proposal Spreadsheet
Offeror and their subcontractors shall each separately submit a cost proposal spreadsheet using the format set forth in Attachment S-1 . The cost proposal spreadsheet shall provide a detailed breakout of every single cost element proposed - Cost Proposal Spreadsheet across each base and option year as applicable. The cost proposal spreadsheet shall include calculations in the cells showing all formulas used to calculate the values. Do not enter hard data where formulas were used to calculate the entered value.
The Offeror's cost proposal spreadsheet shall be overarching, encompassing all proposed costs inclusive of sanitized subcontractor costs, and it shall fully align with and support the proposed Section B pricing. Subcontractor's unsanitized cost proposal spreadsheets shall be submitted separately through the PIEE Solicitation Module in order to protect their proprietary information. Subcontractor cost proposals shall be received by the time and date specified for receipt of proposals specified in this solicitation.
Offeror shall provide a clear crosswalk of all company-specific labor categories to corresponding Government Standard eCRAFT Labor Categories. Unless specified already by the Government, Offeror shall propose Standard eCRAFT Labor Categories based on the descriptions listed at: http://www.navsea.navy.mil/Home/Warfare-Centers/NUWC-Newport/Partnerships/Commercial-Contracts /Labor-Categories/. For labor categories that provide for various levels (I, II, III, IV), Offeror shall select the level that best matches the proposed individual and company-specific labor category. For Service Contract Act (SCA) labor categories (if applicable), Offerors may propose an SCA labor category listed in the SCA Directory of Occupations at http://www.dol.gov/whd/govcontracts/sca.
htm.
3.3.3 Cost Proposal Narrative
Offeror shall provide a cost proposal narrative that fully substantiates the reasonableness and realism of the proposed costs. The cost proposal narrative shall fully align with and support the proposed Section B pricing. The cost proposal narrative shall fully corroborate every cost element that is proposed. Providing insufficient information to substantiate the reasonableness and realism of the proposed costs may result in the identification of a risk, an upward cost adjustment, and/or in the offer no longer being considered eligible for award.
Offeror shall propose realistic costs within its proposal. Offeror bears the sole responsibility to demonstrate that its proposed costs are realistic within its proposal. Offeror is advised that proposing unrealistically lower costs without substantial justification will be an indication that the Offeror does not have a clear understanding of the requirements or does not have the requisite capability to support the effort. Any inconsistency between promised performance in the technical proposal (e.g. Volume 1 - Technical) and the proposed cost must be explained in the proposal. Any inconsistency, if unexplained, may raise a fundamental question of the Offeror's understanding of the nature and scope of the work required and may adversely impact the evaluation of the Offeror's proposal.
The cost proposal narrative shall address:
Subcontractors. Offeror shall describe the contract type proposed for each subcontractor and rationale for why the chosen contract type is most appropriate. In particular, Offeror shall demonstrate the suitability of any Time-and-Materials or fixed price contract types (e.g. FFP, FFP LOE, etc.) and describe how the Government will be billed throughout the performance of this requirement.
Offeror shall demonstrate that their subcontractors have the necessary business systems to perform the contract types being proposed.
Offeror shall conduct appropriate cost or price analysis to establish the reasonableness of the proposed subcontract prices and include the results of these analyses within its cost proposal narrative, in accordance with FAR 15.404-3(b).
All subcontractors shall submit cost proposal narratives in order to fully substantiate the reasonableness and realism of their proposed costs. Subcontractors that are proposed on cost reimbursement basis shall provide the same level of information as required from the Offeror to substantiate their own costs within their cost proposal narratives. Subcontractors that are proposed on a Time-and-Materials or fixed price basis (e.g. FFP, FFP LOE, etc.) are not required to provide the same level details as required under cost reimbursable proposals, but shall still provide an itemized breakout of pricing that is customary with the contract type proposed. Subcontractor unsanitized cost proposal narratives shall be submitted separately through the PIEE Solicitation Module in order to protect their proprietary information. Subcontractor cost proposals shall be received by the time and date specified for receipt of proposals specified in this solicitation.
Labor hours. Offeror shall propose the labor hours as specified in Section B, and shall demonstrate overall adherence to the exactly both the Offeror and subcontractor labor hours, if applicable.Section B labor hours. The labor hours shall include
Direct labor rates. Offeror and cost reimbursement subcontractors shall describe the basis of estimate for each direct labor rate proposed and provide substantiating information that fully corroborates each direct labor rate proposed. The basis of estimate must state the current geographical location of the personnel associated with each direct labor rate at the time of proposal submission. The Government reserves the right, at its discretion, to adjust direct labor rates upward in its cost realism evaluation to reflect prevailing rates in the performance location, regardless of personnel's intent to relocate, telework, or (other circumstances).
For each current employee named in the cost proposal spreadsheet, Offeror and cost reimbursement subcontractors shall provide a screenshot that captures pertinent information from the employer's payroll system, incurred within the last three months preceding release of this solicitation. Payroll screenshots shall not contain any personally identifiable information, such as, social security numbers, date and place of birth, etc. Cost proposal narratives shall fully explain all pertinent data on a screenshot. The Government must be able to derive the individual's direct rate (both inclusive and exclusive of the impact of uncompensated overtime, if proposed) from the payroll screenshot. Alternatively, Offeror and cost reimbursement subcontractors may provide payroll verification instead of payroll screenshots. Payroll verification shall consist of a form containing the named personnel, proposed labor category, direct labor rate, description of current position, and a signed certification by an authorized representative of the company that the information contained in the form is correct and current within the last three months preceding release of this solicitation. This supporting direct labor rate information shall clearly map to individual direct labor rates included within the cost proposal spreadsheet.
For each contingent hire in the cost proposal spreadsheet, Offeror and cost reimbursement subcontractors shall clearly indicate named contingent hires and shall provide a signed letter of intent that explicitly lists the agreed upon annual salary for the named individual and the amount of uncompensated work required. The cost proposal narrative shall fully explain all pertinent data about the letter of intent. The Government must be able to derive the individual's direct rate (both inclusive and exclusive of the impact of uncompensated overtime, if proposed) from the letter of intent information.
For any proposed position for which a specific candidate has not been identified, Offerors and cost-reimbursement subcontractors must provide supporting documentation to justify the estimated cost. If a comparable position with available payroll data exists, provide that data and a detailed analysis explaining how the comparable position aligns with the proposed position. If no comparable position exists, provide alternative cost data and a detailed basis of estimate that supports the proposed cost estimate for the position.
Surge and Special Studies. Offeror shall propose surge and special studies CLINs/SLINs in accordance with Section B if applicable. All surge and special studies CLINs/SLINs shall be proposed utilizing the composite rate for all non-surge and special studies labor in the appropriate year. The following is an example of how to calculate the hourly surge and special studies rate and dollars:
Base Year Surge Hourly Rate = Base Year Labor (excluding fee)/Base Year Hours Base Year Surge Dollars = Base Year Surge Hourly Rate * Base Year Surge Hours Base Year Fixed Fee = Base Year Surge Dollars * Proposed Fixed Fee Percentage
Service Contract Act (SCA) Wage Determinations. Offeror shall propose rates no lower than the minimums listed in SCA Wage Determinations current as of the date of the proposal. Current SCA Wage Determinations can be found at https://sam.gov/content /wage-determinations.
Uncompensated Overtime. Any uncompensated overtime proposed shall be in accordance with FAR 52.237-10, IDENTIFICATION OF UNCOMPENSATED OVERTIME. For any Offeror and/or subcontractors that proposes uncompensated overtime, Offeror and/or subcontractor shall ensure compliance with the following. Describe the company's uncompensated overtime policies and include a copy of its policy addressing uncompensated overtime. Describe the uncompensated overtime being proposed along with an explanation of how it will be used in performance of this requirement and why it is necessary. Describe how the adjusted hourly rate was derived while clearly demonstrating the reasonableness and realism. Describe the company's historical levels of uncompensated overtime incurred previously and provide substantiating historical data that corroborates the adjusted hourly rates proposed.
Forward Pricing Rate Agreement (FPRA) or Forward Pricing Rate Recommendation (FPRR). Offeror and cost reimbursement subcontractors shall indicate whether an FPRA or FPRR has been established for their company and the extent it was used in establishing proposed costs. If an FPRA/FPRR exists, a copy shall be provided within the cost proposal narrative.
Escalation. The below table reflects minimum escalation rates. Offeror may propose escalation that deviates from these minimum escalation rates; however, the Government reserves the right to make upward cost realism adjustments using these minimum escalation rates, unless proposed escalation rates are fully supported by an approved FPRA.
Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4
Minimum Escalation Rate NO MINIMUM NO MINIMUM NO MINIMUM NO MINIMUM NO MINIMUM
Indirect Rates.
Offeror and cost reimbursement subcontractors shall describe its proposed indirect rates, basis of estimate, and calculation methodologies. Offeror and cost reimbursement subcontractors shall provide the three most recent years of incurred actuals for each proposed indirect rate, any provisional billing rates available, also indicating the beginning and end dates for each fiscal year. NOTE: Offerors shall not rely on any Forward Pricing Rate Proposal to provide any form of cost realism substantiation.
Additionally, Provisional Billing Rates (PBRs) are for billing purposes only and should not be used for cost /price proposals.
Offerors are cautioned not to rely on these submissions (FPRPs & PBRs), which lack meaningful Government review, as sufficient to demonstrate the realism of its proposed rates.
Maximum Pass-Through and Fee Rates. Offeror shall ensure its proposal is in compliance with the "Maximum Pass Through Rate" and "Maximum Profit/Fee Rate" requirements contained within its basic IDIQ MAC. Any proposed rate that exceeds these maximum rate requirements may render the proposal unacceptable, and thus ineligible for award. Fee becomes a fixed dollar amount at the time of task order award and is subject to the associated fee payment clauses in Section B. Offeror's proposed fee rate shall represent the maximum fee rate applicable to its subcontractors under this effort.
N5523626R00070002 https://sam.gov/content/wage-determinations https://sam.gov/content/wage-determinations
The Government also strongly encourages the Offeror to eliminate "double pass-thru" costs by avoiding second tier subcontractors /consultants during performance and, where this situation is unavoidable, limiting subcontractor pass-thru costs to the lower of: (1) The Offeror's pass-thru rate under their IDIQ MAC, or (2) The subcontractor's pass-thru rate under their IDIQ MAC, if applicable.
Other Direct Costs (ODCs). Offeror shall propose ODCs in accordance with below table. The below table reflects Government estimated ODCs, which include travel and incidental material costs only. The estimated ODCs do not account for any company specific burdens such as material handling or G&A. Offeror shall propose all applicable burdens in accordance with its disclosure statements.
Labor Category Base Year Option Year 1 Option Year 2 Option Year 3 Option Year 4
Travel $1,036,447.40 $1,036,447.40 $1,036,447.40 $1,036,447.40 $1,036,447.40
Material/ODC $210,000.00 $210,000.00 $210,000.00 $210,000.00 $210,000.00
Total $1,246,447.40 $1,246,447.40 $1,246,447.40 $1,246,447.40 $1,246,447.40
In order for any additional expenses to be allowed as a direct charge under the resulting task order, it must be identified and described within the cost proposal narrative and be reflected in the Section B pricing. For example, the ODC estimates do not include facility related costs since these are typically treated as an indirect cost; however, if the Offeror proposes to direct charge facility costs, Offeror shall propose such cost separately from the ODC estimate, provide a basis of estimate, rationale for direct charging such cost, and explain how the direct cost will be properly allocated to this requirement. ODCs are not subject to fee. Reimbursement for travel will be in accordance with the Joint Travel Regulation (JTR) and B-231-H001 TRAVEL COSTS (NAVSEA) (OCT 2018).
3.4 VOLUME IV - CONTRACT DOCUMENTATION
3.4.1. .Cover Letter
Offeror and subcontractors shall provide a cover letter with the following information:
- Solicitation number;
- Company name, SeaPort NxG MAC IDIQ number, CAGE code, Unique Entity ID (UEI), address, e-mail address, and telephone number;
- A statement confirming agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
- A statement that the proposal is valid through calendar days from the date specified for receipt of proposals;365
- Names, titles, telephone numbers, and e-mail addresses of persons authorized to negotiate on the Offeror's behalf with the Government in connection with this solicitation;
- DCAA and DCMA office POC, including branch location, contact name, telephone number and e-mail address;
- Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office. The Offeror's signature on their proposal indicates the company will meet all requirements of the SOW/PWS, without exception; and
- Identify all enclosures being transmitted as part of the Offeror's proposal.
- If an Offeror believes no organizational conflict(s) of interest exists, an affirmative statement that no such conflict exists shall be included in the cover letter.
3.4.2 .Solicitation Fill-ins
Offeror shall complete all solicitation fill-Ins, including Section B CLIN pricing using the latest amended solicitation version and provide a copy within Volume IV.
3.4.3 .Small Business Participation
The North American Industry Classification (NAICS) code applicable to this solicitation is 541330. Therefore, companies proposing as a subcontractor under this solicitation as a small business concern must have had an average annual receipt over its five previous fiscal years that was less than $47,000,000. Companies proposed as a small business concern shall meet this size standard as of the date of the proposal submission under this solicitation.
Offeror shall demonstrate how it will provide at least of the proposed total estimated amount of the task order to small business 23% concerns. Offeror shall provide sufficient information to demonstrate that the tasks assigned to the selected small business subcontractors are meaningful in the overall success of the program. The approach shall address use of Small Business Concerns, Small Disadvantaged Business Concerns, Women-Owned Small Business Concerns, Hub Zone Small Business Concerns, Veteran- Owned Small Business Concerns, and Service-Disabled Veteran-Owned Small Business Concerns.
3.4.4 Organizational Conflict of Interest (OCI) Mitigation Plan.
Offeror's OCI Mitigation Plan shall be provided in Volume IV. In accordance with the "C.14 ORGANIZATIONAL CONFLICT OF INTEREST" clause within the SeaPort-NxG IDIQ MAC, Offeror shall identify any and all conflicts of interest or potential conflicts of interest related to this solicitation. Offerors shall follow the below described two-step process for identifying known or potential OCI issues to the Government for this solicitation.
Step 1: If it is believed that conflicts of interest are real, possible, or perceived, the contractor shall submit a letter within fourteen (14) days of the release of the solicitation identifying those OCI issues and the strategy that the Offeror intends to use for mitigation. This letter will be for notification purposes only, for the Government to conduct any research, and no determination will be made by the Government at that time. If no OCI issues are present or anticipated, no action is required of the Offeror within this window.
Step 2: Offerors shall submit a statement in affirmation or negation whether they have an OCI conflict regarding this solicitation. If OCI issues are present or anticipated, Offerors shall provide details and submit an OCI mitigation plan and its corporate policy for resolving as part of their proposal submission. If it is believed that no conflicts of interest exist, then the Offeror shall clearly state this, in addition to providing their corporate policy for resolving OCIs. Organizational charts and/or corporate policy are authorized to be submitted in addition to the OCI Mitigation Plan and do not count toward any page limitation.
Award will only be made to an Offeror, including all subcontractors, that has no organizational conflict of interest as defined in FAR
9.5 or that the Government determines has provided a satisfactory mitigation plan in accordance with L-209-H009 herein. Failure by an Offeror to disclose a potential OCI or to submit an OCI mitigation plan with its proposal may render itself no longer being considered for award.
3.4.5 Pre-Award Survey (SF1408).
Offeror and cost reimbursement subcontractors shall assert whether it has a DCAA approved accounting system and provide the date it was approved. If the Offeror or any cost reimbursement subcontractors do not have an approved accounting system, then an SF1408 Pre-Award Survey shall be completed. Offeror is solely responsible for verifying that subcontractors proposed on a cost reimbursement basis have either an approved accounting system or have submitted the SF1408 as part of the subcontractor's proposal.
An SF1408 does not need to be submitted for companies that already have an approved accounting system. A copy of the SF1408 is at https://www.gsa.gov/Forms/TrackForm/32838.
3.4.6 Security Requirements.
Security requirements associated with this effort have been identified in Offeror shall demonstrate the Attachment - J-1 - DD254.
ability to meet the facility clearance and safeguarding capability requirements identified in the attached DD254. Describe the plan to implement the required security clearances and physical access requirements during the transition period so that service is not interrupted. If the Offeror does not currently possess the required facility clearance, the Offeror shall demonstrate the steps it will take to be granted the facility clearance in accordance with DoDM 5220.32 (or latest guidance), including a detailed schedule for attaining the required facility clearance.
3.4.7 Government Furnished Property (GFP).
GFP associated with this effort has been identified . Offeror shall describe its plan for managing this GFP in Attachment - J-6 - GFP in accordance with FAR 52.245-1 "Government Property" and DFARS 252.245-7005 "Management and Reporting of Government Property". Alternatively, Offeror may provide proof that its Property Management System is currently approved by DCMA. Offeror shall address L-245-H001 "AVAILABILITY OF GOVERNMENT PROPERTY" and L-245-H002 "INSTRUCTIONS REGARDING GOVERNMENT PROPERTY" requirements, if applicable.
N5523626R00070002 https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=web&cd=&cad=rja&uact=8&ved=0CAQQw7AJahcKEwjwv-Cvi9L9AhUAAAAAHQAAAAAQAg&url=https%3A%2F%2Fwww.gsa.gov%2FForms%2FTrackForm%2F32838&psig=AOvVaw3CT7Wa0UC9SUxtQkAaMBJ5&ust=1678562450670273 https://www.google.com/url?sa=i&rct=j&q=&esrc=s&source=web&cd=&cad=rja&uact=8&ved=0CAQQw7AJahcKEwjwv-Cvi9L9AhUAAAAAHQAAAAAQAg&url=https%3A%2F%2Fwww.gsa.gov%2FForms%2FTrackForm%2F32838&psig=AOvVaw3CT7Wa0UC9SUxtQkAaMBJ5&ust=1678562450670273
| IDCode: U |
| Page: 1 |
| Pages: 15 |
| AmendNo: 0002 |
| EffDate: 20 Aug 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N55236 |
| AdmCode: |
| IssuedBy: SOUTHWEST REGIONAL MAINT CENTER |
3755 BRINSER STREET SUITE 1, SAN DIEGO CA 92136-5205
SAN DIEGO, CA 92136-5205
UNITED STATES
Anna Nguyen, Email: anna.d.nguyen.civ@us.navy.mil Telephone: 6195564279 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N5523626R0007 |
| SolDate: 04 Aug 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: SUZANNE J. SHIN |
| ContDate: |
| CODate: 20 Aug 2026 |
File details come from the government source that posted it. Updated .