This document summarizes responses to contractor questions regarding solicitation N50054-19-R-0001 for marine boatyard repair and maintenance support services. The solicitation seeks proposals for Lot I and Lot II requirements. Lot I involves vessels less than 50 feet that can be transported by trailer, while Lot II includes vessels 50 feet or greater or those that must be delivered via waterway. Both lots allow for work in or outside the contractor's boatyard. The work includes repairs, modifications, and maintenance for non-commissioned boats and craft of the U.S. Navy in Hampton Roads, Virginia. Responses clarify vessel dimensions, capabilities required, and proposal instructions. Offerors may bid independently on Lot I, Lot II, or both combined. Price proposals are not required for this solicitation but will be evaluated at the delivery order level.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO: Section L
TITLE: Table of Contents
PARA. NO: N/A
PAGE NO: 91
ITEM NO: Section L
TITLE: Lot II
PARA. NO: (i) and (ii)
PAGE NO: 94
ITEM NO: Section L
TITLE: Lot II
PARA. NO: (ii)
PAGE NO: 94
ITEM NO: Section L
TITLE: Office Space
PARA. NO: 3.14
PAGE NO: 95
ITEM NO: Section L
TITLE: Past Performance
PARA. NO: N/A
PAGE NO: 96
ITEM NO: Section I
TITLE: 52.252-4 ALTERATIONS IN
CONTRACT
PARA. NO: Ordering
PAGE NO: 64
CONTRACTOR POC:
REQUEST FOR SPECIFICATION CLARIFICATION
CONTRACTOR PHONE:
DATE OF REQUEST: 8 January 2019 SOLICITATION NO: N50054-19-R-0001
TITLE: Marine Boatyard Repair and Maintenance Support - LOT I and II MARMC POC: Sara Van Gorder
CONTRACTOR: MARMC PHONE: (757) 400-0328
CONTRACTOR QUESTION 5:
Is the Contractor allowed to reference multiple task orders under a single contract, as a single (1) past performance example. Or, do individual task orders count as individual past performance references?
GOVERNMENT RESPONSE: Reference individual task order for past performance. Each "effort" is counted as one reference.
CONTRACTOR QUESTION 1:
Is the Table of Contents requested on RFP page 91 considered part of Volume I - Cover Letter? If yes, is the Table of Contents included in the 3 page limit for the cover letter?
GOVERNMENT RESPONSE: The Table of Contents is included in Volume I, but does not count against the page limit.
CONTRACTOR QUESTION 2:
Section L, page 94 specifies that the sections for LOT II (i) Organization/Management and (ii) Manpower Resources and Capabilities are the same as LOT I. Should the contractor repeat the information provided in proposal paragraphs 1.1-1.8, or will the Government allow the Contractor to make a statement referencing the previous sections?
GOVERNMENT RESPONSE: The Contractor may make a statement referencing the previous sections.
GOVERNMENT RESPONSE: The following changes have been made: "(2.1-2.12)."
CONTRACTOR QUESTION 3:
Page 94 states "Same as Lot I. see above Manpower Resources and Capabilities LOT I (2.1-2.13)." With the paragraph structure provided by the Government in Section L, there is no Section 2.13; LOT I stops at Section 2.12. Please clarify if this is correct, or if there should be a Section
2.13 included with the proposal.
CONTRACTOR QUESTION 4:
Does the Office Space described for the LOT I and LOT II requirements need to be different (i.e. two separate spaces), or can the Contractor provide one office space for both lots? Further, if the same office space can be used for both lots, does the Offeror need to repeat the office space information in each section, or is it allowable to reference the LOT I Office Space section when discussing LOT II Office Space?
GOVERNMENT RESPONSE: Contractor can provide one space for both; space must be able to accommodate the combined requirements if a single space is provided. Contractor may reference Lot I statement.
GOVERNMENT RESPONSE: Yes. This is a requirement per DFARS subpart 217.71.
CONTRACTOR QUESTION 6: Is ABR/MSRA a requirement?
ITEM NO: Multiple
TITLE: Multiple
PARA. NO: Multiple
PAGE NO: Multiple
ITEM NO: Section J
TITLE: List of Documents, Exhibits, and Other Attachments
PARA. NO: C
PAGE NO: 78
ITEM NO: Section C
TITLE: 3.7 Facilities, Lot II
PARA. NO: 3.7.1.b
PAGE NO: 20
ITEM NO: Section I
TITLE: Ordering Work
PARA. NO:
PAGE NO: 64
ITEM NO:
TITLE:
PARA. NO:
PAGE NO:
ITEM NO:
TITLE:
PARA. NO:
PAGE NO:
ITEM NO: Section L
TITLE: Lot II, Facilities
PARA. NO: 3.10.3
PAGE NO: 95
CONTRACTOR QUESTION 12: The RFP, on page 20, page 94, and page 105 refers variously to 78' MK VI vessels, 85" MK VI vessels, and 82" MK V vessels … please clarify this requirement.
GOVERNMENT RESPONSE: The following changes have been made: Change pg. 20, b. Dockside Slips. Dockside slips capable of docking two (2) 78ft MK VI Patrol Boat (144,000 lbs. each), 5 ft. draft, two (2) 135ft LCUs, 10 ft. draft (470,000 lbs. each, and two (2) barges 205 ft. and 55 ft. draft, 640 long tons (each).
Change pg. 20, c. services. f. ...minimum of two (2) 78ft MK VI Patrol Boat (144,000 lbs. each), 5 ft. draft, two (2) 135ft LCUs, 10 ft. draft (470,000 lbs. each, and two (2) barges 205 ft. and 55 ft. draft, 640 long tons (each) simultaneously...
Change pg. 21, first paragraph, ...work two (2) 78 ft. MK VI Patrol Boats simultaneously...
Change pg. 94, 3.10.1 Dockside slips capable of docking two (2) 78ft MK VI Patrol Boat (144,000 lbs. each), 5 ft. draft, two (2) 135ft LCUs, 10 ft. draft (470,000 lbs. each, and two (2) barges 205 ft. and 55
ft. draft, 640 long tons (each)...
Change pg.95, 3.12.3. Removal of craft from water to include marine railway, dry dock, travel lift or similar lifting capability or access to similar lifting capability or some combination thereof to allow work on a minimum of two (2) 78ft MK VI Patrol Boat (144,000 lbs. each), 5 ft.
draft, two (2) 135ft LCUs, 10 ft. draft (470,000 lbs. each, and two (2) barges 205 ft. and 55 ft. draft, 640 long tons (each) simultaneously out of the water. The contractor shall have the capability to work two (2) 78 ft. MK VI Patrol Boats simultaneously under cover in a controlled environment so as not to prevent progress during inclement weather.
CONTRACTOR QUESTION 13: Please clarify the requirement of 3.10.3 Pier space. This is vague.
GOVERNMENT RESPONSE: The following changes have been made: "Pier space located within the facility."
CONTRACTOR QUESTION 10: Page 64 notes that successful offerors are required to have an MSRA or an ABR number "before a delivery orders can be awarded." There is no requirement in Section L for offerors to provide their MSRA or ABR certification data. Please clarify. Shouldn't offerors be required to provide objective evidence of having an existing MSRA or ABR in effect as part of their offer?
GOVERNMENT RESPONSE: Offerors are not required to provide evidence of MSRA or ABR as part of the proposal. Clause 52.252-4 (Alterations in Contract) under "Ordering Work," does state "All successful awardees shall provide the MSRA or ABR number before a delivery orders can be awarded." However, Section L requirements are for the base contract, and does not include this language.
CONTRACTOR QUESTION 11: Please clarify. Is it the case that offerors may bid on (1) Lot I independently, or (2) Lot II independently, or (3) Lot I and Lot II combined?
GOVERNMENT RESPONSE: Yes, offerors may submit proposals for work on either or both Lot I and/or Lot II requirements.
CONTRACTOR QUESTION 8: Section J, paragraph C identifies a total of 17 Attachments, however only Attachments J10 - J-16 were posted on FEDBIZOPS. Could the Government post Attachments J1 - J9?
GOVERNMENT RESPONSE: Attachments J1-J9 have now been attached, along with a slight numbering change.
CONTRACTOR QUESTION 9: Page 20, Dockside Slips calls for slips capable of docking 2 each 78'MK VI boats, 2 each 135' LCUs, and 2 each 205' barges. Page 94, para. 3.10 calls for slips capable of docking 2 85' MK VI boats and 2 135' LCUs, with no requirement listed for the 205' barges. This is inconsistent; please clarify this slip requirement.
GOVERNMENT RESPONSE: The following change have been made:
"Dockside slips capable of docking two (2) 78ft MK VI Patrol Boat, 5
ft. draft, two (2) 135ft LCUs, 10 ft. draft, and two (2) barges 205 ft.
and 55 ft. draft, 640 Long tons."
CONTRACTOR QUESTION 7: Section "B" indicates that Contractor provide a FFP Unit Price for Base Year and each Option Year, however, Section L, nor Section M address Cost Proposal requirements or Pricing evaluation considerations. Could the Government please clarify?
GOVERNMENT RESPONSE: Section B includes the CLIN structure to be used in delivery orders. Please review Section L, Important Notes: "7. Price proposals are not required and will not be evaluated as part of this solicitation." Price will be requested and evaluated at the delivery order level.
ITEM NO: Section L
TITLE: Lot I Facilities
PARA. NO: 3.5
PAGE NO: 94
ITEM NO: Section L
TITLE:
PARA. NO:
PAGE NO: 97
ITEM NO: SECTION J
TITLE: ATTACHMENTS
PARA. NO:
PAGE NO:
ITEM NO:
TITLE:
PARA. NO:
PAGE NO:
ITEM NO:
TITLE:
PARA. NO:
PAGE NO:
ITEM NO:
TITLE:
PARA. NO:
PAGE NO:
CONTRACTOR QUESTION 17: GOVERNMENT RESPONSE:
CONTRACTOR QUESTION 18: GOVERNMENT RESPONSE:
CONTRACTOR QUESTION 15: RFP references to J-12, J-13 and J-14 do not appear to be accurate / consistent; please clarify.
GOVERNMENT RESPONSE: Attachment numbering has been fixed.
CONTRACTOR QUESTION 16: There is no "J" Attachment for the purpose of pricing CLINs 1001, 2001, 3001 AND 4001. Please provide.
GOVERNMENT RESPONSE: Please refer to Question 7: "Please review Section L, Important Notes: '7. Price proposals are not required and will not be evaluated as part of this solicitation.'"
CONTRACTOR QUESTION 14: No requirement for Electrical Shop capabilities is included in this list. Please clarify .. Perhaps this is an omission?
GOVERNMENT RESPONSE: The following changes have been made: Pg. 94 Add 3.5.9. Electrical: Installing and checking out wiring, cabling, controllers, switchboards, equipment, motors (including motor rewind and repair), lighting, communications, telephones, solenoids, switches and metering.