This document contains responses to questions regarding a solicitation for a Service Life Extension Program for the YTT-11 vessel. The scope of work includes modifications, main engine and reduction gear replacement, electrical switchboard upgrade, generator replacements, control system upgrades, piping modifications, sensor replacements, propeller replacement, preservation work and coordinating installation assistance. The contractor must have facilities to accommodate the 186-foot, 1187 ton vessel. The period of performance is from April 1, 2021 to November 30, 2021. This is a 100% small business set-aside for NAICS code 336611 with a size standard of 1,250 employees. Offerors must register in the System for Award Management to be eligible for award.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to RFCs 004-011
4) Question: Paragraph 1.7.14 states that all equipment procurement and install will be by separately contracted AIT teams.
Please confirm that the separately contracted AIT will be performing the full installation of the new system including cable pulls, bracket fabrication, mounting and welding, interference removals and interference re-installs. Please confirm that the only assistance required by the contractor is work that is specifically mentioned in the work items or work specifically called out in the General Requirements.
Please confirm that the separately contracted AIT teams are responsible for the purchase of all items required for the install, including everything listed in the drawings provided as well as anything listed in drawing that are not provided. Please confirm this includes equipment as well as materials and consumables.
Response: ERRATA to follow. All cable pulls, cable installs, bracket fabrication (mounting and welding), foundations, interference removals and interference re-installs as shown in the listed drawings shall be performed as part of this work specification. Install of new equipment which was procured separately shall be installed by the AIT. This will require support services.
5) Question: (SOW Work Item 3.5 Ballast Pump/Motor Replacement) Please provide the dimensional drawings of the original pumps and the replacement pumps for determining pipework and pipe re-routing that may or may not be required.
Response: Dimensional drawings are not available. Make/Model of existing Ballast Pumps/
Motors listed in 3.5
6) Question: (SOW Work Item 3.6 Shipalt YTT0029D Dynamic Positioning System Upgrade)
There are no GFM items listed for this, please confirm that the separately contracted AIT is responsible to supply all the required parts and consumables that are listed in all drawings associated with this install.
Please confirm there are no parts or consumables required to be supplied by the contractor.
Please confirm that the separately contracted AIT will be performing the full installation of the new system including cable pulls, bracket fabrication and welding, interference removals and re-installs. If not, please identify the activities related to the install that are required to be performed by the Contractor.
Response: ERRATA to follow. GFM of 3.6.6 added to Paragraph 4.0 The Contractor is responsible for the removal of consoles, retention of cables, testing new/existing cables, running new cables, ripping out foundations and installing new foundations per the prints. The AIT will install the new console to the foundation and do all final hookups of cables to new/existing equipment and testing of equipment
(separately awarded contract).
7) Question: (SOW Work Item 3.7 Shipalt YTT-0031D Replace Bailey Monitoring & Control
System and Pilot House Console & Engineering Control Room Console Replacement)
Please provide these references:
YTT-11 MCS AND DPS VENDOR CABLE CONN 436-8828681
YTT-11 ACCU ALARM AND MONITORING SYSTEM 41171- OR EQUAL
YTT-11 CENTRALIZED MACHRY MON &CONT SYS 438-6500872
TYPE FDN-MISC ELEC EQUIP (SHOCK) 113-5293062
STD CABLE INSTALLATION REQUIREMENTS 302-5302690
STD STRL PENETRATIONS IN SURFACE SHIPS 101-5317400
TYPE MTG RQS SM EQ IN SHK CR AREA 113-5377425
Response: Drawings 436-8828681, 438-6500872, 113-5293062, 302-5302690 and 101-5317400 provided for reference, please see Attachment J-6b Additional References and Drawings. Drawings
41171- OR EQUAL and 113-5377425 not available to provide for reference.
8) Question: (SOW Work Item 3.7 Shipalt YTT-0031D Replace Bailey Monitoring & Control
There is a conflict between the SOW and Note 1 on Drawing 8797719 Rev A
3.7 SHIPALT YTT-0031D REPLACE BAILEY MONITORING & CONTROL SYSTEM AND PILOT
HOUSE CONSOLE & ENGINEERING CONTROL ROOM CONSOLE REPLACEMENT: Accomplish
Shipalt in accordance with the requirements of drawings 8797719 Rev A, 8797727 Rev A, 8797729, 8797733 Rev C and 8828683. (Seems to conflict with 1.7.14)
3.7.1 Provide the services of a qualified OEM technical representative to provide drawings, applicable manuals, on-site assistance for removal and disassembly of the equipment listed in 3.7 (conflicts with
Drwg Notes)
3.7.6 Drawing 8797719 Rev A Detail 12-A, 20-A, 28-A, 36-A and 44-A are to be accomplished in their entirety under this work specification. (Confuses responsibility for removals)
Drawing 8797719 Note 1: (conflicts with 3.7.1)
Following the order of precedence in SOW 2.1, it is still not clear who removes items listed in 3.7.6).
Please confirm Drawing notes in 8797719 prevails for both 3.7.1 and 3.7.6, if not, please provide clarity.
Response: As per the SOW all removals for 3.7.6 are to be accomplished by the contractor under this work specification. This includes the console.
9) Question: (SOW Work Item 3.7 Shipalt YTT-0031D Replace Bailey Monitoring & Control
It is not clear from 1.7.14, 3.7. and various drawings, who will be pulling new cables. Is it intended to be the Contractor or the AIT?
Response: All cable pulls, cable installs, bracket fabrication (mounting and welding), foundations, interference removals and interference re-installs as shown in the listed drawings shall be performed as part of this work specification. Install of new equipment which was procured separately shall be installed by the AIT. This will require support services.
10) Question: Paragraph 1.7.12 states that “All Equipment removal and install shall be accomplish in its entirety while the vessel is drydocked.” This would leave the vessel out of the water for an extended period of time. Is this requirement due to stability issues? Would the navy consider a removal / installation plan allowing for dockside removals / installs to shorten the drydocking period? This would reduce costs associated to drydocking.
Response:
1) Yes, this is a weight distribution and stability concern.
2) The Navy will consider a removal/installation plan as long as it complies with the following:
Paragraph 3.2 for Propeller removal and install, Paragraph 3.10 Shipalts 0050D, Paragraph 3.11
SHIPALT 0051D, Paragraph 3.12 SHIPALT 0052D, and Paragraph 3.13 SHIPALT 0053D are to be accomplished while drydocked as listed in the SOW due to weight and stability concerns. The remainder of work listed in the SOW and follow on AIT work (separately contracted) can be accomplished while waterborne. (For all items to be installed why drydocked the installation portions been to be accomplished as far as fixing equipment in place for weight distribution final hookup of cables, and such can be accomplished waterborne.
11) Question: KTR is requesting an extension of clarification submittal to Tuesday, 14Dec, 3PM
PST.
Response: Extension granted, please see Amendment 0003.