C04.0 Attachment J-2 YTT-11 N4523A22R1057 Price Proposal Worksheet UPDATED 14NOV2021.xls
XLS spreadsheet 169 KB Posted
- Attached to
- Service Life Extension Program for the YTT-11
- Solicitation number
- N4523A22R1057
About this file
This solicitation package includes a price proposal worksheet, labor hour breakdown template, and details for a federal contract opportunity with the Department of the Navy.
The solicitation seeks a firm-fixed price contract to perform a Service Life Extension Program for the YTT-11 Discovery Bay at the contractor's facility between April 1, 2021 and November 30, 2021. The scope of work involves ship modifications and repairs, including main engine and reduction gear replacement, electrical and monitoring system upgrades, propeller replacement, and preservation work. Offerors must be registered in SAM and qualify as a small business under NAICS code 336611 for shipbuilding and repair with less than 1,250 employees. The solicitation templates provide instructions for contractors to fill out pricing details, labor categories and hours.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instruction Sheet
| Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet | ||
| All yellow fields are to be filled out by the Contractor prior to submittal to The Government. | ||
| DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW. | ||
| Labor Mix & Rates Sheet | ||
| 1 | Enter Company Name and Date | |
| 2 | Fill in each rate in its applicable yellow cell (Fringe, Overhead, G&A, Profit, FCCOM, Regular, and Overtime) | |
| 3 | Fill in each labor category and ensure all yellow boxes are filled in | |
| a. | Example Labor Categories | |
| Shipfitter | ||
| Sheetmetal | ||
| Welder/Burer | ||
| Electrician | ||
| Inside Machinist | ||
| Outside Machinist | ||
| Boilermaker | ||
| Pipefitter | ||
| Insulator/Lagger | ||
| Shipwright/Carpenter | ||
| EX/Ord | ||
| Painter/Blaster | ||
| Rigger/Laborer | ||
| QA/NDT | ||
| b. | Do NOT include labor already accounted for in Fringe, Overhead, or G&A calculations. | |
| 4 | Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours | |
| 5 | Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate. | |
| Price Proposal Worksheet | ||
| 1 | All company and contract information and rates will be autopopulated from previous sheet. | |
| 2 | Fill in each yellow cell with its applicable information | |
| 3 | Anything that is not in yellow is locked, these cells will auto-calculate. | |
| 4 | Before submitting, ensure there are no more bright yellow cells. | |
| IF USING FCCOM | ||
| Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission. | ||
| Labor Hour Breakdown | ||
| 1 | Each labor categoy will autofill from the "labor Mix & Rates" sheet | |
| 2 | Fill in each Regular and Overtime hour for each labor category and line item. |
Labor Mix & Rates
| Contractor/Company Name: | |||||||||
| Project/Vessel Name: | N4523A22R1057 YTT-11 | Date: | |||||||
| Base Rates: | Regular Labor | $0.00 | Fringe | Overhead | G&A | Profit | FCCOM | ||
| Labor Mix and Rates | |||||||||
| Labor Category | Regular Hours | Overtime Hours | Total Category Hours | Total Regular $/hour | Total Overtime $/hour | Total Category Dollars | |||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| Column Totals | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | |||
| Direct Labor Rate Per Hour | 0 |
Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT
Price Proposal Worksheet
| Contractor/Company Name: | 0 | |||||||||||||||||
| Project/Vessel Name: | N4523A22R1057 YTT-11 | Date: | 12/31/99 | |||||||||||||||
| Base Rates: | Labor | $0.00 | Fringe | 0.00% | Overhead | 0.00% | G&A | 0.00% | Profit | 0.00% | FCCOM | 0.00 | ||||||
| Base Work Package Proposal | ||||||||||||||||||
| PARAGRAPH No. | TITLE | PRIME | SUBCONTRACTOR | Other Direct Cost (ODC)* | PRIME | Line Item Total | ||||||||||||
| M/H | Labor Cost | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | ODC | Travel ODC | TOTAL | Fringe | Overhead | G&A | Profit | FCCOM | ||||
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.14 | Hot Work/ Welding | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.16 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.17 | Environmentals | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.19 | Weight Control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.21 | Integrated Logistics Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.22 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.23 | General Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 1.24 | Compartment Arrival & Closeout | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.1 | Personnel & Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.4 | Crib & Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.5 | Setting & alignment of docking blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.6 | Stability Calculations | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.7 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.8 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.9 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.10 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.12 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.2 | Propeller Replacement | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.2.1 | Waterborne Shaft Position | |||||||||||||||||
| 3.2.2 | Propeller Replacement | |||||||||||||||||
| 3.2.2.1 | Clean and Inspect New Propeller | |||||||||||||||||
| 3.2.2.2 | General | |||||||||||||||||
| 3.2.2.3 | Propeller Removal | |||||||||||||||||
| 3.2.2.4 | Inspection for wear and defects | |||||||||||||||||
| 3.2.2.5 | Taper Fit | |||||||||||||||||
| 3.2.2.6 | Propeller Install | |||||||||||||||||
| 3.2.2.7 | System Operational Test | |||||||||||||||||
| 3.3 | Engine Room Preservation | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.3.1 | Engine Room Bilge Visual Inspection | |||||||||||||||||
| 3.3.2 | Identify Color Schemes and Markings | |||||||||||||||||
| 3.3.3 | Engine Room Bilge Preservation | |||||||||||||||||
| 3.4 | STG Bearing Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.5 | Ballast Pump Replacement | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.5.1 | Ballast Pump | |||||||||||||||||
| 3.5.2 | Ballast Pump Motor | |||||||||||||||||
| 3.6 | Shipalt 0029D DPSG | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7 | Shipalt 0031D Bailey Control & Monitoring | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.9 | Shipalt 0043D EDG Day Tank Piping | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.10 | Shipalt 0050D SSDG Replacement | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.12 | Shipalt 0052D ME & Reduction Gear RPL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.13 | Shipalt 0053D E SWBD | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.17 | Shipalt 0077D Wind Sensor RPL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.18 | Shipalt 0078D MRU RPL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.19 | Shipalt 0079D DGPS Fugro Seastar RPL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.20 | Tanks/Voids/Lockers | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| 3.20.1 | Open, Pump, Clean, Vent, and GF | |||||||||||||||||
| 3.20.2 | Tanks/Void/Locker Visual Inspection | |||||||||||||||||
| 3.20.3 | Identify Color Schemes and Markings | |||||||||||||||||
| 3.20.4 | Preliminary Air Test | |||||||||||||||||
| 3.20.5 | Clean, Flush, Disinfection of Pot Water Sys | |||||||||||||||||
| 3.20.6 | Certification of Pot Water Piping and Tanks | |||||||||||||||||
| 3.20.7 | Final Air Test | |||||||||||||||||
| 3.20.8 | Tank/Void Closeout Inspection | |||||||||||||||||
| 3.21 | Dock and sea trials. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| Column Totals | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Base Work Package | $0.00 | |||||||||||||||||
| Option Item Proposal Package | ||||||||||||||||||
| PARAGRAPH No. | TITLE | M/H | Labor Cost | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | ODC | Travel ODC | TOTAL | Fringe | Overhead | G&A | Profit | FCCOM | Line Item Total | |
| 3.8 | Shipalt 0038D Ships Lighting CLIN 0004 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11 | Shipalt 0051D EDG Replacement CLIN 0005 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.14 | Shipalt 0067D Pilot House Flooring RPL CLIN 0006 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.15 | Shipalt 0069D PH/Chart Area REARR CLIN 0007 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.16 | Shipalt 0075D Fire Suppression SYS RPL CLIN 0008 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Option Items (O): | $0.00 | |||||||||||||||||
| TOTAL PROPOSED PRICE: | $0.00 |
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
Labor Hour Breakdown
| Contractor/Company Name: | 0 | |||||||||||||||||||||||||||||||||||||||
| Project/Vessel Name: | N4523A22R1057 YTT-11 | Date: | 12/31/99 | |||||||||||||||||||||||||||||||||||||
| Base Rates: | Regular Labor Rate | $0.00 | ||||||||||||||||||||||||||||||||||||||
| Name | Rate | Total Cost | Name | Rate | Total Cost | |||||||||||||||||||||||||||||||||||
| Labor Hour Breakdown | ||||||||||||||||||||||||||||||||||||||||
| PARAGRAPH No. | TITLE | Labor Categories | Total Overall Labor Cost | |||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | Total Regular Hours | Total Overtime Hours | |||||||||||||||||||||
| REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | |||||
| 1.4 | Arrival Conference | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.5 | Required Documents | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.6 | Progress Meetings | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.7 | Availability Requirements | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.8 | Care of Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.13 | Safety Requirements | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.14 | Hot Work/ Welding | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.16 | Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.17 | Environmentals | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.19 | Weight Control | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.21 | Integrated Logistics Support | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.22 | Gas Free | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.23 | General Requirements for Testing | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.24 | Compartment Arrival & Closeout | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.1 | Personnel & Equipment | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.2 | Docking Procedure | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.3 | Blocking Plan | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.4 | Crib & Brace Blocking | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.5 | Setting & alignment of docking blocks | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.6 | Stability Calculations | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.7 | Docking Conference | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.8 | Docking the Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.9 | Post Docking | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.11 | Undocking the Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.13 | Final Docking Report | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.1 | Waterborne Shaft Position | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2 | Propeller Replacement | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2.1 | Clean and Inspect New Propeller | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2.2 | General | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2.3 | Propeller Removal | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2.4 | Inspections for Wear and Defects | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2.5 | Taper Fit | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2.6 | Propeller Install | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2.7 | System Operational Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.1 | Engine Room Bilge Visual Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.2 | Identify Color Schemes and Markings | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.3.3 | Engine Room Bilge Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.4 | STG Bearing Replacement | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.5.1 | Ballast Pump | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.5.2 | Ballast Pump Motor | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.6 | Shipalt 0029D DPSG | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.7 | Shipalt 0031D Bailey Control & Monitoring | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.9 | Shipalt 0043D EDG Day Tank Piping | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.10 | Shipalt 0050D SSDG Replacement | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.12 | Shipalt 0052D ME & Reduction Gear RPL | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.13 | Shipalt 0053D E SWBD | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.17 | Shipalt 0077D Wind Sensor RPL | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.18 | Shipalt 0078D MRU RPL | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.19 | Shipalt 0079D DGPS Fugro Seastar RPL | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20 | Tanks/Voids/Lockers | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20.1 | Open, Pump, Clean, Vent, and GF | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20.2 | Tanks/Void/Locker Visual Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20.3 | Identify Color Schemes and Markings | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20.4 | Preliminary Air Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20.5 | Clean, Flush, Disinfection of Pot Water Sys | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20.6 | Certification of Pot Water Piping and Tanks | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20.7 | Final Air Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.20.8 | Tank/Void Closeout Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.21 | Dock and sea trials. | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| Column Totals | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Base Work Package | $0.00 | |||||||||||||||||||||||||||||||||||||||
| Labor Hour Breakdown | ||||||||||||||||||||||||||||||||||||||||
| PARAGRAPH No. | TITLE | Labor Categories | Total Overall Labor Cost | |||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | Total Direct Hours | Total Overtime Hours | |||||||||||||||||||||
| REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | |||||
| 3.11 | Shipalt 0051D EDG Replacement | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.14 | Shipalt 0067D Pilot House Flooring RPL | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.15 | Shipalt 0069D PH/Chart Area REARR | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.16 | Shipalt 0075D Fire Suppression SYS RPL | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| Column Totals | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Total Option Items (O): | $0.00 | |||||||||||||||||||||||||||||||||||||||
| TOTAL DIRECT LABOR COSTS BY WORK ITEM | $0.00 |