C09.0 Amendment 0007 N4523A22R1057 YTT-11 14JAN2022.pdf
PDF 138 KB Posted
- Attached to
- Service Life Extension Program for the YTT-11
- Solicitation number
- N4523A22R1057
About this file
This amendment to a federal solicitation updates the pricing worksheet attachment for a firm-fixed-price contract to perform a service life extension program for the YTT-11 Discovery Bay vessel. The contractor will replace main engines, reduction gears, electrical switchboards, diesel generators, monitoring systems, dynamic positioning systems, emergency generators, sensors, and pumps/motors. Additional work includes engine room preservation and arranging vessel transport. The availability period is from April 1, 2021 to November 30, 2021. This is a 100% small business set-aside under NAICS code 336611 with a size standard of 1,250 employees. The proposal due date remains January 18, 2022. The amendment solely revises the pricing worksheet attachment.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PURPOSE: The purpose of this amendment is to update the Attachment J-2 Price Proposal Worksheet, revised 14JAN2022.
SCHEDULE: The proposal due date and time remains unchanged at 10:00 AM PST, 18 January 2022.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 14-Jan-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4523A22R1057
X 9B. DATED (SEE ITEM 11)
16-Nov-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Jan-2022
CODE
PUGET SOUND NAVAL SHIPYARD
1400 FARRAGUT
BREMERTON WA 98314
N4523A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4523A22R1057
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The following have been modified:
SECTION J
Any contract awarded as a result of this solicitation shall consist of the following sections of this solicitation, and the documents, exhibits, and attachments described below:
Part I The Schedule (Sections A through H) Part II Contract Clauses (Section I) Part III List of Documents, Exhibits and other Attachments (Section J) Part IV Representations and Instructions (Sections K through M)
Part IV of the solicitation will not be physically incorporated into the resulting contract. However, Section K, “Representations, Certifications and Other Statements of Offerors” will be retained in the contract file and acceptance of a proposal under this solicitation incorporates Section K by reference into the resultant contract (FAR 15.204-1(b)).
The following is a list of attachments to the Request for Proposal (RFP). Attachments J-1 and Exhibits A will be incorporated into the contract along with all references listed in section two (2) of the Statement of Work (SOW), digital copies of which are available upon contractor request. Attachments J-3 through J-5, and J-7 are included for the purposes of the solicitation, but will not be incorporated into the resulting contract. Additionally, the contractor shall be responsible for the latest revisions of all references, specifications and standards in effect at time of proposal closing.
Number Title Number of Pages Dated Attachment J-1 C04.0 Attachment J-1 Statement of Work (SOW)
YTT-11 N4523A22R1057
C09.0 Attachment J-1 ERRATA-1 SOW YTT-11
15 NOV 2021
07 DEC 2021
Attachment J-2 C04.0 Attachment J-2 YTT-11 N4523A22R1057 Price Proposal Worksheet
C09.0 Errata-1 Attachment J-2 YTT-11 N4523A22R1057 Price Proposal Worksheet
03DEC2021
C09.0 Errata-1 Attachment J-2 YTT-11
N4523A22R1057 Price Proposal Worksheet
14JAN2022
N/A N/A
03 DEC 2021
14 JAN 2022
Attachment J-3 C04.0 Attachment J-3 Request for Clarification
N4523A22R1057 YTT-11
1 N/A
Attachment J-4 C04.0 Attachment J-4 Contract Performance Data Sheet N4523A22R1057 YTT-11
2 N/A
Attachment J-5
C04.0 Attachment J-5 Corporate Experience Data Sheet N4523A22R1057 YTT-11
C09.0 Attachment J-5 Corporate Experience Data Sheet N4523A22R1057 YTT-11 Updated
17NOV2021
N/A
17 NOV 2021
Attachment J-6
Attachment J-6b
Attachment J-6c
C04.0 Attachment J-6 Drawings and References
N4523A22R1057 YTT-11
C09.0 Attachment J-6b Additional Drawings and References N4523A22R1057 YTT-11
C09.0 Attachment J-6c Additional Drawings and References N4523A22R1057 YTT-11
Attachment J-7 C04.0 Attachment J-7 BAVR Instructions
YTT-11
1 N/A
Exhibit A C04.0 Exhibit A CDRLs and DIDs YTT-11 N4523A22R1057
69 items Various
Exhibit B C04.0 Government Furnished Property (GFP) Attachment N4523A22R1057 YTT-11
N/A N/A
NOTE 1:
"Attachment” means any documentation, appended to a contract or incorporated by reference, which does not establish a requirement for deliverables.
"Exhibit” means a document, referred to in a contract, which is attached and establishes requirements for deliverables.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .