C09.0 Addendum to Government Responses to RFCs 015, 016, 017, and 022 N4523A22R1057 YTT-11.pdf

PDF 504 KB Posted

Attached to
Service Life Extension Program for the YTT-11
Solicitation number
N4523A22R1057
Issued by

About this file

This document contains an addendum to government responses to requests for clarification on a solicitation for service life extension work on a vessel. The solicitation seeks a firm-fixed price contract to perform modifications, engine and gear replacement, electrical and generator upgrades, control system replacements, and other work on YTT-11 Discovery Bay at the contractor's facility between April and November 2021. Raytheon and Pacific Power Group are identified as points of contact for original equipment manufacturer support. The responses clarify the roles of the prime contractor and separate award contracts for assistance with installation work.

View the file

Other files

File Type Posted
C09.0 Government Response to RFC 029 N4523A22R1057 YTT-11.pdf PDF
C09.0 Errata-1 Attachment J-2 YTT-11 N4523A22R1057 Price Proposal Worksheet REVISED 17JAN2022.xls XLS spreadsheet
C09.0 Amendment 0008 N4523A22R1057 YTT-11 18JAN2022.pdf PDF
C09.0 Amendment 0007 N4523A22R1057 YTT-11 14JAN2022.pdf PDF
C09.0 Errata-1 Attachment J-2 YTT-11 N4523A22R1057 Price Proposal Worksheet 14JAN2022.xls XLS spreadsheet
C09.0 Government Response to RFC 028 N4523A22R1057 YTT-11.pdf PDF
C09.0 Amendment 0006 N4523A22R1057 YTT-11 07JAN2022.pdf PDF
C09.0 Government Response to RFC 027 and Amended Response to RFC 023 N4523A22R1057 YTT-11.pdf PDF
C09.0 Government Response to RFC 026 N4523A22R1057 YTT-11.pdf PDF
C09.0 Government Responses to RFC 014-025 N4523A22R1057 YTT-11.pdf PDF
C09.0 Amendment 0005 N4523A22R1057 YTT-11 21DEC2021.pdf PDF
C09.0 Amendment 0004 N4523A22R1057 YTT-11 17DEC2021.pdf PDF
C09.0 Government Responses to RFC 012-013 N4523A22R1057 YTT-11.pdf PDF
C09.0 Amendment 0003 N4523A22R1057 YTT-11 09DEC2021.pdf PDF
C09.0 Attachment J-6b N4523A22R1057 YTT-11 Additional Drawings Request.pdf PDF
C09.0 Attachment J-1 ERRATA 1 SOW YTT-11 N4523A22R1057 07DEC2021.pdf PDF
C09.0 Government Responses to RFC 004-011 N4523A22R1057.pdf PDF
C09.0 Government Responses to RFC 001-003 N4523A22R1057 YTT-11.pdf PDF
C09.0 Errata-1 Attachment J-2 YTT-11 N4523A22R1057 Price Proposal Worksheet 03DEC2021.xls XLS spreadsheet
C09.0 Amendment 0002 N4523A22R1057 YTT-11 03DEC2021.pdf PDF
C09.0 Amendment 0001 N4523A22R1057 YTT-11 17NOV2021.pdf PDF
C09.0 Attachment J-5 Corporate Experience Data Sheet N4523A22R1057 YTT-11 Updated 17NOV2021.docx DOCX document
C04.0 Exhibit B GFP Attachment YTT-11 N4523A22R1057.pdf PDF
C04.0 Attachment J-7 BAVR Instructions YTT-11.pdf PDF
C04.0 Attachment J-1 SOW YTT-11 N4523A22R1057 Updated 15NOV2021.pdf PDF
C04.0 Attachment J-4 Past Performance N4523A22R1057.docx DOCX document
C04.0 Attachment J-2 YTT-11 N4523A22R1057 Price Proposal Worksheet UPDATED 14NOV2021.xls XLS spreadsheet
C04.0 Solicitation YTT-11 N4523A22R1057.pdf PDF
C04.0 Attachment J-6 N4523A22R1057 YTT-11 Drawings Request.pdf PDF
C04.0 Attachment J-3 RFC Form N4523A22R1057 YTT-11.docx DOCX document
C04.0 Attachment J-5 Corporate Experience N4523A22R1057 YTT-11.docx DOCX document
C04.0 Exhibit A CDRLS and DIDs YTT-11 N4523A22R1057.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum to Government Responses to RFCs 015, 016, 017, and 022

15) Question: (SOW Work Item 3.6 Ship Alt YTT-0029D Dynamic Positioning System Upgrade)

Paragraph 3.6.1 states “Provide the services of a qualified OEM technical representative to provide drawings, applicable manuals, on-site assistance for removal and disassembly of the equipment listed in 3.6” The provided references do not indicate the OEM for the existing equipment. Provide the OEM information for the equipment to be removed.

Response: Raytheon will be the POC for OEM technical on this portion. Contact the contract specialist, Brittany Chartier brittany.chartier@navy.mil and secondary point of contact, Chris Campbell chris.campbell@navy.mil for specific contact info if needed.

Addendum: Contact with the Point of Contact from Raytheon shall be for coordination efforts only (not for quotes or proposals) as the arrangement for the technician to travel and to provide drawings, applicable manuals, on-site assistance for removal and disassembly of the equipment listed in 3.6 has already been incorporated/awarded separately with the AIT contract.

16) Question: (SOW Work Item 3.7 SHIPALT YTT-0031D REPLACE BAILEY

MONITORING & CONTROL SYSTEM AND PILOT HOUSE CONSOLE & ENGINEERING

CONTROL ROOM CONSOLE REPLACEMENT)

Paragraph 3.7.1 states “Provide the services of a qualified OEM technical representative to provide drawings, applicable manuals, on-site assistance for removal and disassembly of the equipment listed in 3.7” The provided references do not indicate the OEM for the existing equipment. Provide the OEM information for the equipment to be removed.

Chris Campbell chris.campbell@navy.mil for specific contact info if needed.

Addendum: Contact with the POC from Raytheon shall be for coordination efforts only (not for quotes or proposals) as the arrangement for the technician to travel and to provide drawings, applicable manuals, on-site assistance for removal and disassembly of the equipment listed in 3.7 has already been incorporated/awarded separately with the AIT contract.

mailto:brittany.chartier@navy.mil mailto:chris.campbell@navy.mil

17) Question: (SOW Work Item 3.13 Ship Alt YTT-0053D Electrical Switchboard Upgrade)

Paragraph 3.13.1 states “Provide the services of a qualified OEM technical representative to provide drawings, applicable manuals, on-site assistance for removal, disassembly, inspection and repair of the equipment listed in 3.13” The provided references do not indicate the OEM for the existing equipment.

Provide the OEM information for the equipment to be removed.

Chris Campbell chris.campbell@navy.mil for specific contact info if needed.

Addendum: Contact with the POC from Raytheon shall be for coordination efforts only (not for quotes or proposals) as the arrangement for the technician to travel and to provide drawings, applicable manuals, on-site assistance for removal, disassembly, inspection and repair of the equipment listed in 3.13 has already been incorporated/awarded separately with the AIT contract.

22) Question: (SOW Work Item 1.0 General Requirements)

1.7.14 Contracts for equipment procurement and install by AIT for Shipalts 0029, 0031, 0053, 0077, 0078 and 0079 are being separately awarded. Contract numbers and Points of Contact shall be provided upon award.

SHIPALT YTT0029D DYNAMIC POSITIONING SYSTEM UPGRADE:

a. Paragraph 3.6.6 to be done by AIT. Will contractor perform all other work?

SHIPALT YTT-0031D REPLACE BAILEY MONITORING & CONTROL SYSTEM

AND PILOT HOUSE CONSOLE & ENGINEERING CONTROL ROOM CONSOLE

REPLACEMENT:

b. No mention of AIT in spec

SHIPALT YTT-0050D SHIPS SERVICE DIESEL GENERATORS REPLACEMENT:

c. This Shipalt is not mentioned in 1.7.14

Paragraph 3.10.15.1 Hook up of switchboard to be done by AIT

SHIPALT YTT-0053D ELECTRICAL SWITCHBOARD UPGRADE:

d. AIT not mentioned in spec

SHIPALT YTT-0077D WIND SENSOR REPLACEMENT

e. Paragraph 3.17.3 Work to be done by AIT. Will contractor perform all other work?

SHIPALT YTT-0078D MOTION REFERENCE UNIT REPLACEMENT:

f. Paragraph 3.18.3 Work to be done by AIT. Will contractor perform all other work?

SHIPALT YTT-0079D DGPS FUGRO SEASTAR REPLACEMENT:

g. Paragraph 3.19.3 Work to be done by AIT. Will contractor perform all other work?

Response:

a. Paragraph 3.6.6 for 8797701 Item 1 shall be provided as GFP and installed by the awarded shipyard under this specification. As per the drawing the Shipyard will pull/install cables, test cables, remove console and retain equipment, install foundations and assist the AIT with rigging and crane services to get the new console portions into place. The AIT will then fasten equipment into place and connect the equipment. As a reminder the AIT will witness the testing of the existing console before disconnection and removal. The AIT portions for install are separately contracted. The AIT witness of existing console prior to removal will be covered by the awarded shipyard.

b. Raytheon will be the POC for OEM technical on this portion. Contact the contract specialist, Brittany Chartier brittany.chartier@navy.mil and secondary point of contact, Chris Campbell chris.campbell@navy.mil for specific contact info if needed.

Addendum: Contact with the POC from Raytheon shall be for coordination efforts only (not for quotes or proposals) as the arrangement for the technician to travel and to provide drawings, applicable manuals, on-site assistance for removal and disassembly of the equipment listed in 3.6 has already been incorporated/awarded separately with the AIT contract.

c. Pacific Power Group will be the POC for OEM technical on this portion. Contact the contract specialist, Brittany Chartier brittany.chartier@navy.mil and secondary point of contact, Chris Campbell chris.campbell@navy.mil for specific contact info if needed.

d. Correct, the hookup to the switchboard shall be conducted by AIT under 3.11 and noted in 3.10 for clarification. (Separately contracted, contact Raytheon for more info.) The awarded shipyard is being asked to supply rigging and crane support services to get equipment onboard and to its respective location i.e. foundation. It should also be noted that the awarded shipyard is responsible for routing and testing all cabling to the main switchboard and the AIT

(separately contracted) is responsible for terminations and all connections to the main switchboard. All terminations and connections to the emergency switchboard are the responsibility of the awarded shipyard.

e. Paragraph 3.17.3 items 1, 2, and 3 are listed as GFP in paragraph 4.0 and installed by the awarded shipyard under this specification. All other work to be conducted by contractor as shown in drawings of paragraph 3.17. This will include: cabling acquisition, install, and testing by the awarded shipyard. The AIT will terminate cable runs and connect to host (control) subsystem.

f. Paragraph 3.18.3 items 1, 2, and 3 are listed as GFP in paragraph 4.0 and installed by contractor under this specification. All other work to be conducted by contractor as shown in drawings of paragraph 3.18. This will include: cabling acquisition, install, and testing by the awarded shipyard. The AIT will terminate cable runs and connect to host (control) subsystem.

mailto:brittany.chartier@navy.mil mailto:chris.campbell@navy.mil

g. Paragraph 3.19.3 items 1, 2, 3, and 4 are listed as GFP in paragraph 4.0 and installed by contractor under this specification. All other materials listed and work is to be conducted by contractor as shown in drawings of paragraph 3.19. This will include: cabling acquisition, install, and testing by the awarded shipyard. The AIT will terminate cable runs and connect to host (control) subsystem.