RFC 7 - Request for Clarification (Winch Repair) ANS.pdf

PDF 189 KB Posted

Attached to
YT-802 Large Harbor Tug Maintenance Repair and Preservation
Solicitation number
N4523A21R1051
Issued by

About this file

This solicitation seeks maintenance, repair, and preservation services for a large harbor tugboat. The selected contractor must have a ship repair facility located in the Puget Sound, Washington region capable of accommodating a 93-foot vessel. Services include exterior blasting and preservation, hull and tank inspections and cleaning, mechanical and electrical repairs, and routine maintenance. The period of performance is from March 10 to June 15, 2021. The Navy intends to award a firm-fixed-price contract on a lowest-price technically acceptable basis to a small business. The solicitation includes the vessel's scope of work and specifications. Interested parties must register in the System for Award Management and request reference drawings by December 16 to be considered for award scheduled in February 2021.

View the file

Other files

File Type Posted
FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802 Errata One.xls XLS spreadsheet
FOUO C09.0 - N4523A21R1051 YT-802 Amendment 1 5Jan2021.pdf PDF
RFC 12 - Request for Clarification (QA Plan) ANS.pdf PDF
RFC 10 - Request for Clarification (Vessel Draft) ANS.pdf PDF
RFC 2 - Request for Clarification (Winch Tech Pub) ANS.pdf PDF
RFC 4 - Request for Clarification (Steering Cooler) ANS.pdf PDF
RFC 6 - Request for Clarification (Winch Cooler) ANS.pdf PDF
RFC 3 - Request for Clarification (Hull Preservation) ANS.pdf PDF
RFC 8 - Request for Clarification (Zincs) ANS.pdf PDF
RFC 5 - Request for Clarification (MCD Cooler Repair) ANS.pdf PDF
RFC 11 - Request for Clarification (Shore Power) ANS.pdf PDF
FOUO C04.01 - Attachment J-1 Statement of Work YT-802 Errata One.pdf PDF
RFC 9 - Request for Clarification (Engine Tech Pubs) ANS.pdf PDF
RFC 1 - Request for Clarification (Hose List) ANS.pdf PDF
FOUO C04.08- Exhibit A - YT-802 CDLRs (Portfolio).pdf PDF
FOUO C04.03 - Attachment J-3 Request for Clarification (RFC).pdf PDF
FOUO C04.0 - N4523A21R1051 YT-802 Solicitation.pdf PDF
FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802.xls XLS spreadsheet
FOUO C04.01 - Attachment J-1 Statement of Work YT-802.pdf PDF
FOUO C04.05 - Attachment J-5 Corporate Experience Data Sheet.pdf PDF
FOUO C04.09 - Exhibit B - YT-802 GFP Attachment 1.pdf PDF
FOUO C04.04 - Attachment J-4 Contract Performance Data Sheet N4523A20R1061.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST:

REQUIREMENT:

ITEM NO: 3.9.2

TITLE: Repair Winch

PARA. NO: 3.9.2.2

PLANNER’S NAME: PAGE NO: 59

ATTACH. NO:

QUESTION NO:

REQUISITION NO.: N4523A21R1051

ISSUING OFFICE POC: Brian Fergus

PHONE: (360) 476-4071

EMAIL: james.fergus@navy.mil

CONTRACTOR:

CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION: Is it the intent of the specification to completely disassemble the sun & planetary gearbox of the winch for inspection?

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: SERIAL NO:

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO

LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.

12/14/20

No. Disassemble of the motor not required either.

RFC 7

File details come from the government source that posted it. Updated .