FOUO C04.03 - Attachment J-3 Request for Clarification (RFC).pdf

PDF 53 KB Posted

Attached to
YT-802 Large Harbor Tug Maintenance Repair and Preservation
Solicitation number
N4523A21R1051
Issued by

About this file

This federal opportunity notice solicits proposals for maintenance, repair, and preservation services for a large harbor tugboat. The Regional Maintenance Center at Puget Sound Naval Shipyard intends to award a firm-fixed-price contract for work on the YT-802, including blasting and preserving the exterior hull and superstructure, conducting inspections and repairs of various systems and components, and accomplishing scheduled maintenance on propulsion and steering equipment. The contractor's facility must be located in the Puget Sound, Washington region to accommodate the tugboat. Proposals are due in February 2021 and award will be made that same month to the responsible contractor offering the lowest price and meeting technical acceptability standards. The solicitation is set aside exclusively for small businesses and contemplates a period of performance from March to June 2021.

View the file

Other files

File Type Posted
FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802 Errata One.xls XLS spreadsheet
FOUO C09.0 - N4523A21R1051 YT-802 Amendment 1 5Jan2021.pdf PDF
RFC 12 - Request for Clarification (QA Plan) ANS.pdf PDF
RFC 10 - Request for Clarification (Vessel Draft) ANS.pdf PDF
RFC 2 - Request for Clarification (Winch Tech Pub) ANS.pdf PDF
RFC 4 - Request for Clarification (Steering Cooler) ANS.pdf PDF
RFC 7 - Request for Clarification (Winch Repair) ANS.pdf PDF
RFC 6 - Request for Clarification (Winch Cooler) ANS.pdf PDF
RFC 3 - Request for Clarification (Hull Preservation) ANS.pdf PDF
RFC 8 - Request for Clarification (Zincs) ANS.pdf PDF
RFC 5 - Request for Clarification (MCD Cooler Repair) ANS.pdf PDF
RFC 11 - Request for Clarification (Shore Power) ANS.pdf PDF
FOUO C04.01 - Attachment J-1 Statement of Work YT-802 Errata One.pdf PDF
RFC 9 - Request for Clarification (Engine Tech Pubs) ANS.pdf PDF
RFC 1 - Request for Clarification (Hose List) ANS.pdf PDF
FOUO C04.08- Exhibit A - YT-802 CDLRs (Portfolio).pdf PDF
FOUO C04.0 - N4523A21R1051 YT-802 Solicitation.pdf PDF
FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802.xls XLS spreadsheet
FOUO C04.01 - Attachment J-1 Statement of Work YT-802.pdf PDF
FOUO C04.05 - Attachment J-5 Corporate Experience Data Sheet.pdf PDF
FOUO C04.09 - Exhibit B - YT-802 GFP Attachment 1.pdf PDF
FOUO C04.04 - Attachment J-4 Contract Performance Data Sheet N4523A20R1061.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST:

REQUIREMENT:

ITEM NO:

TITLE:

PARA. NO: PAGE NO:

PLANNER’S NAME: ATTACH. NO:

QUESTION NO:

REQUISITION NO.: N4523A21R1051

ISSUING OFFICE POC: Brian Fergus

PHONE: (360) 476-4071

EMAIL: james.fergus@navy.mil

CONTRACTOR:

CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION:

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: SERIAL NO:

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO

LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.

File details come from the government source that posted it. Updated .