FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802.xls

XLS spreadsheet 71 KB Posted

Attached to
YT-802 Large Harbor Tug Maintenance Repair and Preservation
Solicitation number
N4523A21R1051
Issued by

About this file

This document contains a federal contract solicitation and related cost breakdown template. The solicitation is for maintenance, repair, and preservation services for YT-802, a 93-foot harbor tugboat, with a period of performance from March 10 to June 15, 2021. Services include blasting and preserving the hull and superstructure, replacing zinc anodes and sea chest grates, tank cleaning and inspection, various mechanical repairs, and sea trials. Offerors must have a ship repair facility in the Puget Sound, Washington region capable of accommodating the tugboat. The government seeks to award a lowest-price, technically acceptable firm-fixed-price contract to a small business on a 100% set-aside basis under NAICS code 336611 in February 2021. The cost breakdown template is to be filled in by offerors to estimate labor hours and material costs for each line item.

View the file

Other files

File Type Posted
FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802 Errata One.xls XLS spreadsheet
FOUO C09.0 - N4523A21R1051 YT-802 Amendment 1 5Jan2021.pdf PDF
RFC 12 - Request for Clarification (QA Plan) ANS.pdf PDF
RFC 10 - Request for Clarification (Vessel Draft) ANS.pdf PDF
RFC 2 - Request for Clarification (Winch Tech Pub) ANS.pdf PDF
RFC 4 - Request for Clarification (Steering Cooler) ANS.pdf PDF
RFC 7 - Request for Clarification (Winch Repair) ANS.pdf PDF
RFC 6 - Request for Clarification (Winch Cooler) ANS.pdf PDF
RFC 3 - Request for Clarification (Hull Preservation) ANS.pdf PDF
RFC 8 - Request for Clarification (Zincs) ANS.pdf PDF
RFC 5 - Request for Clarification (MCD Cooler Repair) ANS.pdf PDF
RFC 11 - Request for Clarification (Shore Power) ANS.pdf PDF
FOUO C04.01 - Attachment J-1 Statement of Work YT-802 Errata One.pdf PDF
RFC 9 - Request for Clarification (Engine Tech Pubs) ANS.pdf PDF
RFC 1 - Request for Clarification (Hose List) ANS.pdf PDF
FOUO C04.08- Exhibit A - YT-802 CDLRs (Portfolio).pdf PDF
FOUO C04.03 - Attachment J-3 Request for Clarification (RFC).pdf PDF
FOUO C04.0 - N4523A21R1051 YT-802 Solicitation.pdf PDF
FOUO C04.01 - Attachment J-1 Statement of Work YT-802.pdf PDF
FOUO C04.05 - Attachment J-5 Corporate Experience Data Sheet.pdf PDF
FOUO C04.09 - Exhibit B - YT-802 GFP Attachment 1.pdf PDF
FOUO C04.04 - Attachment J-4 Contract Performance Data Sheet N4523A20R1061.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YT-802

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YT-802 VALIENTDATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.16Maintain Preservation OQE Records$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/Hazwaste management$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00
1.23Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
1.24Compartment Arrival/Closeout Inspections$0.00$0.00$0.00$0.00$0.00
1.25PCP Procedure Requirements$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & Equipment$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Stability Calculation$0.00$0.00$0.00$0.00$0.00
3.1.7Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.8Dock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.9Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.10Shifting the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Undocking the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.13Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1I.D. Distuinguished Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting & Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboard UT Inspection$0.00$0.00$0.00$0.00$0.00
3.2.7Skeg Repair$0.00$0.00$0.00$0.00$0.00
3.3.1Bulwark Gunnel Door Repair$0.00$0.00$0.00$0.00$0.00
3.3.2Fender Anchor System Repair$0.00$0.00$0.00$0.00$0.00
3.3.3Main Deck Locker Vent Install$0.00$0.00$0.00$0.00$0.00
3.3.4Install Grabrails$0.00$0.00$0.00$0.00$0.00
3.3.5Port Side Vertical Rubber Fender Repair$0.00$0.00$0.00$0.00$0.00
3.3.6AFT "D" Rubber Chine Straps$0.00$0.00$0.00$0.00$0.00
3.3.7Fire Monitor Safety Chains$0.00$0.00$0.00$0.00$0.00
3.3.8Brow Walkway Entrance Safety Chain$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Ventilate, and Gas Free$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify Color Scemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void touch Up Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Clean, Flush and Disenfection of Potable Water System$0.00$0.00$0.00$0.00$0.00
3.4.7Certification of Potable Water Piping and Tank$0.00$0.00$0.00$0.00$0.00
3.4.8Blast and Preserve Void Access Covers$0.00$0.00$0.00$0.00$0.00
3.4.9Final Air test$0.00$0.00$0.00$0.00$0.00
3.4.10Tank/Void closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.4.11On-Load Fuel$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-Skid Repair$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00
3.5.3Ultrasonic Test (UT) Inspection$0.00$0.00$0.00$0.00$0.00
3.6.1Wheelhouse Deck and Pilothouse Roof Non-skid Repairs$0.00$0.00$0.00$0.00$0.00
3.6.2Engine Room Air Intake Fan Room Preservation$0.00$0.00$0.00$0.00$0.00
3.6.3Handrails Repair$0.00$0.00$0.00$0.00$0.00
3.6.4Stack Tip Modification$0.00$0.00$0.00$0.00$0.00
3.6.5Repair Galley Seating$0.00$0.00$0.00$0.00$0.00
3.6.6Brow Hydraulic Hoses Repair$0.00$0.00$0.00$0.00$0.00
3.6.7Mast Lines and Pulleys Repair$0.00$0.00$0.00$0.00$0.00
3.6.8Portholes Repair$0.00$0.00$0.00$0.00$0.00
3.6.9Deck House Expansion Joint$0.00$0.00$0.00$0.00$0.00
3.7.1Schottel Z-Drive Repair$0.00$0.00$0.00$0.00$0.00
3.7.2Power Transmission Repair$0.00$0.00$0.00$0.00$0.00
3.7.3Hydraulic Systems Repair$0.00$0.00$0.00$0.00$0.00
3.7.4Propeller Repair$0.00$0.00$0.00$0.00$0.00
3.7.5Engine Repair$0.00$0.00$0.00$0.00$0.00
3.7.6Install Marine Control Device Transmission Tank$0.00$0.00$0.00$0.00$0.00
3.7.7MCD Schottel Steering Drive Pump Repair$0.00$0.00$0.00$0.00$0.00
3.9.1Repair Engine Room Vent Silencers$0.00$0.00$0.00$0.00$0.00
3.9.2Repair Winch$0.00$0.00$0.00$0.00$0.00
3.9.3Winch Modification$0.00$0.00$0.00$0.00$0.00
3.10.1Schottel Z-Drive Repair$0.00$0.00$0.00$0.00$0.00
3.10.2SSDG Crankshaft Vibration Damper$0.00$0.00$0.00$0.00$0.00
3.10.3Schottel Control Repair$0.00$0.00$0.00$0.00$0.00
3.11.1.23 Inch and Small Valve Repair$0.00$0.00$0.00$0.00$0.00
3.11.1.3Larger than 3 inch Valve Repair$0.00$0.00$0.00$0.00$0.00
3.11.2Schottel Port Steering Piping Repair$0.00$0.00$0.00$0.00$0.00
3.11.3Steering Cooler Repair$0.00$0.00$0.00$0.00$0.00
3.11.4MCD Cooler Repair$0.00$0.00$0.00$0.00$0.00
3.11.6Winch Hydraulic Storage Tank Piping Repair$0.00$0.00$0.00$0.00$0.00
3.11.7Sea Strainer Repairs$0.00$0.00$0.00$0.00$0.00
3.11.8Mast Hydraulic Hose Repair$0.00$0.00$0.00$0.00$0.00
3.13.2Sea Trial Baseline Testing$0.00$0.00$0.00$0.00$0.00
3.13.4Final Sea Trial$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:
Total Bid:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

File details come from the government source that posted it. Updated .