FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802 Errata One.xls
XLS spreadsheet 76 KB Posted
- Solicitation number
- N4523A21R1051
About this file
This document contains a federal solicitation for maintenance, repair, and preservation services for a large harbor tugboat. The solicitation seeks a firm-fixed price contract to accomplish work on the YT-802, including blasting and preserving the hull, conducting inspections, repairing various systems and components, and undertaking sea trials. The period of performance is from March 10, 2021 to June 15, 2021. The solicitation anticipates awarding to the responsible contractor on a lowest price technically acceptable basis and is contemplating a 100% small business set-aside under NAICS code 336611. Offerors must be registered in the System for Award Management and have a ship repair facility located in the Puget Sound region of Washington state. The deadline to request reference drawings is December 16, 2020 and site visits to the vessel are scheduled for December 9, 2020.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
YT-802
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | YT-802 VALIENT | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | CFR | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.13 | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16 | Maintain Preservation OQE Records | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Enviromental/Hazwaste management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.22 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.23 | Develop & Maintain Test Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.24 | Compartment Arrival/Closeout Inspections | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.25 | PCP Procedure Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.1 | Personnel & Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.4 | Crib and Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.5 | Setting and Aligning Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.6 | Stability Calculation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.7 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.8 | Dock the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.9 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.10 | Shifting the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.11 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.1.13 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.1 | I.D. Distuinguished Figures & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.2 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.4 | Hull Blasting & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.6 | Hull and Freeboard UT Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.2.7 | Skeg Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 | Bulwark Gunnel Door Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.2 | Fender Anchor System Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.3 | Main Deck Locker Vent Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.4 | Install Grabrails | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.5 | Port Side Vertical Rubber Fender Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.6 | AFT "D" Rubber Chine Straps | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.7 | Fire Monitor Safety Chains | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.8 | Brow Walkway Entrance Safety Chain | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.1 | Open, Pump, Clean, Ventilate, and Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.2 | Tank/Void visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.3 | Identify Color Scemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.4 | Preliminary Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.5 | Tank/Void touch Up Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.6 | Clean, Flush and Disenfection of Potable Water System | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.7 | Certification of Potable Water Piping and Tank | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.8 | Blast and Preserve Void Access Covers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.9 | Final Air test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.10 | Tank/Void closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.4.11 | On-Load Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.1 | Main Deck Non-Skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.2 | Visual Inspection for Structural Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.5.3 | Ultrasonic Test (UT) Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.1 | Wheelhouse Deck and Pilothouse Roof Non-skid Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.2 | Engine Room Air Intake Fan Room Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.3 | Handrails Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.4 | Stack Tip Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.5 | Repair Galley Seating | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.6 | Brow Hydraulic Hoses Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.7 | Mast Lines and Pulleys Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.8 | Portholes Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.6.9 | Deck House Expansion Joint | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.1 | Schottel Z-Drive Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.2 | Power Transmission Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.3 | Hydraulic Systems Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.4 | Propeller Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.5 | Engine Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.6 | Install Marine Control Device Transmission Tank | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.7.7 | MCD Schottel Steering Drive Pump Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.1 | Repair Engine Room Vent Silencers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.2 | Repair Winch | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.9.3 | Winch Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.1 | Schottel Z-Drive Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.2 | SSDG Crankshaft Vibration Damper | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.3 | Schottel Control Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.1.2 | 3 Inch and Small Valve Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.1.3 | Larger than 3 inch Valve Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.2 | Schottel Port Steering Piping Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.3 | Steering Cooler Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.4 | MCD Cooler Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.5 | Winch Cooler Repair Errata One | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.6 | Winch Hydraulic Storage Tank Piping Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.7 | Sea Strainer Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.11.8 | Mast Hydraulic Hose Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.13.2 | Sea Trial Baseline Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.13.4 | Final Sea Trial | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | ||||||||
| Total Bid: | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.