RFC 3 - Request for Clarification (Hull Preservation) ANS.pdf

PDF 165 KB Posted

Attached to
YT-802 Large Harbor Tug Maintenance Repair and Preservation
Solicitation number
N4523A21R1051
Issued by

About this file

This document contains a federal contract opportunity solicitation for maintenance, repair, and preservation services for a large harbor tug boat. The Navy seeks a firm-fixed-price contract to accomplish scope of work on its YT-802 tug boat, including blasting and preserving the hull, installing fenders and anodes, conducting inspections, repairing various systems, and performing maintenance on propulsion units. The contractor's facility must be located in the Puget Sound, Washington region and be able to accommodate a 93-foot vessel drafting 12 feet. The performance period is from March 10 to June 15, 2021. The solicitation is set aside for small businesses under NAICS code 336611. The Navy will award the contract in February 2021 on a lowest-price technically acceptable basis to a responsible contractor.

View the file

Other files

File Type Posted
FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802 Errata One.xls XLS spreadsheet
FOUO C09.0 - N4523A21R1051 YT-802 Amendment 1 5Jan2021.pdf PDF
RFC 12 - Request for Clarification (QA Plan) ANS.pdf PDF
RFC 10 - Request for Clarification (Vessel Draft) ANS.pdf PDF
RFC 2 - Request for Clarification (Winch Tech Pub) ANS.pdf PDF
RFC 4 - Request for Clarification (Steering Cooler) ANS.pdf PDF
RFC 7 - Request for Clarification (Winch Repair) ANS.pdf PDF
RFC 6 - Request for Clarification (Winch Cooler) ANS.pdf PDF
RFC 8 - Request for Clarification (Zincs) ANS.pdf PDF
RFC 5 - Request for Clarification (MCD Cooler Repair) ANS.pdf PDF
RFC 11 - Request for Clarification (Shore Power) ANS.pdf PDF
FOUO C04.01 - Attachment J-1 Statement of Work YT-802 Errata One.pdf PDF
RFC 9 - Request for Clarification (Engine Tech Pubs) ANS.pdf PDF
RFC 1 - Request for Clarification (Hose List) ANS.pdf PDF
FOUO C04.08- Exhibit A - YT-802 CDLRs (Portfolio).pdf PDF
FOUO C04.03 - Attachment J-3 Request for Clarification (RFC).pdf PDF
FOUO C04.0 - N4523A21R1051 YT-802 Solicitation.pdf PDF
FOUO C04.02 - Attachment J-2 5-Way Breakdown - YT-802.xls XLS spreadsheet
FOUO C04.01 - Attachment J-1 Statement of Work YT-802.pdf PDF
FOUO C04.05 - Attachment J-5 Corporate Experience Data Sheet.pdf PDF
FOUO C04.09 - Exhibit B - YT-802 GFP Attachment 1.pdf PDF
FOUO C04.04 - Attachment J-4 Contract Performance Data Sheet N4523A20R1061.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST:

REQUIREMENT:

ITEM NO: 3.2.4

TITLE: Hull Blasting and Preservation

PARA. NO: 3.2.4.1

PLANNER’S NAME:

PAGE NO: 35

ATTACH. NO:

QUESTION NO:

REQUISITION NO.: N4523A21R1051

ISSUING OFFICE POC: Brian Fergus

PHONE: (360) 476-4071

EMAIL: james.fergus@navy.mil

CONTRACTOR:

CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION: The specification in 3.2.4.1 states to blast the "entire" underwater body. The hull has "D" rubber fendering installed. There is not a specific reference in the item to remove and replace the fendering to accomplish the work scope. Is the fendering intended to be left in place, or removed as an interference as referenced in 1.12? Please clarify the intent of the specification.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: SERIAL NO:

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO

LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.

12/14/20

Please refer 3.2.2

RFC 3