PPI Attachment.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
Solicitation number
n44255
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This amendment to a federal solicitation provides additional small business forms to be used in responding to the opportunity. The project involves constructing a general purpose berthing pier and trestle with controlled access, as well as a vessel maintenance facility with parking and a fuel distribution and storage system. These facilities will support the Maritime Force Protection Unit at Naval Base Kitsap Bangor in providing security escort for submarines transiting to and from their homeport and test ranges. Responses are due by the date specified in the solicitation. The Department of the Navy, Naval Facilities Engineering Command is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0010 -Use the applicable Small Business Forms attached, newest first.
File Type Posted
VMF Site 1 from Sturgeon St.jpg JPG image
KB Spit 1 - Pier Location.jpg JPG image
MW101 Rev 1.pdf PDF
EW111 Rev 2.pdf PDF
EB131 Rev 1.pdf PDF
22 13 29 Rev.pdf PDF
08 41 13 Rev.pdf PDF
EW404 Rev 3.pdf PDF
Attachment K.docx DOCX document
01 32 17.00 20 Rev.pdf PDF
Sealion Road.jpg JPG image
VMF SIte 3 from Sturgeon St.jpg JPG image
VMF Site 2 from Sturgeon St.jpg JPG image
106 Rev 1.pdf PDF
EW122 Rev 1.pdf PDF
EB606 Rev 1.pdf PDF
MW412 Rev 1.pdf PDF
EW613 Rev 2.pdf PDF
SW521 Rev 2.pdf PDF
09 90 00 Rev.pdf PDF
33 52 11 Rev.pdf PDF
Amendment 0007.pdf PDF
Revised_Sections 00100 and 00800.pdf PDF
P907 TPS Geotech Report_0006.pdf PDF
P907 TPS UST Site Assess Report_0006.pdf PDF
PPIs Continued.pdf PDF
P907_Amend0006_Specs.pdf PDF
P907_Amend0006_Drawings.pdf PDF
EW404 Rev 1.pdf PDF
EW602 Rev 1.pdf PDF
EW611 Rev 1.pdf PDF
AB104 Rev1.pdf PDF
SW526 Rev 1.pdf PDF
EW612 Rev 1.pdf PDF
31 62 16.19.pdf PDF
SW601 Rev 1.pdf PDF
AB101 Rev 1.pdf PDF
EW601 Rev 1.pdf PDF
AB502 Rev 1.pdf PDF
CW161 Rev 1.pdf PDF
EW602 Rev 2.pdf PDF
Amendment 0004.pdf PDF
SF30 Continuation rev.pdf PDF
SITES WALK.pdf PDF
Amendment 0002 SF30.pdf PDF
Amend_1_Page_2.pdf PDF
Amendment 0001.docx DOCX document
RFP Attachment K_EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment J.pdf PDF
Sections A-L forms.pdf PDF
Show all 50

Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PPIs 004 PPI – Insulated Wall Panels with Standing Seam at Maintenance Facility… Section 13 34 19 calls out for a “Foam Insulation Core Wall Panel for the Maintenance Building, but Wall Section A4 on Sheet AB501 references the use of an insulated wall panel with a standing seam. No information is provided which identifies the wall panel thickness, gauge metal thickness and R-value.

Standing seam are typically used on metal roof panels and parapet caps, but do not intended for use on

vertical exterior wall surfaces. Please clarify design intent.83Since the VMF is Pre-Engineered Metal Building, the building envelope is performance specified. Please refer to Building Envelope Requirements on AB101 for U-values. The gauge will be per PEMB manufacturer. The intent of the insulated panels with a standing seam is to have the profile of the roof and walls match and align with a modern appearance. While it is unconventional to use standing seam in vertical applications it is not entirely uncommon. For bidding purposes, assume standing seam; however, feasible will vary depending on PEMB manufacturer. Substiutions will be considered after construction award during the submittal process. The detail referenced is an atypical location which occurs in the multipurpose area.
067The piping from the seawall to the dispensers is called out as DW piping on Sheet MW112, note 4.

But in section 33 52 10 2.4.1, of the specs, the piping is called out as single-wall stainless-steel.

Please advise.138See revised sheets MW112 and MW611, See amendmnet #008.
074If all above ground 2" pipe is to be welded stainless-steel, is expansion loop required as requested on
Sheet MW112, Note 8?145See revised sheets MW112 and MW611, See amendmnet #008.
075If all above ground 2" pipe is to be welded stainless-steel, is expansion loop required as requested on
Sheet MW112, Note 8?146See revised sheets MW112 and MW611, See amendmnet #008.
086How are the electrical conduits supported on drawing EW404157Provide supports beneath pier and trestle to properly support new conduits per Specification 26 27 29 3.1.6.1 .
087How are the electrical conduits supported on drawing EW404158Provide supports beneath pier and trestle to properly support new conduits per Specification 26 27 29 3.1.6.1 .
011These questions pertain to the Hazardous Materials Storage Building

Please provide the electrical requirements for the Hazardous Materials Storage Building listed in Section 13 34 20 / # 2.2. No electrical requirements were included in the specification.

Drawing AB101 shows separate storage bays needed, but the building electrical requirements and alarms typically required for the storage requirements are not included in the specification.

Also, on Drawing AB101 the 4 bay chemical storage building will need to be moved out further from the larger building wall, because of the clearance needed for the electrical gear installed on back wall to support the separate bay storage.

Also on Drawing AB101, we recommend that Hazardous Material Storage 119 be quoted as a separate 4 hour fire-rated chemical storage building that will be installed outside next to the larger building with door access directly into the chemical storage building installed on the outside of the larger structure.

The types of chemicals to be stored in the Hazardous Material Storage Building are not specified.1601. See revised Specification Section 13 34 20 for added lighting and electrical requirements. 2. Power connection added to revised sheet EB111, EB605 and EB608 send in amendment #006. Light fixtures originally shown on plans are deleted in revised Sheets EB121 and EB606. 3. Electrical junction box connection point shall be located on top or side to allow access. See revised Specification Section 13 34 20. Clarification: terminology in specification intended for the prefabricated storage building (rooms X115-118) rather than room 119. See amendment #008 for revised specification 13 34 20 and revised sheets EB121 and EB606.
054RFP Drawings - Vol 2 (VMF)

Sheets: CS101, CS102, CS103, CS501

1. Please provide reinforcing details and cut section connection to main building for key note 28 of CS101 and CS102.

2. Please provide cut section connection to main building for concrete pads and stoops for key note 22 of CS103.

2. Please provide reinforcing details for CS501.170See revised CS102, CS103 and CS501 provided with responses to PPI#57 and PPI#59 in amendment #006. See revised sheet CS101 in amendment #008.
063Reference: EHSI Limited Hazardous Materials Survey Report
EHSI Limited Hazardous Materials Survey Report - Table 3 identifies Electrical Cabinet 7690 as containing hazardous metals. Please confirm if Electrical Cabinet 7690 will have any modifications in the contract. Please provide pictures of Electrical Cabinet 7690 in relation to existing Comm Vault V-01. Please confirm that building labeled B7176 on drawing SL-2 of the report should be B7136.179Specification Section 02 83 00, Hazardous Metals Remediation, removed in its entirety.
064Please provide “Underground Storage Tank Pre-Decommissioning Environmental Services, P-907 Fuel Facility and Vessel Maintenance Facility” document as described in Section 02 65 00.180Report provided in Amendment #006.
017Is the main entry (door #001-1) aluminum storefront or insulated/hollow metal/steel? Door schedule calls

out steel, hardware schedule mentions “HW-1” for “Exterior Aluminum Entry” but there is no aluminum storefront/entry spec. The answer here may also impact blast ratings.

GOVERNMENT RESPONSE:

GOVERNMENT RESPONDER’S184See PPI #135 response.
112Regarding the buried “4” (& 6”) Sanitary Sewer Underground”, running between the Trestle Vault on Sheet MW101 and the Underground Storage Tank on Sheet MW401, is this line Single Wall PVC Pressure Pipe or the Double-Walled Contained Pipe System?209See revised sheets MW402 and MW601, see amendment #008.
119Specification Section 31 00 00 Earthwork, 1.6 G states: “Bids for excavation of unsatisfactory or unsuitable material during grubbing shall be based on removing an average of 8 inches of such material at all locations where existing unpaved surface is disturbed.” However, Volume 2, VMF borings GEI-9 & 10 indicate about 2.5 feet of forest duff and organic matter (topsoil). Please confirm bids are to be based on 8” of stripping, despite the depths Indicated on VMF borings.216VMF: The test pits (which showed 6-inch duff per the Geotechnical Report) are typically more accurate than the borings, so the 8-inch average as specified in Section 31 00 00, 1.6G should be used for bidding purposes. The 8-inch depth allows for some variation in duff and/or extra depth at root ball locations.
065Section 01 57 19 01 3.1.10.4 states “Contractor-generated dangerous or industrial waste

must be disposed of by the Government at the Contractor’s expense”. It is expected that contractors will create some industrial waste (oil, lubricants, excess coatings, etc…) during the execution of the work. Please provide pricing information for this disposal so that the contractors can include this cost their offers, or confirm that contractors can be responsible

for disposing of their own industrial waste225Government charges a disposal fee of $7.46 per pound.
020Do the existing tanks that are to be decommissioned have full size hold-down slabs as opposed to deadmen? This will affect drilling for under tank soil samples.255Existing Drawings do not indicate.
025Division 09 29 00 – Does the insulated core panel ceiling and roof at Room 114 need to meet a One-Hour Fire
Rating?267Room 114, secure materials parts storage and issue, has no ceiling but is open to structure above, the roof structure is not a rated assembly.
077Reference: Plan Sheets EB602, EB502

Please provide sizes, quantity, and type of cables from F412 VMFJC to VMFMVT and F410 VMFJC to VMFMVT.

EB502 shows Padmount Transformer Pad Detail. Please provide Padmount Terminating Cabinet Pad Detail.

Section 01 57 19 01 3.1.10.4 states “Contractor-generated dangerous or industrial waste must be disposed of by the Government at the Contractor’s expense”. It is expected that contractors will create some industrial waste (oil, lubricants, excess coatings, etc…) during the execution of the work. Please provide pricing information for this disposal so that the contractors can include this cost their offers, or confirm that contractors can be responsible for disposing of their own industrial waste.

Background: SF1442 Box 11 states: “The Contractor shall begin performance within 15 calendar days and complete it within 785 calendar days after receiving award.” Section 52.211-10 on page 74 of the RFP states: “The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 785 days.”

Question 1: Is the Contractor expected to complete the work within 785 days after Award per the SF1442 or within 785 days after Notice to Proceed per Section 52.211-10?

Question 2: Please indicate how many days you expect between Award and Notice to Proceed?

RFP Section: SF 1442 Page #: 1 Paragraph: Block 13 Question: Please identify what time the proposal is due on Sept 10.

SF 1442

Block 13 Question: Please identify what time the proposal is due on Sept 10.

RFP Section: Section 00100 and Attachment E Page #: page 12 of RFP, Factor 4 – Safety and Attachment E Paragraph: (i) and Attachment E Question: The RFP asks that “the follow data shall be completed on or attached to the worksheet”. It also states the “technical approach to safety narrative shall be limited to one

(1) double sided page or two (2) single sided pages. However, Attachment E, Block 9 reads “provide the safety narrative using this form” and also states we should “not exceed page limitation specified in the RFP” Our questions are:

1)Please confirm you will accept the safety narrative as an attachment to Attachment E.

2)If you require the safety narrative in Attachment E (rather than as an attachment in support of the worksheet), please revise Attachment E to 2 pages.

Specification 01 57 19 1.7.8 States "List what notifications and permit applications270See response to PPI#269.
027Sheet SB 106, General note 6 directs us to detail B1/SB502 for additional information regarding the channel strut

drop supports and lateral channel strut bracing. Be advised there is no Sheet SB 502. Our assumption is that B1/SB 502 should read B1/SB 503. Please confirm.

On sheet SB 503 there are two details that apply to the drop supports and the lateral channel strut bracing; C4 and B1. Both of those details provide specific maximum lengths for elements of the vertical hanger rods and stiffeners. Neither reflect the actual distance from the channel support ceiling grid at 16 ft. ABF to the underside of the MBM support steel, some 15’ +/- higher up. Please review the referenced details and provide further information as it pertains to the actual needed length of the hanger rod and stiffeners drop supports and seismic bracing.

275The note should reference SB503, as stated in the question. The 18" dimension provided in the detail references the spacing between channel nuts, as required to stiffen the hanger, not the overall length of the hangers. The detail has been updated to clarify and the detail reference has been updated on SB106 as well. See revised sheet SB106, see amendment #008.
147Amendment 0004 references revised drawings SB104 & SB105 that do not appear to have been included. Please provided these updated plan sheets297SB105 was revised in Amendment #006, SB104 not revised.
030Amendment #4, Section 01 14 00, 1.2 Special Scheduling Requirements, Paragraph e.

e. Fuel facility must be completed and operational before decommissioning existing fuel tanks at Service Pier. All fuel facility construction activities shall only occur between 1 September and 1 January.

This paragraph requires further clarification. Does the construction period for “Fuel Facility Construction” between 1 September and 1 January include the following:

Excavation and placement of new fueling UST’s?

Installation of new UST accessories?

Installation of new fueling shed and piping within?

Excavation and placement of new containment fuel lines from the UST location to KB dock?

Piping systems on KB dock?

If so, be advised that this instruction as written places a severe constraint on the schedule and requires that these excavations and installations happen in the wet months further complicating and slowing the fueling facility scope of work. In addition costs associated with excavating in the wet months will cost more. Providing erosion control measures and BMP maintenance will include the use of Baker tanks and pumping systems to handle the water

runoff.302Conform to specification 01 14 00.
031In section 31 62 16.19, paragraph 3.4.1 describes how to drive the pier, trestle, fender, and camel piles but they did
not address the mooring dolphin piles. Will the dolphin piles be driven with vibratory method only?303See revised specification 31 62 16 19, see amendment #008.
032Maintenance Facility Drawings SB102, C1/SB301 & A1, A2, A3, A4 /AB501

The structure drawings show the slab on grade extended to the exterior perimeter of the building and the insulated panels installed directly over the slab on grade. This is in conflict with the details in the architectural drawings, which show a perimeter rigid insulation between the slab on grade and a concrete wall, and the insulated panels

are installed over the concrete walls; please confirm the architectural details are not applicable.304See response to PPI#182.
033Diesel Fuel Tanks:

1. Drawings MW511 (Item “Y”) and MW611 show contained fill/spill containment (dry connection fill port).

These do no harm, but are not required by code in WA. It is typical to direct bury replaceable spill

containment units in the tank pad. Please confirm that these are required.305Provide components described by items V & Y on sheet MW511.
034Fuel Tanks:

1. Drawing MW611 does not indicate transition sumps where the fuel piping transitions from underground to aboveground (on the filtration side). Transition sumps are recommended. They provide a monitored, accessible space for the underground fusible piping to transition to Sch. 40 aboveground piping. Should

transition sumps be included?306Keynote #9 on sheet MW611 calls for connecting the underground DW pipe to the abovegound SW pipe at 6" above the Utility Enclosure's floor. There is a 12" high containment basin to contain fuel spillage in this location, as well as a fuel leak detection sensor (keynote #13). No additional sump is required.
035Fuel Tanks:

The Schedule on Drawing MW613 indicates a 6” pump for DFP-1, and DFP-2. The specified pump is a 4” pump with

a 2” output. Please clarify the specified features.307See revised sheet MW613, see amendment #008.
081Reference: Specification Section 28 31 73.00 20, Plan Sheet FW101.

Specification section 28 31 73.00 20 2.1 calls for connection of masterbox manual stations that are compatible with the existing fire alarm reporting system. Plan sheet FW101 does not show a riser diagram for the fire alarm system. Please provide the following:

1. Manufacturer and frequency of existing fire alarm system.

2. Fire alarm riser diagram.

3. Fire alarm system input/output matrix.

3101. Existing masterbox manual stations at NBK Bangor are Gamewell Three-Fold Master Fire Alarm Boxes, model M34-56, local energy type. Each box transmits a single code via a mechanically wound telegraph mechanism over copper wire. There is no radio frequency or external power source involved. 2. Masterbox riser and wiring details are found on Sheet EW504, details C1 and C4. 3. There are no input or output devices attached to the masterboxes, therefore an input/output matrix is not applicable.
082RFP Drawings - Vol 2 (VMF)

RFP P907 Final Specification Questions:

Spec section 41 22 13, part 2.4.5.1: Breaks mentions an operator’s cab, along with electric-hydraulic bridge and trolley breaks. However, there are no other details on a crane cab in the specifications or the drawings. If a cab is required to be mounted on the the crane, the structure will also need to be adjusted to support the additional weight. Please clarify if the bridge crane is required to have a cab or not, since having remote or pendant controls is the standard for a 2 ton crane system.311Cab is not required on the crane.
085Reference Section 01 14 00 (1.2e)
Please provide the limits for the "fuel facility construction activities" restricted to only be performed between 1 September and 1 January. Does this include the work West of Sea Lion Road, under Sea Lion Road, or on the existing dock? Also, is this limited only to construction work, or does it include activities such as commissioning?314See specification 01 14 00 in amendment #006. Restrictiion applies to all work (cosntruction and commissioning).
086Reference Section 01 14 00 (1.2a, 1.2f, 1.3.4), ESA Requirements Part 2 (2.1)
The pile driving and in-water work exclusionary periods are inconsistent between the above sections. Please confirm the in-water work and pile driving restrictions are the same and whether they start July 22 or 23.315See specification 01 14 00 in amendment #006.
087Reference Section 01 32 17.00 20

Section 1.10.2.8 Anticipated Weather Lost Work Days was replaced with a modified version of 1.10.2.9 Anticipated Restricted Delays. 1.10.2.9 Anticipated Restricted Delays is still as is.

Please confirm whether the previous Anticipated Weather Lost Work Days are still expected to be used or if the contractor is responsible for adding weather days at their discretion. Also, please confirm if the lost days for in-water work due to the presence of marine

mammals and/or marbled murrelets applies to July and January or if those may be prorated to one day per month.316See specification 01 32 17.00 20 in amendment #006.
089Question: Please provide copies of any Environmental Documents required for this solicitation, or please confirm the only requirements to be performed are provided in the contract documents currently provided as of Amendment 4 for this solicitation.318Conform to specifications as stated
090Reference: Plan Sheet EW613

1. Grounding Diagram A1 shows Sheet Keynote 3. Please provide description for Sheet Keynote 3.

2. Please provide Vault/Manhole names on grounding diagram.319See revised sheet EW613, see amendment #008.
091Reference: Specification Section 26 11 13.00 20 Primary Unit Substation

Plan Sheets EW602, EW605 Specification section 26 11 13.00 20 2.2.1 references provision of 38kv and 15kv switchgear and specification section 26 11 13.00 20 2.2.1.10 calls for provision of ventilation ducts through walls to the 15kv and 38kv switchgear areas.

Plan sheets EW602 and EW605 show 15kv switchgear and 15kv feeders but do not show 38kv. Please clarify if there will be 38kv switchgear.320There is no 38kV on this project. See revised Specification Section 26 11 13.00 20. See amendment #008.
092Reference: Plan Sheet EW122

1. Please provide luminaire mounting details for Sheet Keynote 1 (Face of Pier).

2 .Please confirm quantity of FL-1 luminaires to be mounted on pole is three or four. Sheet Keynote 2 calls for three, plan sheet shows four.

3. Please confirm if Sheet Keynote 5 quantity of switches is three or four. (Sheet Keynote 1/EW121 also calls for four switches)321Luminaire shall be securely mounted to the face of the pier. There shall be four FL-1 luminaires. There shall be four switches. See revised Sheet EW122. See amendment #008.
093Reference: Specification Section 26 11 13.00 20 Primary Unit Substation

Plan Sheets EW602, EW605 Specification section 26 11 13.00 20 2.2.1 references provision of 38kv and 15kv switchgear and specification section 26 11 13.00 20 2.2.1.10 calls for provision of ventilation ducts through walls to the 15kv and 38kv switchgear areas.

Plan sheets EW602 and EW605 show 15kv switchgear and 15kv feeders but do not show 38kv. Please clarify if there will be 38kv switchgear.322See response to PPI#320.
002Sent this via email on 9/11/2020324Fuel Tanks.

1. Repeat of PPI 304.

2. No exceptions tanke to single wall sumps.

3.Question 3 about Fuel Tanks diesel vapor detection is unclear, and therefore, cannot be answered.

4. Repeat of PPI 306.

5.Repeat of PPI 307.

6. Vehicle Identification Link (VIL) is generic. See Section 33 57 00 - 2.6.

7. Yes, as indicated in Spec Section 33 57 00 - 2.6 Oily Waste Tank 1 & 2. For revisions to OWS-1, see attached revised drawings MW401, MW601, and MW602, and revised specifications Section 33 56 10, See amendment #008.

001Conduit label T61 is used on the Pier Plan view drawings but is not reflected on the conduit and cable schedule can you provide the reflected on the conduit and cable schedule?325See response to PPI#069.
002While vault P-01 is not on the vault schedule it is reflected on drawing EW111 accompanied by a note 7 which directs to provide a 6’X6’X6’ manhole which is an inconsistent size based on detail A1/EW502326Vault shall be 6'x6'x6' as indicated in Sheet Keynote 7. Detail A1/EW502 indicates size, unless noted otherwise (UON).
038Regarding Specification Section 02 82 00 – Hazardous Metals Remediation, there is no description in either the specification or the plan set outlining the work to be performed. In addition, no “Good Faith Survey” was included in the project documents that would offer insight into the aforementioned remediation work. Please provide a survey, and/or documentation describing this work.327Specification Section, 02 83 00, Hazardous Metals Remediation, removed in its entirety.
156Specification 03 45 33, paragraph 3.2 discusses that prestressed members shall be 28 days of age before being rigidly fixed in position. This requirement adds unnecessary burden on the project schedule. It is requested that precast components may be set upon reaching the required 28 day strength, which is the industry standard.332Precast elements may be set in place upon reaching specified strength. The 28 day aging requirement is only for rigidly fixing the element in place (casting closure pours) and is required to avoid cracking due to concrete creep.
157Sheet SW521, detail A1 specifies haunched deck details, with a fixed length for the full depth haunch at 9”. This will result in significant cost increases associated with forming for Haunched Decks with minor adjustments in total length. It is requested that the 9” fixed dimension is revised to accommodate variable lengths from 4” to 1’’-4”. This change will allow minor adjustments in length to be made in the full depth haunch, rather than the midspan which would require additional, custom formwork.
333See revised drawing sheet SW521, see amendment #008.
158According to Spec. Section 05 50 13 Page 5, there are five items that are required to be galvanized and painted per 09 90 00. Are any of these items required to be painted per 09 97 13.26?334No. These items shall be galvanized and painted in accordance with 09 90 00 section 3.11.1B.
160Amendment 4, Specification Section 01 14 00, 1.2e states: Fuel facility must be completed and operational before decommissioning existing fuel tanks at Service Pier. All fuel facility construction activities shall only occur between 1 September and 1 January. Please confirm the calendar restrictions only apply to the decommissioning at the Service Pier Tanks and not the Uplands Fueling area & KB Docks? Or please indicate more specifically the limits of "all " the fueling facility work to which the 1 Sept to 1 January restriction applies (e.g. does this time restriction apply to the earthwork, grading, new USTs at the new upland site?).336See specification 01 14 00 in amendment #006. Areas have been updated. Restrictions apply to All work as stated (earthwork, grading, new UST's, etc.)
161Specification Section 02 83 00 Hazardous Metals Remediation, 1.3 states: “Construction activities impacting HMCP/HMCM which are covered by this specification include the demolition or removal of material containing RCRA 8 metals in good condition, located on electrical cabinets adjacent to building No. 7690 (B7690)…”. Additionally, the EHSI Limited Hazardous Materials Survey Report’s Table 3 indicates the presence of Hazardous Metals Containing Paint and Materials at the “Electrical Cabinet 7690 – Exterior”. However, B7690 appears to be a substation near the radar station, and there is no electrical work in the P-907 contract associated with B7690. Yet, EHSI’s Sheet SL-2 indicates sample HM01 was collected at B7136, near V-01, “Existing Comm Vault”. Although details regarding V-01 are not provided on the Electrical Schedule on EW627, vaults are typically buried concrete structures and receive conduit from buried duct bank. Additionally, there is no work shown on the electrical drawings related to an existing Metal Electrical Cabinet in the vicinity of Vaull V-01. Please clarify, is it the intention of this specification to require an extensive Hazardous Metals Compliance Program for stubbing conduits into an existing vault? If no, please further define scope. If yes, do the same HMCP/HMCM requirements apply to V-09, “Existing Comm Vault”, as shown on plan sheet EW101?
337Specification Section, 02 83 00, Hazardous Metals Remediation, removed in its entirety.
162Specification Section 02 83 00 Hazardous Metals Remediation describes extensive remediation requirements for HMCP/HMCM located on electrical cabinets adjacent to building No. 7690 (B7690) and on debris along the shore in the vicinity of the new TPP. Yet, EHSI’s Limited Hazardous Material Survey Report did not specifically test the beach debris for HMCP/HMCM (Only ACM). Please clarify what hazardous materials are present in the beach debris and what quantity of beach debris is to be removed so this scope of work can be priced accordingly. Also, please confirm that the Contractor is to treat all the debris along the shore in the vicinity of the new TPP as hazardous, as described in 02 83 00 as HMCP/HMCM and will require an onsite Certified Industrial Hygienist, Medical Examinations, Air Sampling, etc. These extensive requirements will add significant cost to this project.338Specification Section, 02 83 00, Hazardous Metals Remediation, removed in its entirety.
163Fueling Facility Utility Enclosure, Specification Section 33 52 11, 2.1.1, Enclosure, specifies “ASTM A167 Type 304 or 304L” Stainless. Will ASTM A240 Type 316 or 316L Stainless be an acceptable substitution?
339Yes, Type 316 or 316L Stainless steel is acceptable.
164Fueling Facility Utility Enclosure, Specification Section 33 52 11, 2.1.1, Enclosure, specifies “ASTM A167 Type 304 or 304L” Stainless. Will ASTM A240 Type 316 or 316L Stainless be an acceptable substitution?340See response to PPI#163.
165Fueling Facility Utility Enclosure, Specification Section 33 52 11, 2.1.6, Heating and Ventilation states: “The enclosure Equipment Room shall be provided with heating and ventilation systems having all components necessary to maintain the indoor environmental conditions above 40 degrees F in winter and below 100 degrees F in summer. Use 100 percent outdoor air for cooling.” Can you confirm that an air conditioning unit is not required for cooling? If not, please provide heat load values for the equipment within the enclosure.
341Confirmed, no refrigerated air conditioning unit is required for the Utility Enclosure. Provide electric space heater and 100% outdoor ventilation air supply fan as indicated on the drawings.
166Fueling Facility Utility Enclosure, Specification Section 33 52 11, 2.1.5e states: “Insulation in the cores of the roof and wall panels shall be asbestos-free composition and provide an overall "U" value of not more than 0.10.” However, Plan Sheet MW412, Note 2 States: “…with insulated double wall panel (R-19 min.), insulated roof panel (R-26 min.)…”. What is the minimum allowable insulation value?
342Provide insulation requirements as specified in keynote #2 on sheet MW412. See revised Specification Section 33 52 11. See amendment #008.
167Plan Sheet MW412, Note 2, references DWG EW305; however, there is no sheet EW305 within our plan set. Please provide referenced plan sheet.
343See revised sheet MW412, see amendment #008.
168Reference section 03 31 29 part 1.8.2 - Table 1 lists the classes of marine concrete for the project. Note 3 under the tables applies to classes A, C, and F and states "durability modeling is not required." Please confirm that additional requirements for service life modeling of marine concrete - including trial batching, qualifications testing, modeling, production testing - do not apply to these 3 classes of concrete.344Correct. All service life modeling requirements do not apply to concrete class A, C, and F.
095Reference:

* Spec Section 01 14 00-1.2a

* Spec Section 01 14 00-1.2f

* 'Endangered Species Act (ESA)/Marine Mammal Protection Act (MMPA) Monitoring and Construction Restriction Requirements', section 2.1.

Question:

Spec Section 01 14 00-1.2a states: "Pile driving shall only occur between 16 July and 15 January".

Spec Section 01 14 00-1.2f states: "Pile driving shall only occur between 22 July and 15 January".

The 'Endangered Species Act (ESA)/Marine Mammal Protection Act (MMPA) Monitoring and Construction Restriction Requirements', section 2.1 states: "All in-water work shall be limited to occur between July 16 23 and January 15."

Please clarify what dates pile driving is allowed to occur.345See updated specification sent in amendment #006.
011Please see attached RFI from Skyline Steel regarding steel pipe piles dated 08 September, 2020.

Reference Specification: Section 09 97 13.26; 1.4.6.10 - Qualifications of coating contractors and facilities Question:

Attached is a paragraph from SSPC QS1 certification program.

As of right now, there are no coating facilities in WA, OR, and ID that have QS1 and QP3 SSPC Certifications.

Would it be possible to remove the SSPC QS1 certification requirement If the coating shop had a NACE III

inspector? This would provide more opportunities for coaters to bid this job that are in the Pacific NW.346The coating system shall be provided as specified in section 09 97 13.26, including shop certification requirements.
013REF: Vessel Maintenance Facility; overhead crane power requirements, and electrical details.

When reviewing the electrical sheets and equipment schedules, there are no references that detail conductors and equipment requirements to power the overhead bridge crane. Please provide necessary information to furnish power to the crane, such as the panel source, feeder sizes, breaker sizes, disconnects, etc.

It is assumed that power will get delivered to the crane via a disconnect at ground level with conductors extending up to the runway elevation at or near the center of the runway length.348See previous response to PPI# 273.
001Drawing AB603 indicates sealed concrete for rooms 106, 106A, 108-114, 119-122, MO1, and MO2.

I am unable to find any specifications for sealed concrete. What type of sealant? 1 pass grind?

353 Refer to the incorporation of paragraph 2.2 in section 09 90 00 for concrete sealer. See revised specification 09 90 00, see amendment #008.