09 90 00 Rev.pdf
PDF 63 KB Posted
- Attached to
- Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
- Solicitation number
- n44255
About this file
This solicitation requests proposals for the construction of a general purpose berthing pier and trestle with controlled access, vessel maintenance facility with parking, fuel distribution and storage system to support the Maritime Force Protection Unit's operations mission. The facilities will provide security escort for submarines through protection by presence and defense by force during transit between homeport and the surface/dive points in the Strait of Juan de Fuca and test range. This mission supports the stand-up of the Nuclear Weapons Security Program as mandated by National Security Presidential Directive and Instructions. The solicitation seeks to construct facilities that include a berthing pier, trestle, maintenance facility, parking area, and fuel distribution and storage systems. The Naval Facilities Engineering Command is the issuing agency.
View the file
Other files for this federal contract opportunity
Show all 50
Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P907 Vehicle Maintenance Facility 160112
SECTION 09 90 00
PAINTS AND COATINGS
05/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100 (2015; Suppl 2002-2016) Documentation of the Threshold Limit Values and Biological Exposure Indices
ASTM INTERNATIONAL (ASTM)
ASTM D4263 (1983; R 2012) Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D4444 (2013) Use and Calibration of Hand-Held Moisture Meters
ASTM D523 (2014; R 2018) Standard Test Method for Specular Gloss
ASTM D6386 (2016) Standard Practice for Preparation of Zinc (Hot-Dip Galvanized) Coated Iron and Steel Product and Hardware Surfaces for Painting
MASTER PAINTERS INSTITUTE (MPI)
MPI 101 (2012) Primer, Epoxy, Anti-Corrosive, for Metal
MPI 107 (2012) Primer, Rust-Inhibitive, Water Based
MPI 108 (2012) Epoxy, High Build, Low Gloss
MPI 141 (2012) Latex, Interior, High Performance Architectural, Semi-Gloss (MPI Gloss Level 5)
MPI 153 (2012) Light Industrial Coating, Interior, Water Based, Semi-Gloss (MPI Gloss Level 5)
MPI 163 (2012) Light Industrial Coating, Exterior, Water Based, Semi-Gloss (MPI Gloss Level 5)
MPI 23 (2012) Primer, Metal, Surface Tolerant
MPI 27 (2012) Floor Enamel, Alkyd, Gloss (MPI Gloss Level 6)
SECTION 09 90 00 Page 1
MPI 44 (2012) Latex, Interior, (MPI Gloss Level 2)
MPI 50 (2012) Primer Sealer, Latex, Interior
MPI 72 (2012) Polyurethane, Two-Component, Pigmented, Gloss (MPI Gloss Level 6-7)
MPI 79 (2012) Primer, Alkyd, Anti-Corrosive for Metal
MPI 94 (2012) Alkyd, Exterior, Semi-Gloss (MPI Gloss Level 5)
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOCIETY FOR PROTECTIVE COATINGS (SSPC)
SSPC 7/NACE No.4 (2007; E 2004) Brush-Off Blast Cleaning
SSPC PA 1 (2016) Shop, Field, and Maintenance Coating of Metals
SSPC PA Guide 3 (1982; E 1995) A Guide to Safety in Paint Application
SSPC QP 1 (2012; E 2012) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
SSPC SP 1 (2015) Solvent Cleaning
SSPC SP 10/NACE No. 2 (2007) Near-White Blast Cleaning
SSPC SP 12/NACE No.5 (2002) Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
SSPC SP 2 (1982; E 2000; E 2004) Hand Tool Cleaning
SSPC SP 3 (1982; E 2004) Power Tool Cleaning
SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning
SSPC VIS 1 (2002; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
SSPC VIS 3 (2004) Guide and Reference Photographs for Steel Surfaces Prepared by Hand and Power Tool Cleaning
SSPC VIS 4/NACE VIS 7 (1998; E 2000; E 2004) Guide and Reference Photographs for Steel Surfaces Prepared by Waterjetting
SECTION 09 90 00 Page 2
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-STD-101 (2014; Rev C) Color Code for Pipelines and for Compressed Gas Cylinders
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
EPA Method 24 (2000) Determination of Volatile Matter Content, Water Content, Density, Volume Solids, and Weight Solids of Surface Coatings
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
FED-STD-313 (2014; Rev E) Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.1000 Air Contaminants
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
The current MPI, "Approved Product List" which lists paint by brand, label, product name and product code as of the date of contract award, will be used to determine compliance with the submittal requirements of this specification. The Contractor may choose to use a subsequent MPI "Approved Product List", however, only one list may be used for the entire contract and each coating system is to be from a single manufacturer.
Provide all coats on a particular substrate from a single manufacturer.
No variation from the MPI Approved Products List is acceptable.
Samples of specified materials may be taken and tested for compliance with specification requirements.
SD-02 Shop Drawings
Piping Identification
SECTION 09 90 00 Page 3
SD-03 Product Data
Coating; G
SD-04 Samples
Color; G
SD-07 Certificates
Applicator's Qualifications
Qualification Testing laboratory for coatings; G
Indoor Air Quality for Paints and Primers
SD-08 Manufacturer's Instructions
Mixing
Manufacturer's Safety Data Sheets
SD-10 Operation and Maintenance Data
Coatings; G
1.3 CERTIFICATES
1.3.1 Indoor Air Quality
Submit required indoor air quality certifications in one submittal package.
1.3.1.1 Paints and Coatings
Provide paint and coating products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification by other third-party programs.
Provide current product certification documentation from certification body.
1.4 APPLICATOR'S QUALIFICATIONS
1.4.1 SSPC QP 1 Certification
All contractors and subcontractors that perform surface preparation or coating application must be certified by the Society for Protective Coatings (formerly Steel Structures Painting Council) (SSPC) to the requirements of SSPC QP 1 prior to contract award, and must remain certified while accomplishing any surface preparation or coating application. If a contractor's or subcontractor's certification expires, the firm will not be allowed to perform any work until the certification is reissued. Requests for extension of time for any delay to the completion of the project due to an inactive certification will not be considered and liquidated damages will apply. Notify the Contracting Officer of any change in contractor certification status.
SECTION 09 90 00 Page 4
1.5 QUALITY ASSURANCE
1.5.1 Field Samples and Tests
The Contracting Officer may choose up to two coatings that have been delivered to the site to be tested at no cost to the Government. Take samples of each chosen product as specified in the paragraph SAMPLING PROCEDURES. Test each chosen product as specified in the paragraph TESTING PROCEDURE. Remove products from the job site which do not conform, and replace with new products that conform to the referenced specification. Test replacement products that failed initial testing at no cost to the Government.
1.5.1.1 Sampling Procedure
The Contracting Officer will select paint at random from the products that have been delivered to the job site for sample testing. The Contractor will provide one quart samples of the selected paint materials. Take samples in the presence of the Contracting Officer, and label, and identify each sample. Provide labels in accordance with the paragraph PACKAGING, LABELING, AND STORAGE of this specification.
1.5.1.2 Testing Procedure
Provide Batch Quality Conformance Testing for specified products, as defined by and performed by MPI. As an alternative to Batch Quality Conformance Testing, the Contractor may provide Qualification Testing for specified products above to the appropriate MPI product specification, using the third-party laboratory approved under the paragraph "Qualification Testing" laboratory for coatings. Include the backup data and summary of the test results within the qualification testing lab report. Provide a summary listing of all the reference specification requirements and the result of each test. Clearly indicate in the summary whether the tested paint meets each test requirement. Note that Qualification Testing may take 4 to 6 weeks to perform, due to the extent of testing required.
Submit name, address, telephone number, FAX number, and e-mail address of the independent third party laboratory selected to perform testing of coating samples for compliance with specification requirements. Submit documentation that laboratory is regularly engaged in testing of paint samples for conformance with specifications, and that employees performing testing are qualified. If MPI is chosen to perform the Batch Quality Conformance testing, the above submittal information is not required, only a letter is required from the Contractor stating that MPI will perform the testing.
1.6 REGULATORY REQUIREMENTS
1.6.1 Environmental Protection
In addition to requirements specified elsewhere for environmental protection, provide coating materials that conform to the restrictions of the local Air Pollution Control District and regional jurisdiction.
Notify Contracting Officer of any paint specified herein which fails to conform.
SECTION 09 90 00 Page 5
1.6.2 Lead Content
Do not use coatings having a lead content over 0.06 percent by weight of nonvolatile content.
1.6.3 Chromate Content
Do not use coatings containing zinc-chromate or strontium-chromate.
1.6.4 Asbestos Content
Provide asbestos-free materials.
1.6.5 Mercury Content
Provide materials free of mercury or mercury compounds.
1.6.6 Silica
Provide abrasive blast media containing no free crystalline silica.
1.6.7 Human Carcinogens
Provide materials that do not contain ACGIH 0100 confirmed human carcinogens (A1) or suspected human carcinogens (A2).
1.7 PACKAGING, LABELING, AND STORAGE
Provide paints in sealed containers that legibly show the contract specification number, designation name, formula or specification number, batch number, color, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name and address of manufacturer. Furnish pigmented paints in containers not larger than 5 gallons. Store paints and thinners in accordance with the manufacturer's written directions, and as a minimum, stored off the ground, under cover, with sufficient ventilation to prevent the buildup of flammable vapors, and at temperatures between 40 to 95 degrees F. Do not store paint or polyurethane products with materials that have a high capacity to adsorb VOC emissions. Do not store paint, polyurethane, varnish, or wood stain products in occupied spaces.
1.8 SAFETY AND HEALTH
Apply coating materials using safety methods and equipment in accordance with the following:
Comply with applicable Federal, State, and local laws and regulations, and with the ACCIDENT PREVENTION PLAN, including the Activity Hazard Analysis as specified in Section 01 35 26 GOVERNMENT SAFETY REQUIREMENTS and in Appendix A of EM 385-1-1 . Include in the Activity Hazard Analysis the potential impact of painting operations on painting personnel and on others involved in and adjacent to the work zone.
1.8.1 Safety Methods Used During Coating Application
Comply with the requirements of SSPC PA Guide 3 .
SECTION 09 90 00 Page 6
1.8.2 Toxic Materials
To protect personnel from overexposure to toxic materials, conform to the most stringent guidance of:
a. The applicable manufacturer's Safety Data Sheets (SDS) or local regulation.
b. 29 CFR 1910.1000 .
c. ACGIH 0100 , threshold limit values.
Submit manufacturer's Safety Data Sheets for coatings, solvents, and other potentially hazardous materials, as defined in FED-STD-313 .
1.9 ENVIRONMENTAL CONDITIONS
Comply, at minimum, with manufacturer recommendations for space ventilation during and after installation.
1.9.1 Coatings
Do not apply coating when air or substrate conditions are:
a. Less than 5 degrees F above dew point;
b. Below 50 degrees F or over 95 degrees F, unless specifically pre-approved by the Contracting Officer and the product manufacturer.
Do not, under any circumstances, violate the manufacturer's application recommendations.
1.9.2 Post-Application
Vacate space for as long as possible after application. Wait a minimum of 48 hours before occupying freshly painted rooms. Maintain one of the following ventilation conditions during the curing period, or for 72 hours after application:
a. Supply 100 percent outside air 24 hours a day.
b. Supply airflow at a rate of 6 air changes per hour, when outside temperatures are between 55 degrees F and 85 degrees F and humidity is between 30 percent and 60 percent.
c. Supply airflow at a rate of 1.5 air changes per hour, when outside air conditions are not within the range stipulated above.
1.10 SCHEDULING
Allow paint and polyurethane installations to cure prior to the installation of materials that adsorb VOCs.
1.11 COLOR SELECTION
Provide colors of finish coats as indicated or specified. Allow Contracting Officer to select colors not indicated or specified.
Manufacturers' names and color identification are used for the purpose of color identification only. Named products are acceptable for use only if
SECTION 09 90 00 Page 7 they conform to specified requirements. Products of other manufacturers are acceptable if the colors approximate colors indicated and the product conforms to specified requirements.
Tint each coat progressively darker to enable confirmation of the number of coats.
Provide color, texture, and pattern of wall coating systems as indicated.
Submit manufacturer's samples of paint colors. Cross reference color samples to color scheme as indicated. Submit color stencil codes.
1.12 LOCATION AND SURFACE TYPE TO BE PAINTED
1.12.1 Painting Included
Where a space or surface is indicated to be painted, include the following unless indicated otherwise.
a. Surfaces behind portable objects and surface mounted articles readily detachable by removal of fasteners, such as screws and bolts.
b. New factory finished surfaces that require identification or color coding and factory finished surfaces that are damaged during performance of the work.
c. Existing coated surfaces that are damaged during performance of the work.
1.12.1.1 Exterior Painting
Includes new surfaces of the buildings and appurtenances. Also included are existing coated surfaces made bare by cleaning operations.
1.12.1.2 Interior Painting
Includes new surfaces of the buildings and appurtenances as indicated and existing coated surfaces made bare by cleaning operations. Where a space or surface is indicated to be painted, include the following items, unless indicated otherwise.
a. Exposed braced frames, columns, girders, beams, joists, and metal deck; and
b. Other contiguous surfaces.
1.12.2 Painting Excluded
Do not paint the following unless indicated otherwise.
a. Surfaces concealed and made inaccessible by panelboards, fixed ductwork, machinery, and equipment fixed in place.
b. Surfaces in concealed spaces. Concealed spaces are defined as enclosed spaces above suspended ceilings, furred spaces, attic spaces, crawl spaces and chases.
c. Steel to be embedded in concrete.
SECTION 09 90 00 Page 8
d. Copper, stainless steel, aluminum, brass, and lead except existing coated surfaces.
e. Hardware, fittings, and other factory finished items.
1.12.3 Mechanical and Electrical Painting
Includes field coating of interior and exterior new surfaces.
a. Where a space or surface is indicated to be painted, include the following items unless indicated otherwise.
(1) Exposed piping, conduit, and ductwork;
(2) Supports, hangers, air grilles, and registers;
(3) Miscellaneous metalwork and insulation coverings.
b. Do not paint the following, unless indicated otherwise:
(1) New zinc-coated, aluminum, and copper surfaces under insulation
(2) New aluminum jacket on piping
(3) New interior ferrous piping under insulation.
1.12.3.1 Fire Extinguishing Sprinkler Systems
Clean, pretreat, prime, and paint new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metalwork, and accessories where indicated. Apply coatings to clean, dry surfaces, using clean brushes. Clean the surfaces to remove dust, dirt, rust, and loose mill scale. Immediately after cleaning, provide the metal surfaces with one coat primer per schedules. Shield sprinkler heads with protective covering while painting is in progress. Upon completion of painting, remove protective covering from sprinkler heads. Remove sprinkler heads which have been painted and replace with new sprinkler heads. Provide primed surfaces with the following:
a. Piping in Unfinished Interior Areas: Piping located above suspended ceilings and in unfinished areas where ceilings will not receive paint shall remain unfinihsed. Provide piping with 2 inch wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 foot intervals.
b. Piping in Finished Areas and Exterior Locations: Provide primed surfaces with two coats of paint to match adjacent surfaces. Provide piping with 2 inch wide red enamel bands or self-adhering red plastic bands spaced at maximum of 20 foot intervals throughout the piping systems.
1.12.4 Exterior Painting of Site Work Items
Field coat the items indicated in the drawings.
1.12.5 MISCELLANEOUS PAINTING
Lettering Building
SECTION 09 90 00 Page 9
Provide lettering as indicated on the drawings Helvetica type, asphalt gray enamel or water-type decalcomania, finished with a protective coating of spar varnish. Samples must be approved before application.
1.12.6 Definitions and Abbreviations
1.12.6.1 Qualification Testing
Qualification testing is the performance of all test requirements listed in the product specification. This testing is accomplished by MPI to qualify each product for the MPI Approved Product List, and may also be accomplished by Contractor's third party testing lab if an alternative to Batch Quality Conformance Testing by MPI is desired.
1.12.6.2 Batch Quality Conformance Testing
Batch quality conformance testing determines that the product provided is the same as the product qualified to the appropriate product specification. This testing must be accomplished by an MPI testing lab.
1.12.6.3 Coating
A film or thin layer applied to a base material called a substrate. A coating may be a metal, alloy, paint, or solid/liquid suspensions on various substrates (such as metals, plastics, wood, paper, leather, cloth). They may be applied by electrolysis, vapor deposition, vacuum, or mechanical means such as brushing, spraying, calendaring, and roller coating. A coating may be applied for aesthetic or protective purposes or both. The term "coating" as used herein includes emulsions, enamels, stains, varnishes, sealers, epoxies, and other coatings, whether used as primer, intermediate, or finish coat. The terms paint and coating are used interchangeably.
1.12.6.4 DFT or dft
Dry film thickness, the film thickness of the fully cured, dry paint or coating.
1.12.6.5 DSD
Degree of Surface Degradation, the MPI system of defining degree of surface degradation. Five (5) levels are generically defined under the Assessment sections in the MPI Maintenance Repainting Manual.
1.12.6.6 EPP
Environmentally Preferred Products, a standard for determining environmental preferability in support of Executive Order 13101.
1.12.6.7 EXT
MPI short term designation for an exterior coating system.
1.12.6.8 INT
MPI short term designation for an interior coating system.
SECTION 09 90 00 Page 10
1.12.6.9 micron / microns
The metric measurement for 0.001 mm or one/one-thousandth of a millimeter.
1.12.6.10 mil / mils
The English measurement for 0.001 in or one/one-thousandth of an inch, equal to 25.4 microns or 0.0254 mm.
1.12.6.11 mm
The metric measurement for millimeter, 0.001 meter or one/one-thousandth of a meter.
1.12.6.12 MPI Gloss Levels
MPI system of defining gloss. Seven (7) gloss levels (G1 to G7) are generically defined under the Evaluation sections of the MPI Manuals.
Traditionally, Flat refers to G1/G2, Eggshell refers to G3, Semigloss refers to G5, and Gloss refers to G6.
Gloss levels are defined by MPI as follows:
Gloss Description Units Units Level at 60 degrees at 85 degrees
G1 Matte or Flat 0 to 5 10 max G2 Velvet 0 to 10 10 to 35 G3 Eggshell 10 to 25 10 to 35 G4 Satin 20 to 35 35 min G5 Semi-Gloss 35 to 70 G6 Gloss 70 to 85 G7 High Gloss
Gloss is tested in accordance with ASTM D523. Historically, the Government has used Flat (G1 / G2), Eggshell (G3), Semi-Gloss (G5), and Gloss (G6).
1.12.6.13 MPI System Number
The MPI coating system number in each Division found in either the MPI Architectural Painting Specification Manual or the Maintenance Repainting Manual and defined as an exterior (EXT/REX) or interior system (INT/RIN).
The Division number follows the CSI Master Format.
1.12.6.14 Paint
See Coating definition.
1.12.6.15 REX
MPI short term designation for an exterior coating system used in repainting projects or over existing coating systems.
1.12.6.16 RIN
MPI short term designation for an interior coating system used in repainting projects or over existing coating systems.
SECTION 09 90 00 Page 11
PART 2 PRODUCTS
2.1 MATERIALS
Conform to the coating specifications and standards referenced in PART 3.
Submit product data sheets for specified coatings and solvents. Provide preprinted cleaning and maintenance instructions for all coating systems.
Submit Manufacturer's Instructions on Mixing: Detailed mixing instructions, minimum and maximum application temperature and humidity, potlife, and curing and drying times between coats.
Provide certification of Indoor Air Quality for paints and primers.
2.2 CONCRETE SEALER
2.2.1 Sealer
Clear, Waterborne, Membrane-Forming Curing and Sealing Compound: ASTM C1315, Type 1, CLass A.
2.2.2 Hardener
Hardener must be colorless aqueous solution containing a blend of inorganic silicate or siliconate material and proprietary components combined with a wetting agent that pendetrates, hardens, and densifies concrete surfaces.
PART 3 EXECUTION
3.1 PROTECTION OF AREAS AND SPACES NOT TO BE PAINTED
Prior to surface preparation and coating applications, remove, mask, or otherwise protect hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that are in contact with surfaces to be coated. Following completion of painting, reinstall removed items by workmen skilled in the trades. Restore surfaces contaminated by coating materials, to original condition and repair damaged items.
3.2 SURFACE PREPARATION
Remove dirt, splinters, loose particles, grease, oil, disintegrated coatings, and other foreign matter and substances deleterious to coating performance as specified for each substrate before application of paint or surface treatments. Remove oil and grease prior to mechanical cleaning.
Schedule cleaning so that dust and other contaminants will not fall on wet, newly painted surfaces. Spot-prime exposed ferrous metals such as nail heads on or in contact with surfaces to be painted with water-thinned paints, with a suitable corrosion-inhibitive primer capable of preventing flash rusting and compatible with the coating specified for the adjacent areas.
3.3 PREPARATION OF METAL SURFACES
3.3.1 New Ferrous Surfaces
a. Ferrous Surfaces including Shop-coated Surfaces and Small Areas That
SECTION 09 90 00 Page 12 rhendryx Architect rhendryx Cloud+
PPI 353
Contain Rust, Mill Scale and Other Foreign Substances: Solvent clean or detergent wash in accordance with SSPC SP 1 to remove oil and grease. Where shop coat is missing or damaged, clean according to SSPC SP 2 , SSPC SP 3 , SSPC SP 6/NACE No.3 , or SSPC SP 10/NACE No. 2 .
Brush-off blast remaining surface in accordance with SSPC 7/NACE No.4 ;
Water jetting to SSPC SP 12/NACE No.5 WJ-4 may be used to remove loose coating and other loose materials. Use inhibitor as recommended by coating manufacturer to prevent premature rusting. Protect shop-coated ferrous surfaces from corrosion by treating and touching up corroded areas immediately upon detection.
b. Surfaces With More Than 20 Percent Rust, Mill Scale, and Other Foreign Substances: Clean entire surface in accordance with SSPC SP 6/NACE No.3 / SSPC SP 12/NACE No.5 WJ-3 SSPC SP 10/NACE No. 2 / SSPC SP 12/NACE No.5 WJ-2.
3.3.2 Final Ferrous Surface Condition:
For tool cleaned surfaces, the requirements are stated in SSPC SP 2 and SSPC SP 3 . Use as a visual reference, photographs in SSPC VIS 3 for the appearance of cleaned surfaces.
For abrasive blast cleaned surfaces, the requirements are stated in SSPC 7/NACE No.4 , SSPC SP 6/NACE No.3 , and SSPC SP 10/NACE No. 2 . Use as a visual reference, photographs in SSPC VIS 1 for the appearance of cleaned surfaces.
For waterjet cleaned surfaces, the requirements are stated in SSPC SP 12/NACE No.5 . Use as a visual reference, photographs in SSPC VIS 4/NACE VIS 7 for the appearance of cleaned surfaces.
3.4 PREPARATION OF GYPSUM SURFACES
3.4.1 Gypsum Board
a. Surface Cleaning: Verify that plaster and stucco surfaces are free from loose matter and that gypsum board is dry. Remove loose dirt and dust by brushing with a soft brush, rubbing with a dry cloth, or vacuum-cleaning prior to application of the first coat material. A damp cloth or sponge may be used if paint will be water-based.
b. Repair of Minor Defects: Prior to painting, repair joints, cracks, holes, surface irregularities, and other minor defects with patching plaster or spackling compound and sand smooth.
c. Allowable Moisture Content: Latex coatings may be applied to damp surfaces, but not surfaces with droplets of water. Do not apply epoxies to damp surfaces as determined by ASTM D4263. Verify that new plaster to be coated has a maximum moisture content of 8 percent, when measured in accordance with ASTM D4444, Method A, unless otherwise authorized. In addition to moisture content requirements, allow new plaster to age a minimum of 30 days before preparation for painting.
3.5 APPLICATION
3.5.1 Coating Application
Comply with applicable federal, state and local laws enacted to insure compliance with Federal Clean Air Standards. Apply coating materials in
SECTION 09 90 00 Page 13 accordance with SSPC PA 1 . SSPC PA 1 methods are applicable to all substrates, except as modified herein.
At the time of application, paint must show no signs of deterioration.
Maintain uniform suspension of pigments during application.
Unless otherwise specified or recommended by the paint manufacturer, paint may be applied by brush, roller, or spray. Use trigger operated spray nozzles for water hoses. Use rollers for applying paints and enamels of a type designed for the coating to be applied and the surface to be coated.
Wear protective clothing and respirators when applying oil-based paints or using spray equipment with any paints.
Only apply paints, except water-thinned types to surfaces that are completely free of moisture as determined by sight or touch.
Thoroughly work coating materials into joints, crevices, and open spaces.
Pay special attention to ensure that all edges, corners, crevices, welds, and rivets receive a film thickness equal to that of adjacent painted surfaces.
Apply each coat of paint so that dry film is of uniform thickness and free from runs, drops, ridges, waves, pinholes or other voids, laps, brush marks, and variations in color, texture, and finish. Completely hide all blemishes.
Touch up damaged coatings before applying subsequent coats. Broom clean and clear dust from interior areas before and during the application of coating material.
Apply paint to new fire extinguishing sprinkler systems including valves, piping, conduit, hangers, supports, miscellaneous metal work, and accessories. Shield sprinkler heads with protective coverings while painting is in progress. Remove sprinkler heads which have been painted and replace with new sprinkler heads. For piping in unfinished spaces, provide primed surfaces with one coat of red alkyd gloss enamel to a minimum dry film thickness of 1.0 mil. Unfinished spaces include attic spaces, spaces above suspended ceilings, crawl spaces, pipe chases, mechanical equipment room, and space where walls or ceiling are not painted or not constructed of a prefinished material. For piping in finished areas, provide prime surfaces with two coats of paint to match adjacent surfaces, except provide valves and operating accessories with one coat of red alkyd gloss enamel. Upon completion of painting, remove protective covering from sprinkler heads.
a. Drying Time: Allow time between coats, as recommended by the coating manufacturer, to permit thorough drying, but not to present topcoat adhesion problems. Provide each coat in specified condition to receive next coat.
b. Primers, and Intermediate Coats: Do not allow primers or intermediate coats to dry more than 30 days, or longer than recommended by manufacturer, before applying subsequent coats. Follow manufacturer's recommendations for surface preparation if primers or intermediate coats are allowed to dry longer than recommended by manufacturers of subsequent coatings. Cover each preceding coat or surface completely by ensuring visually perceptible difference in shades of successive coats.
SECTION 09 90 00 Page 14
c. Finished Surfaces: Provide finished surfaces free from runs, drops, ridges, waves, laps, brush marks, and variations in colors.
d. Thermosetting Paints: Topcoats over thermosetting paints (epoxies and urethanes) should be applied within the overcoating window recommended by the manufacturer.
3.5.2 Mixing and Thinning of Paints
Reduce paints to proper consistency by adding fresh paint, except when thinning is mandatory to suit surface, temperature, weather conditions, application methods, or for the type of paint being used. Obtain written permission from the Contracting Officer to use thinners. Verify that the written permission includes quantities and types of thinners to use.
When thinning is allowed, thin paints immediately prior to application with not more than 1 pint of suitable thinner per gallon. The use of thinner does not relieve the Contractor from obtaining complete hiding, full film thickness, or required gloss. Thinning cannot cause the paint to exceed limits on volatile organic compounds. Do not mix paints of different manufacturers.
3.5.3 Two-Component Systems
Mix two-component systems in accordance with manufacturer's instructions.
Follow recommendation by the manufacturer for any thinning of the first coat to ensure proper penetration and sealing for each type of substrate.
3.5.4 Coating Systems
a. Systems by Substrates: Apply coatings that conform to the respective specifications listed in the following Tables:
Table
Division 5. Exterior Metal, Ferrous and Non-Ferrous Paint Table
Division 5. Interior Metal, Ferrous and Non-Ferrous Paint Table Division 9: Interior Gypsum Board Paint Table
b. Minimum Dry Film Thickness (DFT): Apply paints, primers, varnishes, enamels, undercoats, and other coatings to a minimum dry film thickness of 1.5 mil each coat unless specified otherwise in the Tables. Coating thickness where specified, refers to the minimum dry film thickness.
c. Coatings for Surfaces Not Specified Otherwise: Coat surfaces which have not been specified, the same as surfaces having similar conditions of exposure.
d. Existing Surfaces Damaged During Performance of the Work, Including New Patches In Existing Surfaces: Coat surfaces with the following:
(1) One coat of primer.
(2) One coat of undercoat or intermediate coat.
(3) One topcoat to match adjacent surfaces.
SECTION 09 90 00 Page 15
e. Existing Coated Surfaces To Be Painted: Apply coatings conforming to the respective specifications listed in the Tables herein, except that pretreatments, sealers and fillers need not be provided on surfaces where existing coatings are soundly adhered and in good condition. Do not omit undercoats or primers.
3.6 COATING SYSTEMS FOR METAL
Apply coatings of Tables in Division 5 for Exterior and Interior.
a. Apply specified ferrous metal primer on the same day that surface is cleaned, to surfaces that meet all specified surface preparation requirements at time of application.
b. Inaccessible Surfaces: Prior to erection, use one coat of specified primer on metal surfaces that will be inaccessible after erection.
c. Shop-primed Surfaces: Touch up exposed substrates and damaged coatings to protect from rusting prior to applying field primer.
d. Surface Previously Coated with Epoxy or Urethane: Apply MPI 101, 1.5 mils DFT immediately prior to application of epoxy or urethane coatings.
e. Pipes and Tubing: The semitransparent film applied to some pipes and tubing at the mill is not to be considered a shop coat. Overcoat these items with the specified ferrous-metal primer prior to application of finish coats.
f. Exposed Nails, Screws, Fasteners, and Miscellaneous Ferrous Surfaces.
On surfaces to be coated with water thinned coatings, spot prime exposed nails and other ferrous metal with latex primer MPI 107 .
3.7 COATING SYSTEMS FOR GYPSUM SUBSTRATES
Apply coatings of Tables in Division 9 for Interior.
3.8 PIPING IDENTIFICATION
Piping Identification, Including Surfaces In Concealed Spaces: Provide in accordance with MIL-STD-101 . Place stenciling in clearly visible locations. On piping not covered by MIL-STD-101 , stencil approved names or code letters, in letters a minimum of 1/2 inch high for piping and a minimum of 2 inches high elsewhere. Stencil arrow-shaped markings on piping to indicate direction of flow using black stencil paint.
3.9 INSPECTION AND ACCEPTANCE
In addition to meeting previously specified requirements, demonstrate mobility of moving components, including swinging and sliding doors, cabinets, and windows with operable sash, for inspection by the Contracting Officer. Perform this demonstration after appropriate curing and drying times of coatings have elapsed and prior to invoicing for final payment.
3.10 WASTE MANAGEMENT
As specified in the Waste Management Plan and as follows. Do not use kerosene or any such organic solvents to clean up water based paints.
SECTION 09 90 00 Page 16
Properly dispose of paints or solvents in designated containers. Close and seal partially used containers of paint to maintain quality as necessary for reuse. Store in protected, well-ventilated, fire-safe area at moderate temperature. Place materials defined as hazardous or toxic waste in designated containers.
3.11 PAINT TABLES
All DFT's are minimum values. Use only materials with a GPS green check mark having a minimum MPI "Environmentally Friendly" E1 rating based on VOC ( EPA Method 24 ) content levels. Acceptable products are listed in the MPI Green Approved Products List, available at http://www.specifygreen.com/APL/ProductIdxByMPInum.asp .
3.11.1 Exterior Paint Tables at TPP Pier
DIVISION 5: EXTERIOR METAL, FERROUS PAINT TABLE
STEEL / FERROUS SURFACES
A. New steel not galvanized, blast cleaned to SSPC SP 10/NACE No. 2 :
1. Epoxy Primer / High Build Epoxy / Pigmented Polyurethane (System 1) MPI EXT 5.1J-G6 (Gloss) Primer: Intermediate: Topcoat:
MPI 101 MPI 108 MPI 72
System DFT: 8.5 mils
B. Galvanized steel indicated or specified to be painted. Steel shall be galvanized as indicated and prepared for painting in accordance with
ASTM D6386:
1. Epoxy Primer / Waterborne Light Industrial Coating MPI EXT 5.3K-G5 (Semigloss) Primer: Intermediate: Topcoat:
MPI 101 MPI 163 MPI 163
System DFT: 5 mils
C. Stainless steel indicated or specified to be painted.:
1. Alkyd (Ssystem 4) MPI EXT 5.1S-G6 (Gloss) Primer: Intermediate: Topcoat:
MPI 79 MPI 27 MPI 27 (plus NSA) System DFT: 5.25 mils
3.11.2 Exterior Paint Tables at Maintenance Facility
DIVISION 5: EXTERIOR METAL, FERROUS PAINT TABLE
STEEL / FERROUS SURFACES
A. New Steel that has been hand or power tool cleaned to SSPC SP 2 or
SSPC SP 3
1. Alkyd New; MPI EXT 5.1Q-G5 (Semigloss) Existing; MPI REX 5.1D-G5 Primer: Intermediate: Topcoat:
MPI 23 MPI 94 MPI 94
SECTION 09 90 00 Page 17
STEEL / FERROUS SURFACES
System DFT: 5.25 mils
3.11.3 Interior Paint Tables at Maintenance Facility
DIVISION 5: INTERIOR METAL, FERROUS PAINT TABLE
INTERIOR STEEL / FERROUS SURFACES
A. Metal, Mechanical, Electrical, Fire extinguishing sprinkler systems including valves, conduit, hangers, supports, and new prefinished equipment:
1. High Performance Architectural Latex
MPI INT 5.1R-G5 (Semigloss) Primer: Intermediate: Topcoat:
MPI 79 MPI 141 MPI 141
System DFT: 5 mils
DIVISION 9: GYPSUM BOARD PAINT TABLE
A. New Gypsum Board not otherwise specified:
1. Latex New; MPI INT 9.2A-G2 (Flat) / Existing; RIN 9.2A-G2 (Flat) Primer: Intermediate: Topcoat:
MPI 50 MPI 44 MPI 44
System DFT: 4 mils
B. New Gypsum Board in restrooms, laundry areas, and other high humidity areas not otherwise specified:
1. Waterborne Light Industrial Coating New; MPI INT 9.2L-G5(Semigloss) / Existing; MPI RIN 9.2L-G5 (Semigloss) Primer: Intermediate: Topcoat:
MPI 50 MPI 153 MPI 153
System DFT: 4 mils
-- End of Section --