EW122 Rev 1.pdf

PDF 378 KB Posted

Attached to
Amendment 0010 -Use the applicable Small Business Forms attached Federal contract opportunity
Solicitation number
n44255
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This package includes construction drawings and specifications for a pier lighting plan to support a federal solicitation for a berthing pier, trestle, vessel maintenance facility and fuel distribution system. The drawings show the layout of lighting fixtures on the pier and in surrounding areas, including flood lights, security lights and low voltage control panels. Specific lighting levels are designated for task lighting on the pier deck and normal mode lighting throughout the facilities. Conduit routing and grounding diagrams are also provided. The related solicitation is for the construction project and seeks to establish a general purpose berthing pier and trestle with controlled access, as well as parking, fuel storage and distribution facilities. The facilities will support maritime force protection and nuclear weapons security operations for submarines transiting to test ranges from their homeport. The solicitation is issued by the Department of the Navy Naval Facilities Engineering Command.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0010 -Use the applicable Small Business Forms attached, newest first.
File Type Posted
Gaurd booths.pdf PDF
MW602 Rev 2.pdf PDF
MB603 Rev 1.pdf PDF
MW103 Rev 1.pdf PDF
EW611 Rev 3.pdf PDF
EW301 Rev 1.pdf PDF
EW303 Rev 2.pdf PDF
EB609 Rev 1.pdf PDF
EB101 Rev 3.pdf PDF
EB603 Rev 1.pdf PDF
EB606 Rev 2.pdf PDF
25 10 10.00 24.pdf PDF
10 56 13 Rev.pdf PDF
Amendment 0009 Final.pdf PDF
601 Rev 2.pdf PDF
EB121 Rev 1.pdf PDF
MW602 Rev 1.pdf PDF
SB106 Rev 1.pdf PDF
SB102 Rev 7.pdf PDF
MW601 Rev 2.pdf PDF
MW401 Rev 1.pdf PDF
33 56 10 Rev.pdf PDF
31 62 16.19 Rev.pdf PDF
PPI Attachment.xlsx XLSX spreadsheet
MW402 Rev 1.pdf PDF
P-876 AS-Built_E130_0006.pdf PDF
Amendment 0006.pdf PDF
P907 TPP Pier Geotech Report_0006.pdf PDF
EW401 Rev4.pdf PDF
CS501 Rev 1.pdf PDF
EW629 Rev 1.pdf PDF
P-907 ESA_Requirements.pdf PDF
01 14 00.pdf PDF
05 52 00.pdf PDF
P907 TPS UST Site Assessment Report.pdf PDF
EW001 Rev 1.pdf PDF
AB501 Rev 1.pdf PDF
1100 kW Generator Photo Collection.pdf PDF
P907 TPS Fuel Facility and Vessel Maintenance Facility Geotechnical Report.pdf PDF
EW603 Rev1.pdf PDF
EW404 Rev 1.pdf PDF
EW602 Rev 1.pdf PDF
EW611 Rev 1.pdf PDF
AB104 Rev1.pdf PDF
Amendment 0004.pdf PDF
SF30 Continuation rev.pdf PDF
Amendment 0002 SF30.pdf PDF
Amend_1_Page_2.pdf PDF
RFP Attachment K_EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment J.pdf PDF
Show all 50

Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D

PC

FL-1

BL-1

BL-1

BL-1

BL-1

D

C

B

A

1 2 3 4 5 6

MATCHLINE SEE DWG EW121

M A

T C

H

LI

N E

S E

E D

W G

E W

BL-13

B1

EW301

B2

EW301

B4

EW508

(TYP)

B1

EW508

(TYP)

A2

EW508

B2

EW508

L-02

L-09

L-21

L-23

L-15

NL-1

B1

EW507

VAULT P-02

EMBEDDED

JUNCTION BOX

EMBEDDED

JUNCTION BOX

XL-03

XL-03

VAULT BELOW

A4

EW507

L-01

L-08

L-03

L-04

EMBEDDED

JUNCTION BOX

EMBEDDED

JUNCTION BOX

L-12

L-11 L-10

L-14

L-26L-22

L-35

L-36

L-37

L-38

PULL BOX PE-05

L-42

C2

EW506

SCADA CABINET

W

L-24

TPPMSB2/14A

TPPMSB2/14A

TPPMSB2/16B

TPPMSB2/18C

TPPMSB2/16B

TPPMSB2/18C

TPPMSB2/16B

TPPMSB2/7,9D

TPP2A/35

A3

EW507

L-25

L-41

L-45

PULL BOX PE-08

L-68

L-32

L-14

A1

EW503

L-13 8

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:3 :1

P M

C U s e rs S b o ll e n D o c u m e n ts P M O D P

IE

R E L E C R S b o ll e n .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

P

IE

R

LI

G H

TI

N G

P

LA

N

S H

EE

T

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EW122

219 269

16046567

DOUG BUSSARD

B. GALLOWAY

B. NIXON

SCALE: 1/8" = 1'-0"

PIER LIGHTING PLAN - SHEET 2

SHEET KEYNOTES:

1. MOUNT BL-1 LUMINAIRE TO FACE OF PIER FOR WATER SECURITY LIGHTING.

2. PROVIDE (4) "FL-1" LUMINAIRES ON POLE.

3. MOUNT BL-1 LUMINAIRE BELOW WALE FOR WATER SECURITY LIGHTING.

4. LOW VOLTAGE LIGHTING CONTROL PANEL MOUNTED ON STRUCTURAL METAL CHANNEL SUPPORT.

5. PROVIDE FOUR LOW VOLTAGE SWITCHES. SWITCH 'A' SHALL TURN ON TRESTLE XL-03

LUMINAIRES. SWITCH 'B' SHALL TURN ON PIER LIGHTING FL-1 FLOOD LUMINAIRES TO GENERAL

LIGHTING LEVEL. SWITCH 'C' SHALL TURN ON PIER LIGHTING FL-1 FLOOD LUMINAIRES TO TASK

LIGHTING LEVEL. SWITCH 'D' SHALL TURN ON PIER FACE LIGHTING BL-1 LUMINAIRES.

SCALE:

8' 8'

1/8" = 1'-0"

16'16'

GENERAL NOTES:

1. REFER TO LIGHTING CABLE/PATHWAY SCHEDULE ON SHEET EW626.

2. LIGHTING LEVEL ON THE PIER DECK SHALL BE MINIMUM OF 3

FOOTCANDLES FOR TASK LIGHTING.

3. LIGHT LEVEL FOR NORMAL MODE SHALL BE 1 FOOTCANDLE

MINIMUM. FIELD COORDINATE FINAL NORMAL MODE LIGHT LEVEL

WITH GOVERNMENT.

KEY PLAN

N

6. SEE SHEET EW124 FOR CONTINUATION OF CONDUIT L-45.

7. SEE SHEET EW125 FOR CONTINUATION OF CONDUIT L-68.

8. ROUTE CONDUIT IN STRUCTURAL SLEEVE. CAP ON BOTH ENDS.

EW124, EW125

P

PI

S M B

Sheets
EW122 - PIER LIGHTING PLAN - SHEET 2
EW613 - GROUNDING DIAGRAM

File details come from the government source that posted it. Updated .