About this file

This document contains a grounding diagram and specifications for a pier and maintenance facility construction project. The project will construct a general purpose berthing pier and trestle with controlled access, as well as a vessel maintenance facility including parking, fuel distribution and storage systems. The facilities are required to support the Maritime Force Protection Unit at Naval Base Kitsap in Bangor, Washington in providing security escort and defense missions for submarines transiting to test ranges. The grounding diagram specifies that a ground connection be provided at each end of pilings and within equipment slabs, and shows the routing of ground conductors to various structures and equipment.

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0010 -Use the applicable Small Business Forms attached, newest first.
File Type Posted
VMF Site 1 from Sturgeon St.jpg JPG image
KB Spit 1 - Pier Location.jpg JPG image
MW101 Rev 1.pdf PDF
EW111 Rev 2.pdf PDF
EB131 Rev 1.pdf PDF
22 13 29 Rev.pdf PDF
08 41 13 Rev.pdf PDF
EW404 Rev 3.pdf PDF
Attachment K.docx DOCX document
01 32 17.00 20 Rev.pdf PDF
106 Rev 1.pdf PDF
MW412 Rev 1.pdf PDF
SW521 Rev 2.pdf PDF
MW613 Rev 1.pdf PDF
MW611 Rev 1.pdf PDF
MW112 Rev 1.pdf PDF
MW601 Rev 1.pdf PDF
Amendment 008 changes.docx DOCX document
Amendment 0007.pdf PDF
Revised_Sections 00100 and 00800.pdf PDF
P907 TPS Geotech Report_0006.pdf PDF
P907 TPS UST Site Assess Report_0006.pdf PDF
PPIs Continued.pdf PDF
1100 kW Generator Photo_0006.pdf PDF
PPI AMEND 0006.pdf PDF
Amendment 0005.pdf PDF
EW404 Rev 1.pdf PDF
EW602 Rev 1.pdf PDF
EW611 Rev 1.pdf PDF
AB104 Rev1.pdf PDF
SW526 Rev 1.pdf PDF
CS102 Rev 1.pdf PDF
EW141 Rev 1.pdf PDF
CS103 Rev 1.pdf PDF
EW124 Rev 1.pdf PDF
P-876 AS-Built_E130.pdf PDF
AB603 Rev 1.pdf PDF
01 32 17.00 20.pdf PDF
AB111 Rev 1.pdf PDF
Amendment 0004.pdf PDF
SF30 Continuation .pdf PDF
SF30 Continuation rev.pdf PDF
Amendment 003.pdf PDF
Amendment 0002 SF30.pdf PDF
Amend_1_Page_2.pdf PDF
P907 Project Location.pdf PDF
SF30 Amendment 0001.pdf PDF
RFP Attachment K_EXAMPLE Overhead Forms.xlsx XLSX spreadsheet
Attachment J.pdf PDF
RFP P-907 Pier and Maintence Facility.pdf PDF
Show all 50

Amendment 0010 -Use the applicable Small Business Forms attached has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P3

M2

DG

G

G

G

G

G

G

G

GG

G

G G

G

G G

G G

G DG

DG

G

G

G

G

G

G

G G

G G

DG

DG

DG

DG

DG

DGDG

DG

GROUND CONNECTION

TO PIER SUBSTATION

GROUND CONNECTION

TO SCADA CABINET

CONNECTION TO B7136

PAD MOUNTED SWITCH

GROUND

GROUND CONNECTION

UP TO GENERATOR

GROUND CONNECTION

UP TO GENERATOR

STEP-UP TRANSFORMER GROUND CONNECTION

UP TO MV SWGR

GROUND LOOP AROUND

VAULT

GROUND CONNECTION

TO VAULT P-02

GROUND CONNECTION

TO VAULT P-03

GROUND CONNECTION

TO PILING (TYP)

GROUND CONNECTION

TO HIGH MAST

LUMINAIRE POLE

GROUND CONNECTION

TO HIGH MAST

LUMINAIRE POLE

GROUND CONNECTION

TO BVR-1&2 GROUND CONNECTION

TO BVR-3&4

GROUND CONNECTION

TO LUMINAIRE POLE

GROUND CONNECTION

TO LUMINAIRE POLE

GROUND CONNECTION

TO LUMINAIRE POLE

PIER OUTLINE

TRESTLE OUTLINE

GUARD BOOTH OUTLINE

6" X 2" GUARD BOOTH

GROUND BAR

MV SWGR OUTLINE

CONNECTION TO

EXISTING COMM

VAULT GROUND

INSTALL GROUND LOOP

AROUND EQUIPMENT 36" FROM

OUTSIDE EDGES OF SLAB AT 18"

BELOW FINISHED GRADE

DUCT BANK GROUND

CONDUCTOR (TYP)

GROUND CONNECTION

TO EXISTING VAULT

GROUND

TPPTA GROUND

CONNECTION

6" X 4" X 1/4" CU GROUND BAR

NEXT TO MAN GATE FOR FUEL

TRUCK GROUNDING

GROUND CONNECTION

TO STEEL HATCHES IN

FRONT OF SWITCHGEAR

PLUS AN ADDITIONAL

HATCH TO EAST AND

WEST OF GEAR.

GROUND CONNECTIONS

REQUIRED AT EACH

STRUCTURAL BENT LINE (TYP)

1 1

GROUND CONNECTIONS

REQUIRED AT EACH TRESTLE

STRUCTURAL BENT LINE (TYP)

G G

G

G G

G

G

4/0 INSULATED

CONDUCTOR ROUTED

UNDER WALKWAY

4/0 INSULATED

CONDUCTOR ROUTED

UNDER WALKWAY

V-04 V-09V-10

V-02

G

V-08

P-01

V-03

P3

M2A

V-01

GENERAL NOTES:

1. PROVIDE 4/0 BARE COPPER GROUND CABLES FOR ALL LOCATIONS EXCEPT AS NOTED.

2. "G" GROUND CONDUCTORS ARE FREE ROUTED THROUGH SOIL OR CONCRETE.

3. "DG" GROUND CONDUCTORS ARE ROUTED IN THE DUCT BANKS.

4. INSTALL ALL GROUND CONDUCTORS IN SOIL A MINIMUM OF 18" BELOW FINISHED

GRADE.

EW502

A3

EW504

A2

EW502

C2

EW502

C1

SCALE:

EPROJECT NO.:

CONSTR. CONTR. NO.

NAVFAC DRAWING NO.

SHEET OF

DRAWFORM REVISION: 31 JANUARY 2017

CHIEF ENG/ARCH

BRANCH MANAGER

PM/DM

AS NOTED

DES DRW CHK

SATISFACTORY TO DATE

ACTIVITY

FOR COMMANDER NAVFAC

APPROVED

A/E INFO

SEAL

D E P A R T M E N T

O F

T H E

N A V Y

N A V F A C

N W

N A V A L

F A C

IL

IT

IE

S

E N G

IN

E E R

IN

G

C O M M A N D

S

IL

V E R D A L E W A S H

IN

G T O N

N A V A L

B A S E

K

IT

S A P B A N G O R

S

IL

V E R D A L E W A S H

IN

G T O N

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

S

YM

D

ES

C R

IP

TI

O N

D A

TE

A P P R

FIRE PROTECTION

D. GIBSON/T. BOLING

1389895

:3 :1

P M

C U s e rs S b o ll e n D o c u m e n ts P M O D P

IE

R E L E C R S b o ll e n .r vt

F Y

M

C O

N P

R O

J E

C T

P -9

T P

P P

IE

R

A N

D M

A

IN

T E

N A

N C

E F

A C

IL

IT

Y

G R O U N D

IN

G

D

IA

G R

AM

N A V A L

FA

C

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

C O M M A N D

N O R

TH

W

ES

T

BCPSMB BGA

EW613

256 269

16046604

DOUG BUSSARD

B. GALLOWAY

B. NIXON

SCALE: NONE

GROUNDING DIAGRAM

A1

SHEET KEYNOTES:

1. PROVIDE GROUND CONNECTION TO EACH END OF

METALLICALLY JOINED FENDER PILINGS.

2. PROVIDE GROUND CONNECTION TO AT LEAST TWO 20'

PIECES OF REINFORCING BAR LOCATED INSIDE EQUIPMENT

SLAB.

P

PI

P

PI

S M B

Sheets
EW122 - PIER LIGHTING PLAN - SHEET 2
EW613 - GROUNDING DIAGRAM

File details come from the government source that posted it. Updated .