Attachment 8-Solic-Pricing Breakdown-Submarine_Preservation.xlsx
XLSX spreadsheet 398 KB Posted
- Solicitation number
- N4215821RS004
About this file
This solicitation requests proposals for submarine preservation and maintenance services for the USS Toledo (SSN-769). The scope of work includes typical preservation and maintenance availability tasks to be performed at Norfolk Naval Shipyard in Portsmouth, VA. Proposals are due by February 15, 2021 and will be evaluated using lowest price technically acceptable procedures. The NAICS code is 336611 and the small business size standard is 1250 employees. This solicitation uses full and open competition procedures. Respondents must be fully capable of providing the required services identified in the Performance Work Statement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions RFP.docx | DOCX document | |
| N4215821RS0040008.pdf | ||
| 156-11-003.pdf | ||
| New RFQ Questions..docx | DOCX document | |
| 156-11-006.pdf | ||
| 156-11-005.pdf | ||
| 156-11-004.pdf | ||
| Updated ESPECs.pdf | ||
| N4215821RS004U0007.pdf | ||
| REVISED-Solit-Pricing Breakdown-Submarine_Preservation.xlsx | XLSX spreadsheet | |
| N4215821RS004U0006.pdf | ||
| N4215821RS0040005.pdf | ||
| N4215821RZ0040004.pdf | ||
| Answers to Questions from Offerors..pdf | ||
| Submarine Preservation Questions-Answers.docx | DOCX document | |
| N4215821RS0040003..pdf | ||
| N4215821RS0040003.pdf | ||
| ESPEC 176-11-002.pdf | ||
| N4215821RS0040001.pdf | ||
| N4215821RS0040002.pdf | ||
| N4215821RS004 RFP.pdf | ||
| CDRL- USS TOLEDO PRESERVATION.pdf | ||
| Attachment 6.docx | DOCX document | |
| Attachment 1.pdf | ||
| ESPECs for USS Toledo.pdf | ||
| Attachment 7.docx | DOCX document | |
| Attachment 9.docx | DOCX document | |
| Attachment 8.xlsx | XLSX spreadsheet |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal
| REQUEST FOR PRICE PROPOSAL | N50054 | ||
| VESSEL: | USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | |
| LOCATION: | NNSY, PORTSMOUTH, VA | CORs: | TBD |
| CONTRACTOR: | CLOSING: | TBD | |
| ACKNOWLEDGEMENT OF AMENDMENT(S): |
E-SPEC NO. TITLE MILESTONE DATES TOTAL COST
Prepare for and accomplish submarine preservation for the USS Toledo (SSN-769), SSP: 502-21 (EXCLUDING spec items identified below as option items) (NON-OPTION ITEM) Includes PRE-PLANNING in accordance with spec item 042-05-001. * See Milestone Dates on the following tab
Considering NAVSEA Standard Items, contractor’s price shall include the latest revision at time of solicitation.
For planning purposes, the Contractor shall consider all FEDERAL holidays and NNSY holiday routines.
SCAFFOLDING
GRAND TOTAL:
*MILESTONE DATES FOR: Prepare for and accomplish submarine preservation for the USS TOLEDO (SSN 769), SSP: 501-14 (excluding spec items identified below as option items) (NON-OPTION ITEM)
| E-SPEC NO. | TITLE | MILESTONE DATES |
| 042-05-001 | GENERAL REQUIREMENTS FOR WORK ON SUBMARINES FOR NORFOLK NAVAL SHIPYARD DEPOT LEVEL AVAILABILITIES | |
| 042-11-001 | GENERAL OCCUPATIONAL SAFETY, HEALTH, AND ENVIROMENT REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-22-001 | GENERAL REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-26-001 | SECURITY REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-27-001 | ACCOUNTABILITY OF MANHOUR AND MATERIAL RESERVATION | |
| 042-28-001 | SPECIAL REQUIREMENTS FOR NON-SUBSAFE WORK ON SUBMARINES | |
| 042-88-001 | PAINTING REQUIREMENTS FOR SUBMARINES WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-89-001 | GENERAL RADIOLOGICAL REQUIREMENTS FOR NUCLEAR POWERED SUBMARINES AT NORFOLK NAVAL SHIPYARD | |
| 111-11-003 | FAIRWATER, SSPC-SP 6 BLAST (INTERIOR) | 6/10/21 |
| 111-11-001 | FAIRWATER, SSPC-SP 6 BLAST (EXTERIOR) | 6/10/21 |
| 111-11-004 | PRESERVE FAIRWATER (INTERIOR) BLAST AND PAINT | 12/10/21 |
| 111-11-002 | PRESERVE FAIRWATER (EXTERIOR) BLAST AND PAINT | 12/10/21 |
| 132-11-004 | VLS BATHTUB SSPC-SP 6 BLAST | 5/10/21 |
| 132-11-001 | RETRACTABLE BOW PLANE RECESS, SSPC-SP 6 BLAST | 6/10/21 |
| 132-11-008 | NON-PRESSURE HULL RECESSES - SSPC-SP 6 BLAST | 4/10/21 |
| 132-11-007 | PRESERVE NON-PRESSURE HULL RECESSES (TOUCH-UP) | 3/10/22 |
| 132-11-005 | PRESERVE VLS BATHTUB (BLAST/PAINT) | 10/10/21 |
| 132-11-002 | RETRACTABLE BOW PLANE RECESS, PRESERVE | 9/10/21 |
| 132-11-009 | PRESERVE NON-PRESSURE HULL RECESSES (BLAST/PAINT) | 9/10/21 |
| 156-11-002/004 | MAIN BALLAST TANK (MBT) LEAD BALLAST INSTALLATION FOR REBALLST | 11/15/21 – 1/30/22 |
| 156-11-006 | LEAD BALLAST REMOVE AUX #2 FOR REBALLAST | 11/15/21 – 12/15/21 |
| 156-11-005 | SEA TRIAL LEAD BALLAST INSTALLATION ( AUX 1 and AUX 2 ) | 11/15/21 – 12/15/21 |
| 156-11-001/003 | MAIN BALLAST TANK (MBT) LEAD BALLAST REMOVAL FOR REBALLST | 6/15/21 – 8/15/21 |
| 176-01-001 | CLEAN SANITARY TANKS 1, 2, & 3 | 4/1/21 – 6/1/21 |
| 176-11-001 | MBT 1A, SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-002 | MBT 1B, SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-003 | MBT 2A, SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-004 | MBT 2B, SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-005 | MBT 3A, SSPC-SP 6 BLAST | 8/15/21 – 9/15/21 |
| 176-11-006 | MBT 3B, SSPC-SP 6 BLAST | 8/15/21 – 9/15/21 |
| 176-11-008 | PRESERVE MBT 1A, BLAST AND PAINT | 10/15/21 – 11/15/21 |
| 176-11-009 | PRESERVE MBT 1B, BLAST AND PAINT | 10/15/21 – 11/15/21 |
| 176-11-010 | PRESERVE MBT 2A, BLAST AND PAINT | 10/15/21 – 11/15/21 |
| 176-11-011 | PRESERVE MBT 2B, BLAST AND PAINT | 10/15/21 – 11/15/21 |
| 176-11-012 | PRESERVE MBT 3A, BLAST AND PAINT | 11/15/21 – 12/15/21 |
| 176-11-013 | PRESERVE MBT 3B, BLAST AND PAINT | 11/15/21 – 12/15/21 |
| 176-11-041 | POTABLE WATER TANKS 1 AND 2; SSPC-SP 6 BLAST | 5/15/21 – 6/15/21 |
| 176-11-042 | POTABLE WATER TANKS 1 AND 2; PRESERVE (BLAST AND PAINT) | 10/1/21 – 11/1/21 |
| 176-11-029 | FORWARD BILGE COLLECTING TANK; SSPC-SP 6 BLAST | 6/15/21 – 7/15/21 |
| 176-11-030 | FORWARD BILGE COLLECTING TANK; preserve (BLAST AND PAINT) | 9/15/21 – 10/15/21 |
| 176-11-023 | TORPEDO IMPULSE TANK 1 & 2; SSPC-SP 6 BLAST | 6/1/21 – 7/1/21 |
| 176-11-024 | TORPEDO IMPULSE TANK 1 & 2; preserve (BLAST AND PAINT) | 9/1/21 – 10/1/21 |
| 176-11-031 | SEA WATER EXPANSION TANK; SSPC-SP 6 BLAST | 8/1/21 – 9/1/21 |
| 176-11-032 | SEA WATER EXPANSION TANK; PRESERVE (BLAST AND PAINT) | 10/1/21 – 11/1/21 |
| 176-11-036 | ALT AUX TANK (TOUCH UP) | 8/1/21 – 9/1/21 |
| 176-11-033 | ALT FWD TRIM (TOUCH UP) | 10/15/21 – 11/15/21 |
| 176-11-027 | FWD TRIM TANK; SSPC-SP 6 BLAST | 6/1/21 – 7/1/15 |
| 176-11-028 | FWD TRIM TANK; preserve (BLAST AND PAINT) | 9/1/21 – 10/15/21 |
| 176-11-021 | WRT TANK #1 & #2; SSPC-SP 6 BLAST | 6/15/21 – 7/15/21 |
| 176-11-022 | WRT TANK #1 & #2; preserve (BLAST AND PAINT) | 9/15/21 – 10/15/21 |
| 176-11-017 | AUXILARY TANK #1 & #2; SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-019 | AUXILARY TANK #1 & #2; PRESERVE (BLAST AND PAINT) | 10/15/21 – 11/15/21 |
| 176-11-018 | AUXILARY TANK #3 & #4; SSPC-SP 6 BLAST | 8/1/21 – 9/1/21 |
| 176-11-020 | AUXILARY TANK #3 & #4; PRESERVE (BLAST AND PAINT) | 10/15/21 – 11/15/21 |
| 176-11-025 | SAN TANK 1, 2 & 3; SSPC-SP 6 BLAST | 5/1/21 – 7/1/21 |
| 176-11-026 | SAN TANK 1, 2 & 3; preserve (BLAST AND PAINT) | 7/1/21 – 9/1/21 |
| 176-11-014 | BOW TANK/ BOW SONAR TANK AND SPHERE, SSPC-SP 6 BLAST | 8/10/21 |
| 176-11-015 | PRESERVE BOW TANK/ BOW SONAR TANK AND SPHERE, BLAST & PAINT | 10/10/21 |
| DOCKING REPORT |
&"-,Bold"&20USS TOLEDO SSN-769 Submarine Preservation
Milestones
| *MILESTONE DATES FOR: Prepare for and accomplish submarine preservation for the USS TOLEDO (SSN 769), SSP: 501-14 (excluding spec items identified below as option items) (NON-OPTION ITEM) | ||
| Milestone dates are the expected date that the ESPEC Items will be ready for contractor work and are subject to change with the USS Toledo Project Schedule | ||
| E-SPEC NO. | TITLE | MILESTONE DATES |
| 042-05-001 | GENERAL REQUIREMENTS FOR WORK ON SUBMARINES FOR NORFOLK NAVAL SHIPYARD DEPOT LEVEL AVAILABILITIES | |
| 042-11-001 | GENERAL OCCUPATIONAL SAFETY, HEALTH, AND ENVIROMENT REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-22-001 | GENERAL REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-26-001 | SECURITY REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-27-001 | ACCOUNTABILITY OF MANHOUR AND MATERIAL RESERVATION | |
| 042-28-001 | SPECIAL REQUIREMENTS FOR NON-SUBSAFE WORK ON SUBMARINES | |
| 042-88-001 | PAINTING REQUIREMENTS FOR SUBMARINES WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-89-001 | GENERAL RADIOLOGICAL REQUIREMENTS FOR NUCLEAR POWERED SUBMARINES AT NORFOLK NAVAL SHIPYARD | |
| 111-11-003 | FAIRWATER, SSPC-SP 6 BLAST (INTERIOR) | 8/10/21 |
| 111-11-001 | FAIRWATER, SSPC-SP 6 BLAST (EXTERIOR) | 8/10/21 |
| 111-11-004 | PRESERVE FAIRWATER (INTERIOR) BLAST AND PAINT | 2/10/22 |
| 111-11-002 | PRESERVE FAIRWATER (EXTERIOR) BLAST AND PAINT | 2/10/22 |
| 132-11-004 | VLS BATHTUB SSPC-SP 6 BLAST | 7/10/21 |
| 132-11-001 | RETRACTABLE BOW PLANE RECESS, SSPC-SP 6 BLAST | 8/10/21 |
| 132-11-008 | NON-PRESSURE HULL RECESSES - SSPC-SP 6 BLAST | 6/10/21 |
| 132-11-007 | PRESERVE NON-PRESSURE HULL RECESSES (TOUCH-UP) | 5/10/22 |
| 132-11-005 | PRESERVE VLS BATHTUB (BLAST/PAINT) | 12/10/21 |
| 132-11-002 | RETRACTABLE BOW PLANE RECESS, PRESERVE | 11/10/21 |
| 132-11-009 | PRESERVE NON-PRESSURE HULL RECESSES (BLAST/PAINT) | 11/10/21 |
| 156-11-002/004 | MAIN BALLAST TANK (MBT) LEAD BALLAST INSTALLATION FOR REBALLST | 1/15/22 – 3/30/22 |
| 156-11-006 | LEAD BALLAST REMOVE AUX #2 FOR REBALLAST | 1/15/22 – 2/15/22 |
| 156-11-005 | SEA TRIAL LEAD BALLAST INSTALLATION ( AUX 1 and AUX 2 ) | 1/15/22 – 2/15/22 |
| 156-11-001/003 | MAIN BALLAST TANK (MBT) LEAD BALLAST REMOVAL FOR REBALLST | 8/15/21 – 10/15/21 |
| 176-01-001 | CLEAN SANITARY TANKS 1, 2, & 3 | 6/1/21 – 8/1/21 |
| 176-11-001 | MBT 1A, SSPC-SP 6 BLAST | 9/15/21 – 10/15/21 |
| 176-11-002 | MBT 1B, SSPC-SP 6 BLAST | 9/15/21 – 10/15/21 |
| 176-11-003 | MBT 2A, SSPC-SP 6 BLAST | 9/15/21 – 10/15/21 |
| 176-11-004 | MBT 2B, SSPC-SP 6 BLAST | 9/15/21 – 10/15/21 |
| 176-11-005 | MBT 3A, SSPC-SP 6 BLAST | 10/15/21 – 11/15/21 |
| 176-11-006 | MBT 3B, SSPC-SP 6 BLAST | 10/15/21 – 11/15/21 |
| 176-11-008 | PRESERVE MBT 1A, BLAST AND PAINT | 12/15/21 – 1/15/22 |
| 176-11-009 | PRESERVE MBT 1B, BLAST AND PAINT | 12/15/21 – 1/15/22 |
| 176-11-010 | PRESERVE MBT 2A, BLAST AND PAINT | 12/15/21 – 1/15/22 |
| 176-11-011 | PRESERVE MBT 2B, BLAST AND PAINT | 12/15/21 – 1/15/22 |
| 176-11-012 | PRESERVE MBT 3A, BLAST AND PAINT | 1/15/22 – 2/15/22 |
| 176-11-013 | PRESERVE MBT 3B, BLAST AND PAINT | 1/15/22 – 2/15/22 |
| 176-11-041 | POTABLE WATER TANKS 1 AND 2; SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-042 | POTABLE WATER TANKS 1 AND 2; PRESERVE (BLAST AND PAINT) | 12/1/21 – 1/1/22 |
| 176-11-029 | FORWARD BILGE COLLECTING TANK; SSPC-SP 6 BLAST | 8/15/21 – 9/15/21 |
| 176-11-030 | FORWARD BILGE COLLECTING TANK; preserve (BLAST AND PAINT) | 11/15/21 – 12/15/21 |
| 176-11-023 | TORPEDO IMPULSE TANK 1 & 2; SSPC-SP 6 BLAST | 8/1/21 – 9/1/21 |
| 176-11-024 | TORPEDO IMPULSE TANK 1 & 2; preserve (BLAST AND PAINT) | 11/1/21 – 12/1/21 |
| 176-11-031 | SEA WATER EXPANSION TANK; SSPC-SP 6 BLAST | 10/1/21 – 11/1/21 |
| 176-11-032 | SEA WATER EXPANSION TANK; PRESERVE (BLAST AND PAINT) | 12/1/21 – 1/1/22 |
| 176-11-036 | ALT AUX TANK (TOUCH UP) | 10/1/21 – 11/1/21 |
| 176-11-033 | ALT FWD TRIM (TOUCH UP) | 12/15/21 – 1/15/22 |
| 176-11-027 | FWD TRIM TANK; SSPC-SP 6 BLAST | 8/1/21 – 9/1/15 |
| 176-11-028 | FWD TRIM TANK; preserve (BLAST AND PAINT) | 11/1/21 – 12/15/21 |
| 176-11-021 | WRT TANK #1 & #2; SSPC-SP 6 BLAST | 8/15/21 – 9/15/21 |
| 176-11-022 | WRT TANK #1 & #2; preserve (BLAST AND PAINT) | 11/15/21 – 12/15/21 |
| 176-11-017 | AUXILARY TANK #1 & #2; SSPC-SP 6 BLAST | 9/15/21 – 10/15/21 |
| 176-11-019 | AUXILARY TANK #1 & #2; PRESERVE (BLAST AND PAINT) | 12/15/21 – 1/15/22 |
| 176-11-018 | AUXILARY TANK #3 & #4; SSPC-SP 6 BLAST | 10/1/21 – 11/1/21 |
| 176-11-020 | AUXILARY TANK #3 & #4; PRESERVE (BLAST AND PAINT) | 12/15/21 – 1/15/22 |
| 176-11-025 | SAN TANK 1, 2 & 3; SSPC-SP 6 BLAST | 7/1/21 – 9/1/21 |
| 176-11-026 | SAN TANK 1, 2 & 3; preserve (BLAST AND PAINT) | 9/1/21 – 11/1/21 |
| 176-11-014 | BOW TANK/ BOW SONAR TANK AND SPHERE, SSPC-SP 6 BLAST | 10/10/21 |
| 176-11-015 | PRESERVE BOW TANK/ BOW SONAR TANK AND SPHERE, BLAST & PAINT | 12/10/21 |
| DOCKING REPORT |
&"-,Bold"&20USS TOLEDO SSN-769 Submarine Preservation
Total - ALL ELINS
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | Total | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
Sub. Pres. Base Year
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year- 5/1/2021 to 4/30/2022 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | Summary ELIN Base Year | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
Sub. Pres. Second Year (OPT 1)
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Option 1- 5/1/2022 to 4/30/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | Summary ELIN Option Year 1 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
Sub. Pres. Third Year (OPT 2)
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Option 2- 5/1/2023 to 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | Summary ELIN Option Year 2 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
Total Estimate Dollars $0.00
Summary ELIN Option
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | Summary Options | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
042-05-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM-042-05-001 | 042-05-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
042-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
042-22-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-22-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
042-26-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-26-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
042-27-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-27-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
042-28-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-28-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
042-88-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-88-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
042-89-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-89-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
111-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 111-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
111-11-002 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 111-11-002 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
111-11-003 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 111-11-003 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
111-11-004 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 111-11-004 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
132-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
132-11-002 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-002 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
132-11-004 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-004 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
132-11-005 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-005 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
132-11-008 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-008 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
132-11-009 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-009 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
156-11-003 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-003 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
156-11-004 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-004 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
156-11-005 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-005 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
176-01-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-01-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
176-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
176-11-002 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-002 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
176-11-003 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-003 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
176-11-004 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-004 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
176-11-005 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 631-11-005 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
176-11-006 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-006 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars $0.00
176-11-008 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 5/1/2021 to 4/30/2022 with 2 Options ending 6/10/2023 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-008 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .