156-11-003.pdf
PDF 75 KB Posted
- Solicitation number
- N4215821RS004
About this file
This document contains a performance work statement (PWS) for submarine preservation and maintenance services for the USS Toledo (SSN-769). The scope of work includes typical services performed during an availability, such as removing and storing lead ballast, cleaning lead bins, and handling hazardous waste in accordance with EPA and OSHA regulations. Responses are due by February 15, 2021 and the contract will be awarded using lowest price technically acceptable procedures to a contractor capable of meeting the requirements in the PWS. The place of performance is Norfolk Naval Shipyard and the solicitation number is N4215821RS004. Proposals must remain valid for 180 days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions RFP.docx | DOCX document | |
| N4215821RS0040008.pdf | ||
| New RFQ Questions..docx | DOCX document | |
| 156-11-006.pdf | ||
| 156-11-005.pdf | ||
| 156-11-004.pdf | ||
| Updated ESPECs.pdf | ||
| N4215821RS004U0007.pdf | ||
| REVISED-Solit-Pricing Breakdown-Submarine_Preservation.xlsx | XLSX spreadsheet | |
| N4215821RS004U0006.pdf | ||
| N4215821RS0040005.pdf | ||
| N4215821RZ0040004.pdf | ||
| Answers to Questions from Offerors..pdf | ||
| Submarine Preservation Questions-Answers.docx | DOCX document | |
| N4215821RS0040003..pdf | ||
| Attachment 8-Solic-Pricing Breakdown-Submarine_Preservation.xlsx | XLSX spreadsheet | |
| N4215821RS0040003.pdf | ||
| ESPEC 176-11-002.pdf | ||
| N4215821RS0040001.pdf | ||
| N4215821RS0040002.pdf | ||
| N4215821RS004 RFP.pdf | ||
| CDRL- USS TOLEDO PRESERVATION.pdf | ||
| Attachment 6.docx | DOCX document | |
| Attachment 1.pdf | ||
| ESPECs for USS Toledo.pdf | ||
| Attachment 7.docx | DOCX document | |
| Attachment 9.docx | DOCX document | |
| Attachment 8.xlsx | XLSX spreadsheet |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRYDOCK REQUIRED
GAS FREE CERTIFICATION REQUIRED
HAZMAT
SHIP: USS TOLEDO (SSN 769) ITEM NO: 156-11-003
COAR: 16 PCN: OX01-0024
CMP: NONE
PLANNER: BASS, JESSE
MATTOX, JAMES
SSP: NNSYN-502-21 1 of 7 ITEM NO: 156-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
1. SCOPE:
1.1 Title: Main Ballast Tank (MBT) Lead Ballast For MRC Inspection;
remove
1.2 Location of Work:
1.2.1 Main Ballast Tank 2B
1.2.2 Main Ballast Tank 5B
1.3 Identification:
1.3.1 Quantity (7,190 Pounds), Lead, MBT 2B, Port Side, Between Frames 16-17
1.3.2 Quantity (7,897 Pounds), Lead, MBT 2B, Port Side, Between Frames 17-18
1.3.3 Quantity (8,214 Pounds), Lead, MBT 5B, Port Side, Between Frames 136-137A
1.3.4 Quantity (3,955 Pounds), Lead, MBT 5B, Port Side, Between Frames 136-137A
2. REFERENCES:
2.1 Standard Items, (FY21)
2.2 OSHA 29 CFR 1910.1025, Lead
2.3 OSHA 29 CRF 1910.134, Respiratory Protection
2.4 P5090.2 VOLUME II CHAPTER 38, Policy, Procedures and Requirements - Non Bulk Recovery Material Control, NAVSHIPYDNORINST P5090.2 VOLUME II
CHAPTER 38
2.5 121-6399755 Rev F, Lead Ballast Stowage Outside Pressure Hull Fwd Fr
2.6 121-6399756 Rev F, Lead Ballast Stowage Outside Pressure Hull Aft Fr
2.7 990-04-19, Code 990 Contractor Temporary Service Policy, Memo 990- 04-19 DTD February 14, 2019
2.8 IPI 9931-452 Rev A, Change-1, Use of Pallets
3. REQUIREMENTS:
3.1 Accomplish Lead Worker training in accordance with 2.2 prior to
SHIP: USS TOLEDO (SSN 769)
SSP: NNSYN-502-21 2 of 7 ITEM NO: 156-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
start of Work Item.
3.1.1 Personnel involved with lead work to be accomplished by this Work Item must receive Lead Worker training in accordance with 2.2.
3.1.2 Contractor Safety Representative must submit to the SUPERVISOR one legible copy, in hard copy or approved transferrable media, of personnel that will be performing lead work and have current training as required by 2.2. Contractor Safety Representative must submit updates to the SUPERVISOR each time personnel are added.
3.2 Identify interferences, including sound damping, to the SUPERVISOR via Contractor Condition Reports. The SUPERVISOR will notify the NNSY Tank Area Manager (TAM). Interferences deemed necessary by NNSY for removal will be removed/reinstalled by NNSY.
3.3 Accomplish the following safety and health precautions:
3.3.1 Accomplish the requirements of Work Item 042-11-001 in support of this Work Item.
3.3.2 Contractor Safety Representative must review procedures and ensure proper safety and health controls are established and performed in accordance with 2.2 and 2.3.
3.3.3 Accomplish air monitoring in accordance with 2.2.
3.3.4 Inform personnel that lead ballast handling, lead ballast cutting, or working in the same compartment with said processes on going, may expose personnel to airborne levels of lead at or above the Permissible Exposure Limit for lead (as established in 2.2) and should utilize proper controls (examples; engineering controls, Personal Protection Equipment (PPE), respiratory protection and showers) as directed by the Contractor Safety Representative in accordance with 2.2 and 2.3.
3.3.5 Use water spray where necessary to prevent generation and release of airborne lead oxide dust when the lead ballast is to be handled. Runoff from water used to spray lead and lead particles must be contained and collected in accordance with 2.4 and turned over to NNSY Code 970 HAZMAT via the SUPERVISOR.
3.3.6 Establish, maintain, and post boundaries in accordance with
2.2 while performing lead work operations in any area expected to exceed the medical surveillance action level (MSAL) of 0.03 milligrams per cubic meter of air.
3.3.6.1 Lead staging or storage areas for covered and protected pallets of lead may be enclosed within a roped or taped boundary and identified as such. Lead staging or storage areas MUST NOT be posted as a "Lead Work Area".
3.3.7 Contractor Safety Representative must establish a laydown area for personnel to remove outer PPE prior to leaving lead work boundary.
3.3.7.1 Blowing with compressed air, dry sweeping or brushing to remove lead dust from clothing is PROHIBITED in accordance with 2.2.
3.3.8 All lead workers must wash their hands and face prior to
SSP: NNSYN-502-21 3 of 7 ITEM NO: 156-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
eating, drinking or smoking in accordance with 2.2.
3.3.8.1 EMPLOYEES MUST NOT BE PERMITTED TO EAT, DRINK OR SMOKE
IN THE LEAD WORK AREA.
3.3.9 Contractor personnel must shower before leaving NNSY if required by 2.2.
3.3.9.1 Contractor must provide appropriate shower and change room facilities, soap, and disposable towels in accordance with 2.2.
3.3.9.2 Accomplish the requirements of 2.2 for using and
maintaining shower and change room facilities.
3.3.9.3 Contractor shower and change room facilities must be
identified with signs on all entrance and exit doors.
3.3.9.4 Location of Contractor change room and shower facilities must be as designated by the NNSY Project Team via the
SUPERVISOR.
3.3.9.5 Shower facilities provided by the Contractor must be
equipped with a catch tank or other means capable of capturing shower drain water. Shower drain water must be handled and disposed of in accordance with local requirements and as designated by NNSY Code 106 and NNSY Code 970 HAZMAT via the
SUPERVISOR.
3.3.9.6 NNSY will provide a source of electrical and water
services for shower and change room facilities.
3.3.9.7 Services must be installed, connected, maintained and removed by the Contractor. Contractor must provide all required adapters and connectors.
3.3.10 Lead Waste disposal: Two options exist for lead waste
disposal. At the option of the Project or Contractor, Lead waste must be handled in accordance with either 3.3.10.1 or 3.3.10.2 through 3.3.10.7. NOTE: The decision for waste disposal process must be decided and communicated to Code 106.321 and the Environmental Coordinator at the building 300 Hazardous Material Control Center (HMCC) prior to the start of work.
3.3.10.1 Waste must be handled in accordance with Paragraph 3.4 of Work Item 042-11-001.
3.3.10.2 The Contractor has the option to perform waste storage in accordance with 3.3.10.1 or to transport the lead contaminated bags of PPE and lead shavings daily to the HMCC less than 90 day Hazardous Waste storage area located at Building 300. The Contractor, as the generator of the waste, is required to ensure that the daily disposition of HW arrived at HMCC and report this to the SUPERVISOR. Bags must be sealed and labeled as lead waste and turned over to the Environmental Coordinator at the HMCC for proper storage in accordance with 3.3.10.3 through 3.3.10.7.
3.3.10.3 To facilitate transport of the waste, the Contractor may request the daily removal of pallet(s) of lead waste from the dry dock by the crane team via the SUPERVISOR. The lead waste must be bagged, tagged, and restrained in a manner such that
SSP: NNSYN-502-21 4 of 7 ITEM NO: 156-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
warning labels are visible.
3.3.10.4 The Contractor must properly fill out and affix a NNSY Material Control Tag (MCT) to each pallet of lead waste that will be lifted by the crane team and transported to the HMCC by forklift. The MCT must list the number of bags of lead waste on each pallet and list Bldg. 300 HMCC as the destination.
3.3.10.5 The Contractor, with oversight from the SUPERVISOR, must record the amount of lead waste removed from the dry dock on a MCT and provide a copy of this MCT to the SUPERVISOR daily.
The Contractor must ensure the daily disposition of lead waste arrived at HMCC by verifying the amount received matches the amount shipped with the on-duty HMCC Coordinator. The SUPERVISOR will conduct surveillances on the disposal process.
3.3.10.6 The SUPERVISOR will retain a copy of the MCT to verify the lead waste arrived at the HMCC. The SUPERVISOR, will provide the Contractor with MCTs and any necessary training to properly fill out the MCT.
3.3.10.7 In instances when crane support is not available, the Contractor will be required to bag lead waste, including proper sealing and labeling, in a manner which they can physically handle the waste and transport the waste daily to HMCC.
3.3.11 Any required ventilation or dehumidification for lead ballast removal locations will be installed and maintained by NNSY in accordance with the requirements of 2.7.
3.3.12 Maintain all surfaces in lead work areas as free as
practicable from accumulations of lead. Contractor must ensure all lead cutting work surfaces are cleaned at least once per shift to prevent accumulation of lead dust. Use the following guidelines for clean-up:
3.3.12.1 Use vacuums designated for lead use equipped with high efficiency particulate filter (HEPA VAC) to clean work surfaces of lead dust. Empty vacuums in a manner to minimize re-entry of lead into the workplace. Blowing down of work surfaces and tools for clean-up is PROHIBITED.
3.3.12.2 Wipe visible dust from work areas, floors, equipment and tools using wetted rags.
3.3.12.3 Use of shoveling, wet sweeping, and brushing for lead flakes, chips and pieces will be permitted only when vacuuming or other equally effective methods have been tried and found not to be effective.
3.3.12.4 Use water spray where necessary to prevent the
generation and release of airborne lead dust. Runoff from water used to spray lead and lead particles must be contained and collected in accordance with 2.4 and turned over to NNSY Code 970 HAZMAT via the SUPERVISOR.
3.3.13 Contractor Safety Representative must ensure personnel utilize appropriate PPE and respiratory protection in accordance with 2.3.
SSP: NNSYN-502-21 5 of 7 ITEM NO: 156-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
3.4 Remove lead ballast, liners and petrolatum or petroleum based products from each lead bin listed in 1.3 at locations listed in 1.2 and specified by 2.5 and 2.6 as designated by the SUPERVISOR.
3.4.1 Contractor must be prepared and equipped with tools (hammers, chisels and pry bars) required to extract any lead and liner which may be difficult to remove from each lead bin listed in 1.3 at locations listed in 1.2.
3.4.2 After removal, lead and liners must be placed on Contractor furnished pallets. Pallets must meet acceptable condition requirements of 2.8. Each pallet must also have a 3/4 inch piece of plywood attached to its top side to prevent any materials from falling through the pallet slots and to support the lead pigs.
Plywood must be fire-retardant conforming to MIL-L-19140E. Lead and liners must be kept segregated from any other lead and liners. Lead and liners from different lead ballast bins must not to be mixed.
Pallets must be marked and tagged to identify location, including tank, frame bay, and bin that lead was removed from. After removal of lead from each location listed in 1.3, lead must be weighed and data recorded by NNSY Shop 11. All lead pigs removed larger than 9-3/8 inches in length must be cut to a size of 9-3/8 inches or less by the Contractor prior to storage or shipment. After the weighing of lead and liners is complete, the Contractor must transport lead to laydown area. Laydown area must be provided by NNSY. If review of weight data sheets is determined unsatisfactory, the SUPERVISOR will notify the Contractor to transport pallet to weight scales for re-weighing by NNSY Shop 11. After re-weighing is complete, subject pallet must be transported back to designated laydown area by the Contractor. No lead and liners must be disposed of until authorized by NNSY Code 253 via the SUPERVISOR. Data on the weight data sheets will be entered by NNSY Shop 11 and provided to NNSY Code 253.
3.4.2.1 The Contractor must furnish all lead cutting equipment.
3.4.3 Laydown areas will be provided and identified by the NNSY Project Team. All specific equipment dimensions must be provided to the NNSY Project Team via the SUPERVISOR no later than five days after Task Order award to allow for specific allocation of space.
Lay down areas are solely for material needed to support current work evolutions and are not intended for long term storage. All material must be kept to a minimum. The lay down area must not be used for conex boxes unless approved by the SUPERVISOR. Vehicles must not be parked in any area intended for material storage. Contractor must maintain Shipyard cleanliness requirements in laydown areas. If conex boxes are approved for use, no material must be stored around, between or on top of conex boxes. Upon submission of a service request form by the Contractor to the SUPERVISOR, NNSY will provide a source of electrical services for approved conex boxes. Services for conex boxes must be installed, maintained and removed by the Contractor.
3.4.4 All stored lead must be protected from the weather. Stored lead pigs must not be larger than 9-3/8 inches in length. Contractor must provide material and services to band and securely cover lead placed on pallets to protect lead from the weather. Each pallet must be labeled with location, including tank, frame bay, bin, and weight
SSP: NNSYN-502-21 6 of 7 ITEM NO: 156-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
of removed lead. Pallets will also require a 3/4 inch piece of plywood, cut to the approximate size of the pallet, to be banded above the covered lead to facilitate stacking and storage of loaded pallets. Plywood must be fire-retardant conforming to MIL-L-19140E.
3.4.5 Accomplish cleaning of each lead pig, to remove oxidation and other foreign matter. Cleaning must be accomplished by scraping or hydro-blasting. Scraping is the preferred method of cleaning and must be utilized when possible.
3.4.6 Clean lead bin pockets and canning plates in way of lead removal utilizing scrapers, rags, and Simple Green Liquid.
3.4.6.1 If using Simple Green Liquid or other solvent, ventilation must be installed in accordance with the requirements of 2.7.
3.4.6.2 Satisfactory cleanliness is defined as lead bin pocket being grease free and satisfactory for hot work. All areas of work site including scaffolding (boards and piping), dry dock floor, and plastic drop clothes must be clean and grease free.
3.4.6.3 Notify the SUPERVISOR that lead bins are clean and ready for inspection.
(I)(G) "CLEANLINESS INSPECTION"
3.4.7 Accomplish a cleanliness inspection of lead bins. Inspections will be accomplished by the Contractor, SUPERVISOR and NNSY TAM.
3.4.7.1 Submit one legible copy, in hard copy or approved
transferrable media, of a report listing results of the requirements of 3.4.7 to the SUPERVISOR.
3.4.8 Exercise care when handling lead ballast in order to eliminate damage to lead bin and surrounding structure.
3.4.8.1 Ship structure and equipment, including but not limited to hydrophones and cables, must be wrapped and shielded to prevent damage.
3.5 Crane and rigging services will be provided by NNSY Code 700 to support movement of lead ballast between dry dock floor and pier side.
All other rigging services must be accomplished by the Contractor.
3.5.1 Crane services will be provided on weekdays. Weekend lifts will be accomplished to support Schedule at NNSY Project Team discretion. The Contractor representative must make lift notifications 48 hours prior to need during the NNSY Project Team meeting. The Contractor must also notify the SUPERVISOR of crane lifts and identify amount, type and disposition of material to be lifted. Weekend crane lifts must be requested by noon on Wednesday of the week preceding the weekend lift due to overtime considerations. NNSY will attempt to perform the lift within the requested shift (eight hour time frame) based on the logistics of the total number of pieces of equipment or material requested to be lifted within the shift.
3.6 Accomplish lead ballast handling in accordance with OSHA
SSP: NNSYN-502-21 7 of 7 ITEM NO: 156-11-003
EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.
International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.
requirements and 2.1 through 2.4.
3.7 Scrap any lead that is deemed unusable by the SUPERVISOR or NNSY Code 253.
3.8 Route any excess lead deemed usable by the SUPERVISOR or NNSY Code 253 to the nearest Naval Property Administrator.
3.9 Route and maintain all temporary services in accordance with the requirements of 2.7.
3.10 Accomplish all work in accordance with all local, regional, state, and federal rules and regulations regarding safety, health, and the environment.
4. NOTES:
4.1 Scaffolding of tanks and entry into tanks to support this Work Item will be provided by Work Item 991-11-001.
4.2 NNSY will provide rollers and boxes to support lead ballast removals.
4.3 NNSY will remove canning plates and provide welding services required for canning plate removal on lead bins.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
File details come from the government source that posted it. Updated .