Attachment 8.xlsx
XLSX spreadsheet 323 KB Posted
- Solicitation number
- N4215821RS004
About this file
This document is a Request for Price Proposal (RFP) for submarine preservation services to support the USS Toledo (SSN-769). The scope of work includes typical preservation and maintenance availability services. Responses are requested from qualified sources and are due by February 15, 2021. The work will be performed at Norfolk Naval Shipyard in Portsmouth, VA from February 23, 2021 through February 22, 2024, with two one-year option periods. The evaluation will use lowest price technically acceptable procedures. Only small business standards apply. The solicitation requests unit pricing for labor rates and materials to complete specified work items according to provided ELIN schedules and milestones from February 2021 through December 2022.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions RFP.docx | DOCX document | |
| N4215821RS0040008.pdf | ||
| 156-11-003.pdf | ||
| New RFQ Questions..docx | DOCX document | |
| 156-11-006.pdf | ||
| 156-11-005.pdf | ||
| 156-11-004.pdf | ||
| Updated ESPECs.pdf | ||
| N4215821RS004U0007.pdf | ||
| REVISED-Solit-Pricing Breakdown-Submarine_Preservation.xlsx | XLSX spreadsheet | |
| N4215821RS004U0006.pdf | ||
| N4215821RS0040005.pdf | ||
| N4215821RZ0040004.pdf | ||
| Answers to Questions from Offerors..pdf | ||
| Submarine Preservation Questions-Answers.docx | DOCX document | |
| N4215821RS0040003..pdf | ||
| Attachment 8-Solic-Pricing Breakdown-Submarine_Preservation.xlsx | XLSX spreadsheet | |
| N4215821RS0040003.pdf | ||
| ESPEC 176-11-002.pdf | ||
| N4215821RS0040001.pdf | ||
| N4215821RS0040002.pdf | ||
| N4215821RS004 RFP.pdf | ||
| CDRL- USS TOLEDO PRESERVATION.pdf | ||
| Attachment 6.docx | DOCX document | |
| Attachment 1.pdf | ||
| ESPECs for USS Toledo.pdf | ||
| Attachment 7.docx | DOCX document | |
| Attachment 9.docx | DOCX document |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal
| REQUEST FOR PRICE PROPOSAL | N50054 | ||
| VESSEL: | USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | |
| LOCATION: | NNSY, PORTSMOUTH, VA | CORs: | TBD |
| CONTRACTOR: | CLOSING: | TBD | |
| ACKNOWLEDGEMENT OF AMENDMENT(S): |
E-SPEC NO. TITLE MILESTONE DATES TOTAL COST
Prepare for and accomplish submarine preservation for the USS Toledo (SSN-769), SSP: 502-21 (EXCLUDING spec items identified below as option items) (NON-OPTION ITEM) Includes PRE-PLANNING in accordance with spec item 042-05-001. * See Milestone Dates Below
Considering NAVSEA Standard Items, contractor’s price shall include the latest revision at time of solicitation.
For planning purposes, the Contractor shall consider all FEDERAL holidays and NNSY holiday routines.
SCAFFOLDING
GRAND TOTAL:
*MILESTONE DATES FOR: Prepare for and accomplish submarine preservation for the USS TOLEDO (SSN 769), SSP: 501-14 (excluding spec items identified below as option items) (NON-OPTION ITEM)
| E-SPEC NO. | TITLE | MILESTONE DATES |
| 042-05-001 | GENERAL REQUIREMENTS FOR WORK ON SUBMARINES FOR NORFOLK NAVAL SHIPYARD DEPOT LEVEL AVAILABILITIES | |
| 042-11-001 | GENERAL OCCUPATIONAL SAFETY, HEALTH, AND ENVIROMENT REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-22-001 | GENERAL REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-26-001 | SECURITY REQUIREMENTS FOR WORK WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-27-001 | ACCOUNTABILITY OF MANHOUR AND MATERIAL RESERVATION | |
| 042-28-001 | SPECIAL REQUIREMENTS FOR NON-SUBSAFE WORK ON SUBMARINES | |
| 042-88-001 | PAINTING REQUIREMENTS FOR SUBMARINES WITHIN NORFOLK NAVAL SHIPYARD | |
| 042-89-001 | GENERAL RADIOLOGICAL REQUIREMENTS FOR NUCLEAR POWERED SUBMARINES AT NORFOLK NAVAL SHIPYARD | |
| 111-11-003 | FAIRWATER, SSPC-SP 6 BLAST (INTERIOR) | 6/10/21 |
| 111-11-001 | FAIRWATER, SSPC-SP 6 BLAST (EXTERIOR) | 6/10/21 |
| 111-11-004 | PRESERVE FAIRWATER (INTERIOR) BLAST AND PAINT | 12/10/21 |
| 111-11-002 | PRESERVE FAIRWATER (EXTERIOR) BLAST AND PAINT | 12/10/21 |
| 132-11-004 | VLS BATHTUB SSPC-SP 6 BLAST | 5/10/21 |
| 132-11-001 | RETRACTABLE BOW PLANE RECESS, SSPC-SP 6 BLAST | 6/10/21 |
| 132-11-008 | NON-PRESSURE HULL RECESSES - SSPC-SP 6 BLAST | 4/10/21 |
| 132-11-007 | PRESERVE NON-PRESSURE HULL RECESSES (TOUCH-UP) | 3/10/22 |
| 132-11-005 | PRESERVE VLS BATHTUB (BLAST/PAINT) | 10/10/21 |
| 132-11-002 | RETRACTABLE BOW PLANE RECESS, PRESERVE | 9/10/21 |
| 132-11-009 | PRESERVE NON-PRESSURE HULL RECESSES (BLAST/PAINT) | 9/10/21 |
| 156-11-002/004 | MAIN BALLAST TANK (MBT) LEAD BALLAST INSTALLATION FOR REBALLST | 11/15/21 – 1/30/22 |
| 156-11-006 | LEAD BALLAST REMOVE AUX #2 FOR REBALLAST | 11/15/21 – 12/15/21 |
| 156-11-005 | SEA TRIAL LEAD BALLAST INSTALLATION ( AUX 1 and AUX 2 ) | 11/15/21 – 12/15/21 |
| 156-11-001/003 | MAIN BALLAST TANK (MBT) LEAD BALLAST REMOVAL FOR REBALLST | 6/15/21 – 8/15/21 |
| 176-01-001 | CLEAN SANITARY TANKS 1, 2, & 3 | 4/1/21 – 6/1/21 |
| 176-11-001 | MBT 1A, SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-002 | MBT 1B, SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-003 | MBT 2A, SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-004 | MBT 2B, SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-005 | MBT 3A, SSPC-SP 6 BLAST | 8/15/21 – 9/15/21 |
| 176-11-006 | MBT 3B, SSPC-SP 6 BLAST | 8/15/21 – 9/15/21 |
| 176-11-008 | PRESERVE MBT 1A, BLAST AND PAINT | 10/15/21 – 11/15/21 |
| 176-11-009 | PRESERVE MBT 1B, BLAST AND PAINT | 10/15/21 – 11/15/21 |
| 176-11-010 | PRESERVE MBT 2A, BLAST AND PAINT | 10/15/21 – 11/15/21 |
| 176-11-011 | PRESERVE MBT 2B, BLAST AND PAINT | 10/15/21 – 11/15/21 |
| 176-11-012 | PRESERVE MBT 3A, BLAST AND PAINT | 11/15/21 – 12/15/21 |
| 176-11-013 | PRESERVE MBT 3B, BLAST AND PAINT | 11/15/21 – 12/15/21 |
| 176-11-041 | POTABLE WATER TANKS 1 AND 2; SSPC-SP 6 BLAST | 5/15/21 – 6/15/21 |
| 176-11-042 | POTABLE WATER TANKS 1 AND 2; PRESERVE (BLAST AND PAINT) | 10/1/21 – 11/1/21 |
| 176-11-029 | FORWARD BILGE COLLECTING TANK; SSPC-SP 6 BLAST | 6/15/21 – 7/15/21 |
| 176-11-030 | FORWARD BILGE COLLECTING TANK; preserve (BLAST AND PAINT) | 9/15/21 – 10/15/21 |
| 176-11-023 | TORPEDO IMPULSE TANK 1 & 2; SSPC-SP 6 BLAST | 6/1/21 – 7/1/21 |
| 176-11-024 | TORPEDO IMPULSE TANK 1 & 2; preserve (BLAST AND PAINT) | 9/1/21 – 10/1/21 |
| 176-11-031 | SEA WATER EXPANSION TANK; SSPC-SP 6 BLAST | 8/1/21 – 9/1/21 |
| 176-11-032 | SEA WATER EXPANSION TANK; PRESERVE (BLAST AND PAINT) | 10/1/21 – 11/1/21 |
| 176-11-036 | ALT AUX TANK (TOUCH UP) | 8/1/21 – 9/1/21 |
| 176-11-033 | ALT FWD TRIM (TOUCH UP) | 10/15/21 – 11/15/21 |
| 176-11-027 | FWD TRIM TANK; SSPC-SP 6 BLAST | 6/1/21 – 7/1/15 |
| 176-11-028 | FWD TRIM TANK; preserve (BLAST AND PAINT) | 9/1/21 – 10/15/21 |
| 176-11-021 | WRT TANK #1 & #2; SSPC-SP 6 BLAST | 6/15/21 – 7/15/21 |
| 176-11-022 | WRT TANK #1 & #2; preserve (BLAST AND PAINT) | 9/15/21 – 10/15/21 |
| 176-11-017 | AUXILARY TANK #1 & #2; SSPC-SP 6 BLAST | 7/15/21 – 8/15/21 |
| 176-11-019 | AUXILARY TANK #1 & #2; PRESERVE (BLAST AND PAINT) | 10/15/21 – 11/15/21 |
| 176-11-018 | AUXILARY TANK #3 & #4; SSPC-SP 6 BLAST | 8/1/21 – 9/1/21 |
| 176-11-020 | AUXILARY TANK #3 & #4; PRESERVE (BLAST AND PAINT) | 10/15/21 – 11/15/21 |
| 176-11-025 | SAN TANK 1, 2 & 3; SSPC-SP 6 BLAST | 5/1/21 – 7/1/21 |
| 176-11-026 | SAN TANK 1, 2 & 3; preserve (BLAST AND PAINT) | 7/1/21 – 9/1/21 |
| 176-11-014 | BOW TANK/ BOW SONAR TANK AND SPHERE, SSPC-SP 6 BLAST | 8/10/21 |
| 176-11-015 | PRESERVE BOW TANK/ BOW SONAR TANK AND SPHERE, BLAST & PAINT | 10/10/21 |
| DOCKING REPORT |
&"-,Bold"&20USS TOLEDO SSN-769 Submarine Preservation
Total - ALL ELINS
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | Total | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
Summary ELIN Base
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | Total | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
042-05-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM-042-05-001 | Total | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
042-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
042-22-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-22-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
042-26-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-26-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
042-27-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-27-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
042-28-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-28-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
042-88-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-88-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
042-89-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 042-89-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
111-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 111-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
111-11-002 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 111-11-002 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
111-11-003 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 111-11-002 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
111-11-004 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 111-11-004 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
132-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
132-11-002 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-002 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
132-11-004 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-004 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
132-11-005 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-005 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
132-11-007 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-007 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
132-11-008 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-008 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
132-11-009 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 132-11-009 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
156-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
156-11-002 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-002 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
156-11-003 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-003 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
156-11-004 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-004 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
156-11-005 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-005 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
156-11-006 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 156-11-006 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-01-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-01-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-001 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-001 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-002 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-002 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-003 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-003 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-004 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-004 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-005 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 631-11-005 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-006 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-006 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-008 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-008 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-009 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-009 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-010 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-010 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr | ||||||
| Carpenter OT | Hr | ||||||
| Shipfitter ST | Hr | ||||||
| Shipfitter OT | Hr | ||||||
| Painter/Sandblaster ST | Hr | ||||||
| Painter/Sandblaster OT | Hr | ||||||
| Burner/Welder ST | Hr | ||||||
| Burner/Welder OT | Hr | ||||||
| Laborer ST | Hr | ||||||
| Laborer OT | Hr | ||||||
| Tank Cleaner ST | Hr | ||||||
| Tank Cleaner OT | Hr | ||||||
| Shipwright ST | Hr | ||||||
| Shipwright OT | Hr | ||||||
| Firewatch ST | Hr | ||||||
| Firewatch OT | Hr | ||||||
| Material | Dollars | ||||||
| Material G&A handling | Dollars | ||||||
| Travel | Dollars | ||||||
| Travel G&A | Dollars | ||||||
| Staging | Dollars |
TOTAL Dollars
176-11-011 ELIN
| REQUEST FOR PRICE PROPOSAL | N42158-21-R-S004 | NO. PAGES: 1 OF 1 | |||||
| VESSEL: USS Toledo (SSN-769) | POP: Base Year 2/23/2021 to 2/22/2022 with 2 1-year options ending 2/22/2024 | ||||||
| LOCATION: NNSY, PORTSMOUTH, VA | CORs: | TBD | |||||
| CONTRACTOR: | CLOSING: | TBD | |||||
| ITEM | 176-11-011 | ||||||
| DESCRIPTION | PRIME QTY | SUBKR QTY | TOTAL QTY | UNIT OF ISSUE | UNIT PRICE | TOTAL | |
| Project Manager ST | Hr | ||||||
| Project Engineer ST | Hr | ||||||
| Project Engineer OT | Hr | ||||||
| Supervisor ST | Hr | ||||||
| Supervisory OT | Hr | ||||||
| Quality Assurance ST | Hr | ||||||
| Quality Assurance OT | Hr | ||||||
| Marine Chemist ST | Hr | ||||||
| Marine Chemist OT | Hr | ||||||
| Competent Person ST | Hr | ||||||
| Competent Person OT | Hr | ||||||
| Rigger ST | Hr | ||||||
| Rigger OT | Hr | ||||||
| Carpenter ST | Hr |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .