This is Amendment #0001 to NAVFAC Specification 7179548 for upgrading restrooms in multiple DLA buildings at Marine Corps Air Station Cherry Point, NC. The amendment provides responses to pre-award RFIs and maintains the original deadlines.
The amendment includes important submission deadlines: pre-award RFIs are due December 9, 2024 at 9:00 AM, and proposals are due December 18, 2024 at 12:00 PM local time. The amendment addresses one RFI question regarding project phasing, directing contractors to reference paragraph 1.2.e in Section 01 14 00 for phasing details and submit proposals in accordance with the RFP, specifications, drawings and amendments. The amendment emphasizes that acknowledgment is required with proposal submission and failure to acknowledge may result in proposal rejection. For proposals already submitted, acknowledgment must be made by telegram stating whether the price will remain unchanged or be adjusted, and must be received before the proposal opening time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0008 7179548.pdf | ||
| Amendment 0007 7179548.pdf | ||
| Amendment 0006 7179548.pdf | ||
| Amendment 0005 7179548.pdf | ||
| Amendment 0004 7179548.pdf | ||
| Amendment 0003 7179548.pdf | ||
| Amendment 0002 7179548.pdf | ||
| 7179548 SpecsAsOne SIGNED.pdf | ||
| RFP 7179548.pdf | ||
| 7179548 DrawingsAsOne SIGNED.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVFAC
SPECIFICATION
7179548 Upgrade Restrooms DLA Multiple Bldgs.
MCAS Cherry Point, NC
AMENDMENT #0001
IMPORTANT
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of the proposal.
If your proposal has been submitted prior to the receipt of this amendment, acknowledgement should be made by telegram, which should state whether the price contained in your proposal is to remain unchanged, is to be decreased by an amount, or is to be increased by an amount. The acknowledgement must be received prior to proposal opening time.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0001 11/26/2024 7179548
6. ISSUED BY Code N40085 7. ADMINISTERED BY (If other than item 6.) Code CG MCAS Cherry Point
FACILITIES, ROICC
B-87, 748 Roosevelt Blvd.
PSC BOX 8006
CHERRY POINT, NC 28533
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION
Upgrade Restrooms DLA Multiple Bldgs.
9B. DATED (SEE ITEM 11)
AMENDMENT MUST BE ACKNOWLEDGED WITH YOUR PROPOSAL 10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (if required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14. ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATION CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER: (specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return original to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
7179548 Upgrade Restrooms DLA Multiple Bldgs., Marine Corps Air Station Cherry Point, NC
Amendment 0001 is being issued to answer pre-award RFI’s.
The deadline to submit pre-award RFI’s REMAINS 09 December 2024 at 9:00 AM.
The proposal due date of 18 December 2024 at 12:00 PM local time REMAINS unchanged.
See Attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR (Same as Item 8) 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.1-83) 0224-3(10-90)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
Amendment 0001 7179548 Upgrade Restrooms DLA Multiple Bldgs.
RFI Responses:
1. Spec Section 01 11 00, Paragraph 1.3 indicates that before work is started on the project the Contractor is to arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways. However, the Tenant Command’s or the FEAD’s approach to completing this multi‐site project as specified may differ significantly from the Contractor’s approach. Can a phasing plan for the project be provided by Amendment?
Response:
See paragraph 1.2 e. in Section 01 14 00 where phasing is described. Submit proposals in accordance with RFP, Specifications, Drawings and all amendments. Also a continuation sheet must be provided.