This is an Amendment to Solicitation (Amendment 0002) for solicitation N40085-26-R-9026, issued by NAVPAC Mid-Atlantic on April 15, 2026, with an effective date of March 25, 2026. The solicitation pertains to painting and flooring work for Buildings 960, 962, 1069, and others at Camp Lejeune, NC (Project 25-0405).

The amendment consists of answers to 13 questions submitted by potential offerors regarding the scope of work. Key clarifications include: extent of coverage and surface scope requirements are detailed in the project scope of work; coating requirements and surface preparation standards are specified in Paint Specs and Division 1 specifications; color matching should follow existing colors unless otherwise specified; all flooring quantities must be verified by the contractor in the field; cove base specifications and linear footage should be confirmed by the contractor; phasing and access must be coordinated with the Point of Contact (POC); buildings will remain occupied during construction unless noted otherwise; the contractor is responsible for furniture movement; and final inspection standards reference Flooring Specs and Division 1 specifications. The time and date for receipt of proposals remains unchanged. Offerors must acknowledge receipt of this amendment when submitting proposals, as failure to do so may result in rejection.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N40085-26-R-9026 Amendment 0002

CONTINUATION SHEET

Question 1: Extent of Coverage – Confirm whether all rooms, hallways, stairwells, and common areas require painting or only repair areas.

Answer 1: Refer to scope of work for project.

Question 2: Surface Scope – Should painting include walls, ceilings, doors, frames, trim, and baseboards?

Answer 2: Refer to scope of work for project.

Question 3: Coating Requirements – Confirm number of coats and whether primer is required.

Answer 3: Refer to Paint Specs and Division 1 specs

Question 4: Color Specifications – Will standard colors be provided or match existing?

Answer 4: Match existing color unless a color is specified in scope of work.

Question 5: Surface Preparation – Confirm level of prep required (patching, sanding, crack repair).

Answer 5: Refer to Paint Specs and Division 1 Specs

Question 6: Flooring Quantities – Confirm whether quantities are per room, per building, or total.

Answer 6: All quantities should be verified by contractor.

Question 7: Flooring Type – Confirm required materials and matching requirements.

Answer 7: Refer to scope of work for project.

Question 8: Subfloor Preparation – Confirm prep requirements (adhesive removal, leveling, moisture mitigation).

Answer 8: Refer to Flooring Specs.

Question 9: Cove Base – Confirm linear footage and specifications.

Answer 9: All quantities should be field verified by contractor for lineal footage. to Flooring Specs. Refer to Flooring Specs and Division 1 Specs for cove base.

Question 10: Phasing and Access – Will all areas be available at once or phased?

Answer 10: Contact POC for access and scheduling.

Question 11: Occupancy – Will buildings be vacant during construction?

Answer 11: Buildings will be occupied unless otherwise noted by POC.

Question 12: Furniture – Will furniture be removed or contractor responsibility?

Answer 12: Moving furniture is responsibility of contractor.

Question 13: Inspection Standards – Confirm expectations for final finish quality.

Answer 13: Refer to Flooring Specs and Division 1 specs.

2. All other terms and conditions remain unchanged.

Amendment 0002 SF30
Untitled
Untitled

SF30 Continuation Sheet

IDCode:
Page: 1
Pages: 3
AmendNo: AMENDMENT NO. 0002
EffDate: 04/15/26
ReqNo:
ProjNo: 25-0405
IssCode: N40085
IssuedBy: NAVFAC Mid-Atlantic

Resident Officer in Charge of Construction 1107A Birch Street Camp Lejeune, NC 28547-2521

AdmCode:
AdminBy: See Item 6
ContName:
ContStrt:
ContCnty:
ContSt:
ContZIP:
Code:
FacCode:
SolChgYs: Yes
SolChgNo: Off
SolAmdNo: N40085-26-R-9026
AmendDate: 3/25/26
ModNo:
ModDate:
NoCopies: 1
Amended: Yes
OffrExt: Off
OffrNoEx: No
ApprData:
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: 25-0405, Painting and Flooring Bldg S960, S962, 1069, etc.

Amendment 0002, Answer Requests for information

The time and date for receipt of proposals remains unchanged.

This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.