Attachment B SP-364 Dwgs.pdf

PDF 10 MB Posted

Attached to
SP-364 Replace Underground Cabling in SP Area
Solicitation number
N4008526R0249
Issued by

About this file

This is a set of construction drawings for a federal contract project to replace underground cabling in the SP Area at Naval Station Norfolk, Virginia. The project is administered by Naval Facilities Engineering Systems Command (NAVFAC) Mid-Atlantic, with the Resident Officer in Charge of Construction located in Norfolk, Virginia. The contract number is SP-364, and the drawings were last revised on September 14, 2023.

The project scope includes demolition of existing underground electrical cabling and associated infrastructure, followed by installation of new underground electrical ductbank systems and cable routing. Key deliverables shown in the drawings include existing conditions and demolition plans (sheets CD101-CD104), civil site plans (sheets CS101-CS104), structural details for electrical junction box concrete pads (sheets S501), electrical site plans (sheets ED101-ED104 and ES101-ES104), manhole details for various existing structures (sheets ED501-ED502 and ES501-ES502), termination cabinet details, ductbank installation details, one-line electrical diagrams, and new and demolition cable schedules. The work involves coordination among civil, structural, and electrical disciplines, with specific requirements for concrete pads supporting electrical junction boxes with maximum weights of 800 and 700 pounds respectively. Construction materials specifications include 4,000 PSI normal weight concrete, ASTM A615 Grade 60 reinforcing steel, and concrete surface finishes per ACI 301 Class A standards. The drawings reference coordination requirements with NAVFAC Utilities Energy Management for outage scheduling on 11.5kV electrical systems and require contractor compliance with special inspection requirements and utility locating procedures prior to excavation work.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP

SP-364 REPLACE UNDERGROUND

CABLING IN SP AREA

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND ~ MID-ATLANTIC

RESIDENT OFFICER IN CHARGE OF CONSTRUCTION

NORFOLK, VIRGINIA

LOCATION MAP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NAVAL STATION NORFOLK - NORFOLK, VIRGINIA

N

N

G-001

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

SHEET LIST TABLE

SHEET SHEET

NUMBER NAVFAC DRAWING SHEET TITLE

SHEET LIST TABLE

SHEET SHEET

NUMBER NAVFAC DRAWING SHEET TITLE

FI

LE

N

AM

E:

P

:\V A\

Na va lS tat ion No rfo lk\

Si tew or k\E lec Si te\ El ec tD ist r\2

4_

9_

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

SW

CH

1-

4\B _D es ign

\D W

GS

\S he et\

_C

IV

\18

9- C-

1.d wg L

AY

OU

T

NA

ME

: C

-0

A

BB

RE

VI

AT

IO

NS

L

EG

EN

D A

ND

G

EN

ER

AL

N

OT

ES

P

LO

TT

ED

: T hu rsd ay

, M ay

, 2

6 -

:02 pm U

SE

R:

da vid

.n.

bu rn ett e

BITUMINOUS PAVEMENT

BOLLARD

BUILDING

CONCRETE SIDEWALK

CONTOUR

DROP INLET

ELECTRIC MANHOLE

EXIST TRANSFORMER

FENCE

FIRE HYDRANT

MOORING EYE

NATURAL GAS

SPOT ELEVATION

STORM MANHOLE

STORM DRAIN LINE

SANITARY CLEANOUT

SANITARY MANHOLE

SANITARY SEWER

UNDERGROUND COMMUNICATIONS

UNDERGROUND ELECTRIC

WATER

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

AB

BR

EV

IA

TI

ON

S, LE

GE

ND

, A

ND

G

EN

ER

AL

N

OT

ES

CEV CEV WHW

AS NOTED

12,944,648

C-001

W. WITHAM, P.E.

1. VERIFY THE EXISTENCE AND LOCATION OF UTILITIES PRIOR TO EXCAVATION

AND CONSTRUCTION WORK. NOTIFY THE CONTRACTING OFFICER WHERE

CONFLICTS EXIST THAT WOULD ADVERSELY AFFECT WORK.

2. REPLACE WITH MATCHING MATERIALS PAVEMENT, DRIVEWAYS, WALKS,

CURBS, LANDSCAPING, ETC., THAT MAY BE CUT OR THAT ARE DAMAGED

DURING CONSTRUCTION AT CONTRACTOR'S EXPENSE.

3. REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL SITE WORK INCLUDING

DEMOLITION AND NEW UTILITY INSTALLATION.

4. UNLESS OTHERWISE NOTED, EXISTING UTILITIES MUST REMAIN IN PLACE.

PROTECT EXISTING UTILITIES FROM DAMAGE DURING CONSTRUCTION. HAND

EXCAVATE WITHIN 2 FEET OF EXISTING UTILITIES. DAMAGE TO EXISTING

UTILITIES (INCLUDING BUT NOT LIMITED TO WATER, SEWER, FUEL, ELECTRIC,

TELEPHONE, AND STORM DRAINS) MUST BE REPAIRED TO THE SATISFACTION

OF THE CONTRACTING OFFICER, AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. DEPTH OF EXISTING UTILITIES, SUCH AS FUEL, WATER, ELECTRIC,

TELECOMMUNICATIONS, AND FIBER OPTIC ARE BASED ON INDUSTRY

STANDARDS. VERIFY THE DEPTH AND SIZE OF EXISTING UTILITIES PRIOR TO

CONSTRUCTION. IMMEDIATELY CONTACT THE CONTRACTING OFFICER IF

EXISTING UTILITIES WILL CONFLICT WITH WORK.

6. PRIOR TO EXCAVATION, CONTACT MISS UTILITY OF VIRGINIA (TELEPHONE#

811) TO HAVE THE EXISTING UNDERGROUND LINES MARKED ON THE GROUND

SURFACE IN THE AREAS OF CONSTRUCTION.

7. COMPLY WITH THE PROVISIONS OF THE "VIRGINIA UNDERGROUND UTILITY

DAMAGE PREVENTION ACT" (SECTION 56-265.14 ET. SEQ., CODE OF VIRGINIA,

1950, AMENDED).

8. PROVIDE SMOOTH AND GRADUAL GRADE TRANSITIONS WITH NO SHARP OR

ABRUPT CHANGES UNLESS OTHERWISE NOTED.

9. COORDINATE WITH THE CONTRACTING OFFICER FOR LAYDOWN AREAS PRIOR

TO DELIVERY OF MATERIALS.

10. FIELD VERIFY EXISTING DIMENSIONS AND QUANTITIES PRIOR TO ORDERING

MATERIALS OR BEGINNING WORK.

11. BEGIN EARTHWORK ACTIVITIES ONLY AFTER SOIL EROSION DEVICES ARE

IN-PLACE. SOIL EROSION DEVICES MUST INCLUDE, BUT ARE NOT LIMITED TO,

INLET PROTECTION. ENSURE THAT NO OFFSITE SEDIMENT LOSS OCCURS.

12. NEW WORK WILL BE ACCOMPLISHED IN AND AROUND AREAS WHICH WILL

REMAIN OPERATIONAL. ACCORDINGLY, AVOID INTERFERENCE WITH THE

OPERATIONAL WORK ROUTINE.

13. PROPERLY STOCKPILE SOIL THAT IS EXCAVATED AND REUSED TO PREVENT

OFFSITE SEDIMENT LOSS.

14. ANY EXCAVATED SOIL SHIPPED OFFSITE MUST BE MANIFESTED AND DISPOSED

OF AT A PERMITTED FACILITY.

15. ALL LAND DISTURBANCES MUST BE GRADED AND A LANDSCAPE PATCH TO A

WIDTH OF AT LEAST 5 FEET BEYOND THE DISTURBANCE. REFER TO SHEET

C-501 FOR DETAIL.

EXISTING NEW

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL NOTES:

CIVIL ABBREVIATIONS:

CIVIL LEGEND:

A/C AIR CONDITIONING UNIT

APPROX APPROXIMATE

ATFP ANTI-TERRORISM FORCE

PROTECTION

BLDG BUILDING

BOL BOLLARD

BW BOTTOM OF WALL

CO CLEANOUT

CONC CONCRETE

DEMO DEMOLITION

DI DROP INLET

DIP DUCTILE IRON PIPE

EJB ELECTRIC JUNCTION BOX

EMH ELECTRIC MANHOLE

EXIST EXISTING

EP EDGE OF ASPHALT

PAVEMENT

FDC FIRE DEPARTMENT

CONNECTION

FEP FUEL EFFICIENT PARKING

FES FLARED END SECTION

FFE FINISHED FLOOR

ELEVATION

FH FIRE HYDRANT

FL FLOW LINE

FM SANITARY SEWER FORCE

MAIN

FO FIBER OPTIC

GV GATE VALVE

HP HIGH POINT

INV INVERT

LF LINEAR FEET

L/P LIGHT POLE

MG MATCH EXISTING GRADE

MH MANHOLE

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OHE OVERHEAD ELECTRICAL

PIV POST INDICATOR VALVE

P/P POWER POLE

R RADIUS

RD ROOF DRAIN

SCO SANITARY CLEANOUT

SMH SANITARY MANHOLE

TBM TEMPORARY BENCHMARK

TC TOP OF CURB

TEMP TEMPORARY

TMH TELEPHONE MANHOLE

T PED TELEPHONE PEDESTAL

TOB TOP OF BANK

TSV TAPPING SLEEVE & VALVE

TW TOP OF WALL

TYP TYPICAL

RCO ROOF DRAIN CLEANOUT

RD ROOF DRAIN

UD UNDER DRAIN

UGE UNDER GROUND

ELECTRICAL

UON UNLESS OTHERWISE

NOTED

WV WATER VALVE

VB VALVE BOX

W/ WITH

E

XFR

D

S

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

EX

IS

TI

NG

C

ON

DI

TI

ON

S

DE

MO

LIT

IO

N

PL

AN

CEV CEV WHW

AS NOTED

12,944,649

CD101

W. WITHAM P.E.

EXISTING CONDITIONS AND DEMOLITION PLAN

GRAPHIC SCALE

40'0'

1"=20' 20'10'

GENERAL SHEET NOTES

KEYNOTES

1. COORDINATE WITH THE ELECTRICAL PLANS FOR RELATED WORK.

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

MATCHLINE SHEET CD102

PLA

NORTH

KEY MAP

CD101

CD102

CD103

CD104

IP

IP IP

IP

EX

IS

TI

NG

C

ON

DI

TI

ON

S

DE

MO

LIT

IO

N

PL

AN

CEV CEV WHW

AS NOTED

12,944,650

CD102

W. WITHAM, P.E.

EXISTING CONDITIONS AND DEMOLITION PLAN

GRAPHIC SCALE

40'0'

1"=20' 20'10'

GENERAL SHEET NOTES

KEYNOTES

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

MATCHLINE SHEET CD101

MATCHLINE SHEET CD103

PLA

NORTH

1. COORDINATE WITH THE ELECTRICAL PLANS FOR RELATED WORK.

2. REMOVE CONCRETE SIDEWALK. SAWCUT SIDEWALK AT THE NEAREST

EXISTING JOINTS.

1 2

KEY MAP

CD101

CD102

EX

IS

TI

NG

C

ON

DI

TI

ON

S

DE

MO

LIT

IO

N

PL

AN

CEV CEV WHW

AS NOTED

12,944,651

CD103

W. WITHAM, P.E.

EXISTING CONDITIONS AND DEMOLITION PLAN

GRAPHIC SCALE

LEGEND

LIMITS OF DISTURBANCE

40'0' 1"=20'

20'10'

GENERAL SHEET NOTES

KEYNOTES

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

SAWCUT PAVEMENT

IP

2" MILL AND OVERLAY

PAVEMENT MARKING ERADICATION

INLET PROTECTION

REMOVE

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

MATCHLINE SHEET CD102

M

ATCHLINE SHEET CD104

PLA

NORTH

1. COORDINATE WITH THE ELECTRICAL PLANS FOR RELATED WORK.

2. REMOVE CONCRETE SIDEWALK. SAWCUT SIDEWALK AT THE NEAREST

EXISTING JOINTS.

1 1

2 2

93'

6'

8'

6' 8'

KEY MAP

CD101

CD102

EX

IS

TI

NG

C

ON

DI

TI

ON

S

DE

MO

LIT

IO

N

PL

AN

CEV CEV WHW

AS NOTED

12,944,652

CD104

W. WITHAM, P.E.

EXISTING CONDITIONS AND DEMOLITION PLAN

GRAPHIC SCALE

40'0'

1"=20' 20'10'

GENERAL SHEET NOTES

KEYNOTES

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

M

AT

CH

LI

NE

S

HE

ET

C D1

PLA

NORTH

1. COORDINATE WITH THE ELECTRICAL PLANS FOR RELATED WORK.

KEY MAP

CD101

CD102

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

CS101

MATCHLINE SHEET CS102

PLA

NORTH

CIVIL SITE PLAN

KEYPLAN

CS101

CS102

CS103

CS104

IP IP

IP

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

CS102

MATCHLINE SHEET CS103

MATCHLINE SHEET CS101

PLA

NORTH

CIVIL SITE PLAN

KEY MAP

CS101

CS102

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

CS103

MATCHLINE SHEET CS102

M

ATCHLINE SHEET CS104

PLA

NORTH

CIVIL SITE PLAN

KEY MAP

CS101

CS102

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

CS104

PLA

NORTH

M

ATCHLINE SHEET CS103

CIVIL SITE PLAN

KEY MAP

CS101

CS102

CI

VI

L D

ET

AI

LS

CEV CEV WHW

AS NOTED

12,944,657

C-501

W. WITHAM, P.E.

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

TYPICAL CONCRETE SIDEWALK TYPICAL CONCRETE JOINT DETAIL

2'-6" MIN2'-6" MIN

TRENCH

WIDTH

TYPICAL UTILITY TRENCH IN UN-PAVED AREAS

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/ 5/

:5

5:

P M

C :\U se rs

\d av id .n

.b ur ne tte

\D oc um en ts \S

P3

_1

_S _R

_d av id

.n .b ur ne tte .rv t

S-001

SP

R

EP

LA

CE

U

ND

ER

G

RO

UN

D

CA

BL

IN

G

ST

RU

CT

UR

AL

S

YM

BO

LS

, L

EG

EN

DS

, A

BB

RE

VI

AT

IO

NS

A

ND

N O

TE

S

DSG

12,944,658

BSH BSH

05/05/2026

JANICE D. FISHBURN, P.E.

DAVE BURNETTE

1806349

N/A

NO

RF

OL

K, V

IR

GI

NI

A

NA

VA

L S

TA

TI

ON

N

OR

FO

LK

J. MILLER, P.E.

D. GREGORY, P.E.

M

ID

LA

N

T D

C C

O R

E

S-

GENERAL NOTES GENERAL SCOPE OF WORK REINFORCING STEEL NOTES STRUCTURAL ABBREVIATIONS STRUCTURAL SYMBOLS

1 STRUCTURAL DRAWINGS MUST BE USED IN CONJUNCTION WITH DRAWINGS

OF ALL OTHER DISCIPLINES AND SPECIFICATIONS. VERIFY REQUIREMENTS

OF OTHER TRADES AS TO SLEEVES, CHASES, HANGERS, INSERTS, ANCHORS,

HOLES AND OTHER ITEMS TO BE PLACED OR SET IN THE STRUCTURAL WORK

AS WELL AS TO BE TEMPORARILY DISCONNECTED AND RECONNECTED TO

ALLOW FOR THE INSTALLATION OF THE STRUCTURAL WORK.

2 THE CONTRACTOR IS RESPONSIBLE FOR COMPLYING WITH SAFETY

PRECAUTIONS AND REGULATIONS DURING THE WORK. THE STRUCTURAL

ENGINEER WILL NOT ADVISE ON, NOR ISSUE DIRECTION AS TO SAFETY

PRECAUTIONS AND PROGRAMS.

3 STRUCTURAL DRAWINGS HEREIN REPRESENT THE FINISHED STRUCTURE.

PROVIDE ALL TEMPORARY SHORING, TEMPORARY SUPPORTS, GUYING AND

BRACING REQUIRED TO ERECT AND HOLD THE STRUCTURE IN PROPER

ALIGNMENT UNTIL ALL STRUCTURAL WORK AND CONNECTIONS HAVE BEEN

COMPLETED. THE INVESTIGATION, DESIGN, SAFETY, ADEQUACY AND

INSPECTION OF ERECTION BRACING, SHORING, TEMPORARY SUPPORTS, ETC.,

IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

4 THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR THE METHODS,

TECHNIQUES, AND SEQUENCES OF PROCEDURES TO PERFORM THE WORK.

SUPERVISION OF WORK IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

5 DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION.

WHERE CONDITIONS ARE NOT SPECIFICALLY SHOWN, USE SIMILAR DETAILS

OF CONSTRUCTION, SUBJECT TO APPROVAL BY THE CONTRACTING OFFICER.

6 ALL ASTM AND OTHER REFERENCES ARE PER THE LATEST EDITIONS OF

THESE STANDARDS, UNLESS OTHERWISE NOTED.

7 SHOP DRAWINGS MUST BE SUBMITTED FOR REVIEW BY THE GENERAL

CONTRACTOR PRIOR TO CONSTRUCTION. ALL SHOP DRAWINGS MUST BE

REVIEWED BY THE GENERAL CONTRACTOR BEFORE SUBMITTAL. THE REVIEW

IS TO BE FOR CONFORMANCE WITH THE DESIGN CONCEPT AND GENERAL

COMPLIANCE WITH THE RELEVANT CONTRACT DOCUMENTS. THE REVIEW

DOES NOT RELIEVE THE CONTRACTOR OF THE SOLE RESPONSIBILITY TO

REVIEW, CHECK, AND COORDINATE THE SHOP DRAWINGS PRIOR TO

SUBMISSION. THE CONTRACTOR REMAINS SOLELY RESPONSIBLE FOR

ERRORS AND OMISSIONS ASSOCIATED WITH THE PREPARATION OF SHOP

DRAWINGS AS THEY PERTAIN TO SIZES, DETAILS, DIMENSIONS, ETC. ANY

PROPOSED CHANGES MUST BE SUBMITTED IN A LETTER OR DETAIL TO THE

CONTRACTING OFFICER FOR APPROVAL.

8 IN NO CASE MAY REPRODUCTION OF THE CONTRACT DRAWINGS BE USED AS

SHOP DRAWINGS. SUBCONTRACTOR MUST PROVIDE INDEPENDENTLY

CREATED DRAWINGS BASED ON THE PLANS AND DETAILS.

9 IN ACCORDANCE WITH THE IBC, SPECIAL INSPECTIONS WILL BE REQUIRED

FOR THIS PROJECT. SPECIAL INSPECTIONS MUST BE PERFORMED IN

ACCORDANCE WITH THE "SCHEDULE OF SPECIAL INSPECTIONS". THE

CONTRACTOR MUST NOTIFY THE SPECIAL INSPECTOR AT LEAST 48 HOURS IN

ADVANCE FOR WORK THAT WILL REQUIRE INSPECTION OR TESTING. IF

REQUIRED, THE CONTRACTOR MUST EMPLOY THIRD PARTY SPECIAL

INSPECTOR.

10 CONTRACTOR MUST VISIT THE SITE PRIOR TO BID TO ASCERTAIN CONDITIONS

WHICH MAY ADVERSELY AFFECT THE WORK OR COST THEREOF.

11 FIELD VERIFY DIMENSIONS, ELEVATIONS, INTERFERENCES AND OTHER

REQUIREMENTS NECESSARY FOR THE PROPER CONSTRUCTION AND

ALIGNMENT OF NEW PORTIONS OF THE STRUCTURE TO EXISTING. MAKE ALL

MEASUREMENTS NECESSARY FOR CONSTRUCTION. DISCREPANCIES MUST

BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER PRIOR TO

ORDERING MATERIALS OR BEGINNING WORK (CONSTRUCTION OR

DEMOLITION).

12 ALL ITEMS NOTED TO BE DEMOLISHED OR REMOVED WILL BECOME THE

CONTRACTOR'S PROPERTY, UNLESS NOTED OTHERWISE. DISPOSITION OF

THE ITEMS / MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR AND

MUST ADHERE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL

REGULATIONS.

13 TAKE CARE NOT TO DAMAGE THE EXISTING STRUCTURE. WHERE EXISTING

CONSTRUCTION IS DAMAGED BY THE CONSTRUCTION REQUIRED BY THESE

DOCUMENTS, REPAIR THE DAMAGE ITEM(S) WITH MATERIALS TO MATCH THE

ADJACENT MATERIAL, TEXTURE, AND COLOR.

14 DO NOT HANG ITEMS FROM EXISTING STRUCTURE, UNLESS NOTED

OTHERWISE.

15 LOCATE AND PROTECT ALL EXISTING UNDERGROUND UTILTIES.

1 THE EXTERIOR EQUIPMENT PADS HAVE BEEN DESIGNED FOR AN

ELECTRICAL JUNCTION BOX LIMITED TO 800 LBS. MAXIMUM WEIGHT.

2 EXCAVATION MADE WITH POWER-DRIVEN EQUIPMENT IS NOT PERMITTED

WITHIN TWO FEET OF KNOWN UTILTIES OR OTHER SUBSURFACE

CONSTRUCTION. FOR WORK IMMEDIATLEY ADJACENT TO, OR FOR

EXCEVATIONS EXPOSING A UTILTIY OR OTHER BURRIED OBSTRUCTION,

EXCEVATE BY HAND.

3 POROUS FILL MUST BE COURSE AGGREGATE VDOT NO. 57.

4 REUSE EXCAVATED MATERIAL TO THE BEST EXTENT POSSIBLE. REMOVE

ALL UNUSED EXCAVATED MATERIAL AND DISPOSE OF OFF SITE, FOR

BIDDING PURPOSES, ASSUME ALL EXCAVATED MATERIAL THAT IS NOT

REUSED AS CONTAMINATED.

FOUNDATION NOTES

1. THE GENERAL SCOPE OF WORK INCLUDES, BUT IS NOT LIMITED TO:

SP-364:

- (1) CONCRETE PADS FOR ELECTRICAL JUNCTION BOX

(MAX. WEIGHT 800 LBS., EQUIP. PLAN DIMENSION 72.73"(L) X 35"(W))

- (1) CONCRETE PADS FOR ELECTRICAL JUNCTION BOX

(MAX. WEIGHT 700 LBS., EQUIP. PLAN DIMENSION 61.89"(L) X 35"(W))

ANY INCIDENTAL RELATED WORK SHOWN ON OTHER DISCIPLINE DRAWINGS.

CAST-IN-PLACE CONCRETE NOTES

1 REINFORCING MATERIALS MUST BE AS FOLLOWS:

A. REINFORCING BARS - ASTM A615, GRADE 60, DEFORMED

B. TIES AND STIRRUPS - ASTM A615, GRADE 40

2 PLACE REINFORCING STEEL IN ACCORDANCE WITH THE CONCRETE

REINFORCING STEEL INSTITUTE (crsi) "MANUAL OF STANDARD PRACTICE".

REINFORCING STEEL MUST NOT CONTAIN RUST, SCALE, OIL, GREASE,

CLAY, OR FOREIGN SUBSTANCES THAT WOULD REDUCE THE BOND.

REMOVE LOOSE RUST PRIOR TO PLACEMENT.

3 UNLESS OTHERWISE NOTED, THE FOLLOWING MINIMUM CONCRETE COVER

MUST BE PROVIDED FOR CONCRETE PROTECTION OF REINFROCING, AS

WELL AS PLACING AND FABRICATION OF REINFORCING, IN ACCORDANCE

WITH RECCOMENDATIONS IN ACI 318:

A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH = 3"

B. CONCRETE CAST IN FORMS AND EXPOSED TO EARTH OR WEATHER:

I. STRUCTURAL SLAB ON GRADE = 2"

II. #6 AND LARGER BARS = 2 1/2"

III. #5 BAR, W31 OR D31 WIRE & SMALLER = 1-1/2"

IV. INTERIOR WALLS AND SLABS = 1-1/2"

4 SHOP DRAWINGS MUST BE SUBMITTED FOR REVIEW PRIOR TO

FABRICATION OF REINFORCING STEEL.

5 LAP CONTINUOUS REINFORCING STEEL A MINIMUM LENGTH OF 36 X BAR

DIAMETER OF SLAMMER BAR BEING LAPPED.

6 DETAIL BARS IN ACCORDANCE WITH ACI DETAILING MANUAL, LATEST

EDITION. PROVIDE ALL ACCESSORIES NECESSARY TO SUPPORT

REINFORCING IN POSITIONS SHOWN. BAR SUPPORTS AND HOLDING BARS

MUST BE PROVIDED FOR ALL REINFORCING STEEL TO INSURE MINIMUM

CONCRETE COVER. BAR SUPPORTS MUST BE PLASTIC TIPPED OR

STAINLESS STEEL.

7 EACH REINFORCING BAR MUST BE WIRED TO A CROSS BAR AT A MAXIMUM

SPACING OF 2'-0" ON CENTER.

8 ALL REINFORCING STEEL, DOWELS, ANCHOR RODS, AND OTHER

HARDWARE TO BE SET IN CONCRETE MUST BE TIED IN PLACE PRIOR TO

THE PLACEMENT OF CONCRETE TO PREVENT DISPLACEMENT BEYOND

PERMITTED TOLERANCES.

ARCH ARCHITECT, -URAL

B.P. BASE PLATE

BLDG BUILDING

BOD BOTTOM OF DECK

BOF BOTTOM OF FOOTING

BOT BOTTOM

BRCG BRACING

CJ CONTROL JOINT

CL CENTER LINE

CLR CLEAR

COL COLUMN

CONC CONCRETE

CONT CONTINUOUS

DEMO DEMOLISH

DIA (OR) Ø DIAMETER

DIM(S) DIMENSION(S)

DWGS DRAWINGS

E, EXIST EXISTING

E.W. EACH WAY

EA EACH

EF EACH FACE

EL, ELEV ELEVATION

EQ, EQUIV EQUAL, EQUIVALENT

F'C COMPRESSIVE STRESS

FDN FOUNDATION

FF EL FINISHED FLOOR ELEVATION

FOS FACE OF SLAB

FS FAR SIDE

FTG FOOTING

FY ALLOWABLE YIELD STRESS

GA GAUGE

HDG, GALV HOT DIPPED GALVANIZED

HORIZ HORIZONTAL

HSS HOLLOW STRUCTURAL SHAPES

IAW IN ACCORDANCE WITH

INFO INFORMATION

INT INTERIOR

KSI KILOPOUNDS (KIPS) PER SQUARE INCH

L ANGLE

LB, LBS POUNDS

LF LINEAR FEET

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

MATL MATERIAL

MAX MAXIMUM

MD METAL DECK

MECH MECHANICAL

MFR MANUFACTURER

MIN MINIMUM

MOS MID-DEPTH OF SLAB

MPH MILES PER HOUR

NS NEAR SIDE

NTS NOT TO SCALE

OC ON CENTER

OPH OPPOSITE HAND

PL PLATE

PLF POUNDS PER LINEAR FOOT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

RE, REF REFERENCE

REINF REINFORCE, -MENT

REQD REQUIRED

SF SQUARE FEET

SIM SIMILAR

SPA SPACING

SPEC CONTRACT SPECIFICATIONS

SQ SQUARE

SS STAINLESS STEEL

STD STANDARD

T&B TOP AND BOTTOM

THK THICKNESS

TOC TOP OF CONCRETE

TOF TOP OF FOOTING / FOUNDATION

TOS TOP OF STEEL

TS THICKENED SLAB

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VERT VERTICAL

W/, W/O WITH, WITHOUT

WWF WELDED WIRE FABRIC

~ , APPROX APPROXIMATELY

COMPACTED SUBGRADE / FILL

CRUSHED STONE

N/A

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

1 CONCRETE WORK MUST CONFORM TO THE REQUIREMENTS OF ACI 318-22

"BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE."

2 CONCRETE MUST BE NORMAL WEIGHT AND MUST OBTAIN A 28 DAY

COMPRESSIVE STRENGTH OF 4,000 PSI.

3 BEFORE PLACING CONCRETE, EMBEDDED ITEMS MUST BE PROPERLY

LOCATED, ACCURATELY POSITIONED, AND MAINTAINED SECURELY IN

PLACE. DO NOT FIELD BEND BARS PARTIALLY EMBEDDED IN HARDENED

CONCRETE UNLESS INDICATED OR APPROVED BY THE CONTRACTING

OFFICER.

4 EDGES OF PERMANENTLY EXPOSED CONCRETE SURFACES MUST BE

CHAMFERED 3/4" UNLESS OTHERWISE NOTED.

5 FORMWORK MUST REMAIN IN PLACE UNTIL CONCRETE HAS OBTAINED AT

LEAST 70% OF ITS 28 DAY COMPRESSIVE STRENGTH. THE CONTRACTOR

MUST PROVIDE ALL SHORING AND RESHORING.

6 SLAB FINISH TOLERANCE IN ACCORDANCE WITH ACI 301, CLASS A.

7 CONCRETE MUST BE MECHANICALLY VIBRATED IN ACCORDANCE WITH

ASTM 309R.

8 ANCHOR RODS WITH UPSET THREADS ARE NOT ALLOWED.

9 COORDINATE WITH THE CIVIL AND ELECTRICAL DRAWINGS FOR EXACT

LOCATIONS AND DIMENSIONS OF CONCRETE PADS.

10 SLOPE EXTERIOR SLAB(S) TO DRAIN. COORDINATE WITH CIVIL DRAWINGS

AT LOCATIONS WHERE STRUCTURAL WORK REQUIRES DEMOLITION OF

EXISTING SITE ELEMENTS (PARKING LOTS, SIDEWALKS, ETC.)AND AT WORK

COMPLETION, PATCHING OF THOSE ELEMENTS TO MATCH ADJACENT.

11 CONCRETE EXPOSED TO FREEZE/THAW CYCLES MUST HAVE 6% (+/- 1 1/2%)

ENTRAINED AIR.

NOTES:

1. COORDINATE ELECTRICAL JUNCTION BOX LOCATION AND CABLE WELL WITH

CIVIL, MECHANICAL, AND ELECTRICAL DRAWINGS.

2. CHAMFER (BEVEL) ALL CABLE TRAINING INTERIOR EDGES @ 45 DEGREE

1'

- 0

9"

1'

- 1

0" 4"

1' - 6 1/2" 1' - 6 1/2"

9' - 2"

5'

- 4

1'

- 5

3"

REINFORCEMENT (#4 BARS)

AT MID - SLAB THICKNESS (6" TH.)

TY

PI

CA

L

2" C

LE

AR

1'

- 1

3"

1'

- 1

1'

- 2

3" 1'

- 2

CABLE TRAINING OPENING

ELECTRICAL JUNCTION BOX PAD I:

EQUIPMENT PLAN DIMENSION : 6' - 1" (L) X 2' - 11"'(W)

PAD DIMENSION : 9' - 2" (L) X 5' - 4" (W) X 6" (TH.)

3"5' - 7"

ELECTRICAL JUNCTION

BOX EQUIPMENT

OUTLINE

BETWEEN BARS AT OPENING, TYP.

3" O.C. SPACING

1' - 2" 3" 5" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 5" 3" 1' - 2"

REBAR SPACINGS

RE

BA

R

SP

AC

IN

GS

A3 S501

NOTES:

1. COORDINATE ELECTRICAL JUNCTION BOX LOCATION AND CABLE WELL WITH

CIVIL, MECHANICAL, AND ELECTRICAL DRAWINGS.

2. CHAMFER (BEVEL) ALL CABLE TRAINING INTERIOR EDGES @ 45 DEGREE

1'

- 0

9"

1'

- 1

0" 4"

1' - 6 1/2" 1' - 6 1/2"

8' - 3"

5'

- 4

1'

- 5

3" 4' - 8" 3"

2" CLEAR

REINFORCEMENT (#4 BARS)

AT MID - SLAB THICKNESS (6" TH.)

TY

PI

CA

L

2" C

LE

AR

BETWEEN BARS AT OPENINGS, TYP

3" OC SPACING

1'

- 1

3"

1'

- 1

1'

- 2

3" 1'

- 2

CABLE TRAINING OPENING

ELECTRICAL JUNCTION BOX PAD II:

EQUIPMENT PLAN DIMENSION : 5' - 2" (L) X 2' - 11"'(W)

PAD DIMENSION : 8' - 3" (L) X 5' - 4" (W) X 6" (TH.)

ELECTRICAL JUNCTION

BOX EQUIPMENT

OUTLINE

1' - 1" 3" 6" 1' - 0" 1' - 0" 1' - 0" 1' - 0" 6" 3" 1' - 1"

REBAR SPACINGS

RE

BA

R

SP

AC

IN

GS

A3 S501

6"

CHAMFER TO INTERIOR EDGES

OF CABLE WELL AND ALL PAD

SLAB TOP EDGES

(3/4"x3/4" AT 45 DEGREE)

#4 BARS

AS SHOWN ON

PLAN

CRUSHED VDOT #57 STONE

COMPACTED EXISTING GRADE

6"

CONCRETE PAD3"4"

2"

6"

FINISHED GRADE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 14 SEP 2023

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L F

AC

ILI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

MS

C

OM

MA

ND

MI

D-

AT

LA

NT

IC

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

5/ 5/

:5

5:

P M

C :\U se rs

\d av id .n

.b ur ne tte

\D oc um en ts \S

P3

_1

_S _R

_d av id

.n .b ur ne tte .rv t

S501

SP

R

EP

LA

C E

U N

D

ER

G R

O U

N D

C

AB

LI

N

G

PA

D

D

ET

AI

LS

F O

R E

LE

C

TR

IC

AL

J

U N

C

TI

O N

B O

X

DSG

12,944,659

BSH BSH

05/05/2026

DAVE BURNETTE

1806349

N/A

N O

R

FO

LK

, V

IR

G

IN

IA

N

AV

AL

S

TA

TI

O N

N O

R

FO

LK

J. MILLER, P.E.

D. GREGORY, P.E.

MI

DL

AN

T

DC

C

OR

E

S5

JANICE D. FISHBURN, P.E.

SCALE: 3/4" = 1'-0"A1 PAD DETAILS FOR ELECTRICAL JUNCTION BOX I (PLAN)

SCALE: 3/4" = 1'-0"A4 PAD DETAILS FOR ELECTRICAL JUNCTION BOX II (PLAN)

SCALE: 1" = 1'-0"A3 SECTION 1

MA

RK

D

ES

CR

IP

TI

ON

DA

TE

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL NOTESABBREVIATIONS

GENERAL DEMOLITION NOTES

GENERAL

SITE

ELECTRICAL PROJECT NOTES:

EL

EC

TR

IC

AL

S

YM

BO

LS

L

EG

EN

D A

BB

RE

VI

AT

IO

NS

A

ND

N

OT

ES

DNB DNB JAT

AS NOTED

12,944,660

ES001

J. MORTON, P.E.

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

ELECTRICAL SEQUENCE OF

CONSTRUCTION

SP35

SP254 SP256

SP384

SP296

SP15

SP16

SP250

SP108

SP364

SP30

SP40

SP124

SP256

SP257

SP132

SP12

SP35

SP362

SP254

SP383

SP366

SP250

SP254

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

ELECTRICAL SITE PLAN - DEMOLITION

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

ED101

MATCHLINE SHEET ED102

PLA

NORTH

ED101

ED102

ED103

ED104

KEYPLAN

SP256

SP254

SP250

SP383

SP254 SP366

ELECTRICAL SITE PLAN - DEMOLITION

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

ED102

MATCHLINE SHEET ED103

MATCHLINE SHEET ED101

PLA

NORTH

ED101

ED102

ED103

SP257SP362

SP366

ELECTRICAL SITE PLAN - DEMOLTION

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

ED103

MATCHLINE SHEET ED102

PLA

NORTH

M

ATCHLINE SHEET ED104

GRAPHIC SCALE

CD101

CD102

CD103

CD104

GRAPHIC SCALE

KEYPLAN

CD101

CD102

CD103

CD104

ED101

ED102

ED103

SP364

SP384

SP296

SP15

SP16

SP250

SP108

SP364

SP30

SP40

SP124

SP256

SP257

SP132

SP12

SP35

SP362

SP254

SP383

SP366

SP250

SP254

ELECTRICAL SITE PLAN - DEMOLTION

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

ED104

PLA

NORTH

M

ATCHLINE SHEET ED103

ED101

ED102

ED103

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

EX

IS

TI

NG

M

AN

HO

LE

D

ET

AI

LS

DE

MO

LIT

IO

N

DNB DNB JAT

AS NOTED

12,944,665

ED501

J. MORTON, P.E.

NOT TO SCALE

EXISTING MANHOLE SP-42A DETAIL - DEMOLITIONB3 NOT TO SCALE

EXISTING MANHOLE SP-42B DETAIL - DEMOLITIONB4

(THIS SHEET ONLY)GENERAL SHEET NOTES KEYNOTES

DESCRIPTION VOLTAGE LGTHSIZE INSULID

SW115-3 TO SW111-1

SW110-3 TO SP381N, SP381W, SP383

SW165-3 TO SW131-2

SW115-1 TO SW153-1

SW111-4 TO SP254, SP256, SP257, SP362, SP364, SP366

SW111-2 TO SW111-1

SW110-1 TO SW113-2

SW111-3 TO SW112-2

15KV 500MCM

15KV

15KV

15KV

15KV

15KV

15KV

15KV

500MCM

500MCM

500MCM

4/0

500MCM

500MCM

500MCM

EPR

UNK

EPR

EPR

EPR

EPR

EPR

EPR

UNK

UNK

UNK

UNK

UNK UNK UNK UNK UNK POOR SOUTH OF BLDG SP35UNK

NOT TO SCALE

EXISTING MANHOLE SP-42 DETAIL - DEMOLITIONB1

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

EX

IS

TI

NG

M

AN

HO

LE

D

ET

AI

LS

DE

MO

LIT

IO

N

DNB DNB JAT

AS NOTED

12,944,666

ED502

J. MORTON, P.E.

NOT TO SCALE

MANHOLE SP-42D DETAIL - DEMOLITIONB3 NOT TO SCALE

MANHOLE SP-42E DETAIL - EXISTING/DEMOLITIONB4

(THIS SHEET ONLY)GENERAL SHEET NOTES KEYNOTES

1 11

NOT TO SCALE

MANHOLE SP-42C DETAIL - DEMOLITIONB1

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

U/S 750

U/S 500

SP366

U/S 500

SP254B

SP364(1)

SP362

SP256A

SP256B

SP364(2)

SP257

SW 111 (sf6)

FM SW112

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

ON

E-

LIN

E

DI

AG

RA

M

- D

EM

OL

IT

IO

N

DNB DNB JAT

AS NOTED

12,944,668

ED601

J. MORTON, P.E.

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

KEYNOTES

1. EXISTING EQUIPMENT TO REMAIN.

2. DEMOLISH CABLING. REFER TO SHEET ED701 FOR CABLE SCHEDULE.

3. EXISTING CABLE TO REMAIN.

NOT TO SCALE

PARTIAL ONE-LINE DIAGRAM - DEMOLITION

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

CA

BL

E

SC

HE

DU

LE

DE

MO

LIT

IO

N

DNB DNB JAT

AS NOTED

12,944,667

ED701

J. MORTON, P.E.

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

ELECTRICAL SITE PLAN

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

ES101

MATCHLINE SHEET ES102

PLA

NORTH

KEYPLAN

ES101

ES103

ES104

ES102

SP256

SP254

SP250

SP383

SP254 SP366

SP384

SP296

SP15

SP16

SP250

SP108

SP364

SP30

SP40

SP124

SP256

SP257

SP132

SP12

SP35

SP362

SP254

SP383

SP366

SP250

SP254

ELECTRICAL SITE PLAN

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

ES102

MATCHLINE SHEET ES103

MATCHLINE SHEET ES101

PLA

NORTH

ES101

ES102

ES103

ES104

SP257SP362

SP366

SP254 SP366

ELECTRICAL SITE PLAN

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

ES103

MATCHLINE SHEET ES102

PLA

NORTH

M

AT

CH

LI

NE

S

HE

ET

E S1

ES101

ES102

ES103

SP364

SP384

SP296

SP15

SP16

SP250

SP108

SP364

SP30

SP40

SP124

SP256

SP257

SP132

SP12

SP35

SP362

SP254

SP383

SP366

SP250

SP254

ELECTRICAL SITE PLAN

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

GENERAL SHEET NOTES

GRAPHIC SCALE

KEYNOTES

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

ES104

PLA

NORTH

M

ATCHLINE SHEET ES103

ES101

ES102

ES103

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

MA

NH

OL

E

DE

TA

ILS

DNB DNB JAT

AS NOTED

12,944,673

ES501

J. MORTON, P.E.

(THIS SHEET ONLY)GENERAL SHEET NOTES KEYNOTES

DESCRIPTION VOLTAGE LGTHSIZE INSULID

SW115-3 TO SW111-1

SW110-3 TO SP381N, SP381W, SP383

SW165-3 TO SW131-2

SW115-1 TO SW153-1

SW111-4 TO JB-1 WAY #1

SW111-2 TO SW111-1

SW110-1 TO SW113-2

SW111-3 TO SW112-2

15KV

15KV

15KV

15KV

15KV

15KV

15KV

15KV

4/0

EPR

UNK

EPR

EPR

EPR

EPR

EPR

EPR

UNK

UNK

UNK

UNK

UNK UNK UNK UNK UNK POOR SOUTH OF BLDG SP35UNK

NTS

MANHOLE SP-42 DETAILB1 NTS

MANHOLE SP-42A DETAILB2 NTS

MANHOLE SP-42B DETAILB4

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

4/0 4/0 4/0 4/0

4/0 4/0 4/0

UNK

UNK

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

MA

NH

OL

E

DE

TA

ILS

DNB DNB JAT

AS NOTED

12,944,674

ES502

J. MORTON, P.E.

(THIS SHEET ONLY)GENERAL SHEET NOTES KEYNOTES

NTS

MANHOLE SP-42C DETAILB1 NTS

MANHOLE SP-42D DETAILB2 NTS

MANHOLE SP-42E DETAILB4

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

TE

RM

IN

AT

IO

N

CA

BI

NE

T

DE

TA

ILS

DNB DNB JAT

AS NOTED

12,944,675

ES503

J. MORTON, P.E.

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

NOT TO SCALE

600A ABOVEGROUND TERMINATION CABINET (TYPICAL)

A1

AF-1APRIL 2015

GENERAL ARC FLASH WARNING LABEL

SKETCH DATE STYLE

FINISHED GRADE

CABLE WELL

CONCRETE PAD

REFER TO SHEET

S-XXX

COMPACTED SOIL BACKFILL

REFER TO SHEET S-XXX

DUCT/CONDUIT (SIZE AS INDICATED

IN FEEDER SCHEDULE)

3/4" X 10' COPPERCLAD

GND ROD

CONCRETE DUCT ENVELOPE

#4/0 BARE COPPER GND IN

PRIMARY DUCTBANK

#4/0 COPPER GROUND GRID IN PAD

CONCRETE STEP 12"AFG

FOR SWITCHES ONLY

CONDUIT END BELL

MINIMUM 22" FROM TOP OF

CONCRETE

TERMINATION CABINET SECTION THROUGH CABLE WELL

C1

TERMINATION CABINET PAD (6" THICK), TYPICAL OF ONE LOCATION

C4

12" 12"

SIZED FOR JUNCTION BOX (JB)

SI

ZE

D

FO

R

JU

NC

TI

ON

B

OX

(J

B)

REINFORCED CONCRETE PAD

6" LAYER COMPACTED

VDOT 57 STONE

6" LAYER COMPACTED

VDOT 57 STONE

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

EL

EC

TR

IC

AL

D

ET

AI

LS

DNB DNB JAT

AS NOTED

12,944,676

ES504

J. MORTON, P.E.

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

4/0AS11.5

KV W 4TO W - 2 7

4- 2 6 S

CABLE TAG DETAILS

D1

6-WAY DUCTBANK DETAIL

C3

6" LAYER COMPACTED

VDOT 57 STONE

2-WAY DUCTBANK DETAIL

A1 1-WAY DUCTBANK DETAIL

A3

0/

U/S 750

U/S 500

SP366

U/S 500

SP254B

SP364(1)

SP362

SP256A

SP256B

SP364(2)

SP257

SW 111 (sf6)

JB-1

JB-2

FM SW 112

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

ON

E-

LIN

E

DI

AG

RA

M

DNB DNB JAT

AS NOTED

12,944,678

ES601

J. MORTON, P.E.

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

N/A

KEYNOTES

1. CIRCUIT FROM SW111 WAY #4 TO TO JUNCTION BOX (JB-1) WAY #1

2. PROVIDE A PAD MOUNTED, 6-WAY, 600A ABOVE GROUND JUNCTION BOX

(JB-1).

3. CIRCUIT FROM JUNCTION BOX (JB-1) WAY #2 TO SP-254B SUBSTATION.

4. CIRCUIT FROM JUNCTION BOX (JB-1) WAY #3 TO SP-256A XFMR.

5. CIRCUIT FROM JUNCTION BOX (JB-1) WAY #4 TO SP-256B SUBSTATION.

6. CIRCUIT FROM JUNCTION BOX (JB-1) WAY #5 TO TO JUNCTION BOX (JB-2)

WAY #1.

7. PROVIDE A PAD MOUNTED, 5 WAY, 600A, ABOVE GROUND JUNCTION BOX

(JB-2).

8. CIRCUIT FROM JUNCTION BOX (JB-2) WAY #2 TO SP-257 XFMR.

9. CIRCUIT FROM JUNCTION BOX (JB-2) WAY #3 TO SP-366 SUBSTATION.

10. CIRCUIT FROM JUNCTION BOX (JB-2) WAY #4 TO SP-362 XFMR.

11. CIRCUIT FROM JUNCTION BOX (JB-2) WAY #5 TO SP-364 (1) AND SP-364(2).

12. JUNCTION BOX (JB-1) WAY #6 PROVIDED FOR FUTURE USE.

13. EXISTING CIRCUIT IN EMH-SP-42D TO REMAIN.

NOT TO SCALE

PARTIAL ONE-LINE DIAGRAM

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

DRAWFORM REVISION: 14 SEP 2023

CHK

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

CA

BL

E

SC

HE

DU

LE

DNB DNB JAT

AS NOTED

12,944,677

ES701

J. MORTON, P.E.

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D~

M

ID

-A

TL

AN

TI

C

MI

DL

AN

T

- R

OI

CC

N

OR

FO

LK

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V

A

NA

VA

L

ST

AT

IO

N

NO

RF

O

LK

, V

IR

G

IN

IA

SP

-3

RE

PL

AC

E

UN

DE

RG

RO

UN

D

CA

BL

IN

G

IN

S P

AR

EA

JANICE D. FISHBURN, P.E.

05-05-26

DAVE BURNETTE

J. MILLER, P.E.

N/A

1806349

Sheets and Views
G-001 COVER SHEET
NFM STANDARD SHEETSET ELEC.pdf
Sheets and Views
ES001 ELECTRICAL SYMBOLS LEGEND ABBREVIATIONS AND NOTES
ED101 ELECTRICAL SITE PLAN - DEMOLITION
ED102 ELECTRICAL SITE PLAN - DEMOLITION
ED103 ELECTRICAL SITE PLAN - DEMOLITION
ED104 ELECTRICAL SITE PLAN - DEMOLITION
ED501 EXISTING MANHOLE DETAILS - DEMOLITION
ED502 EXISTING MANHOLE DETAILS - DEMOLITION
ED601 ONE-LINE DIAGRAM - DEMOLITION
ED701 CABLE SCHEDULE - DEMOLITION
ES101 ELECTRICAL SITE PLAN
ES102 ELECTRICAL SITE PLAN
ES103 ELECTRICAL SITE PLAN
ES104 ELECTRICAL SITE PLAN
ES501 MANHOLE DETAILS
ES502 MANHOLE DETAILS
ES503 TERMINATION CABINET DETAILS
ES504 ELECTRICAL DETAILS
ES602 PARTIAL ONE-LINE DIAGRAM
ES701 CABLE SCHEDULE
NFM STANDARD SHEETSET ELEC.pdf
Sheets and Views
ES001 ELECTRICAL SYMBOLS LEGEND ABBREVIATIONS AND NOTES
ED101 ELECTRICAL SITE PLAN - DEMOLITION
ED102 ELECTRICAL SITE PLAN - DEMOLITION
ED103 ELECTRICAL SITE PLAN - DEMOLITION
ED104 ELECTRICAL SITE PLAN - DEMOLITION
ED501 EXISTING MANHOLE DETAILS - DEMOLITION
ED502 EXISTING MANHOLE DETAILS - DEMOLITION
ED601 ONE-LINE DIAGRAM - DEMOLITION
ED701 CABLE SCHEDULE - DEMOLITION
ES101 ELECTRICAL SITE PLAN
ES102 ELECTRICAL SITE PLAN
ES103 ELECTRICAL SITE PLAN
ES104 ELECTRICAL SITE PLAN
ES501 MANHOLE DETAILS
ES502 MANHOLE DETAILS
ES503 TERMINATION CABINET DETAILS
ES504 ELECTRICAL DETAILS
ES601 ONE-LINE DIAGRAM
ES701 CABLE SCHEDULE
G-001-G-001 COVER SHEET.pdf
Sheets and Views
G-001 COVER SHEET
NFM STANDARD SHEETSET CIVIL.pdf
Sheets and Views
C-001 ABBREVIATIONS, LEGEND, AND GENERAL NOTES
CD101 EXISTING CONDITIONS & DEMOLITION PLAN
CD102 EXISTING CONDITIONS & DEMOLITION PLAN
CD103 EXISTING CONDITIONS & DEMOLITION PLAN
CD104 EXISTING CONDITIONS & DEMOLITION PLAN
CS101 CIVIL SITE PLAN
CS102 CIVIL SITE PLAN
CS103 CIVIL SITE PLAN
CS104 CIVIL SITE PLAN
C-501 CIVIL DETAILS
1806349-CD101-CD102 EXISTING CONDITIONS & DEMOLITION PLAN.pdf
Sheets and Views
CD102 EXISTING CONDITIONS & DEMOLITION PLAN
1806349-CS101-CS102 CIVIL SITE PLAN.pdf
Sheets and Views
CS102 CIVIL SITE PLAN

2026-07-02T12:13:34-0400

2026-07-02T12:13:35-0400

2026-07-02T12:13:36-0400

2026-07-02T12:13:37-0400

2026-07-02T12:13:37-0400

2026-07-02T12:13:37-0400

2026-07-02T12:13:38-0400

2026-07-02T12:13:39-0400

2026-07-02T12:13:40-0400

2026-07-02T12:13:40-0400

2026-07-02T12:13:41-0400

2026-07-02T12:13:41-0400

2026-07-02T12:13:41-0400

2026-07-02T12:13:42-0400

2026-07-02T12:13:42-0400

2026-07-02T12:13:43-0400

2026-07-02T12:13:43-0400

2026-07-02T12:13:44-0400

2026-07-02T12:13:44-0400

2026-07-02T12:13:44-0400

2026-07-02T12:13:45-0400

2026-07-02T12:13:45-0400

2026-07-02T12:13:45-0400

2026-07-02T12:13:46-0400

2026-07-02T12:13:46-0400

2026-07-02T12:13:46-0400

2026-07-02T12:13:47-0400

2026-07-02T12:13:47-0400

2026-07-02T12:13:47-0400

2026-07-02T12:13:48-0400

2026-07-02T12:13:48-0400

2026-07-02T12:13:49-0400

2026-07-02T12:17:17-0400

2026-07-02T12:17:17-0400

2026-07-02T12:18:56-0400

2026-07-02T12:18:56-0400

2026-07-02T12:18:57-0400

2026-07-02T12:18:57-0400

2026-07-02T12:18:58-0400

2026-07-02T12:18:58-0400

2026-07-02T12:18:59-0400

2026-07-02T12:18:59-0400

2026-07-02T12:19:00-0400

2026-07-02T12:19:00-0400

2026-07-02T12:19:01-0400

2026-07-02T12:19:01-0400

2026-07-02T12:19:01-0400

2026-07-02T12:19:02-0400

2026-07-02T12:19:02-0400

2026-07-02T12:19:03-0400

2026-07-02T12:19:03-0400

2026-07-02T12:19:04-0400

2026-07-02T12:19:04-0400

2026-07-02T12:19:05-0400

2026-07-02T12:19:05-0400

2026-07-02T12:19:06-0400

2026-07-02T12:19:06-0400

2026-07-02T12:19:07-0400

2026-07-02T12:19:07-0400

2026-07-02T12:19:08-0400

2026-07-02T12:19:09-0400

2026-07-02T12:19:09-0400

2026-07-02T12:19:10-0400

2026-07-02T12:19:10-0400

2026-07-02T12:19:11-0400

2026-07-02T12:19:11-0400

2026-07-02T12:21:22-0400

2026-07-02T12:21:23-0400

File details come from the government source that posted it. Updated .