This is a Summary of Work section from a federal construction specification for Building 114 at the Naval Undersea Warfare Center Division in Newport, Rhode Island.

The base bid work requires removal and disposal of an existing 3-ton overhead electric traveling bridge crane (Crane 64) and installation of one new 3-ton overhead electric traveling (OET) bridge crane configured as a top-running bridge with an under-running trolley hoist. The existing W12x crane rail beams shall be retained for reuse, and the new crane's maximum self-weight must not exceed that of the existing crane. The existing crane rails and conductor system shall be replaced with new infrastructure to accommodate two cranes operating on the same rail system. The existing electric power feed shall be replaced with upgraded power sufficient to operate two new 3-ton OET cranes on a common conductor system. Bid Option 1 requires provision of a second new 3-ton overhead electric traveling bridge crane (Crane 2) operating on the same rail system as the base bid crane, including anti-collision sensor systems equipped on each crane to maintain a minimum safe distance between them during simultaneous operation.

The contractor must submit a salvage plan for government approval and coordinate with the Contracting Officer regarding work sequence, material storage, and access arrangements. Building 114 will remain occupied during work performance. The contractor shall notify the Naval Station Newport Public Works Department and local utility locating services at least 10 days prior to excavation. All salvaged materials designated by the Contracting Officer remain government property and must be stored within 5 miles of the construction site with property control records maintained throughout.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B114 NUWC Crane 64 Replacement B114NEWCRANE

SECTION 01 11 00

SUMMARY OF WORK

08/15, CHG 2: 08/21

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" classification are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals Salvage Plan; G

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes:

1. BASE BID. Building 114 work includes removal and disposal of the existing 3-ton overhead electric traveling bridge crane (crane 64) and installation of one (1) new 3-ton overhead electric traveling (OET) bridge crane. Crane configuration shall be a top-running bridge with an under-running trolley hoist.

The existing W12x crane rail beams shall remain for re-use. The new crane maximum self-weight shall be less than or equal to that of the existing crane to be removed.

The existing crane rails and crane conductor system shall be replaced with new to accommodate two new cranes operating on the same rail system.

The existing electric power feed to the crane shall be replaced with a new and upgraded power feed and shall provide sufficient power to operate two new 3-ton OET bridge cranes on the same conductor system.

This work described above shall be included in the BASE BID.

2. BID OPTION 1. Provide a second new 3-ton overhead electric traveling bridge crane (crane 2) to operate on the same common rail system as the new crane (crane 1) provided in the base bid. Include in this bid option the provision for an anti-collision sensor system to be equipped on each of the new cranes. At all times, a minimum distance shall be maintained between the two cranes operating on the shared rail.

1.2.2 Location

The work is located at the Naval Undersea Warfare Center Division, Newport, Rhode Island, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.3 OCCUPANCY OF PREMISES

Building(s) will be occupied during performance of work under this

SECTION 01 11 00 Page 1 gary.ormiston Text Box

ADDENDUM 1

28 JULY 2026

gary.ormiston Polygon

B114 NUWC Crane 64 Replacement B114NEWCRANE

Contract.

Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

1.4 EXISTING WORK

In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.

1.5 LOCATION OF UNDERGROUND UTILITIES

Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities.

Notify Naval Station Newport PWD Utilities Department and contact local utility locating service a minimum of 10 days prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. Verify existing utility locations indicated on contract drawings, within area of work. Identify and mark all other utilities not managed and located by the local utility companies. 1.5.1

Notification Prior to Excavation

Notify the Contracting Officer at least 10 days prior to starting excavation work.

1.6 SALVAGE MATERIAL AND EQUIPMENT

Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the Government designated storage area located within 5 miles of the construction site.

Provide a salvage plan, listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Provide a system for property control in the salvage plan. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --