This is a Request for Proposals (RFP) for a Design-Bid-Build construction task order under a Navy Multiple Award Construction Contract (MACC) for crane replacement work at Naval Undersea Warfare Center, Newport Naval Station in Newport, Rhode Island.
The solicitation N4008526R0177 (Work Order 1785210) is issued by Naval Facilities Engineering System Command, Mid-Atlantic on June 4, 2026, with proposals due July 31, 2026 at 2:00 PM EST. This is an indefinite delivery/indefinite quantity (IDIQ) contract vehicle under the Newport/New London MACC with four pre-selected contractors eligible to compete: Armitage SAI JV (N40085-22-D-0022), Black Horse Construction Group (N40085-22-D-0023), CCI Facility Support Services LLC (N40085-22-D-0024), and Doyon Management Services LLC (N40085-22-D-0025). The scope includes removing and disposing of an existing 3-ton overhead bridge crane, installing a new 3-ton overhead electric traveling bridge crane with top-running bridge and under-running trolley hoist configuration, replacing crane rails and conductors for dual-crane operation, and upgrading electrical power infrastructure to support two 3-ton cranes on a common rail system (CLIN 0001). An optional line item (CLIN 0002) includes providing a second 3-ton crane in room 101 and anti-collision sensor systems for both cranes. The estimated price range is $1,000,000 to $5,000,000. The contract duration is 450 calendar days from award date (including 15 days for bond/insurance approval), with liquidated damages of $192.16 per day for delays. Award will be made to the lowest priced, responsive offer. Prevailing wage rates per Department of Labor General Decision RI20260001 (05/18/2026) apply. Bid guarantees of 20 percent of proposed price (not to exceed $3,000,000) and performance/payment bonds are required within 10 days of award. The proposal must include pricing on the provided bid schedule form, representations and certifications, SAM registration proof, VETS-4212 filing confirmation, and all amendments acknowledged. Submissions are limited to electronic format through the PIEE Solicitation Module only, with individual file size limits of 1.9 GB. A site visit is scheduled for June 24, 2026 at 11:00 AM at Building 114 with base access forms due by June 10, 2026. Pre-proposal inquiries must be submitted by July 17, 2026 using the provided PPI form. The proposal acceptance period is 120 days from receipt (90 days for options). All terms of the underlying MACC contracts (N4008522D0022/0023/0024/0025) apply to this task order.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design Bid Build - Building 114 Crane 64 Replacement Solicitation No.: N4008526R0177 Naval Undersea Warfare Center, Newport Naval Station, Newport, RI Work Order No.: 1785210
NAVAL FACILITIES ENGINEERING SYSTEM COMMAND, MID-ATLANTIC
9324 VIRGINIA AVE, BLDG Z-144, ROOM 225
NAVAL STATION NORFOLK, NORFOLK, VA 23511
POC: Stefan Nassaney, stefan.e.nassaney.civ@us.navy.mil
DESIGN-BUILD (DB) / DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY /
INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD CONSTRUCTION
CONTRACT (MACC) FOR NEW LONDON, CT / NEWPORT, RI AORs
PROPOSED TASK ORDER:
N4008526R0177 Design Bid Build Building 114 Crance 64 Replacement. Naval Undersea
Warfare Center, Naval Station Newport, Newport, RI.
DATE OF SOLICITATION: 6/4/2026
NEWPORT/NEW LONDON MACC HOLDERS:
N40085-22-D-0022
Armitage SAI JV
Penny Armitage
505 Ellicott Street, Suite A2
Buffalo, NY 14203
Phone : 716-525-2754
Bob.Macdonald@armitagecorp.com (new
POC)
penny.armitage@armitagecorp.com (updated) bhalsey@structuralassociates.com jp.armitage@armitagecorp.com
N40085-22-D-0023
Black Horse Construction Group
681 Falmouth Rd Suite A-20f
Mashpee, Ma 02649 mary@blackhorsegroup.us
N40085-22-D-0024
CCI Facility Support Services, LLC
Candida Shelton/Ralph Snow
29 Bowdoin St., Ste. 109
Manchester, ME 04351 dmorrison@cci-alliance.com; CGeorge@cci-alliance.com; cshelton@cci-alliance.com;
rsnow@cci-alliance.comRETIRED
Jim Henebury takes Ralph Snow's POC spot: Jim Henebury jhenebury@bbch-llc.com
N40085-22-D-0025
Doyon Management Services, LLC
Anthony Wood
33 College Hill Road, #31 Second Floor
Warwick, RI 02886
BD@doyongovgrp.com;
anthony.wood@doyongovgrp.com
GENERAL REQUIREMENTS
mailto:Bob.Macdonald@armitagecorp.com mailto:penny.armitage@armitagecorp.com mailto:bhalsey@structuralassociates.com mailto:jp.armitage@armitagecorp.com mailto:rsnow@cci-alliance.com mailto:jhenebury@bbch-llc.com
All terms and conditions of N4008522D0022/0023/0024/0025 IDIQ Contract apply to this solicitation. Please review your MACC award document for guidance on contract clauses and requirements that may pertain to this order. You are responsible to adhere to all applicable clauses, even if they are not restated in this RFP package or the Task Order award document. For clarification on any clause or other contractual issue please contact Stefan Nassaney at stefan.e.nassaney.civ@us.navy.mil.
Amendments will be posted directly to PIEE, Sam.gov and sent directly via email to MACC
Holders. It is ultimately the responsibility of the MACC Holders to monitor SAM.gov for any updates.
NAVFAC Solicitation No.: N4008526R0177
NAVFAC Specification/Drawing: Work Order No. 1785210
Title: N4008526R0177 Naval Undersea Warfare Center Building 114 Crance 64 Replacement.
Naval Station Newport, Newport, RI.
Location of the work: Naval Undersea Warfare Center, Newport Naval Station, Newport, RI
Description of the work:
CLIN 0001 Base Price work includes, but is not limited to:
a. Removing and disposing the existing 3-ton overhead bridge crane.
b. Providing a new 3-ton overhead electric traveling bridge crane. New crane configuration shall be top-running bridge with an under-running trolley hoist.
c. Replacing existing crane rails and crane conductors with new rails and conductors to accommodate two cranes operating on the same common rail system.
d. Replacing existing electric power infrastructure to crane with a new upgraded power feed that will support two new 3-ton cranes operating on the common rail system.
CLIN 0002 Option Item No. 1 - Price includes the following:
a. CLIN 0002. Price for providing all work in connection with a second new 3-ton overhead electric traveling bridge crane in room 101 in Building 114, complete in accordance with the NAVFAC project drawings and technical specifications.
b. Option Item No. 1 includes providing a crane anti-collision sensor system for each of two cranes.
Estimated Budget Amount or Price Range: In accordance with FAR 36.204(g) Disclosure of the
Magnitude of Construction Projects, the estimated price range for this project is between
$1,000,000 and $5,000,000.
Time for completion: In accordance with FAR 52.211-10 Commencement, Prosecution, and
Completion of Work, the duration of this task order (including Bid Options) shall be 450 calendar days from date of award (includes 15 calendar days for submission and approval of bonds and insurance).
Wage Determination: Department of Labor (DoL) General Decision Number: RI20260001
05/18/2026 (Attachment 05) applies to this work. Should this wage determination be modified by DoL prior to award, the most current wage determination will be incorporated in the award.
Liquidated damages: In accordance with FAR 52.211-12 Liquidated Damages, if the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $192.16 for each calendar day of delay until the work is completed or accepted.
Utilities: The Contractor shall be responsible for obtaining all utilities required for construction and testing. The Contractor shall provide these utilities at his expense, paid for at the current utility rate delivered to the job site. The Contractor shall provide and maintain all temporary utility connections and distribution lines, and all meters required to measure the amount of each utility used.
Record Shop Drawings: In accordance with FAR 52.236.21, Specifications and Drawings for
Construction, record shop drawings are required. Reproducible copies of these record drawings are required.
Government Furnished Property: There is no Government Furnished Property.
Bond Requirements: In accordance with FAR 52.228-1, Bid Guarantees, each offeror shall submit with its offer a guarantee bond (Standard Form 24) in a penal sum equal to at least 20 percent of the offer price or $3,000,000, whichever is less.
Performance and Payment Bonds are required from the contract task order awardee ten (10) calendar days after date of award.
Proposal Acceptance Period: Proposal acceptance period shall be 120 days from receipt of offers.
90 Day for Options
Definitization Of Equitable Adjustments For Change Orders Under Construction Contracts
No data is available regarding the timely definitization of equitable adjustments for change orders under construction contracts. The REA definitization information referenced in Navy
Marine Corps Acquisition Regulation Supplement (NMCARS) 5236.211(b)(2), should not be utilized. There are no agency-specific policies and procedures that apply to the definitization of equitable adjustments for change orders under construction contracts. This Contract contains rated order quantities certified for national defense use, and you are required to follow all the provisions of the DPAS regulation (DPAS Regulation - 15 CFR Part 700.12) only as it pertains to the rated quantities.
Site Visit: All MACC holders are invited to attend the Site Visit for this project. Firms participating in the site visit will not be directly compensated for their participation.
Date: 24 JUNE 2026
Time: 1100 AM
Site Visit Location: Building 114 Naval Undersea Warfare Center
Base Access Instructions: Refer to Attachment 07, 08, 09, 10, and 11 for Base Access. ALL
BASE ACCESS FORMS ARE DUE BY NOON 10 JUNE 2026.
Site Visit Attachments:
Attachment 08 - SECNAV FORM 5512-NSNPT
Attachment 09 - Site Visit Instructions
Site Visit POCs:
Stefan Nussaney, Contracting Officer, (401) 829-9161
Ray Cournoyer, Design Manager, (401) 841-7625
Pre-Proposal Inquiries (PPIs): Offerors who determine that the technical and or contractual requirements of this RFP require clarification(s) in order to permit submittal of a responsive proposal shall submit all questions in writing. All inquiries shall be submitted via email to
Stefan Nassaney at stefan.e.nassaney.civ@us.navy.mil no later than, fourteen (14) calendar days prior to proposal due date. Additionally, all inquiries shall be submitted using the Pre-Proposal
Inquiry (PPI) form (Attachment 04). Do not submit the same inquiry more than once. Please verify that inquiries submitted by you on behalf of your subcontractors are not duplicates. A response will be published via an amendment by email to MACC holders.
Proposal Due Date: Wednesday, 31 JULY 2026 at 02:00PM EST. LATE RESPONSES WILL
BE HANDLED IN ACCORDANCE WITH FAR 15.208(b).
Electronic Copies: Only the PIEE Solicitation Module is authorized for the submission of electronic proposals in response to this solicitation. Electronic proposal submissions should be no larger than 1.9 GB per file. Offerors shall ensure that the Government has received the electronic proposal prior to the date and time specified. PIEE Solicitation Vendor Access
Instructions are provided via Attachment E. Emailed submissions will not be accepted.
Offerors shall allow adequate time to upload files which may be slower for non-DoD users and to avoid other technical difficulties that may be encountered. Offerors are also responsible for submitting files in the format specified and consistent with requirements stated elsewhere in this solicitation. Files that cannot be opened or are otherwise missing the required content are the responsibility of the Offeror.
The PIEE system will record the date and time of package submittal. Upon successful receipt of the proposal through PIEE, the Offeror should receive email confirmation. Please keep this for your records. The date and time of package receipt recorded in PIEE shall govern the timeliness of any proposal submission. Late responses will be handled in accordance with FAR 15.208(b).
Evaluation Factors for Award:
1. The proposed task order will be awarded to the responsible Offeror offering the best value to the Government. The lowest price source selection process is selected as appropriate for this acquisition because the best value is expected to result from selection of the proposal with the lowest evaluated price. To make a determination of best value, the Government shall evaluate each Offeror on price only.
2. Basis of Evaluation and Submittal Requirements.
Price:
i. Solicitation Submittal Requirements:
Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) electronic copy via The Procurement Integrated Enterprise Environment (PIEE), with the solicitation submittal requirements identified below:
a. Cover page with solicitation number, solicitation title, offeror name, address, phone number, Employer Identification Number (EIN), Unique Entity Identifier (UEI) in SAM, CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and POC email address;
b. All amendments acknowledged;
c. Price Schedule Form;
d. Copy of Representation and Certifications and proof of registration in System for Award
Management (SAM);
e. Confirmation of filing of Veterans’ Employment and Training (VETS) VETS-4212 for the 2023/2024 filing cycle; and
f. Bid Guarantee in accordance with FAR Clause 52.228-1, Bid Guarantee. Amount shall be at least twenty percent (20%) of the proposed price, but shall not exceed $3 million
The Offeror is required to submit a complete Price Proposal Form that includes completion of all line-item numbers. All required proposal documents shall be submitted in accordance with FAR
15.208.
II. Basis of Evaluation:
The Government will evaluate price based on the total lump sum price. Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
a. Comparison of proposed prices received in response to the RFP.
b. Comparison of the proposed prices with the Independent Government Cost Estimate
(IGCE).
c. Comparison of proposed prices with available historical information.
d. Comparison of market survey results.
Evaluation:
1. The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract; to negotiate with offerors in the competitive range; and to award the contract to the Offeror submitting the lowest price proposal.
2. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
In addition, if the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
ATTACHMENTS:
Attachment 01 ML-C00073 MACC Cover NPT NLON
Attachment 02 - Spec Rev 1 Final - Bldg 114 Crane 64 12-12-25
Attachment 03 - Dwgs Rev 1 Final - Bldg 114 Crane 64 12-10-25
Attachment 04 - Pre-Proposal Inquiry (PPI) form
Attachment 05 - WD RI20260001 5-18-26
Attachment 06 - Bid Schedule Bldg 114 Crane 64
Attachment 07 - PIEE Vendor Access Instructions
Attachment 08 - NUWC Visitor Request Information Guidelines
Attachment 09 - SECNAV Form 5512-NSNPT
Attachment 10 - Site Visit Instructions
Attachment 11 - Base Access Email Template
Attachment 01
MACC COVER PAGE with Solicitation General Requirements
Attachment 02
Entire Specification Request for Proposal Package, including:
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
00 22 13.00 20 02/14, CHG 3: 11/18 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/11, CHG 13: 08/21 WORK RESTRICTIONS
01 20 00 11/20, CHG 2: 08/21 PRICE AND PAYMENT PROCEDURES
01 30 00 11/20, CHG 1: 08/21 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 05/17, CHG 7: 11/21 ELECTRONIC CONSTRUCTION AND FACILITY
SUPPORT CONTRACT MANAGEMENT SYSTEM
01 32 16.00 20 08/18, CHG 1: 08/20 SMALL PROJECT CONSTRUCTION PROGRESS
SCHEDULES
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 26 11/20, CHG 2: 11/21 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 05/24 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 20 11/11, CHG 8: 02/21 QUALITY CONTROL
01 50 00 11/20, CHG 1: 08/21 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15, CHG 5: 08/21 TEMPORARY ENVIRONMENTAL CONTROLS
01 57 19.01 20 11/15, CHG 5: 08/21 SUPPLEMENTAL TEMPORARY ENVIRONMENTAL
CONTROLS
01 74 19 02/19, CHG 3: 11/21 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 05/19, CHG 1: 08/21 CLOSEOUT SUBMITTALS
01 78 23 08/15, CHG 2: 08/21 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 02/15, CHG 3: 08/21 FACILITY ELECTRONIC OPERATION AND
MAINTENANCE SUPPORT INFORMATION (eOMSI)
01 91 00.15 20 02/21, CHG 1: 05/21 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10, CHG 2: 02/19 DEMOLITION AND DECONSTRUCTION
DIVISION 05 - METALS
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.15 11/22, CHG 1: 02/23 BRIDGE CRANES, OVERHEAD ELECTRIC,
UNDER RUNNING TROLLEY
See separately attached PDF Files labeled as follows:
Attachment 02 - Spec Rev 1 Final - Bldg 114 Crane 64 12-12-25
Attachment 03
Complete Drawings
Attachment 03 - Dwgs Rev 1 Final - Bldg 114 Crane 64 12-10-25
Attachment 04
Pre-Proposal Inquiry (PPI) Form
Attachment 04 - Pre-Proposal Inquiry (PPI) form
Attachment 05
"General Decision Number: RI20260001 05/18/2026
State: Rhode Island
Construction Types: Building, Heavy and Highway
Counties: Rhode Island Counties of
Bristol, Kent, Newport, Providence and
Washington
Includes Marine Construction Projects
Modification Number Publication Date
2 01/30/2026
3 05/18/2026
ASBE0006-006 09/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,
BAGGING & DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 49.91 36.63
ASBE0006-008 09/01/2024
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS & FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS)............................................$ 49.91 36.63
BOIL0029-001 01/01/2025
BOILERMAKER.........................................$ 50.62 28.82
BRRI0003-001 06/01/2022
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86 29.14
BRRI0003-002 09/01/2022
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54 30.34
BRRI0003-003 09/01/2022
MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78 29.61
CARP0330-001 01/01/2023
PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35
WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50
CARP0330-001 06/02/2025
PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35
WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50
CARP1121-002 04/21/2025
MILLWRIGHT..........................................$ 45.72 31.50
ELEC0099-002 06/01/2025
TELEDATA SYSTEM INSTALLER FOOTNOTES: WORK OF
A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30
FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING
OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL.
WORK IN TUNNELS BELOW GROUND LEVEL IN COMBINED
SEWER OUTFALL: 20% PER HOUR ADDITIONAL..............$ 42.09 19.71
ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS
NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE
FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED
LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS
BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20%
PER HOUR ADDITIONAL.................................$ 56.11 24.74
ELEV0039-001 01/01/2025
ELEVATOR MECHANIC FOOTNOTES: A. PAID HOLIDAYS:
NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE
FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY.
B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR
5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE
FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY
CREDIT..............................................$ 64.52 38.44
ENGI0057-001 12/01/2025
Rates Fringes
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 9 BOAT & TUG OPERATOR.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210
FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00
270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $
8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER
+ $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE
CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT
PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR
COMPRESSOR.
A. BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $
2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER
+ $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND
OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET
AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 45.00 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS
A.
BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER +
$ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND
OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET
AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350
FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 6 WELL-POINT INSTALLATION CREW.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND
OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET
AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270
FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00
350 FEET AND OVER + $ 9.00 400 FEET AND OVER +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 39.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER
LOADER, TRACTOR, SCRAPER, COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD.
CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP).
A. BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00
210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $
5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER
+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND
OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.35 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 4 OILER ON CRAWLER BACKHOE.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER
+ $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND
OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET
AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350
FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 42.07 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 3 OILERS ON CRANES.
A. BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00
210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $
5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER
+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND
OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER,
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,
GRADERS, FRONT END LOADER (3 YDS. AND OVER),
VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS,
FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL
BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE
PLANTS.
A. BOOM LENGTHS, INCLUDING
JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND
OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET
AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300
FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00
400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A:
ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A.
FOOTNOTES: HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.......$ 49.30 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS
A. BOOM LENGTHS,
INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180
FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00
240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $
7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER
+ $ 9.00 400 FEET AND OVER + $10.00 A. PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 51.30 29.95
ENGI0057-003 12/01/2025
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER,
WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND
ELECTRIC DRIVEN PUMP & AIR COMPRESSOR
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER:
+ $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 44.54 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 7 WELL POINT INSTALLATION CREW
A. BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180
FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00
240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $
7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER:
+ $ 9.00 400 FT. AND OVER: + $10.00 A.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 47.22 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS,
TRACTOR, GRADER, SCRAPER,COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS.
CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP)
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 47.65 29.95
GROUP 5 OILER ON CRAWLER BACKHOE
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND
OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT.
AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270
FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00
350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 41.50 29.95
GROUP 4 FIREMAN & OILER ON CRANES
A. BOOM
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE
PUMP & ON-SITE CONCRETE PLANT
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 48.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE,
HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER
BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER
(3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM
TRUCK
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.57 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS.
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 50.57 29.95
ENGI0057-005 12/01/2025
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS
AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT
PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS
A. FOOTNOTE: A. ANY
EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 38.70 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7
COMBINATION LOADER / BACKHOES, FRONT-END LOADERS
(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS,
BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF
ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS,
OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 43.43 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6
OILERS ON CRANES AND DECKHANDS
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 39.73 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5
SIGNAL PERSONS
A.
FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4
UTILITY ENGINEERS
A. FOOTNOTE:
A. ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 25.75 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3
WELLPOINT INSTALLATION AND DRILL/BORING MACHINE
ASSISTANTS
A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 39.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2
DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN
HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD
PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS,
FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK,
DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER
BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS,
CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER
MACHINES, ROTATING TELEHANDLERS, SPMT TYPE
EQUIPMENT
A. FOOTNOTE: A.
ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 44.45 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1
CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS,
HOISTS, DERRICKS
A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 46.45 29.95
IRON0037-001 09/16/2025
IRONWORKER..........................................$ 43.03 33.53
LABO0271-001 12/03/2023
LABORER GROUP 5 (BUILDING CONSTRUCTION).............$ 39.00 26.90
LABORER GROUP 4 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 3 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 2 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 1 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABO0271-002 11/27/2022
LABORER TEST BORING LABORER.........................$ 41.95 24.15
LABORER TEST BORING DRILLER.........................$ 41.95 24.15
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND
BORING CREW TOP MAN & LABORER...................$ 35.60 24.15
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND
BORING CREW BOTTOM MAN..............................$ 41.50 24.15
LABORER FREE AIR GROUP 3............................$ 42.45 24.15
LABORER FREE AIR GROUP 2............................$ 45.00 24.15
LABORER FREE AIR GROUP 1............................$ 46.00 24.15
LABORER COMPRESSED AIR GROUP 3......................$ 42.45 24.15
LABORER COMPRESSED AIR GROUP 2......................$ 52.93 24.15
LABORER COMPRESSED AIR GROUP 1......................$ 55.40 24.15
PAIN0011-005 06/01/2025
Rates Fringes
PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57 26.60
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE &
STRUCTURAL STEEL)...................................$ 41.57 26.60
PAINTER (BRUSH AND ROLLER)..........................$ 39.57 26.60
PAIN0011-006 06/01/2024
GLAZIER FOOTNOTES: SWING STAGE: $1.00 PER
HOUR ADDITIONAL. PAID HOLIDAYS: LABOR DAY &
CHRISTMAS DAY.......................................$ 41.63 26.15
PAIN0011-011 06/01/2024
PAINTER (BRIDGE WORK)...............................$ 57.85 26.40
PAIN0035-008 06/01/2011
SIGN PAINTER........................................$ 24.79 13.72
PLAS0040-001 01/01/2025
CEMENT MASON/CONCRETE FINISHER (BUILDING
CONSTRUCTION) FOOTNOTE: CEMENT MASON: WORK ON
FREE SWINGING SCAFFOLDS UNDER 3 PLANKS WIDTH AND
WHICH IS 20 OR MORE FEET ABOVE GROUND AND ANY
OFFSET STRUCTURE: $.30 PER HOUR ADDITIONAL..........$ 44.75 29.10
PLAS0040-002 01/01/2025
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY
CONSTRUCTION).......................................$ 44.75 29.10
PLAS0040-003 01/01/2025
PLASTERER...........................................$ 45.52 29.43
PLUM0051-002 08/25/2025
PLUMBERS AND PIPEFITTERS............................$ 54.34 34.50
ROOF0033-004 12/01/2025
ROOFER..............................................$ 47.49 31.44
SFRI0669-001 04/01/2025
SPRINKLER FITTER....................................$ 53.76 33.44
SHEE0017-002 06/01/2025
SHEET METAL WORKER..................................$ 44.42 41.94
TEAM0251-001 05/01/2025
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
5 FOUR- AND FIVE-AXLE EQUIPMENT
FOOTNOTES:
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS
BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS
THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE
LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID
VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION;
10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C.
EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE
HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR
HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE
HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A
DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A
PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.
........................................$ 32.21 34.51
10 TRACTOR TRAILER
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.36 34.51
9 SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR OVER
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.56 34.51
8 SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35 TONS
FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.31 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
7 TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING
2 TRAILERS)
FOOTNOTES: A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS
BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS
THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE
LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID
VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION;
10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C.
EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE
HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR
HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE
HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A
DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A
PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.
........................................$ 32.81 34.51
6 LOW-BED OR BOOM TRAILER.
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.61 34.51
4 THREE-AXLE DUMP TRUCK
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF…