This document is Amendment 0003 to solicitation N4008526B0008, a Design-Bid-Build (DBB) dredging contract issued by the Naval Facilities Systems Command Mid-Atlantic on August 26, 2026. The amendment addresses dredging operations at three Virginia Beach, Virginia locations: JEBLC Fuel Pier, JEBLC Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar. The contract is administered by the Navy and the point of contact is Angie Clifton (angela.j.clifton2.civ@us.navy.mil).

Amendment 0003 incorporates three primary changes: provision of a site visit log, an updated Attachment D Price Proposal Form REV2, and responses to Request for Information (RFI) submissions. The amendment addresses RFI #12 regarding overlapping scopes in the contract line items, specifically clarifying the distinction between dredging and depositing activities at berm locations versus ground preparation, vegetation removal, dewatering, grading, and planting activities. The response directs offerors to the updated Attachment D Price Proposal Form REV2 for clarification on the allocation of costs among contract line items 2B, 2C, 2D, 2E, and 2F. The receipt deadline for offers remains unchanged and acknowledging receipt of this amendment is required prior to the specified hour and date.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): N40085-26-B-0008, Design-Bid-Build (DBB), Dredging at JEBLC Fuel Pier, JEBLC Anzio Beach Sandbar, and JEBFS Utah Beach Sandbar, Virginia Beach, Virginia

SEE SF30 BLOCK 14 CONTINUATION PAGE

Contract POC: Angie Clifton, angela.j.clifton2.civ@us.navy.mil

This amendment is issued to incorporate the following:

1. Provide site visit log

2. Provide Updated Attachment D - Price Proposal Form REV2

3. Provide RFI responses

Section 00 73 00 - Supplementary Conditions

The following attachments were added:

26B0008 site visit log Amendment 0003 continuation page Attachment D PriceProposalForm REV2

N4008526B00080003

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0003

This amendment is issued to incorporate the following:

1. Provide site visit log (attached separately)

2. Provide Updated ATTACHMENT D – Price Proposal Form REV2 (attached separately)

3. Provide RFI responses (enclosed)

1. Provide site visit log (attached separately)

2. Provide Updated ATTACHMENT D – Price Proposal Form REV2 (attached separately)

3. Request For Information responses (enclosed)

RFI # Page Section Paragraph Question Response

4-Mar Price Proposal Form

It appears that Clin Items 2b and 2D have overlapping scopes & Clin Items 2C and 2E&2F have overlapping scopes.

IE: All seem to cover depositing or placing dredged material in the language.

We would assume that 2B and 2C would cover the dredging and depositing at berm locations.

See ATTACHMENT D – Price Proposal Form REV2 provided in Amendment 0003.

We would assume that 2D, 2E, and 2F would cover all the ground prep, veg removal and disposal, dewatering of dredge spoils, grading of the dredge spoils, and planting but not the depositing.

Is this a correct assumption? Or are the scopes supposed to have overlapping cost?

IDCode: J
Page: 1
Pages: 4
AmendNo: 0003
EffDate: 26 Aug 2026
ReqNo: See Continuation Sheet
ProjNo: 1840734
IssCode: N40085
AdmCode:
IssuedBy: NAVFACSYSCOM MID-ATLANTIC

9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395

NORFOLK, VA 23511-0395

UNITED STATES

Angela Clifton, Email: angela.j.clifton2.civ@us.navy.mil Telephone: 757-341-0692 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N4008526B0008
SolDate: 30 Jul 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section 00 70 00 - Conditions of the Contract
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: See Schedule
ContNameTitle:
CoNameTitle: KRISTY L. GERREK
ContDate:
CODate: 26 Aug 2026