This document is a Price Proposal Form for a dredging project at military installations in Virginia Beach, Virginia. The contract encompasses two fiscal years of dredging work at Joint Base Little Creek-Story (JEBLC) and Joint Base Fort Story (JEBFS).

The base price (CLIN 0001) covers FY26 dredging at JEBLC Fuel Pier and includes four line items: mobilization and demobilization (1 LS), dredging via clamshell bucket of 25,000 cubic yards (CY) deposited into Berm Area #5, material placement and berm construction of 25,000 CY, and 16 hours of downtime compensation. The optional award (CLIN 0002) covers FY27 work at JEBLC Anzio Beach Sandbar and JEBFS Utah Beach Sandbar, consisting of seven line items totaling approximately 640,000 CY of dredged material handling and placement across multiple berm areas, with 24 hours of downtime compensation. The government reserves the right to award the option within 180 calendar days of base contract award. Unit prices are required for all line items, with unit prices taking precedence over extended totals in case of discrepancies. A Notice to Proceed will be issued approximately 90 days after base contract award, with mobilization and dredging commencing within 30 days thereafter. Base contract work must be completed within 180 days of the NTP, while optional work must be completed within 365 days. The optional work is subject to an environmental time-of-year restriction from April 1 through June 30 for sandbar dredging activities, with any contractor demobilization during this period at the contractor's sole expense.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY26 DREDGING AT JEBLC Fuel Pier and FY27 DREDGING AT JEBLC Anzio Beach Sandbar and JEBFS Utah Beach Sandbar, Virginia Beach e-Projects WO# 1840734

DOCUMENT 00 22 13.00 20 Page 1

PRICE PROPOSAL FORM

Anzio Beach Sandbar and JEBFS Utah Beach Sandbar, Virginia Beach, VA Base Price (CLIN 0001)

CLIN EST. QUANTITY UNIT UNIT PRICE TOTAL PRICE

0001A 1 LS $________ $_________

0001B 25,000 CY $________ $_________

0001C 25,000 CY $________ $_________

0001D 16 HR $________ $_________

TOTAL FOR CLIN 0001 $_________

OPTION 0001 (CLIN 0002)

CLIN EST. QUANTITY UNIT UNIT PRICE TOTAL PRICE

0002A 1 LS $________ $__________

0002B 140,000 CY $________ $__________

0002C 180,000 CY $________ $__________

0002D 140,000 CY $________ $__________

0002E 13,120 CY $________ $__________

0002F 166,880 CY $________ $__________

0002G 24 HR $________ $__________

TOTAL FOR CLIN 0002 $___________

TOTAL FOR CLIN 0001 + CLIN 0002 $___________

DOCUMENT 00 22 13.00 20 Page 2

DOCUMENT 00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS

PART 1 GENERAL

1.1 CONTRACT LINE ITEMS

The terms Offeror and Bidder and versions thereof (offer/bid) have the same definition as used within this contract.

Provide the Contract Line Item (CLIN) price for the following items:

CLIN 0001 ‐ BASE PRICE – FY26 DREDGING AT: JEBLC Fuel Pier, Virginia Beach, VA Price includes the following: CLIN 0001A, 0001B, 0001C and 0001D Project permits remain under review by regulatory agencies; therefore, a delay in the construction start is anticipated. Once the contract has been awarded and all regulatory permits have been issued, the government and the contractor will negotiate the execution schedule. A Notice to Proceed (NTP) will be issued within approximately 90 days or less from the contract award date. Upon issuance of the NTP, the contractor shall begin mobilization and dredging no later than 30 days afterward. All work shall be completed no later than 180 days from the NTP date.

CLIN ITEM UNIT UNIT

PRICE

Estimated Quantity

TOTAL PRICE

(UNIT PRICE X NO.UNITS)

0001A Price for mobilization and demobilization from the project site.

LS

0001B JEBLC FUEL PIER DREDGING via clamshell bucket as shown on the plan, deposit into scow/barge, transport to and deposit dredged material into Berm Area #5 as shown on plans and as specified in CLIN 0001C.

CY

25,000

0001C Mechanically or hydraulically unload to place dredged material from JEBLC Fuel Pier to create Berm Area #5.

Scope of work includes debris and vegetation removal (brush, shrubs and trees), offsite disposal of debris and vegetation, dredged material dewatering & containment measures, grading to create berms, planting of vegetation and all other ancillary work in accordance with plans and specifications.

25,000

0001D Downtime (Delays) Pursuant to Specs Sec. 35 20 23, 3.2.2.2 Compensation for Interruption of Operations.

HR

CLIN 0001 Total Cost $____________

DOCUMENT 00 22 13.00 20 Page 3

CLIN 0002 ‐ OPTION 001 – FY27 DREDGING AT: JEBLC Anzio Beach Sandbar and JEBFS Utah Beach Sandbar, Virginia Beach, VA The decision to award this bid option as described herein shall be at the sole discretion of the Government. The government reserves the right to award this option no later than 180 Calendar Days after base contract award. No provision is made for economic price adjustment. Method of evaluation of bids for award purposes is specified below.

Price includes the following:

CLIN 0002A, 0002B, 0002C, 0002D, 0002E, 0002F and 0001G Project permits remain under review by regulatory agencies; therefore, a delay in the construction start is anticipated. In addition, an environmental time-of-year restriction from April 1 through June 30 will apply to the sandbar dredging and sand berm construction along the Chesapeake Bay shoreline.

Once the bid option has been awarded and all regulatory permits have been issued, the government and the contractor will negotiate the execution schedule. A Notice to Proceed (NTP) will be issued within approximately 60 days or less from the contract award date. Upon issuance of the NTP, the contractor shall begin mobilization and commence with dredging work no later than 30 days afterward. All work shall be completed no later than 365 days from the NTP date. Should the contractor choose to demobilize from the project site during the April 1 through June 30 environmental time-of-year restriction, they do so at their sole expense and shall not be entitled to additional mobilization/demobilization payment(s).

CLIN ITEM UNIT UNIT

PRICE

Estimated Quantity

TOTAL PRICE

(UNIT PRICE X NO.UNITS)

0002A Price for mobilization and demobilization to and from the project site.

LS

0002B Dredge Sand Bar at JEB Little Creek Anzio Beach via clamshell bucket or hydraulic cutterhead dredge as shown on the plan, deposit into scow/barge, transport to and deposit (or direct pump) dredged material into Berm Areas #3, #4, #6 and #7 as shown on plans pursuant to CLIN 0002D.

140,000

0002C

Dredge Sand Bar at JEB Fort Story Utah Beach via clamshell bucket or hydraulic cutterhead dredge as shown on the plan, deposit (or direct pump) into a scow/barge, transport to and deposit dredged material first into Berm Areas #9 and #10 to repair dune damage, pursuant to CLIN 0002E, and the remaining material to be placed into Berm Area #8 as shown on plans pursuant to CLIN 0002F.

180,000

DOCUMENT 00 22 13.00 20 Page 4

0002D Hydraulically unload from barge/scow (or direct pump) to place dredged material from JEBLC Anzio Beach Sand Bar to create Berm Areas #3, #4, #6 and #7 including debris and vegetation removal (brush, shrubs and trees), offsite disposal of debris and vegetation, dredged material dewatering & containment measures, grading to create berms, planting of vegetation and all other ancillary work in accordance with plans and specifications.

140,000

0002E Hydraulically unload from barge/scow (or direct pump) to place dredged material from JEB Fort Story Utah Beach Sand Bar to create Berm Areas #9 and #10 including debris and vegetation removal (brush, shrubs and trees), offsite disposal of debris and vegetation, dredged material dewatering & containment measures, grading to create berms, planting of vegetation and all other ancillary work in accordance with plans and specifications.

13,120

0002F Hydraulically unload from barge/scow (or direct pump) to place dredged material from JEB Fort Story Utah Beach Sand Bar to create Berm Areas #8 including debris and vegetation removal (brush, shrubs and trees), offsite disposal of debris and vegetation, dredged material dewatering & containment measures, grading to create berms, planting of vegetation and all other ancillary work in accordance with plans and specifications.

166,880

0002G Downtime (Delays) Pursuant to Specs Sec. 35 20 23, 3.2.2.2 Compensation for Interruption of Operations.

HR

CLIN 0002 Total Cost

DOCUMENT 00 22 13.00 20 Page 5

1.2 GENERAL BID NOTES

a. Award will be made on the total cost of CLIN 0001 + CLIN 0002. Enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

b. This contract will be awarded as one lump sum with unit prices required for specifically selected work as shown herein. See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys," "DFARS.236-7008, Contract Prices."

PART 2 PRODUCTS

Not Used.

PART 3 EXECUTION

Not Used.

PRICE PROPOSAL FORM
CLIN 0001 ‐ BASE PRICE – FY26 DREDGING AT: JEBLC Fuel Pier, Virginia Beach, VA
CLIN 0002 ‐ OPTION 001 – FY27 DREDGING AT: JEBLC Anzio Beach Sandbar and
JEBFS Utah Beach Sandbar, Virginia Beach, VA