About this file
These are engineering design documents for the Naval Facilities Engineering Command Mid-Atlantic, specifically for Site Fire Suppression Improvements at Naval Support Activity Mechanicsburg, Pennsylvania. The technical drawings include multiple detailed diagrams covering electrical and piping systems, featuring:
-
Pressure Reducing Valve (PRV) installation diagrams for typical configurations, boiler room emergency shower piping, and warning signs indicating 140 PSI water supply pressure. The documents include specific technical details for Building 504C, including an electrical plan, one-line electrical diagram, and site area layout. Detailed technical specifications cover transformer pad mounting, conduit trench installations, and slotted channel rack configurations. A prominent warning label highlights shock, arc flash, and arc blast hazards, emphasizing the need for appropriate Personal Protective Equipment (PPE).
-
The technical package is part of project DAA CRH 1654727, approved by Paul Reed via email on 11/08/2023, and includes comprehensive engineering drawings with precise measurements, installation guidelines, and safety protocols for electrical and fire suppression infrastructure improvements at the naval support facility.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHOWER PIPING DIAGRAMS
C5
BOILER ROOM EMERGENCY
TYPICAL PRV INSTALLATION DIAGRAMS
C2
WARNING:
140 PSI WATER
SUPPLY PRESSURE
WARNING SIGN B5
ONLY CONNECT
DOWNSTREAM OF
PRESSURE REDUCING VALVE
PRV 309-2 INSTALLATION
A2
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
N A
V A
L
S
U P
P O
R T
A
C T
I V
I T
Y M
E C
H A
N I C
S B
U R
G
P
E N
N S
Y V
A N
I A
SI
TE
F
IR
E
SU
PP
RE
SS
IO
N
IM
PR
O
VE
M
EN
TS
APPD BY PAUL REED VIA EMAIL
11/08/2023
DAA
CRH
1654727
PES
P-501 carlos.r.hernandezal Pencil
BUILDING 504C ELECTRICAL PLAN
504C ELECTRIC FIRE PUMP POWER DIAGRAMA3
ENLARGED 504C SITE AREAC4
"E " S
TR
EE
T BLDG
BLDG
504C
FIRE PUMP ONE-LINE DIAGRAMB1
BUILDING 504C
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
NA
VA
L
SU
PP
O
RT
A
CT
IV
IT
Y
M
EC
HA
NI
CS
BU
RG
, P
EN
NS
YV
AN
IA
SI
TE
F
IR
E
SU
PP
RE
SS
IO
N
IM
PR
O
VE
M
EN
TS
APPD BY PAUL REED VIA EMAIL
11/08/2023
DAA
CRH
1654727
PES
E-103
GRAPHIC SCALES
REMOVALS KEYNOTES
GENERAL NOTES
KEY PLAN
KEYNOTES
C4
EXISTING KEYNOTES
PAD MOUNTED TRANSFORMER DETAILC4
TRANSFORMER PAD DETAIL A2
SECONDARY CONDUIT TRENCH DETAILA4
SLOTTED CHANNEL RACK DETAIL A5
PULL BOX CONDUIT INSTALLATION DETAILC5
PRIMARY CONDUIT TRENCH DETAILB4
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
NA
VA
L
SU
PP
O
RT
A
CT
IV
IT
Y
M
EC
HA
NI
CS
BU
RG
, P
EN
NS
YV
AN
IA
SI
TE
F
IR
E
SU
PP
RE
SS
IO
N
IM
PR
O
VE
M
EN
TS
APPD BY PAUL REED VIA EMAIL
11/08/2023
DAA
CRH
1654727
PES
E-501
| 39_P-501-R1 |
| Sheets and Views |
| P-501 |
| 44_E-103-R1 |
| Sheets and Views |
| E-103 |
| 45_E-501-R1 |
| Sheets and Views |
| E-501 |
File details come from the government source that posted it. Updated .