AMENDMENT 0005.pdf
PDF 331 KB Posted
- Solicitation number
- N4008525R2684
About this file
This is an Amendment (Amendment 0005) to a federal solicitation for a Design-Bid-Build contract for fire pump replacement and associated infrastructure work at multiple buildings. The key changes include:
The proposal due date has been extended from 25 September 2025 to 02 October 2025 by 2:00 PM EDT. The amendment addresses multiple pre-proposal inquiries regarding project requirements, including clarifications on personnel roles (superintendent, SSHO, and QC manager must be separate individuals), fire protection engineering, asbestos remediation, fire pump specifications, and electrical system modifications. Significant specification revisions were made to sections covering administrative requirements, safety requirements, and plumbing specifications. The project involves replacing fire pumps in Buildings 2 and 18B, with work including electrical infrastructure upgrades, pressure reducing valve installations, and limited asbestos remediation across approximately 75 buildings.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
Created On:
23 Sep 2025, 14:14 PM Greenwich Mean Time
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Date 25 Sep 2025 02 Oct 2025
N4008525R26840005
The purpose of this amendment is to provide the following:
1. Extend proposal due date from 25 September 2025 to 02 October 2025 NLT 2:00 PM EDT.
2. Responses to Pre-Proposal Inquiries (PPI’s)
3. Specification Revision(s) (See Attachments)
4. Drawing Revisions (See Attachment)
PRE-PROPOSAL INQUIRY RESPONSES:
Question # Reference
Question Government Response Page Section Paragraph
7 01 35 26 1.7.1.1.1
Spec states that SSHO may perform duties of the Site
Superintendent while Spec 01 30
00, 1.6.1 confirms that the Site
Superintendent cannot perform duties of neither SSHO nor QC
Manager. Please clarify.
Superintendent, SSHO, and
QC manager shall be 3 separate rolls to be filled by 3 separate individuals.
See revised Section 01 35 26 para. 1.7.1.1.1 and Spec
Section 01 30 00 para. 1.6.1.
8 21 13 13
Please confirm that Qualified Fire
Protection Engineer is not required for quality control for this project.
A Qualified Fire Protection
Engineer is required per spec sections 21 13 13, 21 30 00, 28 31 70, and UFC 3-600-
01. UFC 3-600-01 Section 2-
1.16.2. allows the QFPE to act as the designer of record and/or quality control rep for fire protection matters. This is only allowed if the individual can meet the requirements and qualifications for both roles and there’s not a conflict of interest.
9 02 82 00
Please elaborate on the abatement scope of work. There are no
Hazmat Survey or Hazmat
Drawings provided.
Refer to specification section
02 82 00 Asbestos
Remediation, and plumbing drawings. Locations could be at a location of plumbing work. Basis of proposal quantities is provided.
10 02 82 00
Does the contractor need to provide Hazmat Survey? If yes, please confirm that all fundings of hazmat materials will be treated as a change order.
Refer to specification section
02 82 00 Asbestos
Remediation, and plumbing drawings. Locations could be at an location of plumbing work.
11 03 30 00
Please elaborate on concrete work since no scope noted on the drawings.
Refer to specification section
03 30 00 Cast-in-Place
Concrete, specification section 21 30 00 Fire Pumps, electrical drawings, and "FX" drawings.
Will the government provide CAD drawings to prepare shop drawing?
Will be provided after award.
19 E-001 21 13 13
The specifications require compliance with NFPA 20 for fire pump power, but the drawings leave the feeder source and protective device information
Reference electrical drawings.
blank. Please confirm the intended feeder source and protective device requirements for the fire pump and jockey pump.
E-101, E-102, E-103
26 05 00
The drawings show utility service connections for fire pumps, but do not address whether a secondary/emergency source is required. Please confirm if utility power alone is acceptable or if an alternate source is required for this project.
Primary power source is considered reliable.
HC001
HC003
21 13 13 2.1
Specifications call for ductile iron pipe for underground fire mains, but the drawings do not clearly indicate pipe material. Please confirm the intended pipe material and joint type for underground fire service piping.
Reference FP drawings.
Underground piping is not required.
FX111–
FX132
21 13 13 3.2
Specifications reference Fire
Department Connections, but the drawings do not clearly identify their locations or tie-in details.
Please confirm the required FDC locations and configurations for each building.
Reference FP drawings.
LS111–
LS131
21 13 13 1.5
The specifications reference NFPA
13 hazard classifications, but the drawings do not indicate the design criteria for each building. Please confirm the required hazard classification and density/area basis of design.
Calculations are required for the new fire pumps to show that the fire pumps are sized correctly to protect the existing buildings and fire flow. Hydraulic placards within the buildings will indicate the flow and pressure required.
24 FX501 21 05 48
The specifications reference seismic requirements generally, but the drawings do not provide design parameters. Please confirm the seismic bracing and restraint requirements to be applied to the sprinkler piping.
Seismic restraints are not required.
P-501, P-601 22 05 23
Plumbing drawings note a 140 PSI supply and PRVs, while the specifications provide general piping requirements. Please confirm whether PRVs are required on the fire suppression systems, and if so, identify the intended pressure setpoints.
PRVs are not required on the fire suppression systems.
FA111–
FA131,
FA501
28 31 00
The specifications describe a complete fire alarm system, while the drawings primarily show new devices without clearly indicating if new fire alarm control panels are included. Please confirm whether the scope requires new FACUs or modifications to the existing systems.
Reference FA drawings.
FA111–
FA131
28 31 00 2.2
The specifications reference NFPA
72, but the drawings do not indicate circuit class, survivability, or notification criteria. Please confirm the required circuit configuration and notification device coverage parameters.
Reference Specification section 28 31 00
The total building commissioning specification (01 91 00.15 20 – 1.4) lists the systems to be commissioned as “pressure reducing valves and associated piping and accessories”.
Drawing P-601 lists the pressure reducing valves and general note E identifies the maximum water system supply pressure.
Should the pressure reducing valves be functionally tested with and without the fire suppression pumps in operation?
What associated piping and accessories shall receive commissioning oversight?
Which pressure reducing valves have system flow meters, sensors, actuators or are connected to a control system as referenced in the functional performance test section
01 91 00.15 20 – 3.4.2?
Please detail which systems are interconnected with the pressure reducing valves as referenced in the integrated systems test sections
01 91 00.15 20 – 3.4.3 and 01 91
00.15 20 – 3.6.3.
Delete specification section
01 91 00.15 20 as indicated below.
Please confirm if a single, duly qualified individual may "triple hat" and serve as the project superintendent, QC Manager, and
SSHO.
See response to PPI #7.
Are we going to be able to perform the water shutdowns during the day, or will this be off shift?
Refer to Specification Section
01 11 00 Summary of Work
What's the procedure in the event that the main valves do not hold?
In the event this occurs, Public Works will provide directions on which upstream and downstream valves will provide isolation.
Will the government require that a temporary generator is provided/connected to provide temporary power to the existing transformers when we provide new feeder conductors for Buildings 2 and 18B? Is there anything downstream critical that would
A coordinated power outage will preclude the use of temporary generators for
Government buildings.
require power during a shutdown event? Are there any other trades
(SIMOPS) performing work during this time that would require power?
In Section 00 22 16 -
Supplementary Instructions to
Proposers (General Requirements), there is NO mention of asbestos abatement work. The provided project drawings indicate (1) valve location and to include (5) additional random locations, each consisting of 5-ft of pipe insulation. In the Attachment E
Price Proposal Form, the description lists "providing asbestos remediation as shown, of pipe insulation, at locations where pressure-reducing valves are being provided." Is the intent of this RFP to include abatement scope pricing in our CLIN 0001 total price proposal?
Yes
Can the government provide a building/site survey report identifying ACM, LCM, and other hazardous materials that could be either disturbed or a potential for exposure during a work activity within the work areas defined in the scope?
B313 Asbestos report provided with Amendment
0002. Additional reports to be provided as needed after award.
Can the government confirm that the specifications for the new fire pumps are correct? The design differs from existing equipment specifications. New pumps
Building 2 and 18B call for diesel
1500 gpm @ 40 psi and the electric
1500 gpm @ 40 psi. The existing systems equipment is as follows:
Building 2 diesel 1500 gpm @ 90 psi and electric 2000 gpm @80 psi;
Building 18B diesel 2000 gpm
@80 psi and electric 2000 gpm
@80 psi.
The specifications for the pump are based on preliminary calculations that were completed as part of the design effort. Calculations will need to be performed to verify the final sizing of the new pumps.
43 8 of 54 Section 00
21 16
Section 2, paragraph 1
The first sentence says that the seed project will be DBB.
However, the next sentence says that the seed project includes the
"design and replacement of the existing fire pumps" and "to design a new primary electric pump."
Does the seed project scope include design? If so, what are the design deliverables?
This is a general description of the entire project from a planning perspective. This is a DBB project. The fire pumps have been designed.
See drawings and specifications for full details.
Section 00
21 16
Are there any restrictions on how small proposal margins can be?
No
Can prime offerors team with more than one A-E partner?
Yes, however still limited to five (5) projects to demonstrate design experience.
Is a design project example too old for Factor 1 if the design work was performed before 7/22/2020 but the contract scope included construction administration services and a period of performance that extended into
2024?
Yes. See response to PPI #14.
Do construction projects for Factor
1 need to be 100% complete?
Yes.
01 91 00.15
1.9.1.1
Please confirm the Contractor will be responsible for hiring the Lead
Commissioning Specialist (CxC).
See response to PPI #29.
49 01 50 00 3.5.3
Referenced paragraph states, "construct a temporary 6 foot high chain link fence around trailers…include plastic strip inserts…" Will a fabric windscreen be acceptable in lieu of plastic strip inserts (which are more costly)?
No plastic inserts or visibility barrier is required.
50 01 50 00
Please indicate a location the contractor may utilize for laydown and construction trailer. Please also provide information on available utility tie-ins for temp power and water.
Construction Trailor and laydown area to be coordinated with Contracting
Officer's Representative.
51 01 50 00 3.2.2
Referenced paragraph reads that
Contractor will have to pay for temporary utilities consumed by
Contractor. Please confirm the
Contractor will be responsible for paying for temporary utilities.
Water and electricity will be provided as available from existing outlets and supplies as available, at no charge.
52 01 11 00 1.5.1
Will the Contractor performing this
SOW be subject to additional fees charged by NSA Mechanicsburg
(e.g., BOS contractor) for utility outages, dig permits, etc.?
Considering the number of buildings (i.e., 75) where PRV's are required alone, there is potential for a significant cost for utility shutdowns and this should be clear for all contractors to account for such cost.
Only fees indicated in the task order
53 01 11 00 1.5.1
If this project will be subject to
BOS contractor, please provide a rate/fee sheet for the BOS contractor.
This is not a BOS contract.
54 01 11 00 1.6
Will the Contractor be required to perform and pay for Ground
Penetrating Radar (GPR) services in conjunction with all dig permits?
Reference electrical drawings.
55 01 11 00 1.2.1
The Project Description indicates the Contractor will be required to provide asbestos remediation of pipe insulation at five locations where pressure-reducing valves are being provided. Section 02 82 00 paragraph 1.3.1 indicates, "The asbestos work includes the demolition and removal of approximately 20 feet of pipe insulation per building located in six buildings." General Note #7 on
P-001 states, "For bidding purposes, assume asbestos abatement at five additional locations beyond those keynoted on plans..." Sheet P-104 Keynote #20 indicates Bldg 313 requires abatement. Since no hazardous material survey/report is found in the RFP documents, please confirm abatement of six locations is accurate.
Asbestos abatement is as indicated. See response to PPI
#41.
56 02 82 00
We are unable to find a hazardous material report / survey in the RFP documents. Please provide.
See response to PPI #41.
57 02 82 00
If the Government does not possess a current hazardous material survey, please clarify if the
Contractor will be required to hire a hazardous material testing agency to test and provide a hazardous material report/survey to verify the absence of hazardous materials for each of the 75+ buildings where work will be performed under this contract.
No
58 21 13 13 3.5
Paragraph indicates to "Paint all fire sprinkler piping red…" No painting specification section is found in the specifications. Please provide.
Provided with Amendment
0002.
59 E-103
Sheet E-103 indicates to provide a pad-mounted transformer
(150KVA, 12470, 480/277). We're hearing a transformer of this size may have a lead time of 40-45 weeks (after approval).
Considering this project's POP is only 365 calendar days, please consider increasing the POP to allow for the procurement and delivery of the transformer to ensure ample time is provided to complete the installation and testing of the fire pump.
480 calendar days period of performance (including 15 days for bonds/insurance) is the correct duration for the seed project.
E-103;
E-501
Detail A3 on E-301 indicates to refer to A4/E-501 for the primary conduit trench detail. Detail A4 on
E-501 indicates this primary conduit to have a minimum 24" depth and does not indicate a requirement for concrete duct bank.
Considering this UG conduit will contain 12470 cabling, please confirm that this conduit is not required to be concrete encased.
Please also confirm 24" min depth.
For PRIMARY conduit installation, provide depth below finished grade of 36 inches to top of conduits.
Encase the two 5-inch primary metal conduits within concrete envelope, with minimum concrete coverage of 4 inches around the conduits on all sides.
Provide concrete encasement with 4000 PSI rating. Provide plastic conduit spacers to support Primary conduits and to maintain 3-inch separation between those conduits.
Does this project include after hours?
After hours work shall be coordinated with the
Contracting Officer's
Representative.
62 Please provide the sign-in sheet.
Provided with Amendment
0001.
Could you please confirm if the
Superintendent can also fill the roles of the SSHO and QCM?
See response to PPI #7.
64 Who is the HVAC controls? Propose per RFP.
Who's Fire protection is in the building Propose per RFP.
If there is a font requirement, please clarify if the charts and graphics may have a smaller font size in order to fit
See response to PPI #3.
67 16 Factor 4
Please clarify if previously completed and signed PPQ's that do not reference another RFP are acceptable
Yes, as long as it meets the
RFP requirements.
68 11, 13 Factor 1
Can the 5 year time limit for projects under "Corporate
Experience" (construction experience and design experience) be extended to allow projects completed in the past 7 years?
No. Propose per RFP.
69 9
General
Overview of the Seed
Project
Page 9 of the solicitation states the seed project is design-bid-build but then states that the project includes design. Please clarify.
This is a general description of the entire project from a planning perspective. This is a DBB project. The fire pumps have been designed.
Full drawings and specifications have been provided.
Can the two-page limit on
Attachment B "Construction &
Design Experience Project Data
Sheet" be extended to three pages per project?
No. Propose per RFP.
Please confirm if professional registration in the state of
Pennsylvania is required for all disciplines within the DOR’s team, or if registration from other states will be permissible for subcontract design disciplines under the DOR
Propose per RFP.
Please verify if the tasks under this contract are anticipated to include interior design in conjunction with
UFC 03-120-10, and if the DOR’s team should include a registered interior design professional
Propose per RFP.
73 12 Factor 1
Please confirm that only the design portion/phase of a project needs to be completed (i.e. construction is still ongoing) for projects submitted as design experience for the DOR.
Confirmed for Design-Build design experience only.
Propose per RFP.
Amend
Summary of Work
Please provide revised drawings, specs, and a more detailed scope of the new transformer required as per
Amendment 0001.
Refer to Electrical Drawings including E-001, E-101, E-
102, E-103, E-501, E-601.
And Refer to Electrical
Specifications, Division 26, including 26 12 19 .10
THREE PHASE LIQUID
FILLED PAD MOUNTED
TRANSFORMERS
75 10-Sep
Price
Proposal;
Additional
Information
1. Bank
Reference -
2. Financial
Statements
Offerors are required to submit both a bid bond (SF-24) demonstrating bonding capacity and provide additional financial documentation including: (1) a signed bank reference demonstrating adequate financial resources, and (2) the latest three complete fiscal year financial statements. Given that the required bid bond and bonding capacity letter already demonstrate the contractor's financial capability and credit worthiness through surety company underwriting and evaluation, we respectfully request clarification on whether the bank reference and financial statements are still required, or if the
Government would consider the bid bond and bonding capacity letter as sufficient demonstration of financial responsibility for the responsibility determination and remove the requirement for a bank letter and financial statements.
Propose per RFP.
76 9 of 54
4.
Evaluation
Factors
4.(i).5
Can the government provide more guidance on the FAPIIS requirement? Our company is registered in SAM but is not familiar with FAPIIS and does not see where to update it on
SAM. Can this requirement be removed or pushed back until after contract award?
Propose per RFP.
Please Confirm if the Gov will issue another amendment responding to the pending RFIs?
Confirmed. See Amendment
0005.
Continuation Sheet
The following information has been revised:
DRAWINGS:
On NAVFAC Drawing No. 12893480 (P-501):
REVISE the DETAIL C5- BOILER ROOM EMERGENCY SHOWER PIPING DIAGRAM
SPECIFICATIONS
01 30 00 – ADMINISTRATIVE REQUIREMENTS
DELETE paragraph 1.6.1 and REPLACE with
1.6.1 Superintendent Qualifications
Provide project superintendent with a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
The Superintendent may not serve as the Quality Control (QC) Manager or the Site Safety and Health Officer
(SSHO).
01 35 26- GOVERNMENTAL SAFETY REQUIREMENTS
DELETE paragraph 1.7.1.1.1 and REPLACE with
1.7.1.1.1 Additional Site Safety and Health Officer (SSHO) Requirements and Duties
The SSHO may not serve as the Quality Control Manager, or as the Superintendent.
01 91 00.15 20 TOTAL BUILDING COMMISSIONING
Delete specification section 01 91 00.15 20
22 00 00- PLUMBING GENERAL PURPOSE
ADD TO paragraph 3.1
Provide a pressure gauge downstream of pressure reducing valves for testing, to verify downstream pressure is not in excess of 75 PSI when fire pumps are operating.
ATTACHMENTS:
1. Amendment 0005 – Spec Section 01 30 00 Revised
2. Amendment 0005 – Spec Section 01 35 26 Revised
3. Amendment 0005 – Spec Section 22 00 00 Revised
4. Amendment 0005 – Revised Drawings
(End Summary of Changes)
25R2684 Amendment 0005 Text
| IDCode: J |
| Page: 1 |
| Pages: 2 |
| AmendNo: 0005 |
| EffDate: 23 Sep 2025 |
| ReqNo: See Continuation Sheet |
| ProjNo: 1850246 |
| IssCode: N40085 |
| AdmCode: |
| IssuedBy: NAVFACSYSCOM MID-ATLANTIC |
9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395
NORFOLK, VA 23511-0395
UNITED STATES
BRITTANY CRISTELLI, Email: brittany.n.cristelli.civ@us.navy.mil Telephone: 757-341-1978 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| SolNo: N4008525R2684 |
| SolChg: 1 |
| SolDate: 22 Jul 2025 |
| AwardChg: Off |
| AwardNo: |
| Code: |
| FacCode: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Section G - Contract Administration Data |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: SOLICITATION NO. N4008525R2684 DESIGN-BUILD / DESIGN-BID-BUILD, INDEFINITE DELIVERY/INDEFINITE QUANTITY MULTIPLE AWARD CONSTRUCTION CONTRACT FOR GENERAL CONSTRUCTION SERVICES IN THE PUBLIC WORKS DEPARTMENT PENNSYLVANIA AREA OF RESPONSIBILITY |
The proposal due date has been extended to 02 October 2025 NLT 1400 EDT.