25R2668 AMENDMENT 0003(1).pdf

PDF 17 MB Posted

Attached to
UPGRADE TO CONTROLLED AREA, BUILDING 310, NAVAL AIR STATION OCEANA
Solicitation number
N4008525R2668
Issued by

About this file

This document is a Standard Form 30 (SF-30) Amendment to Solicitation for the Upgrade to Controlled Area, Building 310 at Naval Air Station Oceana in Virginia Beach, Virginia, with Amendment Number 0003 dated 17-Apr-2025. The amendment's primary purpose is to issue PPI (Pre-Proposal Information) Responses and include four additional attachments: a Master PPI Spreadsheet from NAVFAC, an HDR Energy Conservation Project document from 2015, an ESPC OCEANA B310 document, and ESPC Design Building 310 As-Built drawings. The solicitation (N40085-25-R-2668) involves security infrastructure upgrades for a 10,184 square foot building, including creating a Controlled Area with specific sound transmission and RF shielding requirements, reconfiguring debrief spaces, and adding specialized rooms such as a Live Room, Storage Room, Servers Room, Mission Planning Room, Entry Control Room, and Admin Room.

View the file

Other files

File Type Posted
25R2668 AMENDMENT 0006 (1).pdf PDF
25R2668 AMENDMENT 0005 (1).pdf PDF
Zip 2 of 4.zip ZIP file
Zip 4 of 4.zip ZIP file
Zip 1 of 4.zip ZIP file
Zip 3 of 4.zip ZIP file
25R2668 AMENDMENT 0004 (1).pdf PDF
25R2668 AMENDMENT_0002.pdf PDF
25R2668 AMENDMENT_0001.pdf PDF
PROVISION 52.204-24.pdf PDF
1667133_B310 NASO_UPGRADE TO CONTROLLED AREA_FINAL DBRFP_SIGNED.pdf PDF
N400852R2668 GENERAL REQUIREMENTS .pdf PDF
WAGE DETERMINATION.txt TXT text file
Attachment F-PPI Spreadsheet.xlsx XLSX spreadsheet
BASE ACCESS INSTRUCTION.pdf PDF
SECNAV 5512.pdf PDF
BLANK SPONSOR VERIFICATION SPREADSHEET.xls XLS spreadsheet
Oceana IDIQ Front End SPECS - 20220602.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

J

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. P ROJECT NO.(If applicable)

6. ISSUED BY CODE N4008 7. ADMINISTERED BY (If other than item 6) CODE

See Item 6

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.

X 9B. DATED (SEE ITEM 11)

10A. MOD. OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORIT Y OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

TEL: EMAIL:

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

0003 17-Apr-2025 ACQR6047518

N40085-25-R-2668

04-Apr-2025

SOLICITATION N40085-25-R-2668, UPGRADE TO CONTROLLED AREA, BUILDING 310, NAS OCEANA, VIRGINIA BEACH, VIRGINIA

The purpose of this amendment is to issue PPI Responses, and three (3) additional attachments: HDR Energy Conservation Project 2015, ESPC OCEANA B310

ASB 11-5-10, AECOM ESPC DESIGN BLDG_310_-_AS-BUILTS.

SEE CONTINUATION PAGE.

17-Apr-2025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

(End of Summary of Changes)

N40085-25-R-2668

SOLICITATION N40085-25-R-2668, UPGRADE TO CONTROLLED AREA, BUILDING 310,

NAS OCEANA, VIRGINIA BEACH, VIRGINIA

The purpose of this amendment is to issue the PPI Responses and additional As-Builts.

Attachments:

1) Adobe PDF- Master PPI Spreadsheet -Round 2 - NAVFAC Responses

2) Adobe PDF- HDR Energy Conservation Project 2015

3) Adobe PDF- ESPC OCEANA B310 ASB 11-5-10

4) Adobe PDF- ECOM ESPC DESIGN BLDG_310_-_AS-BUILTS

All attachments are embedded into this Amendment.

MT1G_N_0001-22x34

MT1M_N_0001-22x34

MT1M_N_0401-Client-specified

MT1M_N_0402-Client-specified

MT1M_N_0501-Client-specified

MT1E_N_0001-22x34

MT1E_N_0501-Client-specified

SALESPERSON:

DRAWING TITLE:

PROJECT:

FILE NAME:

NO. REVISION DATE: BY:

DESIGNED BY: CHECKED BY:

PROJECT NUM.

DRAWING NUM.

OCEANA NAS PERFORMANCE

CONTRACT

09.0300.3467

TITLE PAGE

OCEANA B310.AXD

DONALD R. DAWSON

DAMUTH TRANE

1100 CAVALIER BLVD

CHESAPEAKE, VA 23323

(757) 558-0200

BUILDING 310

04/15/2010

THIS DRAWING SET IS THE PROPERTY OF

TRANE. DESIGN INFORMATION, DRAWINGS,

DETAILS OR SPECIFICATION DATA MAY NOT BE

REPRODUCED OR DUPLICATED NOR MAY ANY

WORK BE EXECUTED HEREFROM WITHOUT THE

WRITTEN AUTHORIZATION OF TRANE.

AUTOMATIC TEMPERATURE CONTROL SYSTEM FOR

NAS, OCEANA

VIRGINIA BEACH, VIRGINIA

CONSULTING ENGINEER: PACE COLLABORATIVE PH# (757) 499-7223

MECHANICAL CONTRACTOR: D.E. KIRBY, INC. PH# (757) 488-5065

11/05/2010

AS BUILT

ENGINEERED BY: CHECKED BY:

DRAWING INDEX

DRAWING

NUM BER

DRAWING TITLE REVISION LEVEL REVISION DATE COM M ENTS

1 TITLE PAGE

2 DRAWING INDEX

3 LEGEND & GENERAL NOTES

4 COM M UNICATION RISER AS BUILT REVISIONS 11/5/2010

5 OCEANA B310 BM TX - 19 WIRING DETAIL

6 DUAL TEM PERATURE SYSTEM FLOW PAGE

7 HW SYSTEM M P581 - 1 WIRING DETAIL

8 CHW SYSTEM M P581 - 2 WIRING DETAIL

9 EXISTING CH-1 WIRING DETAIL

10 EXISTING CH-2 WIRING DETAIL

11 COM PUTER ROOM FLOW PAGE

12 CRAC UNITS EX2 - 1 WIRING DETAIL

13 SEQUENCE OF OPERATIONS

14 DETAIL SHEET # 1

15 DETAIL SHEET # 2

INDEX OF CONTROL SYSTEM DRAWINGS

LEGEND & GENERAL NOTES

Symbol Legend

AIR FLOW STATION

AFS

AIR FLOW STATION, FAN

MOUNTED

AFS

ALARM, BELL

ALM

ALARM, STROBE

ALARM, PIEZIO

BLENDER, AIR BURNER, FUEL-FIRED

DIRECT COIL, COAXIAL

COIL, CHW, DX, HW,

STEAM, ETC.

C

CONTROL POINT

CS - CURRENT SENSOR

CSR - CURRENT

SENSOR W/RELAY

CS OR CSR

DAMPER, OPPOSED OR

PARALLEL

D

TRAQ DAMPER

ACTUATOR, DAMPER

DA

SENSOR, DIFFERENTIAL

PRESSURE

DPS

AIR DIFFERENTIAL

SWITCH OR SENSOR

DPS, DPT

DIFFERENTIAL

PRESSURE SWITCH OR

SENSOR

DPT, DPS

H L EXCHANGER, FUEL FIRE

HEAT

EXCHANGER, FLUID

HEAT FAN OR PUMP

FAN, ROOF TOP FILTER, AIR FILTER, AIR BAG FILTER, AIR HEPA

FILTER, AIR ROLL SWITCH, FLOAT

FLT

FIRESTAT

FS

SENSOR, FLOW

FS

HEATER, ELECTRIC

DUCT

SENSOR, ROOM STATIC

HDW

TUBE, STATIC

HDW

SENSOR, DUCT

HUMIDITY AND

TEMPERATURE

HE, TEH

SENSOR, HUMIDITY OR

TEMPERATURE AND

HUMIDITY

HE, TEH

SENSOR, INDOOR AIR

QUALITY

IAQ

SENSOR, INDOOR AIR

QUALITY (CO2)

IRQ

THERMOSTAT, LOW

LIMIT

LLT

STARTER, MOTOR

MS

SENSOR, OCCUPANCY

OCC

TRANSMITTER,

PT

RELAY

R

RELAY, SOCKET

SENSOR, OUTDOOR

RB

SWITCH, RESET

STATION

RST

DETECTOR, SMOKE

SD

SEQUENCER

SEQ

SWITCH

SW

ON

OFF

SOLENOID, AIR

SOL

SWITCH, BUTTON

THERMOSTAT, WALL

T

COMPOUND, THERMAL

TC

SENSOR, AVERAGING

TE

SENSOR, STRAP ON

SWITCH, ROTARY

HEAT COOL

AUTO

SENSOR,

SENSOR, ZONE

TIMER, ELECTRONIC

WALL

TMR

TIMER, WALL

TMR

WELL, THERMAL

TW

TRANSFORMER

TX

LIGHT, ULTRAVIOLET

UV

VALVE, 2-WAY COIL

VAL

VALVE, 3-WAY COIL

VALVE, DUCT

HUMIDIFIER

VARIABLE FREQUENCY

DRIVE

VFD

Wiring NotesWiring Notes

ELECTRICAL CONTRACTOR FOR TRANE:

1. REFER TO DEVICE INSTALLATION MANUALS FOR SPECIFIC WIRING REQUIREMENTS.

2. FIELD WIRING MUST BE IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE, STATE AND LOCAL

BUILDING CODES, AND DIVISION 16 OF SPECIFICATIONS.

3. TAG ALL CONTROL WIRING AT EACH END OF THE CABLE OR WIRE PER TAGS SHOWN IN

ATTACHED DRAWINGS.

4. AVOID OVER TIGHTENING CABLE TIES AND OTHER FORMS OF CABLE WRAPS. THIS CAN DAMAGE

THE WIRES INSIDE THE CABLES.

5. DO NOT CABLE TIE TO INSULATED WATER, STEAM OR OTHER LINES.

6. IN OPEN PLENUMS, AVOID RUNNING WIRE NEAR LIGHTING BALLASTS, ESPECIALLY THOSE USING

277 VAC.

7. DO NOT RUN FIELD DEVICE AND COMMUNICATIONS WIRING IN SAME CONDUIT WITH WIRING

CARRYING VOLTAGE GREATER THAN 30 VOLTS.

8. ALL PANELS AND FIELD DEVICES LISTED IN THIS DOCUMENT ARE TO BE INSTALLED BY

CONTROLS ELECTRICAL SUBCONTRACTOR UNLESS OTHERWISE NOTED ON DRAWINGS.

9. MOUNT ALL ROOM SENSORS/SWITCHES AS SHOWN ON THE CONSTRUCTION DOCUMENTS,

UNLESS OTHERWISE DIRECTED IN WRITING BY THE OWNER/ENGINEER.

10. FLEXIBLE CONDUIT IS NOT TO EXCEED 24” IN LENGTH.

11. CONTROL PANELS ARE NOT TO BE USED AS JUNCTION BOXES OR RACEWAYS. WIRING THAT

DOES NOT TERMINATE IN A CONTROL PANEL IS NOT TO BE RUN WITHIN THE PANEL.

12. BINARY INPUT LIMITS: 1000 FEET (300 METERS).

13. 0~10 VDC ANALOG INPUT LIMITS: 300 FEET (100 METERS).

14. 0~20 MA ANALOG INPUT LIMITS: 1000 FEET (300 METERS).

15. VARIABLE RESISTANCE ANALOG INPUT LIMITS: 300 FEET (100 METERS).

16. ANALOG OUTPUT LIMITS: 1000 FEET (300 METERS)

17. BINARY OUTPUT LIMITS: 1000 FEET (300 METERS)

18. WIRING POWER FROM THE AC OUT TERMINALS TO POWER ANALOG INPUT DEVICES WILL

CAUSE IMMEDIATE CONTROLLER FAILURE IF INPUT DEVICE USES HALF-WAVE RECTIFICATION.

WHEN UNSURE, USE A SEPARATE POWER SUPPLY FOR DEVICE.

19. COMM 3 AND COMM 4 COMMUNICATION LINK WIRING MUST BE SHIELDED, TWISTED PAIR, 18

AWG MINIMUM, STRANDED, TINNED COPPER CONDUCTORS. SHIELD MUST BE CONTINUOUS

THROUGHOUT, ISOLATED FROM OTHER CONDUCTORS OR GROUND, AND GROUNDED AT BCU

ONLY. MAXIMUM CAPACITANCE BETWEEN CONDUCTORS IS 25 PICOFARADS PER FOOT.

MAXIMUM DISTANCE IS 5000 FEET.

• UNDER CERTAIN CONDITIONS, A TERMINATION RESISTOR NEEDS TO BE PLACED ON THE LAST

DEVICE ON A COMM 3 COMMUNICATION LINK.

20. COMM 5/LONTALK COMMUNICATION LINK WIRING (INCLUDING EX2):

• 22 AWG LEVEL 4 UNSHIELDED COMMUNICATION CABLE RECOMMENDED FOR COMM 5

INSTALLATIONS. MAXIMUM CAPACITANCE BETWEEN CONDUCTORS IS 17 PICOFARADS PER

FOOT.

• SHIELDED LEVEL 4 CABLE IS RECOMMENDED FOR THE COMM 5 TRACKER AND FOR ALL

COMMUNICATION WIRING ON THE VARITRAC CCP.

• COMM 5 LINK LIMITS: 4500 FEET (1,400 METERS), 60 DEVICES MAXIMUM (WITHOUT REPEATER).

• EX2 LINK LIMIT: 1000 FEET (778 METERS).

• CCP III LINK LIMIT: 3500 FEET (1,090 METERS).

• TERMINATION RESISTORS ARE REQUIRED:

~ 105 OHMS, 1%, ¼ WATT AT EACH END FOR LEVEL 4 WIRE.

~ 82 OHMS, 1%, ¼ WATT AT EACH END FOR 18 AWG SHIELDED (PURPLE) WIRE.

• COMM 5 TOPOLOGY MUST BE DAISY CHAINED.

• ONE REPEATER (ONLY ONE PER COMM 5 LINK) CAN BE USED FOR AN ADDITIONAL 4500 FEET

(1,400 METERS), 60 DEVICES.

• DO NOT RUN COMM 5 CABLE ALONGSIDE OR IN THE SAME CONDUIT AS 24 VAC POWER. THIS

INCLUDES THE CONDUCTORS RUNNING FROM TRIAC-TYPE OUTPUTS.

• KEEP COMM 5 POLARITY CONSISTENT THROUGHOUT THE SITE.

• MAKE SURE THAT THE 24 VAC POWER SUPPLIES ARE CONSISTENT IN HOW THEY ARE

GROUNDED. AVOID SHARING 24 VAC BETWEEN COMM 5 CONTROLLERS.

• USE ONLY ONE TYPE OF COMMUNICATION WIRE DO NOT MIX WIRE. IN THE EVENT OF AN

EXISTING JOB THAT USED 18 AWG WIRE, CONTINUE USING THE SAME WIRE AFTER PRIOR

APPROVAL FROM THE PROJECT MANAGER.

21. ETHERNET LAN COMMUNICATION MAXIMUM DISTANCE IS 295 FEET (90 METERS) PLUS 33 FEET

(10 METERS) FOR PATCH CABLES.

MECHANICAL CONTRACTOR:

1. DAMPERS ARE TO BE INSTALLED BY SHEET METAL CONTRACTOR UNLESS OTHERWISE NOTED.

2. CONTROL VALVES AND ACCESSORIES INSTALLED DIRECTLY

INTO PIPING (SENSOR WELLS, THREADOLETS, ETC.) ARE TO

BE INSTALLED BY MECHANICAL CONTRACTOR.

CONFIG WIRE LENGTH RESISTANCE RESISTOR PLACEMENT

0-800 ft 270-330 Ω ON THE LAST DEVICE OF LINK

800-2500 ft NOT REQUIRED N/A >2,500 ft 100 Ω ON THE LAST DEVICE OF LINK

DAISY

CHAIN

BRANCH ANY LENGTH

270-330 Ω

(IF NEEDED)

ON THE DEVICES AT THE END

OF EACH BRANCH

FIELD WIRING NOTE:

WHT

BLK

SOLID LINES: NOT

WIRED BY FIELD

DASHED LINES:

WIRED BY FIELD

121 37

2TB

WIRED BY FACTORY WIRED BY FIELD

FIELD MOUNTED

CONTROLLER

FACTORY

TERMINAL

CABLE

TAG

FACTORY MOUNTED DEVICE WITH FIELD MOUNTED CONTROLLER:

CABLE MATRIX NOTES:

KEEP ALL COMMUNICATION LINK WIRING IN A DAISY CHAIN CONFIGURATION. ALL CABLE WIRING MUST BE TRANE RECOMMENDED WIRING , ESPECIALLY COMMUNICATION CABLES. CONTACT TRANE FOR RECOMMENDED CABLES

AND SPECIFICATIONS.

Cable MatrixCable Matrix

* When ordering cable specify jacket color. Part numbers are subject to change without notice.

CT

TYR52008-E15-U1000

TRANE NUMBER*

A WHT, BLK

DESCRIPTION

18/2 TWIST SHLD PURPLE COMM CABLE

TYR52412-006-U1000C WHT, BLK22/2 TWIST NON-SHLD BLUE COMM CABLE

TYM51200-009-U1000D WHT, BLK18/2 TWIST SHLD PLEN WHITE CABLE

TYM51201-009-U1000E WHT, BLK, RED18/3 TWIST SHLD PLEN WHITE CABLE

TYM51202-009-U1000F WHT, BLK, RED, GRN18/4 TWIST SHLD PLEN WHITE CABLE

J WHT, BLK1 PAIR #14 THHN STRANDED IN CONDUIT

L B9907 ETHERNET RG58 THNNET PLEN CABLE

CMP-00424BICC-5U-01M ETHERNET CAT-5 PLEN CABLE

TYM51203-009-1000O WHT, BLK, RED, ORN, YEL, GRN, BLU, BRN18/8 TWIST SHLD PLEN WHITE CABLE

TYR52414-003-U1000P WHT, BLK22/2 TWIST SHLD PLEN ORANGE COMM CABLE

WIRE COLORS

FA-1602C-1-2N-03Q WHT, BLK16/2 SOLID RED SMOKE DETECTOR CABLE

WIR025932C WHT, RED18/2 SOLID PLENUM THERMOSTAT CABLE

WIR025943C WHT, RED, GRN18/3 SOLID PLENUM THERMOSTAT CABLE

WIR025965C WHT, RED, GRN, YEL, BLU18/5 SOLID PLENUM THERMOSTAT CABLE

WIR025988C WHT, RED GRN, YEL, BLU, ORN, BLK, BRN18/8 SOLID PLENUM THERMOSTAT CABLE

10C WHT, RED, GRN, YEL, BLU, ORN, BLK, BRN, GRY, PNK18/10 SOLID PLENUM THERMOSTAT CABLE 12C 18/12 SOLID PLENUM THERMOSTAT CABLE WHT, RED, GRN, YEL, BLU, ORN, BLK, BRN, GRY, PNK, PUR, TAN

CABLE INFORMATION SHAPE (CIS):

EACH CABLE CONNECTION HAS A CIS WHICH PROVIDES SOME OR ALL OF THE INFORMATION INDICATED BELOW:

WIRE COLOR

OR POLARITY

SHIELD

CONFIGURATION

CABLE TYPE FROM

CABLE MATRIX

CABLE

NUMBER

DEVICE TAG AND

POINT DESCRIPTION

END DEVICE DETAIL

REFERENCE INSET & PAGE

B

CSR-3 CONDENSER PUMP STATUS

BLK TAPE SHLD

SHIELDING NOTE:

ATTACH ALL SHIELDS TO

COMMON AS SHOWN

TAPE OFF SHIELD

AT DEVICE

FACTORY

PROVIDED

AND WIRED

DEVICE

Field, Factory And Existing Device Note:

EXISTING

DEVICE

FIELD WIRED

DEVICE (FIELD

OR FACTORY

PROVIDED)

FACT

10D

EXST

RISER WIRING BY NOTE:

TX

120 VAC

BY EC

EC - ELECTRICAL CONTRACTOR

ESC - ELECTRICAL SUBCONTRACTOR

OTHERS

TRANE

EXIST - EXISTING POWER

CONTROLLER

PAGE

NUMBER

CABLE TYPE

FROM

CABLE MATRIX

DEVICE TAG

FLOW SHAPE NOTES:

D 10

TE - 1

CABLE TAG

COMMUNICATION RISER

AS BUILT REVISIONS 11/5/2010 BLD

OUTSIDE

FLOOR 1

BMTX - 19

OCEANA B310

MECH RM 115

BY ESC

MP581 - 1

HW SYSTEM

MECH RM

MP581 - 2

CHW SYSTEM

EX2 - 1

CRAC UNITS

24 VAC

EX2 LINK (C)

1 INSTALLING ATC CONTRACTOR MUST PROVIDE AND INSTALL 105 OHM TERMINATION RESISTOR AT

THE BEGINNING AND AT THE END OF THE COMM 5 LINK.

(E) CH - 1

RTAA

OUTSIDE MECH RM 115

(E) CH - 2

RTAA

COMM5

ISO COMM3

OCEANA B310 BMTX - 19 WIRING

DETAIL

TAG QTY VENDOR PART NO DESCRIPTION

BM TX - 19 1 TRANE BM TX001AAB011 BCU, 120V, W/DISPLAY AND M ODEM

CONV - 1 1 RAD ASM I-52L CAT5 TO PHONE (COPPER) CONDUCTOR

BILL OF M ATERIALS

TYPICAL FOR 1

(OCEANA B310)

BMTX - 19

LOCATION:

MECH RM 115

OCEANA B310

SYSTEM

CONTROLLED:

N

L

GND

O

M

4A

4B

ROVER

COM5

MINI-MONITOR

PORT

COM4B

COM4A

TB2

TB3

TB4

TB5

TB6

BIP1

GND

BIP2

GND P5

P4

P3

P2

P1

A net

TB

GND 24VAC

SEE DRAWING LEGEND PAGE AND / OR

BMTX INSTALLATION MANUAL FOR

COMM LINK WIRING REQUIREMENTS

IF SHIELD IS USED AS A SHIELD TERMINATE AT

THE COMMON TERMINAL ON THE

CONTROLLER AND TAPE BACK. CUT AND TAPE

AT THE END DEVICE.

WHEN WIRING A BINARY INPUT: CONNECT THE

SHIELD WIRE TO A COMMON TERMINAL AT THE

TERMINATION BOARD AND TAPE IT BACK AT

THE OUTPUT DEVICE.

INPUT WIRING NOTES:COMM LINK WIRING NOTES:

INSTALL TERMINATION RESISTOR AT THE

BEGINNING AND AT THE END OF THIS LINK.

TB2

TB4

TB5

IN

Y

P U

TS

BIP1

BIP2

TB6

P1 net

IS

G

4A

4B

ICOMM3

SHLD

NOT USED

105 Ohm

ENET

CAT5

OUTLET CONNECT TO PHONE

LINE COPPER

CONDUCTOR

CONV - 1

(LOCATED IN ENCLOSURE

NEAR BCU)

IP ADDRESS: 193.168.100.123

SUBNET MASK: 255.255.255.0

GATEWAY: 193.168.100.1

UDP PORT: 47824

PNL: MP

CKT: #6

DUAL TEMPERATURE SYSTEM

FLOW PAGE

CS - 3, CS - 4 2 TRANE X13310270-01 CUR SW, 2-135A, SOLID, NO, LED

OATS - 1 1 TRANE 4190-1101 TEM P SENS, OA, THERM

TC - 1 4 TRANE 4190-1114 HEAT SINK COM POUND

E - 1, TE - 2, TE - 3, TE - 4, TE - 5, TE - 6 TRANE 41901133 TEM P SENS, DUCT/ IM M , THERM , 6 IN

, WEL - 17, WEL - 1, WEL - 2, WEL - 3 6 TRANE 4190-1112 WELL, 6IN X 1/2IN FPT X 3/4IN M PT, B

V - 1, V - 2 2 BELIM O F6100HD + SY2-120M FTBF VAL 4'' 2W PROP NSR 285# 451CV

CS - 1, CS - 2, CS - 5 3 KELE SCS1150A-LED CUR SW, 1.75-150A, SPLIT, NO, VFD

BLR - 1

HOT WATER

BOILER

CHW/HW

SUPPLY

D 7

TE - 2

CHW/HW

RETURN

P - 3

DUAL TEMPERATURE WATER SYSTEM - MECH. ROOM 115

FACTORY PROVIDED BOILER DEVICES:

ENABLE / DISABLE RELAY

GENERAL ALARM CONTACT

4-20mA MODULATING CONTROL

LOW WATER CUTOFF (FACTORY MOUNTED AND WIRED)

FLOW SWITCH (FACTORY MOUNTED AND WIRED)

HIGH TEMPERATURE LIMIT (FACTORY MOUNTED AND WIRED)

P - 4

(NEW BOILER B-1)

S/S F

R - 3

116STS

CS - 3

MS - 3

R - 4

SKT - 5

117STS

CS - 4

MS - 4

TC - 1

DRAWING REFERENCE NOTE:

CONTROLS ENGINEERING BASED ON INFORMATION SHOWN ON MECHANICAL

PLANS ISSUED BY:

NAVFAC (AECOM)

DATED: 11/13/2009

"NAS OCEANA - OCEANA II BUILDING 100/107"

CH - 1 CH - 2

D 8

TE - 3

D8

TE - 4

E

V - 1

V - 2

TE - 5

TE - 6

P - 1

P - 2

R - 1

SKT - 1

147STS

CS - 1

MS - 1

R - 2

SKT - 2

148STS

CS - 2

MS - 2

INTRLK

V - 26

COMNC

HW

V - 28

V - 27

CHW

CHW

BCP

H

W

S

P - 5

AHU - 1 PARTIAL DIAGRAM

R - 5

118STS

CS - 5

MS - 5

CHW PLANT

CHW PLANT

EXISTING

SUMMER/WINTER

SWITCH

(V-26,V-27,V-28)

OATS - 1

8 D

8D

HW SYSTEM MP581 - 1 WIRING

M P581 - 1 1 TRANE BM TM 000AAC01 M P581, 120VAC, PLASTIC ENC, LCD

(HW SYSTEM)

LO

TP

MP581 - 1

HW SYSTEM

SYSTEM CONTROLLED:

BO1

BO2

BO3

BO4

BO5

BO6

24VAC

AO1

AO2

AO3

AO4

AO5

AO6

IN1

IN2

IN3

IN4

IN5

IN6

IN7

IN8

IN9

IN10

IN11

IN12

+24VDC

24V

INPUT

POWER

BINARY

OUTPUTS

ANALOG

INPUTS

24 VDC

DUCT STATIC

EX2 COMM

COMM5I/O COMM

STATIC

IN OUT

103X - 1 BOILER ENABLE/DISABLE WHT

BLKSHLD

R - 3 HOT WATER PUMP - 3 START/STOP WHT

R - 4 HOT WATER PUMP - 4 START/STOP WHT

R - 5 HOT WATER PUMP - 5 START/STOP WHT

BLR - 2 4-20MA RESET

115X - 2 BOILER ALARM

CS - 3 HOT WATER PUMP - 3 STATUS

CS - 4 HOT WATER PUMP - 4 STATUS

CS - 5 HOT WATER PUMP - 5 STATUS

TE - 3 CRAC UNIT - 3 SPACE TEMP

CRAC UNIT 3 ALARM

TE - 2 HW SUPPLY TEMP SENSOR

TE - 1 HW RETURN TEMP

SUMMER/WINTER SWITCH STATUS

OATS - 1 OUTSIDE AIR TEMP

COMM

FROM BCU-1 BMTX

TO CW SYSTEM MP-581

CWHT

NID: 04-AA-3F-68-04-00

PNL: MP

CKT: #6

CHW SYSTEM MP581 - 2 WIRING

M P581 - 2 1 TRANE BM TM 000AAC01 M P581, 120VAC, PLASTIC ENC, LCD

(CHW SYSTEM)

MP581 - 2

CHW SYSTEM

BO1

BO2

BO3

BO4

BO5

BO6

AO1

AO2

AO3

AO4

AO5

AO6

IN1

IN2

IN3

IN4

IN5

IN6

IN7

IN8

IN9

IN10

IN11

IN12

INPUT

POWER

BINARY

ANALOG

24 VDC

DUCT STATIC

EX2 COMM

COMM5I/O COMM

STATIC

IN OUT

R - 1 CHW PUMP - 1 START/STOP WHT

R - 2 CHW PUMP - 2 START/STOP WHT

V - 1 PLANT ISOLATION VALVE V - 1

V - 2 PLANT ISOLATION VALVE V - 2

CS - 1 CHW PUMP - 1 STATUS

CS - 2 CHW PUMP - 2 STATUS

TE - 5 CHW RETURN TEMP

TE - 6 CHW SUPPLY TEMP

V - 1 ISOLATION VALVE STATUS CLOSE

TE - 4 PLANT CHWS TEMP

TE - 3 PLANT CHWR TEMP

CH -1 CHW PUMP REQUEST

CH -2 CHW PUMP REQUEST

Term Resistor 105 Ohm

COMMUNICATIONS IN

I/O TO EX2 - 1

BILL OF M ATERIALSTYPICAL FOR 1

(EXISTING CH-1)

(E) CH - 1

DESCRIPTION:

EXISTING CH-1

RTAA CHILLER

1TB1 CHILLER MODULE

EM STOP

NORMAL/TRIP

1U1

1 TB3

FLOW SWITCH

EXT AUTO/STOP

1 TB4

CONFIGURABLE

ALARM

UNIT RUNNING

MAX. CAPACITY

CHW PUMP REQUEST

7J3 COMPR. A MODULE

1U4

EXT. CKT. LOCKOUT #1

1TB1 OPTIONS MODULE

EXT. CHW STPT

1U2

1 TB2

ZONE TEMP/ICE CONTROL

7 EXT. CURRENT

LIMIT STPT8

7J3 COMPR. B MODULE

1U5

EXT. CKT. LOCKOUT #2

1TB3

GD

CUSTOMER PROVIDED

DEDICATED 115V 60HZ

EVAPORATOR HEATER. MAX

FUSE SIZE 20 AMPS.

EXISTING CH-1 WIRING DETAIL

9OCEANA B310.AXD

FILE

NAME:

NUM. REVISION DATE: BY:

DWG:

PROJECT ID:CID: PID:

ADDR:55

BILL OF M ATERIALSTYPICAL FOR 1

(EXISTING CH-2)

(E) CH - 2

DESCRIPTION:

EXISTING CH-2

RTAA CHILLER

1TB1 CHILLER MODULE

EM STOP

NORMAL/TRIP

1U1

1 TB3

FLOW SWITCH

EXT AUTO/STOP

1 TB4

CONFIGURABLE

UNIT RUNNING

MAX. CAPACITY

CHW PUMP REQUEST

7J3 COMPR. A MODULE

1U4

EXT. CKT. LOCKOUT #1

1TB1 OPTIONS MODULE

EXT. CHW STPT

1U2

1 TB2

ZONE TEMP/ICE CONTROL

7 EXT. CURRENT

LIMIT STPT8

7J3 COMPR. B MODULE

1U5

EXT. CKT. LOCKOUT #2

1TB3

GD

CUSTOMER PROVIDED

DEDICATED 115V 60HZ

EVAPORATOR HEATER. MAX

FUSE SIZE 20 AMPS.

EXISTING CH-2 WIRING DETAIL

10OCEANA B310.AXD

ADDR: 56

COMPUTER ROOM FLOW PAGE

TE - 1, TE - 2, TE - 3, TE - 4 4 TRANE X1351152801 TEM P SENS ZONE THERM

D 12

TE - 2

TE - 3

TE - 4

COMPUTER ROOM 1 MONITORING

FIG#1

COMPUTER ROOM 2 MONITORING

FIG#2

COMPUTER ROOM 3 MONITORING

FIG#3

COMPUTER ROOM 4 MONITORING

FIG#4

CRAC UNITS EX2 - 1 WIRING

EX2 - 1 1 TRANE 49500500 EX2 EXPAN M OD'L, M ETAL ENC

(CRAC UNITS)

EX2 - 1

CRAC UNITS

SYSTEM

CONTROLLED:

SHLD

I/O

IV

AL

1 2

O N

ADDRESS

SET TO 1

TE - 1 CRAC UNIT - 1 SPACE TEMP

CRAC UNIT 1 ALARM

TE - 2 CRAC UNIT - 2 SPACE TEMP

CRAC UNIT 2 ALARM

TE - 4 CRAC UNIT - 4 SPACE TEMP

CRAC UNIT 4 ALARM

I/O

FROM CHW MP581 - 2 WHT

SEQUENCE OF OPERATIONS

SEQUENCE OF OPRATIONS

HOT WATER SYSTEM

THE HOT WATER SYSTEM WILL BE ENERGIZED BY THE BUILDING AUTOMATION SYSTEM

WHENEVER THE OUTSIDE AIR TEMPERATURE FALLS BELOW AN ADJUSTABLE OUTSIDE AIR

ENABLE SETPOINT (INITIAL SETTING 58 DEGREES F). WHEN THE HOT WATER SYSTEM IS

ENERGIZED, THE DIRECT DIGITAL CONTROLLER WILL COMMAND THE BOILER CIRCULATING

PUMP. WHEN PUMP STATUS IS PROVEN, THE DDC CONTROLLER WILL ENABLE THE LEAD BOILER

TO RUN. THE BOILER WILL OPERATE SUBJECT TO ITS PACKAGED CONTROLS TO MAINTAIN THE

HOT WATER SUPPLY SETPOINT. THE DDC CONTROLLER WILL SEND THE SETPOINT TO THE

BOILER TO RESET THE HOT WATER SUPPLY SETPOINT INVERSELY WITH THE OUTSIDE AIR

TEMPERATURE. THE INITIAL RESET SCHEDULE WILL BE AS FOLLOWS:

OUTSIDE AIR TEMP HOT WATER SUPPLY SETPOINT

60 DEG 120 DEG

40 DEG 160 DEG

THE DDC CONTROLLER WILL MONITOR: HW SUPPLY TEMP, HW RETURN TEMP, BOILER

DISCHARGE TEMP, AND BOILER ALARM CONTACT.

SHOULD THE CIRCULATING PUMP FAIL TO START, THE DDC CONTROLLER WILL DE-ENERGIZE

THE BOILER, AND GENERATE AND ALARM.

SHOULD ANY BOILER FAIL THE DDC CONTROLLER WILL GENERATE AND ALARM.

CHILLED WATER SYSTEM

THE BAS WILL ENERGIZE THE CHILLED WATER CIRCULATING PUMP WHENEVER THE OUTSIDE

AIR IS GREATER THAN AN ADJUSTABLE OUTSIDE AIR ENABLE SETPOINT (INITIAL SETTING 60

DEGRESS F) OR UPON A CALL FOR COLLING. WHEN THE CIRCULATING PUMP RUN STATUS IS

PROVEN, THE DDC WILL MODULATE THE BYPASS TO MAINTAIN A 1 DEGREE DIFFERENTIAL

BETWEEN THE CHILLED WATER PLANT SUPPLY TEMPERATURE AND THE CHILLED WATER LOOP

SUPPLY TEMPERATURE.

THE BAS WILL MONITOR: CHILLED WATER SUPPLY TEMPERATURE AND CHILLED WATER RETURN

TEMPERATURE, AND THE CHILLED WATER PUMP STATUS.

SHOULD THE CHILLED WATER PUMP FAIL TO START, THE DDC CONTROLLER WILL GENERATE AN

ALARM.

COMPUTER ROOM MONITORING AND CRAC UNIT ALARMS

THE DDC CONTROLLER WILL MONITOR THE COMPUTER ROOM SPACE TEMPERATURE. ON A RISE

IN SPACE TEMPERATURE ABOVE THE SPACE TEMPERARTUE HIGH LIMIT SETPOINT, THE DDC

CONTROLLER WILL GENERATE AN ALARM.

SHOULD THE CRAC UNIT GENERATE AN ALARM CONDITION BY ENABLING ITS ALARM RELAY, THE

DDC CONTROLLER WILL GENERATE AN ALARM.

DETAIL SHEET #1

SENSOR OUTDOOR AIR TEMP THERM

4190-1101

RED WHT TEMP

GRN BLK COMMON

SENSOR TEMP 4" DUCT/IMM THERM

41901132

DIFF PRESS TRANSMITTER, 0-50PSID, 4-20mA

KELE

M230-050PD-C

WHT +4-20mA SIGNAL

BLK +24VDC

X

HIGH LOW

VALVE ACTUATOR, MOD, 110VAC

BELIMO

SY2-110P

WHT 110VAC NEUTRAL

G GRN GROUND

BLK 110VAC POWER

BLK - SIGNAL

NO END SWITCH

NO END SWITCH

WHT NC END SWITCH

BLK NC END SWITCH

WHT + SIGNAL

BLK - FEEDBACK SIGNAL

12 WHT + FEEDBACK SIGNAL

12345678

DIP SWITCH

OUTPUT = 2-10VDC

INPUT = 2-10VDC

ZONE SENSOR THERM

ZONE TEMP

COMMON

X1351152801

SWITCH CURRENT SPLIT CORE, 1~135A, VAC/DC, NO, LED

SCS1150A-LED

KELE

STATUS

WIRE

SIDE

TOP

SENSOR TEMP 6" DUCT/IMM THERM

41901133

RELAY CURRENT SENSING SWITCH

X13310270-01

OUTPUT STATUS

SETPOINT

SENSOR POWER

STATUS

WIRE

SIDE

TOP

DETAIL SHEET #2

15OCEANA B310.AXD

BELIMO

SY2-120MFT

SY-MFT ACTUATOR

U5

L

120 VAC HOTBLK

120 VAC NEUTRALWHT

SIGNAL (+)WHT

SIGNAL (-)BLK

FEEDBACK SIGNAL (+)WHT

FEEDBACK SIGNAL (-)BLK

LS3 COMMONWHT

LS3 VALVE OPENBLK

LS3 VALVE CLOSE

LS4 COMMONWHT

LS4 VALVE OPENBLK

LS4 VALVE CLOSE

PE EARTH GROUNDGRN

Package B Construction Issue 27 May 2015 1

Package B Construction Issue 27 May 2015 2

Package B Construction Issue 27 May 2015 3

Package B Construction Issue 27 May 2015 4

Package B Construction Issue 27 May 2015 5

Package B Construction Issue 27 May 2015 6

Package B Construction Issue 27 May 2015 17

Package B Construction Issue 27 May 2015 18

Package B Construction Issue 27 May 2015 19

Package B Construction Issue 27 May 2015 20

Package B Construction Issue 27 May 2015 21

Package B Construction Issue 27 May 2015 22

Package B Construction Issue 27 May 2015 23

Package B Construction Issue 27 May 2015 24

Package B Construction Issue 27 May 2015 25

Package B Construction Issue 27 May 2015 26

Package B Construction Issue 27 May 2015 27

Package B Construction Issue 27 May 2015 28

Package B Construction Issue 27 May 2015 29

Package B Construction Issue 27 May 2015 30

Package B Construction Issue 27 May 2015 31

Package B Construction Issue 27 May 2015 32

Package B Construction Issue 27 May 2015 33

Package B Construction Issue 27 May 2015 34

Package B Construction Issue 27 May 2015 35

Package B Construction Issue 27 May 2015 36

Page Section Para. Dwg #

1 Baron/Rand D5030 6

The RFP states requirements for the A/V (audiovisual) equipment including the requirement for a CTS-D AV specialist to design/specify the equipment and administer the BVD process for the AV package however, there does not seem any indication of the A/V scope/requirements on the project. Are Room Requirements sheets or other documentation available that would capture the functional A/V requirements?

The CTS-D A/V requirement is located in Part 4 / D5030 Communications And Security / Section #6 with Additional A/V requirements. The project specific A/V requiremetns are located in Part 3 / D5030 Communications And Security / A/V Systems. BDP

2 Baron/Rand Could the government please provide existing as-builts of building 310 if they are available?

As-Builts will be provided by the Contract Specialist.

3 Baron/Rand Will all occupants be removed from this building prior to the start of construction?

Refer to PART 3, 4.0 BUILDING/GENERAL REQUIREMENTS second to last paragraph concerning operations.

Baron/Rand Will escorts be required to access this building during construction?

Refer to PART 2, 01 14 00.05 20 WORK RESTRICTIONS and PART 3, 5.0 ROOM REQUIREMENTS, STRUCTURAL, last paragraph concerning entry into new Controlled Area.

Baron/Rand

Design, lead times, and on-site coordination with the existing tenants will cause this project to extend past 730 days. Would the government consider extending the project 180 days to account for the additional time needed to execute?

730 days is adequate time to execute the design and construction of this project.

Baron/Rand Will all existing furniture be removed by the government prior to the commencemnt of work?

Contractor is responsible for removal and disposal of existing furniture.

Does our proposals need to include the cost associated with moving the existing furniture?

Refer to PART 3, 5.0 ROOM REQUIREMENTS, INTERIORS for demolition requirements of existing furniture.

Please provide an existing furniture list for the furniture that will need to be removed.

An inventory list will NOT be provided. Cost may be calculated on a cost per square foot basis for administrative spaces.

Baron/Rand Could the government please provide a hazardous materials report if available?

Refer to PART 2, 01 57 19 TEMPORARY

ENVIRONMENTAL CONTROLS 1.1.

Baron/Rand Are there any hazerdous materials present in the areas where demolition will be taking place?

Refer to PART 2, 01 57 19 TEMPORARY

ENVIRONMENTAL CONTROLS 1.1.

Baron/Rand Is after hours work available for the execution of this project? Refer to PART 2, 01 14 00.05 20 WORK RESTRICTIONS 1.2.d.

12 Baron/Rand

Will on-site utilities be available for and during construction activities? Electrical power for the facility will be available for this contract except where building power outages of the Main Switchboard are required under Part 3 / D50 Electrical. BDP

Baron/Rand Can the awarded GC use one of the interior rooms as an office during construction?

Yes. It must be approved by the SSM and Contracting Officer.

Baron/Rand Is the stadium seating part of the FF&E budget or is this to be included in the base bid?

Stadium seating is to be included in base construction bid.

Will temporary cooling / heating need to be provided in the base price to accommodate any personnel?

Existing VAV system remains operable during construction. Refer to PART3, D30 HVAC, Para General.

The SOW (Part 3) states several times to "provide the following FF&E Requirements". Are the items following this statement to be provided in the base bid, or will these items be part of the FF&E budget?

Items listed after "provide the following FF&E Requirements" are to be included in the FF&E budget

17 Baron/Rand Will the existing electronics be disposed of as part of the base bid or will the government be removing and disposing of the prior to the commencemnt of construction?

Refer to Demolition portions of Part 3 / D5030 Communications And Security. BDP

Project Title: UPGRADE TO CONTROLLED AREA, BUILDING

310, NAS OCEANA

Solicitation / RFP#: N4008525R2668 - PPI Cut Off Date: 16 APRIL 2025

Amend No.

GOVERNMENT RESPONSE

PPI No.

Offeror Date

Submitted

REFERENCE QUESTION

Could the government provide photos of all the existing piping at the exterior to be removed as part of construction?

Assume the "piping" reference relates to natural gas piping. Photo will be provided of meter and exterior piping.

Baron/Rand Could the government please provide photos where the roof will be disturbed as part of construction? Will provide photos of roof.

Could the government please provide a photo of the door being removed outside of the electrical room 114?

Requested photos were taken at the PreBid walk-thru. Those photos will be issued once they have been cleaned. No additional photos will be taken.

could the government please provide photos of the doors being painted and replaced at the interior of the building?

Requested photos were taken at the PreBid walk-thru. Those photos will be issued once they have been cleaned. No additional photos will be taken.

Baron/Rand Could the government please provide photos of the existing walk pads on the roof please? Will provide photos of roof.

Could the government please provide a photo of the area where the roof is to be replaced at the new rooftop unit? Could the government please specify in the photo where the pitch is less than 3" in 12?

Will provide photos of roof.

30-40 lockers are quantified in the SOW. Could the government please provide an exact number of lockers required for this contract? A minimum of 30 cell phone lockers are required.

Would the government extend the PPI deadline to allow our trade partners more time to digest this design/build project? It would be beneficial to everyone to allow them time to submit questions. Yes.

MIG GOV

04/15/25

Can we please be sent the files referenced in Part 6 of the RFP document; Tactical Aircrew Combat Training System, NAS Oceana Energy Conservation Project, and 2016 Automatic Temperature Control System, BLDG 310?

As-Builts will be provided by the Contract Specialist.

During the site visit, it looked as though the building has an existing NFPA 12 CO2 extinguishing system in several rooms, however there is no work associated with this listed in the fire protection sections of the RFP. Is there any work to be done to this system?

Remove all existing CO2 suppression system components as well as CO2 releasing system detection, conduit and wiring.

28 MIG GOV 04/15/25

Existing Rooms 125, 128, 129, 130, 131, and 132; RFP says to salvage, store and reinstall bracket supports for large screen monitors.

Are these supports for the large TV's that are in those rooms or are these the black supports that the existing computer monitor arms are attached to?

Coordinate and provide in accordance with Part 3 / D5030 Communications And Security. BDP

Can we be provided with the existing finished ceiling heights? And is the intent to keep the ceilings at these heights?

Existing ceiling heights have not been verified. Design intent is for new ceilings to match existing ceiling height.

MIG GOV 04/15/25 Will the government consider allowing the Superintendent to also serve as the QC Manager in addition to serving as the SSHO? Provide what is required in the RFP.

MIG GOV 04/15/25 Will commissioning of the new mechanical equipment be required? Commissioning of Mechanical quipment is not included as part of the RFP.

Baron/Rand Please confirm all SLC and NAC wiring to be class B. Class B is permissible, confirmed.

Are there any existing sprinkler plans? If so please provide.

There are no existing sprinkler piping plans available within the Government archives.

Are there any fire alarm plans from the previous project that was mentioned? If so please provide.

There are no fire alarm shop drawings available for this work within the Government archives.

Baron/Rand Please provide photos from the site visit. NAVFAC is currently waiting on the photos from the Customer.

Part 3 5.0 Structural

Are there as-built structural documents? Cannot provide accurate pricing for potential structural modifications without knowing what is in place. As-Builts were already sent by the CS.

Please consider removing seismic load checks. This building is SDC A and existing building lateral system is unknown at this time.

Seismic checks are not required to be included in the structural calculations.

Minimum code-prescribed lateral loads on interior partitions as applicable will be adequate. In the Design Criteria Notes on the drawings, please include the seismic criteria, including building risk category, Ss, and S1.

Please verify that RTU connections will follow industry norm and be provided by the mechancial contractor. EOR will provide necesary structural support and attachment points in the roof framing, if there are RTUs.

The DOR must verify that all connections are adequate to resist uplift, overturning, and/or sliding of the units, in addition to ensuring the adequacy of the roof structure to support these loads along with the gravity loads of the RTUs and other added items.

Part 3 6.0 A10 RFP says foundations are not applicable. Please verify there are no slab on grade checks and modifications associated with this project. Slab on grade checks are not required for this project.

Part 3 6.0 B10

Snow load listed as 10 psf. Please verify it should be 35 psf or provide other value if neither of these are correct.

Code references have been updated since the completion of this RFP. Considering load requirements in accordance with ASCE 7-22, please replace the RFP, Part 3, Chapter 6.0, ESR B10 SUPERSTRUCTURE with the following:

The structural system must be designed and/or analyzed using the following parameters:

Risk Category: II.

Live Loads: In accordance with UFC 3-301- 01, Structural Engineering.

Wind loads: Design wind speed: 124 mph;

Exposure category C

Snow loads: Ground snow load: 30 psf; Roof exposure: Partially exposed.

Earthquake loads: Mapped seismic acceleration parameters: SS: 0.10g; S1:

Part 3 6.0 B10

Building is listed as partially enclosed in snow loading portion. Please confirm this is an enclosed building for wind analysis as there are no significant exterior envelope openings based on the RFP.

In the snow load portion of the RFP, Part 3, Chapter 6.0, ESR B10 SUPERSTRUCTURE, this should read, "Partially exposed". For wind analysis, this is an enclosed building.

Part 3 D30 Please confirm that only mechancial engineer needs to be licensed in VA and all design other professionals may be licensed in other states. All design professionals can be licensed in any state.

Baron/Rand Part 6 May we get the 1995 and 2015 record drawings for the existing HVAC systems?

Additional As-Builts will be provided by the Contract Specialist.

Baron/Rand Part 3 D30 Is commissioning required?

Commissioning of Mechanical equipment is not included as part of the RFP.

Part 6 Please provide existing as-built drawings.

g g provided by the Contract Specialist (CS).

Additional As-Builts will be provided by the

CS.

14 Part 3 B3060

Since this is not a complete roof replacement, can the requirement of a Registered Roof Consultant (RCC) or equal be reduced to a Registered Architect with standard roofing experience? Provide what is required in the RFP.

Baron/Rand Part 3 Does the floor slab need RF shielding?

The Controlled Area must meet the 60db requirements.

Part 3 D30 Are z-ducts required for sound attenution?

Design of the HVAC system must be in accordance with RFP Para 2.1, Controlled Areas: Work must be in compliance with “Accreditation Documentation”.

7 Part 3

5.0 Room Requirem ents

How are acoustical celing tiles adhered to RF shielding? C3030 indicates a suspended ceiling.

This is a means and methods by the RF Shielding subcontractor.

Sheet1