This document is a Standard Form 30 (SF-30) Amendment to Solicitation for the Upgrade to Controlled Area, Building 310 at Naval Air Station Oceana in Virginia Beach, Virginia, with Amendment Number 0003 dated 17-Apr-2025. The amendment's primary purpose is to issue PPI (Pre-Proposal Information) Responses and include four additional attachments: a Master PPI Spreadsheet from NAVFAC, an HDR Energy Conservation Project document from 2015, an ESPC OCEANA B310 document, and ESPC Design Building 310 As-Built drawings. The solicitation (N40085-25-R-2668) involves security infrastructure upgrades for a 10,184 square foot building, including creating a Controlled Area with specific sound transmission and RF shielding requirements, reconfiguring debrief spaces, and adding specialized rooms such as a Live Room, Storage Room, Servers Room, Mission Planning Room, Entry Control Room, and Admin Room.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25R2668 AMENDMENT 0006 (1).pdf | ||
| 25R2668 AMENDMENT 0005 (1).pdf | ||
| Zip 2 of 4.zip | ZIP file | |
| Zip 4 of 4.zip | ZIP file | |
| Zip 1 of 4.zip | ZIP file | |
| Zip 3 of 4.zip | ZIP file | |
| 25R2668 AMENDMENT 0004 (1).pdf | ||
| 25R2668 AMENDMENT_0002.pdf | ||
| 25R2668 AMENDMENT_0001.pdf | ||
| PROVISION 52.204-24.pdf | ||
| 1667133_B310 NASO_UPGRADE TO CONTROLLED AREA_FINAL DBRFP_SIGNED.pdf | ||
| N400852R2668 GENERAL REQUIREMENTS .pdf | ||
| WAGE DETERMINATION.txt | TXT text file | |
| Attachment F-PPI Spreadsheet.xlsx | XLSX spreadsheet | |
| BASE ACCESS INSTRUCTION.pdf | ||
| SECNAV 5512.pdf | ||
| BLANK SPONSOR VERIFICATION SPREADSHEET.xls | XLS spreadsheet | |
| Oceana IDIQ Front End SPECS - 20220602.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
J
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. P ROJECT NO.(If applicable)
6. ISSUED BY CODE N4008 7. ADMINISTERED BY (If other than item 6) CODE
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X 9A. AMENDMENT OF SOLICITATION NO.
X 9B. DATED (SEE ITEM 11)
10A. MOD. OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.
IT MODIFIES T HE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.
A. T HIS CHANGE ORDER IS ISSUED PURSUANT T O: (Specify authority) THE CHANGES SET FORT H IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO T HE AUT HORIT Y OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORT ANT : Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
TEL: EMAIL:
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
0003 17-Apr-2025 ACQR6047518
N40085-25-R-2668
04-Apr-2025
SOLICITATION N40085-25-R-2668, UPGRADE TO CONTROLLED AREA, BUILDING 310, NAS OCEANA, VIRGINIA BEACH, VIRGINIA
The purpose of this amendment is to issue PPI Responses, and three (3) additional attachments: HDR Energy Conservation Project 2015, ESPC OCEANA B310
ASB 11-5-10, AECOM ESPC DESIGN BLDG_310_-_AS-BUILTS.
SEE CONTINUATION PAGE.
17-Apr-2025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
(End of Summary of Changes)
N40085-25-R-2668
SOLICITATION N40085-25-R-2668, UPGRADE TO CONTROLLED AREA, BUILDING 310,
NAS OCEANA, VIRGINIA BEACH, VIRGINIA
The purpose of this amendment is to issue the PPI Responses and additional As-Builts.
Attachments:
1) Adobe PDF- Master PPI Spreadsheet -Round 2 - NAVFAC Responses
2) Adobe PDF- HDR Energy Conservation Project 2015
3) Adobe PDF- ESPC OCEANA B310 ASB 11-5-10
4) Adobe PDF- ECOM ESPC DESIGN BLDG_310_-_AS-BUILTS
All attachments are embedded into this Amendment.
MT1G_N_0001-22x34
MT1M_N_0001-22x34
MT1M_N_0401-Client-specified
MT1M_N_0402-Client-specified
MT1M_N_0501-Client-specified
MT1E_N_0001-22x34
MT1E_N_0501-Client-specified
SALESPERSON:
DRAWING TITLE:
PROJECT:
FILE NAME:
NO. REVISION DATE: BY:
DESIGNED BY: CHECKED BY:
PROJECT NUM.
DRAWING NUM.
OCEANA NAS PERFORMANCE
CONTRACT
09.0300.3467
TITLE PAGE
OCEANA B310.AXD
DONALD R. DAWSON
DAMUTH TRANE
1100 CAVALIER BLVD
CHESAPEAKE, VA 23323
(757) 558-0200
BUILDING 310
04/15/2010
THIS DRAWING SET IS THE PROPERTY OF
TRANE. DESIGN INFORMATION, DRAWINGS,
DETAILS OR SPECIFICATION DATA MAY NOT BE
REPRODUCED OR DUPLICATED NOR MAY ANY
WORK BE EXECUTED HEREFROM WITHOUT THE
WRITTEN AUTHORIZATION OF TRANE.
AUTOMATIC TEMPERATURE CONTROL SYSTEM FOR
NAS, OCEANA
VIRGINIA BEACH, VIRGINIA
CONSULTING ENGINEER: PACE COLLABORATIVE PH# (757) 499-7223
MECHANICAL CONTRACTOR: D.E. KIRBY, INC. PH# (757) 488-5065
11/05/2010
AS BUILT
ENGINEERED BY: CHECKED BY:
DRAWING INDEX
DRAWING
NUM BER
DRAWING TITLE REVISION LEVEL REVISION DATE COM M ENTS
1 TITLE PAGE
2 DRAWING INDEX
3 LEGEND & GENERAL NOTES
4 COM M UNICATION RISER AS BUILT REVISIONS 11/5/2010
5 OCEANA B310 BM TX - 19 WIRING DETAIL
6 DUAL TEM PERATURE SYSTEM FLOW PAGE
7 HW SYSTEM M P581 - 1 WIRING DETAIL
8 CHW SYSTEM M P581 - 2 WIRING DETAIL
9 EXISTING CH-1 WIRING DETAIL
10 EXISTING CH-2 WIRING DETAIL
11 COM PUTER ROOM FLOW PAGE
12 CRAC UNITS EX2 - 1 WIRING DETAIL
13 SEQUENCE OF OPERATIONS
14 DETAIL SHEET # 1
15 DETAIL SHEET # 2
INDEX OF CONTROL SYSTEM DRAWINGS
LEGEND & GENERAL NOTES
Symbol Legend
AIR FLOW STATION
AFS
AIR FLOW STATION, FAN
MOUNTED
AFS
ALARM, BELL
ALM
ALARM, STROBE
ALARM, PIEZIO
BLENDER, AIR BURNER, FUEL-FIRED
DIRECT COIL, COAXIAL
COIL, CHW, DX, HW,
STEAM, ETC.
C
CONTROL POINT
CS - CURRENT SENSOR
CSR - CURRENT
SENSOR W/RELAY
CS OR CSR
DAMPER, OPPOSED OR
PARALLEL
D
TRAQ DAMPER
ACTUATOR, DAMPER
DA
SENSOR, DIFFERENTIAL
PRESSURE
DPS
AIR DIFFERENTIAL
SWITCH OR SENSOR
DPS, DPT
DIFFERENTIAL
PRESSURE SWITCH OR
SENSOR
DPT, DPS
H L EXCHANGER, FUEL FIRE
HEAT
EXCHANGER, FLUID
HEAT FAN OR PUMP
FAN, ROOF TOP FILTER, AIR FILTER, AIR BAG FILTER, AIR HEPA
FILTER, AIR ROLL SWITCH, FLOAT
FLT
FIRESTAT
FS
SENSOR, FLOW
FS
HEATER, ELECTRIC
DUCT
SENSOR, ROOM STATIC
HDW
TUBE, STATIC
HDW
SENSOR, DUCT
HUMIDITY AND
TEMPERATURE
HE, TEH
SENSOR, HUMIDITY OR
TEMPERATURE AND
HUMIDITY
HE, TEH
SENSOR, INDOOR AIR
QUALITY
IAQ
SENSOR, INDOOR AIR
QUALITY (CO2)
IRQ
THERMOSTAT, LOW
LIMIT
LLT
STARTER, MOTOR
MS
SENSOR, OCCUPANCY
OCC
TRANSMITTER,
PT
RELAY
R
RELAY, SOCKET
SENSOR, OUTDOOR
RB
SWITCH, RESET
STATION
RST
DETECTOR, SMOKE
SD
SEQUENCER
SEQ
SWITCH
SW
ON
OFF
SOLENOID, AIR
SOL
SWITCH, BUTTON
THERMOSTAT, WALL
T
COMPOUND, THERMAL
TC
SENSOR, AVERAGING
TE
SENSOR, STRAP ON
SWITCH, ROTARY
HEAT COOL
AUTO
SENSOR,
SENSOR, ZONE
TIMER, ELECTRONIC
WALL
TMR
TIMER, WALL
TMR
WELL, THERMAL
TW
TRANSFORMER
TX
LIGHT, ULTRAVIOLET
UV
VALVE, 2-WAY COIL
VAL
VALVE, 3-WAY COIL
VALVE, DUCT
HUMIDIFIER
VARIABLE FREQUENCY
DRIVE
VFD
Wiring NotesWiring Notes
ELECTRICAL CONTRACTOR FOR TRANE:
1. REFER TO DEVICE INSTALLATION MANUALS FOR SPECIFIC WIRING REQUIREMENTS.
2. FIELD WIRING MUST BE IN ACCORDANCE WITH NATIONAL ELECTRICAL CODE, STATE AND LOCAL
BUILDING CODES, AND DIVISION 16 OF SPECIFICATIONS.
3. TAG ALL CONTROL WIRING AT EACH END OF THE CABLE OR WIRE PER TAGS SHOWN IN
ATTACHED DRAWINGS.
4. AVOID OVER TIGHTENING CABLE TIES AND OTHER FORMS OF CABLE WRAPS. THIS CAN DAMAGE
THE WIRES INSIDE THE CABLES.
5. DO NOT CABLE TIE TO INSULATED WATER, STEAM OR OTHER LINES.
6. IN OPEN PLENUMS, AVOID RUNNING WIRE NEAR LIGHTING BALLASTS, ESPECIALLY THOSE USING
277 VAC.
7. DO NOT RUN FIELD DEVICE AND COMMUNICATIONS WIRING IN SAME CONDUIT WITH WIRING
CARRYING VOLTAGE GREATER THAN 30 VOLTS.
8. ALL PANELS AND FIELD DEVICES LISTED IN THIS DOCUMENT ARE TO BE INSTALLED BY
CONTROLS ELECTRICAL SUBCONTRACTOR UNLESS OTHERWISE NOTED ON DRAWINGS.
9. MOUNT ALL ROOM SENSORS/SWITCHES AS SHOWN ON THE CONSTRUCTION DOCUMENTS,
UNLESS OTHERWISE DIRECTED IN WRITING BY THE OWNER/ENGINEER.
10. FLEXIBLE CONDUIT IS NOT TO EXCEED 24” IN LENGTH.
11. CONTROL PANELS ARE NOT TO BE USED AS JUNCTION BOXES OR RACEWAYS. WIRING THAT
DOES NOT TERMINATE IN A CONTROL PANEL IS NOT TO BE RUN WITHIN THE PANEL.
12. BINARY INPUT LIMITS: 1000 FEET (300 METERS).
13. 0~10 VDC ANALOG INPUT LIMITS: 300 FEET (100 METERS).
14. 0~20 MA ANALOG INPUT LIMITS: 1000 FEET (300 METERS).
15. VARIABLE RESISTANCE ANALOG INPUT LIMITS: 300 FEET (100 METERS).
16. ANALOG OUTPUT LIMITS: 1000 FEET (300 METERS)
17. BINARY OUTPUT LIMITS: 1000 FEET (300 METERS)
18. WIRING POWER FROM THE AC OUT TERMINALS TO POWER ANALOG INPUT DEVICES WILL
CAUSE IMMEDIATE CONTROLLER FAILURE IF INPUT DEVICE USES HALF-WAVE RECTIFICATION.
WHEN UNSURE, USE A SEPARATE POWER SUPPLY FOR DEVICE.
19. COMM 3 AND COMM 4 COMMUNICATION LINK WIRING MUST BE SHIELDED, TWISTED PAIR, 18
AWG MINIMUM, STRANDED, TINNED COPPER CONDUCTORS. SHIELD MUST BE CONTINUOUS
THROUGHOUT, ISOLATED FROM OTHER CONDUCTORS OR GROUND, AND GROUNDED AT BCU
ONLY. MAXIMUM CAPACITANCE BETWEEN CONDUCTORS IS 25 PICOFARADS PER FOOT.
MAXIMUM DISTANCE IS 5000 FEET.
• UNDER CERTAIN CONDITIONS, A TERMINATION RESISTOR NEEDS TO BE PLACED ON THE LAST
DEVICE ON A COMM 3 COMMUNICATION LINK.
20. COMM 5/LONTALK COMMUNICATION LINK WIRING (INCLUDING EX2):
• 22 AWG LEVEL 4 UNSHIELDED COMMUNICATION CABLE RECOMMENDED FOR COMM 5
INSTALLATIONS. MAXIMUM CAPACITANCE BETWEEN CONDUCTORS IS 17 PICOFARADS PER
FOOT.
• SHIELDED LEVEL 4 CABLE IS RECOMMENDED FOR THE COMM 5 TRACKER AND FOR ALL
COMMUNICATION WIRING ON THE VARITRAC CCP.
• COMM 5 LINK LIMITS: 4500 FEET (1,400 METERS), 60 DEVICES MAXIMUM (WITHOUT REPEATER).
• EX2 LINK LIMIT: 1000 FEET (778 METERS).
• CCP III LINK LIMIT: 3500 FEET (1,090 METERS).
• TERMINATION RESISTORS ARE REQUIRED:
~ 105 OHMS, 1%, ¼ WATT AT EACH END FOR LEVEL 4 WIRE.
~ 82 OHMS, 1%, ¼ WATT AT EACH END FOR 18 AWG SHIELDED (PURPLE) WIRE.
• COMM 5 TOPOLOGY MUST BE DAISY CHAINED.
• ONE REPEATER (ONLY ONE PER COMM 5 LINK) CAN BE USED FOR AN ADDITIONAL 4500 FEET
(1,400 METERS), 60 DEVICES.
• DO NOT RUN COMM 5 CABLE ALONGSIDE OR IN THE SAME CONDUIT AS 24 VAC POWER. THIS
INCLUDES THE CONDUCTORS RUNNING FROM TRIAC-TYPE OUTPUTS.
• KEEP COMM 5 POLARITY CONSISTENT THROUGHOUT THE SITE.
• MAKE SURE THAT THE 24 VAC POWER SUPPLIES ARE CONSISTENT IN HOW THEY ARE
GROUNDED. AVOID SHARING 24 VAC BETWEEN COMM 5 CONTROLLERS.
• USE ONLY ONE TYPE OF COMMUNICATION WIRE DO NOT MIX WIRE. IN THE EVENT OF AN
EXISTING JOB THAT USED 18 AWG WIRE, CONTINUE USING THE SAME WIRE AFTER PRIOR
APPROVAL FROM THE PROJECT MANAGER.
21. ETHERNET LAN COMMUNICATION MAXIMUM DISTANCE IS 295 FEET (90 METERS) PLUS 33 FEET
(10 METERS) FOR PATCH CABLES.
MECHANICAL CONTRACTOR:
1. DAMPERS ARE TO BE INSTALLED BY SHEET METAL CONTRACTOR UNLESS OTHERWISE NOTED.
2. CONTROL VALVES AND ACCESSORIES INSTALLED DIRECTLY
INTO PIPING (SENSOR WELLS, THREADOLETS, ETC.) ARE TO
BE INSTALLED BY MECHANICAL CONTRACTOR.
CONFIG WIRE LENGTH RESISTANCE RESISTOR PLACEMENT
0-800 ft 270-330 Ω ON THE LAST DEVICE OF LINK
800-2500 ft NOT REQUIRED N/A >2,500 ft 100 Ω ON THE LAST DEVICE OF LINK
DAISY
CHAIN
BRANCH ANY LENGTH
270-330 Ω
(IF NEEDED)
ON THE DEVICES AT THE END
OF EACH BRANCH
FIELD WIRING NOTE:
WHT
BLK
SOLID LINES: NOT
WIRED BY FIELD
DASHED LINES:
WIRED BY FIELD
121 37
2TB
WIRED BY FACTORY WIRED BY FIELD
FIELD MOUNTED
CONTROLLER
FACTORY
TERMINAL
CABLE
TAG
FACTORY MOUNTED DEVICE WITH FIELD MOUNTED CONTROLLER:
CABLE MATRIX NOTES:
KEEP ALL COMMUNICATION LINK WIRING IN A DAISY CHAIN CONFIGURATION. ALL CABLE WIRING MUST BE TRANE RECOMMENDED WIRING , ESPECIALLY COMMUNICATION CABLES. CONTACT TRANE FOR RECOMMENDED CABLES
AND SPECIFICATIONS.
Cable MatrixCable Matrix
* When ordering cable specify jacket color. Part numbers are subject to change without notice.
CT
TYR52008-E15-U1000
TRANE NUMBER*
A WHT, BLK
DESCRIPTION
18/2 TWIST SHLD PURPLE COMM CABLE
TYR52412-006-U1000C WHT, BLK22/2 TWIST NON-SHLD BLUE COMM CABLE
TYM51200-009-U1000D WHT, BLK18/2 TWIST SHLD PLEN WHITE CABLE
TYM51201-009-U1000E WHT, BLK, RED18/3 TWIST SHLD PLEN WHITE CABLE
TYM51202-009-U1000F WHT, BLK, RED, GRN18/4 TWIST SHLD PLEN WHITE CABLE
J WHT, BLK1 PAIR #14 THHN STRANDED IN CONDUIT
L B9907 ETHERNET RG58 THNNET PLEN CABLE
CMP-00424BICC-5U-01M ETHERNET CAT-5 PLEN CABLE
TYM51203-009-1000O WHT, BLK, RED, ORN, YEL, GRN, BLU, BRN18/8 TWIST SHLD PLEN WHITE CABLE
TYR52414-003-U1000P WHT, BLK22/2 TWIST SHLD PLEN ORANGE COMM CABLE
WIRE COLORS
FA-1602C-1-2N-03Q WHT, BLK16/2 SOLID RED SMOKE DETECTOR CABLE
WIR025932C WHT, RED18/2 SOLID PLENUM THERMOSTAT CABLE
WIR025943C WHT, RED, GRN18/3 SOLID PLENUM THERMOSTAT CABLE
WIR025965C WHT, RED, GRN, YEL, BLU18/5 SOLID PLENUM THERMOSTAT CABLE
WIR025988C WHT, RED GRN, YEL, BLU, ORN, BLK, BRN18/8 SOLID PLENUM THERMOSTAT CABLE
10C WHT, RED, GRN, YEL, BLU, ORN, BLK, BRN, GRY, PNK18/10 SOLID PLENUM THERMOSTAT CABLE 12C 18/12 SOLID PLENUM THERMOSTAT CABLE WHT, RED, GRN, YEL, BLU, ORN, BLK, BRN, GRY, PNK, PUR, TAN
CABLE INFORMATION SHAPE (CIS):
EACH CABLE CONNECTION HAS A CIS WHICH PROVIDES SOME OR ALL OF THE INFORMATION INDICATED BELOW:
WIRE COLOR
OR POLARITY
SHIELD
CONFIGURATION
CABLE TYPE FROM
CABLE MATRIX
CABLE
NUMBER
DEVICE TAG AND
POINT DESCRIPTION
END DEVICE DETAIL
REFERENCE INSET & PAGE
B
CSR-3 CONDENSER PUMP STATUS
BLK TAPE SHLD
SHIELDING NOTE:
ATTACH ALL SHIELDS TO
COMMON AS SHOWN
TAPE OFF SHIELD
AT DEVICE
FACTORY
PROVIDED
AND WIRED
DEVICE
Field, Factory And Existing Device Note:
EXISTING
DEVICE
FIELD WIRED
DEVICE (FIELD
OR FACTORY
PROVIDED)
FACT
10D
EXST
RISER WIRING BY NOTE:
TX
120 VAC
BY EC
EC - ELECTRICAL CONTRACTOR
ESC - ELECTRICAL SUBCONTRACTOR
OTHERS
TRANE
EXIST - EXISTING POWER
CONTROLLER
PAGE
NUMBER
CABLE TYPE
FROM
CABLE MATRIX
DEVICE TAG
FLOW SHAPE NOTES:
D 10
TE - 1
CABLE TAG
COMMUNICATION RISER
AS BUILT REVISIONS 11/5/2010 BLD
OUTSIDE
FLOOR 1
BMTX - 19
OCEANA B310
MECH RM 115
BY ESC
MP581 - 1
HW SYSTEM
MECH RM
MP581 - 2
CHW SYSTEM
EX2 - 1
CRAC UNITS
24 VAC
EX2 LINK (C)
1 INSTALLING ATC CONTRACTOR MUST PROVIDE AND INSTALL 105 OHM TERMINATION RESISTOR AT
THE BEGINNING AND AT THE END OF THE COMM 5 LINK.
(E) CH - 1
RTAA
OUTSIDE MECH RM 115
(E) CH - 2
RTAA
COMM5
ISO COMM3
OCEANA B310 BMTX - 19 WIRING
DETAIL
TAG QTY VENDOR PART NO DESCRIPTION
BM TX - 19 1 TRANE BM TX001AAB011 BCU, 120V, W/DISPLAY AND M ODEM
CONV - 1 1 RAD ASM I-52L CAT5 TO PHONE (COPPER) CONDUCTOR
BILL OF M ATERIALS
TYPICAL FOR 1
(OCEANA B310)
BMTX - 19
LOCATION:
MECH RM 115
OCEANA B310
SYSTEM
CONTROLLED:
N
L
GND
O
M
4A
4B
ROVER
COM5
MINI-MONITOR
PORT
COM4B
COM4A
TB2
TB3
TB4
TB5
TB6
BIP1
GND
BIP2
GND P5
P4
P3
P2
P1
A net
TB
GND 24VAC
SEE DRAWING LEGEND PAGE AND / OR
BMTX INSTALLATION MANUAL FOR
COMM LINK WIRING REQUIREMENTS
IF SHIELD IS USED AS A SHIELD TERMINATE AT
THE COMMON TERMINAL ON THE
CONTROLLER AND TAPE BACK. CUT AND TAPE
AT THE END DEVICE.
WHEN WIRING A BINARY INPUT: CONNECT THE
SHIELD WIRE TO A COMMON TERMINAL AT THE
TERMINATION BOARD AND TAPE IT BACK AT
THE OUTPUT DEVICE.
INPUT WIRING NOTES:COMM LINK WIRING NOTES:
INSTALL TERMINATION RESISTOR AT THE
BEGINNING AND AT THE END OF THIS LINK.
TB2
TB4
TB5
IN
Y
P U
TS
BIP1
BIP2
TB6
P1 net
IS
G
4A
4B
ICOMM3
SHLD
NOT USED
105 Ohm
ENET
CAT5
OUTLET CONNECT TO PHONE
LINE COPPER
CONDUCTOR
CONV - 1
(LOCATED IN ENCLOSURE
NEAR BCU)
IP ADDRESS: 193.168.100.123
SUBNET MASK: 255.255.255.0
GATEWAY: 193.168.100.1
UDP PORT: 47824
PNL: MP
CKT: #6
DUAL TEMPERATURE SYSTEM
FLOW PAGE
CS - 3, CS - 4 2 TRANE X13310270-01 CUR SW, 2-135A, SOLID, NO, LED
OATS - 1 1 TRANE 4190-1101 TEM P SENS, OA, THERM
TC - 1 4 TRANE 4190-1114 HEAT SINK COM POUND
E - 1, TE - 2, TE - 3, TE - 4, TE - 5, TE - 6 TRANE 41901133 TEM P SENS, DUCT/ IM M , THERM , 6 IN
, WEL - 17, WEL - 1, WEL - 2, WEL - 3 6 TRANE 4190-1112 WELL, 6IN X 1/2IN FPT X 3/4IN M PT, B
V - 1, V - 2 2 BELIM O F6100HD + SY2-120M FTBF VAL 4'' 2W PROP NSR 285# 451CV
CS - 1, CS - 2, CS - 5 3 KELE SCS1150A-LED CUR SW, 1.75-150A, SPLIT, NO, VFD
BLR - 1
HOT WATER
BOILER
CHW/HW
SUPPLY
D 7
TE - 2
CHW/HW
RETURN
P - 3
DUAL TEMPERATURE WATER SYSTEM - MECH. ROOM 115
FACTORY PROVIDED BOILER DEVICES:
ENABLE / DISABLE RELAY
GENERAL ALARM CONTACT
4-20mA MODULATING CONTROL
LOW WATER CUTOFF (FACTORY MOUNTED AND WIRED)
FLOW SWITCH (FACTORY MOUNTED AND WIRED)
HIGH TEMPERATURE LIMIT (FACTORY MOUNTED AND WIRED)
P - 4
(NEW BOILER B-1)
S/S F
R - 3
116STS
CS - 3
MS - 3
R - 4
SKT - 5
117STS
CS - 4
MS - 4
TC - 1
DRAWING REFERENCE NOTE:
CONTROLS ENGINEERING BASED ON INFORMATION SHOWN ON MECHANICAL
PLANS ISSUED BY:
NAVFAC (AECOM)
DATED: 11/13/2009
"NAS OCEANA - OCEANA II BUILDING 100/107"
CH - 1 CH - 2
D 8
TE - 3
D8
TE - 4
E
V - 1
V - 2
TE - 5
TE - 6
P - 1
P - 2
R - 1
SKT - 1
147STS
CS - 1
MS - 1
R - 2
SKT - 2
148STS
CS - 2
MS - 2
INTRLK
V - 26
COMNC
HW
V - 28
V - 27
CHW
CHW
BCP
H
W
S
P - 5
AHU - 1 PARTIAL DIAGRAM
R - 5
118STS
CS - 5
MS - 5
CHW PLANT
CHW PLANT
EXISTING
SUMMER/WINTER
SWITCH
(V-26,V-27,V-28)
OATS - 1
8 D
8D
HW SYSTEM MP581 - 1 WIRING
M P581 - 1 1 TRANE BM TM 000AAC01 M P581, 120VAC, PLASTIC ENC, LCD
(HW SYSTEM)
LO
TP
MP581 - 1
HW SYSTEM
SYSTEM CONTROLLED:
BO1
BO2
BO3
BO4
BO5
BO6
24VAC
AO1
AO2
AO3
AO4
AO5
AO6
IN1
IN2
IN3
IN4
IN5
IN6
IN7
IN8
IN9
IN10
IN11
IN12
+24VDC
24V
INPUT
POWER
BINARY
OUTPUTS
ANALOG
INPUTS
24 VDC
DUCT STATIC
EX2 COMM
COMM5I/O COMM
STATIC
IN OUT
103X - 1 BOILER ENABLE/DISABLE WHT
BLKSHLD
R - 3 HOT WATER PUMP - 3 START/STOP WHT
R - 4 HOT WATER PUMP - 4 START/STOP WHT
R - 5 HOT WATER PUMP - 5 START/STOP WHT
BLR - 2 4-20MA RESET
115X - 2 BOILER ALARM
CS - 3 HOT WATER PUMP - 3 STATUS
CS - 4 HOT WATER PUMP - 4 STATUS
CS - 5 HOT WATER PUMP - 5 STATUS
TE - 3 CRAC UNIT - 3 SPACE TEMP
CRAC UNIT 3 ALARM
TE - 2 HW SUPPLY TEMP SENSOR
TE - 1 HW RETURN TEMP
SUMMER/WINTER SWITCH STATUS
OATS - 1 OUTSIDE AIR TEMP
COMM
FROM BCU-1 BMTX
TO CW SYSTEM MP-581
CWHT
NID: 04-AA-3F-68-04-00
PNL: MP
CKT: #6
CHW SYSTEM MP581 - 2 WIRING
M P581 - 2 1 TRANE BM TM 000AAC01 M P581, 120VAC, PLASTIC ENC, LCD
(CHW SYSTEM)
MP581 - 2
CHW SYSTEM
BO1
BO2
BO3
BO4
BO5
BO6
AO1
AO2
AO3
AO4
AO5
AO6
IN1
IN2
IN3
IN4
IN5
IN6
IN7
IN8
IN9
IN10
IN11
IN12
INPUT
POWER
BINARY
ANALOG
24 VDC
DUCT STATIC
EX2 COMM
COMM5I/O COMM
STATIC
IN OUT
R - 1 CHW PUMP - 1 START/STOP WHT
R - 2 CHW PUMP - 2 START/STOP WHT
V - 1 PLANT ISOLATION VALVE V - 1
V - 2 PLANT ISOLATION VALVE V - 2
CS - 1 CHW PUMP - 1 STATUS
CS - 2 CHW PUMP - 2 STATUS
TE - 5 CHW RETURN TEMP
TE - 6 CHW SUPPLY TEMP
V - 1 ISOLATION VALVE STATUS CLOSE
TE - 4 PLANT CHWS TEMP
TE - 3 PLANT CHWR TEMP
CH -1 CHW PUMP REQUEST
CH -2 CHW PUMP REQUEST
Term Resistor 105 Ohm
COMMUNICATIONS IN
I/O TO EX2 - 1
BILL OF M ATERIALSTYPICAL FOR 1
(EXISTING CH-1)
(E) CH - 1
DESCRIPTION:
EXISTING CH-1
RTAA CHILLER
1TB1 CHILLER MODULE
EM STOP
NORMAL/TRIP
1U1
1 TB3
FLOW SWITCH
EXT AUTO/STOP
1 TB4
CONFIGURABLE
ALARM
UNIT RUNNING
MAX. CAPACITY
CHW PUMP REQUEST
7J3 COMPR. A MODULE
1U4
EXT. CKT. LOCKOUT #1
1TB1 OPTIONS MODULE
EXT. CHW STPT
1U2
1 TB2
ZONE TEMP/ICE CONTROL
7 EXT. CURRENT
LIMIT STPT8
7J3 COMPR. B MODULE
1U5
EXT. CKT. LOCKOUT #2
1TB3
GD
CUSTOMER PROVIDED
DEDICATED 115V 60HZ
EVAPORATOR HEATER. MAX
FUSE SIZE 20 AMPS.
EXISTING CH-1 WIRING DETAIL
9OCEANA B310.AXD
FILE
NAME:
NUM. REVISION DATE: BY:
DWG:
PROJECT ID:CID: PID:
ADDR:55
BILL OF M ATERIALSTYPICAL FOR 1
(EXISTING CH-2)
(E) CH - 2
DESCRIPTION:
EXISTING CH-2
RTAA CHILLER
1TB1 CHILLER MODULE
EM STOP
NORMAL/TRIP
1U1
1 TB3
FLOW SWITCH
EXT AUTO/STOP
1 TB4
CONFIGURABLE
UNIT RUNNING
MAX. CAPACITY
CHW PUMP REQUEST
7J3 COMPR. A MODULE
1U4
EXT. CKT. LOCKOUT #1
1TB1 OPTIONS MODULE
EXT. CHW STPT
1U2
1 TB2
ZONE TEMP/ICE CONTROL
7 EXT. CURRENT
LIMIT STPT8
7J3 COMPR. B MODULE
1U5
EXT. CKT. LOCKOUT #2
1TB3
GD
CUSTOMER PROVIDED
DEDICATED 115V 60HZ
EVAPORATOR HEATER. MAX
FUSE SIZE 20 AMPS.
EXISTING CH-2 WIRING DETAIL
10OCEANA B310.AXD
ADDR: 56
COMPUTER ROOM FLOW PAGE
TE - 1, TE - 2, TE - 3, TE - 4 4 TRANE X1351152801 TEM P SENS ZONE THERM
D 12
TE - 2
TE - 3
TE - 4
COMPUTER ROOM 1 MONITORING
FIG#1
COMPUTER ROOM 2 MONITORING
FIG#2
COMPUTER ROOM 3 MONITORING
FIG#3
COMPUTER ROOM 4 MONITORING
FIG#4
CRAC UNITS EX2 - 1 WIRING
EX2 - 1 1 TRANE 49500500 EX2 EXPAN M OD'L, M ETAL ENC
(CRAC UNITS)
EX2 - 1
CRAC UNITS
SYSTEM
CONTROLLED:
SHLD
I/O
IV
AL
1 2
O N
ADDRESS
SET TO 1
TE - 1 CRAC UNIT - 1 SPACE TEMP
CRAC UNIT 1 ALARM
TE - 2 CRAC UNIT - 2 SPACE TEMP
CRAC UNIT 2 ALARM
TE - 4 CRAC UNIT - 4 SPACE TEMP
CRAC UNIT 4 ALARM
I/O
FROM CHW MP581 - 2 WHT
SEQUENCE OF OPERATIONS
SEQUENCE OF OPRATIONS
HOT WATER SYSTEM
THE HOT WATER SYSTEM WILL BE ENERGIZED BY THE BUILDING AUTOMATION SYSTEM
WHENEVER THE OUTSIDE AIR TEMPERATURE FALLS BELOW AN ADJUSTABLE OUTSIDE AIR
ENABLE SETPOINT (INITIAL SETTING 58 DEGREES F). WHEN THE HOT WATER SYSTEM IS
ENERGIZED, THE DIRECT DIGITAL CONTROLLER WILL COMMAND THE BOILER CIRCULATING
PUMP. WHEN PUMP STATUS IS PROVEN, THE DDC CONTROLLER WILL ENABLE THE LEAD BOILER
TO RUN. THE BOILER WILL OPERATE SUBJECT TO ITS PACKAGED CONTROLS TO MAINTAIN THE
HOT WATER SUPPLY SETPOINT. THE DDC CONTROLLER WILL SEND THE SETPOINT TO THE
BOILER TO RESET THE HOT WATER SUPPLY SETPOINT INVERSELY WITH THE OUTSIDE AIR
TEMPERATURE. THE INITIAL RESET SCHEDULE WILL BE AS FOLLOWS:
OUTSIDE AIR TEMP HOT WATER SUPPLY SETPOINT
60 DEG 120 DEG
40 DEG 160 DEG
THE DDC CONTROLLER WILL MONITOR: HW SUPPLY TEMP, HW RETURN TEMP, BOILER
DISCHARGE TEMP, AND BOILER ALARM CONTACT.
SHOULD THE CIRCULATING PUMP FAIL TO START, THE DDC CONTROLLER WILL DE-ENERGIZE
THE BOILER, AND GENERATE AND ALARM.
SHOULD ANY BOILER FAIL THE DDC CONTROLLER WILL GENERATE AND ALARM.
CHILLED WATER SYSTEM
THE BAS WILL ENERGIZE THE CHILLED WATER CIRCULATING PUMP WHENEVER THE OUTSIDE
AIR IS GREATER THAN AN ADJUSTABLE OUTSIDE AIR ENABLE SETPOINT (INITIAL SETTING 60
DEGRESS F) OR UPON A CALL FOR COLLING. WHEN THE CIRCULATING PUMP RUN STATUS IS
PROVEN, THE DDC WILL MODULATE THE BYPASS TO MAINTAIN A 1 DEGREE DIFFERENTIAL
BETWEEN THE CHILLED WATER PLANT SUPPLY TEMPERATURE AND THE CHILLED WATER LOOP
SUPPLY TEMPERATURE.
THE BAS WILL MONITOR: CHILLED WATER SUPPLY TEMPERATURE AND CHILLED WATER RETURN
TEMPERATURE, AND THE CHILLED WATER PUMP STATUS.
SHOULD THE CHILLED WATER PUMP FAIL TO START, THE DDC CONTROLLER WILL GENERATE AN
ALARM.
COMPUTER ROOM MONITORING AND CRAC UNIT ALARMS
THE DDC CONTROLLER WILL MONITOR THE COMPUTER ROOM SPACE TEMPERATURE. ON A RISE
IN SPACE TEMPERATURE ABOVE THE SPACE TEMPERARTUE HIGH LIMIT SETPOINT, THE DDC
CONTROLLER WILL GENERATE AN ALARM.
SHOULD THE CRAC UNIT GENERATE AN ALARM CONDITION BY ENABLING ITS ALARM RELAY, THE
DDC CONTROLLER WILL GENERATE AN ALARM.
DETAIL SHEET #1
SENSOR OUTDOOR AIR TEMP THERM
4190-1101
RED WHT TEMP
GRN BLK COMMON
SENSOR TEMP 4" DUCT/IMM THERM
41901132
DIFF PRESS TRANSMITTER, 0-50PSID, 4-20mA
KELE
M230-050PD-C
WHT +4-20mA SIGNAL
BLK +24VDC
X
HIGH LOW
VALVE ACTUATOR, MOD, 110VAC
BELIMO
SY2-110P
WHT 110VAC NEUTRAL
G GRN GROUND
BLK 110VAC POWER
BLK - SIGNAL
NO END SWITCH
NO END SWITCH
WHT NC END SWITCH
BLK NC END SWITCH
WHT + SIGNAL
BLK - FEEDBACK SIGNAL
12 WHT + FEEDBACK SIGNAL
12345678
DIP SWITCH
OUTPUT = 2-10VDC
INPUT = 2-10VDC
ZONE SENSOR THERM
ZONE TEMP
COMMON
X1351152801
SWITCH CURRENT SPLIT CORE, 1~135A, VAC/DC, NO, LED
SCS1150A-LED
KELE
STATUS
WIRE
SIDE
TOP
SENSOR TEMP 6" DUCT/IMM THERM
41901133
RELAY CURRENT SENSING SWITCH
X13310270-01
OUTPUT STATUS
SETPOINT
SENSOR POWER
STATUS
WIRE
SIDE
TOP
DETAIL SHEET #2
15OCEANA B310.AXD
BELIMO
SY2-120MFT
SY-MFT ACTUATOR
U5
L
120 VAC HOTBLK
120 VAC NEUTRALWHT
SIGNAL (+)WHT
SIGNAL (-)BLK
FEEDBACK SIGNAL (+)WHT
FEEDBACK SIGNAL (-)BLK
LS3 COMMONWHT
LS3 VALVE OPENBLK
LS3 VALVE CLOSE
LS4 COMMONWHT
LS4 VALVE OPENBLK
LS4 VALVE CLOSE
PE EARTH GROUNDGRN
Package B Construction Issue 27 May 2015 1
Package B Construction Issue 27 May 2015 2
Package B Construction Issue 27 May 2015 3
Package B Construction Issue 27 May 2015 4
Package B Construction Issue 27 May 2015 5
Package B Construction Issue 27 May 2015 6
Package B Construction Issue 27 May 2015 17
Package B Construction Issue 27 May 2015 18
Package B Construction Issue 27 May 2015 19
Package B Construction Issue 27 May 2015 20
Package B Construction Issue 27 May 2015 21
Package B Construction Issue 27 May 2015 22
Package B Construction Issue 27 May 2015 23
Package B Construction Issue 27 May 2015 24
Package B Construction Issue 27 May 2015 25
Package B Construction Issue 27 May 2015 26
Package B Construction Issue 27 May 2015 27
Package B Construction Issue 27 May 2015 28
Package B Construction Issue 27 May 2015 29
Package B Construction Issue 27 May 2015 30
Package B Construction Issue 27 May 2015 31
Package B Construction Issue 27 May 2015 32
Package B Construction Issue 27 May 2015 33
Package B Construction Issue 27 May 2015 34
Package B Construction Issue 27 May 2015 35
Package B Construction Issue 27 May 2015 36
Page Section Para. Dwg #
1 Baron/Rand D5030 6
The RFP states requirements for the A/V (audiovisual) equipment including the requirement for a CTS-D AV specialist to design/specify the equipment and administer the BVD process for the AV package however, there does not seem any indication of the A/V scope/requirements on the project. Are Room Requirements sheets or other documentation available that would capture the functional A/V requirements?
The CTS-D A/V requirement is located in Part 4 / D5030 Communications And Security / Section #6 with Additional A/V requirements. The project specific A/V requiremetns are located in Part 3 / D5030 Communications And Security / A/V Systems. BDP
2 Baron/Rand Could the government please provide existing as-builts of building 310 if they are available?
As-Builts will be provided by the Contract Specialist.
3 Baron/Rand Will all occupants be removed from this building prior to the start of construction?
Refer to PART 3, 4.0 BUILDING/GENERAL REQUIREMENTS second to last paragraph concerning operations.
Baron/Rand Will escorts be required to access this building during construction?
Refer to PART 2, 01 14 00.05 20 WORK RESTRICTIONS and PART 3, 5.0 ROOM REQUIREMENTS, STRUCTURAL, last paragraph concerning entry into new Controlled Area.
Baron/Rand
Design, lead times, and on-site coordination with the existing tenants will cause this project to extend past 730 days. Would the government consider extending the project 180 days to account for the additional time needed to execute?
730 days is adequate time to execute the design and construction of this project.
Baron/Rand Will all existing furniture be removed by the government prior to the commencemnt of work?
Contractor is responsible for removal and disposal of existing furniture.
Does our proposals need to include the cost associated with moving the existing furniture?
Refer to PART 3, 5.0 ROOM REQUIREMENTS, INTERIORS for demolition requirements of existing furniture.
Please provide an existing furniture list for the furniture that will need to be removed.
An inventory list will NOT be provided. Cost may be calculated on a cost per square foot basis for administrative spaces.
Baron/Rand Could the government please provide a hazardous materials report if available?
Refer to PART 2, 01 57 19 TEMPORARY
ENVIRONMENTAL CONTROLS 1.1.
Baron/Rand Are there any hazerdous materials present in the areas where demolition will be taking place?
Refer to PART 2, 01 57 19 TEMPORARY
ENVIRONMENTAL CONTROLS 1.1.
Baron/Rand Is after hours work available for the execution of this project? Refer to PART 2, 01 14 00.05 20 WORK RESTRICTIONS 1.2.d.
12 Baron/Rand
Will on-site utilities be available for and during construction activities? Electrical power for the facility will be available for this contract except where building power outages of the Main Switchboard are required under Part 3 / D50 Electrical. BDP
Baron/Rand Can the awarded GC use one of the interior rooms as an office during construction?
Yes. It must be approved by the SSM and Contracting Officer.
Baron/Rand Is the stadium seating part of the FF&E budget or is this to be included in the base bid?
Stadium seating is to be included in base construction bid.
Will temporary cooling / heating need to be provided in the base price to accommodate any personnel?
Existing VAV system remains operable during construction. Refer to PART3, D30 HVAC, Para General.
The SOW (Part 3) states several times to "provide the following FF&E Requirements". Are the items following this statement to be provided in the base bid, or will these items be part of the FF&E budget?
Items listed after "provide the following FF&E Requirements" are to be included in the FF&E budget
17 Baron/Rand Will the existing electronics be disposed of as part of the base bid or will the government be removing and disposing of the prior to the commencemnt of construction?
Refer to Demolition portions of Part 3 / D5030 Communications And Security. BDP
Project Title: UPGRADE TO CONTROLLED AREA, BUILDING
310, NAS OCEANA
Solicitation / RFP#: N4008525R2668 - PPI Cut Off Date: 16 APRIL 2025
Amend No.
GOVERNMENT RESPONSE
PPI No.
Offeror Date
Submitted
REFERENCE QUESTION
Could the government provide photos of all the existing piping at the exterior to be removed as part of construction?
Assume the "piping" reference relates to natural gas piping. Photo will be provided of meter and exterior piping.
Baron/Rand Could the government please provide photos where the roof will be disturbed as part of construction? Will provide photos of roof.
Could the government please provide a photo of the door being removed outside of the electrical room 114?
Requested photos were taken at the PreBid walk-thru. Those photos will be issued once they have been cleaned. No additional photos will be taken.
could the government please provide photos of the doors being painted and replaced at the interior of the building?
Requested photos were taken at the PreBid walk-thru. Those photos will be issued once they have been cleaned. No additional photos will be taken.
Baron/Rand Could the government please provide photos of the existing walk pads on the roof please? Will provide photos of roof.
Could the government please provide a photo of the area where the roof is to be replaced at the new rooftop unit? Could the government please specify in the photo where the pitch is less than 3" in 12?
Will provide photos of roof.
30-40 lockers are quantified in the SOW. Could the government please provide an exact number of lockers required for this contract? A minimum of 30 cell phone lockers are required.
Would the government extend the PPI deadline to allow our trade partners more time to digest this design/build project? It would be beneficial to everyone to allow them time to submit questions. Yes.
MIG GOV
04/15/25
Can we please be sent the files referenced in Part 6 of the RFP document; Tactical Aircrew Combat Training System, NAS Oceana Energy Conservation Project, and 2016 Automatic Temperature Control System, BLDG 310?
As-Builts will be provided by the Contract Specialist.
During the site visit, it looked as though the building has an existing NFPA 12 CO2 extinguishing system in several rooms, however there is no work associated with this listed in the fire protection sections of the RFP. Is there any work to be done to this system?
Remove all existing CO2 suppression system components as well as CO2 releasing system detection, conduit and wiring.
28 MIG GOV 04/15/25
Existing Rooms 125, 128, 129, 130, 131, and 132; RFP says to salvage, store and reinstall bracket supports for large screen monitors.
Are these supports for the large TV's that are in those rooms or are these the black supports that the existing computer monitor arms are attached to?
Coordinate and provide in accordance with Part 3 / D5030 Communications And Security. BDP
Can we be provided with the existing finished ceiling heights? And is the intent to keep the ceilings at these heights?
Existing ceiling heights have not been verified. Design intent is for new ceilings to match existing ceiling height.
MIG GOV 04/15/25 Will the government consider allowing the Superintendent to also serve as the QC Manager in addition to serving as the SSHO? Provide what is required in the RFP.
MIG GOV 04/15/25 Will commissioning of the new mechanical equipment be required? Commissioning of Mechanical quipment is not included as part of the RFP.
Baron/Rand Please confirm all SLC and NAC wiring to be class B. Class B is permissible, confirmed.
Are there any existing sprinkler plans? If so please provide.
There are no existing sprinkler piping plans available within the Government archives.
Are there any fire alarm plans from the previous project that was mentioned? If so please provide.
There are no fire alarm shop drawings available for this work within the Government archives.
Baron/Rand Please provide photos from the site visit. NAVFAC is currently waiting on the photos from the Customer.
Part 3 5.0 Structural
Are there as-built structural documents? Cannot provide accurate pricing for potential structural modifications without knowing what is in place. As-Builts were already sent by the CS.
Please consider removing seismic load checks. This building is SDC A and existing building lateral system is unknown at this time.
Seismic checks are not required to be included in the structural calculations.
Minimum code-prescribed lateral loads on interior partitions as applicable will be adequate. In the Design Criteria Notes on the drawings, please include the seismic criteria, including building risk category, Ss, and S1.
Please verify that RTU connections will follow industry norm and be provided by the mechancial contractor. EOR will provide necesary structural support and attachment points in the roof framing, if there are RTUs.
The DOR must verify that all connections are adequate to resist uplift, overturning, and/or sliding of the units, in addition to ensuring the adequacy of the roof structure to support these loads along with the gravity loads of the RTUs and other added items.
Part 3 6.0 A10 RFP says foundations are not applicable. Please verify there are no slab on grade checks and modifications associated with this project. Slab on grade checks are not required for this project.
Part 3 6.0 B10
Snow load listed as 10 psf. Please verify it should be 35 psf or provide other value if neither of these are correct.
Code references have been updated since the completion of this RFP. Considering load requirements in accordance with ASCE 7-22, please replace the RFP, Part 3, Chapter 6.0, ESR B10 SUPERSTRUCTURE with the following:
The structural system must be designed and/or analyzed using the following parameters:
Risk Category: II.
Live Loads: In accordance with UFC 3-301- 01, Structural Engineering.
Wind loads: Design wind speed: 124 mph;
Exposure category C
Snow loads: Ground snow load: 30 psf; Roof exposure: Partially exposed.
Earthquake loads: Mapped seismic acceleration parameters: SS: 0.10g; S1:
Part 3 6.0 B10
Building is listed as partially enclosed in snow loading portion. Please confirm this is an enclosed building for wind analysis as there are no significant exterior envelope openings based on the RFP.
In the snow load portion of the RFP, Part 3, Chapter 6.0, ESR B10 SUPERSTRUCTURE, this should read, "Partially exposed". For wind analysis, this is an enclosed building.
Part 3 D30 Please confirm that only mechancial engineer needs to be licensed in VA and all design other professionals may be licensed in other states. All design professionals can be licensed in any state.
Baron/Rand Part 6 May we get the 1995 and 2015 record drawings for the existing HVAC systems?
Additional As-Builts will be provided by the Contract Specialist.
Baron/Rand Part 3 D30 Is commissioning required?
Commissioning of Mechanical equipment is not included as part of the RFP.
Part 6 Please provide existing as-built drawings.
g g provided by the Contract Specialist (CS).
Additional As-Builts will be provided by the
CS.
14 Part 3 B3060
Since this is not a complete roof replacement, can the requirement of a Registered Roof Consultant (RCC) or equal be reduced to a Registered Architect with standard roofing experience? Provide what is required in the RFP.
Baron/Rand Part 3 Does the floor slab need RF shielding?
The Controlled Area must meet the 60db requirements.
Part 3 D30 Are z-ducts required for sound attenution?
Design of the HVAC system must be in accordance with RFP Para 2.1, Controlled Areas: Work must be in compliance with “Accreditation Documentation”.
7 Part 3
5.0 Room Requirem ents
How are acoustical celing tiles adhered to RF shielding? C3030 indicates a suspended ceiling.