N4008525R2667_Section F Annexes.pdf
PDF 290 KB Posted
- Solicitation number
- N4008525R2667
About this file
This document is a Deliverables section (Section F) for a federal contract covering multiple administrative and operational requirements across various domains, with a specific section focused on Wastewater Treatment Services. The deliverables table outlines numerous reporting and procedural submissions required from the contractor, including monthly and periodic reports such as:
Key deliverables include monthly Emergent Wastewater Treatment Service Order Summary Reports, Wastewater Treatment Work Schedules (submitted 7 days prior to work start), Laboratory Analysis of Wastewater Effluent Reports, Operator Attendance Schedules, and Wastewater Treatment Operating Records and Logs. Most submissions are to be made to the Contracting Officer (KO), with specific timelines ranging from 2-7 days after month-end or work completion. The document specifies precise submission requirements for documentation related to work procedures, service schedules, compliance reports, and operational logs, indicating a comprehensive approach to tracking and managing wastewater treatment services.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section F – 0200000
Management and Administration
Section F 0200000
Deliveries or Performance
DELIVERABLES
Spec Item
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.2.1.2 N/A Request to Work
Outside
Government’s
Regular Working
Hours
At least seven calendar days prior to requested day.
KO and
COR
1 As required
2.3.1 N/A Sign-in Sheets and
Minutes for
Review and
Comments
Within two working days
KO, COR
and all attendees
1 As
Required
2.3.1 N/A Sign-in Sheets and
Minutes Final
Revision
Within two working days
KO, COR
and all attendees
1 As
Required
2.3.4 N/A Permits and
Licenses
Before work commences and as requested by the KO.
KO and
COR
1 As specified
2.3.5 N/A Certificate of
Insurance
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.3.5.1 N/A Written Notice of
cancellation or material change in policy coverage
At least 30 calendar days prior to cancellation or material change in policy coverage
KO and
COR
1 As required
2.6.1 N/A Plans of Action
and Milestones
(POA&Ms)
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Command
Security
Manager
1 As required
2.6.1 N/A Cybersecurity
Incident
Immediately upon discovery during regular working hours and by
0800 the following work day for discoveries after regular working hours
KO, COR,
and
Command
Security
Manager
1 As required
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.4 N/A Scheduling and
Work Status
Updates
Weekly, within
30 minutes of the inquiry during regular working hours, and by
08:00 the following work day for inquiries after regular working hours
KO and
COR
1 As
Specified
2.6.4 N/A Work Schedules Within 15
calendar days prior to contract start, 10 days prior to the beginning of the month in which services are scheduled to be performance, and within two calendar days of changes.
COR 1 Monthly
2.6.5 N/A Notification of any
Difficulty in
Scheduling Work
By the end of each workday
KO and
COR
1 As required
2.6.6 N/A Status of
Deliverables
Within 30 minutes of the inquiry during regular working hours, and by
0800 the following work day for inquiries after regular working hours
KO and
COR
1 As required
2.6.7 N/A Service
Interruptions
At least five working days in advance
KO and
COR
1 As required
2.6.8.1 N/A Quality
Management Plan
Within 15 calendar days prior to contract start.
KO and
COR
1 As specified
2.6.8.1 N/A Revised Quality
Management Plan
Within seven calendar days of changes.
KO and
COR
specified
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.6.8.2 N/A QC Inspection File Within five
calendar days of completion/ termination of the contract.
KO and
COR
1 As specified
2.6.8.3 N/A Contractor Quality
Inspection and
Surveillance
Report
First work day of each month.
KO and
COR
1 Monthly
2.6.9 N/A Property
Management Plan
Within 45 calendar days after award.
KO and
COR
1 As specified
2.7.1 N/A List of Key
Personnel and
Qualifications
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.1 N/A Organizational
Chart
Within 15 calendar days prior to contract start
KO and
COR
1 As specified
2.7.2.6 N/A Proof of Legal
Residency
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.2.6 N/A Proof of United
States of America
Citizenship
Prior to be admitted to site of work.
KO and
COR
1 As specified
2.7.3 N/A Service Contract
Reporting (SCR)
No later than 31
October
KO and
COR
1 Annually for labor executed during the period of performanc e during each
Governmen t fiscal year
(FY)
2.8.1 N/A Employee List Within 15
calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.8.8 N/A OF-306
Declaration for
Federal
Employment and
Digital
Fingerprints
Prior to commencement of work
KO, COR,
and
Security
Manager
1 As required
2.8.9 N/A List of personnel
requiring access to and the justification for their access to
Government IT, OT, and FRCS
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO, COR,
and
Security
Manager
1 As required
2.9.2 N/A Accident
Prevention Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.9.3 N/A Activity Hazard
Analysis
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4 N/A Compliance Plans, Programs, and
Procedures
Together with the
Accident
Prevention Plan and within seven calendar days of and changes.
KO and
COR
1 As specified
2.9.4.4 N/A Control of
Hazardous Energy
(lockout/tagout)
Within 30 calendar days after annual inspection.
KO and
COR
1 Annually
2.9.5 J-0200000-05-
NAVFAC
Contractor Incident
Reporting System
(CIRS)
Within five calendar days of accident.
KO and
COR
1 As required
2.9.5 J-0200000-05-
Weight Handling
Equipment
Accident Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.5 J-0200000-05-
Crane and Rigging
Gear Near Miss
Report
Within 15 working days of accident.
KO and
COR
1 As required
2.9.7 N/A Monthly On-Site
Labor Report
First work day of each month.
KO and
COR
1 Monthly
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.9.8 N/A OSHA Citations
and Violations
Corrective Action
Report
Within 48 hours after receiving a citation.
KO and
COR
1 As required
2.9.9 N/A Safety Inspection
and Monitoring
Report
Upon request. KO and
COR
1 As required
2.9.10 N/A Safety
Certifications
Within 15 calendar days prior to contract start and as old certifications, expire.
KO and
COR
1 As specified
2.10 N/A EMS Goals and
Policy
Measurement
Information
Upon request. KO and
COR
1 As required
2.10.1.1 N/A Water
Conservation Plan
Within 15 calendar days after award and for changes.
KO and
COR
1 As specified
2.10.2 N/A Environmental
Protection Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.10.2.1 N/A Sampling Plan Prior to Sampling KO, COR, and Code
106.3
1 As required
2.10.2.1 N/A Laboratory
Analysis
Upon Request KO and
COR
1 As specified
2.10.2.4 N/A Spill notification Immediately
following a spill incident with the following information:
material identification, estimated quantity, and potential impact to drainage/ waterways.
KO and
COR
1 As required
2.10.2.4 N/A Spill report Within 24 hours
of the spill incident
KO and
COR
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.2.5 N/A Emergency
Planning and
Community Right-
To-Know Act
(EPCRA) Report
Within 15 calendar days prior to contract start and not less than 10 working days prior to planned use of hazardous material.
KO and
COR
1 As specified
2.10.2.5 J-0200000-08 Contractor
Hazardous
Material Inventory
Log
Within 15 calendar days after the end of each calendar year and at termination of the contract.
KO and
COR
1 Annually
2.10.2.9 N/A Asbestos
Containing
Material (ACM)
Verbally notify the KO and COR within one hour and follow-up with written
Notification within 24 hours
KO and
COR
1 As specified
2.10.2.10 N/A Hazardous Air
Pollutants Semi-annual Reports
At intervals of
160 to 200 calendar days
KO, COR,
Installation
Environme ntal
Division, City, State, and EPA
1 Semi-annually
2.10.2.10 N/A Hazardous Air
Pollutants Monthly
Data
First workday of each month.
KO, COR,
Installation
Environme ntal
Division
1 Monthly
2.10.3 N/A Sustainable
Procurement and
Practices Plan
Within 15 calendar days prior to contract start and within
15 calendar days after exercised option periods.
KO and
COR
1 Annually
2.10.3 N/A Sustainable
Delivery of
Services Report
Within five calendar days after each contract period.
KO and
1 Annually
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.10.3.2 N/A Recovered
Material
Certification
When a product containing recovered materials is equal to or better than the original and could be used.
KO and
COR
1 As specified
2.10.4.20 N/A Environmental
Management
Procedure
Prior to start of work and within seven calendar days of changes.
KO, COR,
and Code
106.31
1 As specified
2.11 N/A Mission Essential
Contractor
Services Plan
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As
Required
2.11 N/A Mission
Critical/Mission
Essential Personnel
Within 15 calendar days prior to contract start and within seven calendar days of changes.
KO and
COR
1 As specified
2.12 N/A Technical Library
Table of Contents
Within 15 calendar days after contract start and within seven calendar days of changes
KO and
COR
1 As specified
2.14.1 N/A Recurring Work
Proposals
Within five calendar days following receipt of request
KO and
COR
1 As required
2.14.2 N/A Notification to the
Government for
Work Above the
Recurring Work
Limitations and
Rough Order of
Magnitude
Within two hours of identification
KO and
COR
1 As required
2.15.1.1 N/A Non-Recurring
Work Quantities
Ordered via
FedMall
By the fifth day of the following month
KO and
1 Monthly
Form
Attachment
Number Deliverable Title
Date (s) of
Submission
Distribution
Frequency Original
Copies
(including original)
2.15.2.1 N/A Non-Recurring
Work Proposals
Within two working days following receipt of request
KO 1 As required
1604000 – Wastewater
SECTION F: DELIVERIES OR PERFORMANCE
Annex/Spec
Item
Form
Attachment
Number
Deliverable
Title
Date (s) of
Submission
Distribution Frequency
Original/
Copies
Number of Copies
(including original)
1604000 / 3.1 N/A Emergent
Wastewater
Treatment
Service Order
Summary
Report
First work day of each month
KO 2 Monthly
1604000 / 3.2 N/A Wastewater
Treatment
Work Schedule
7 days prior to the start of work and within 2 days of request
KO 4 7 days prior to the start of work and as requested
1604000 / 3.2 N/A Wastewater
Treatment
Services
Procedure
Within 30 days after contract start and within five days after making changes to any wastewater treatment service procedure
KO 4 Once. Update if the requirements change.
1604000 / 3.2.1 N/A Laboratory
Analysis of
Wastewater
Effluent Report
Within 2 days of discovery when found non-compliant.
4 days after the end of the month if compliant.
KO 4 Monthly or within
2 days if found non-compliant
1604000 / 3.2.2 N/A Schedule of
Operator
Attendance
7 days prior to the start of work and within 2 days of request
KO 4 7 days prior to the start of work and as requested
1604000 / 3.2.3 N/A Wastewater
Treatment
Operating
Records, Logs, Reports, and
Procedures
3 days after the end of the month during which work is performed
KO 4 Monthly
File details come from the government source that posted it. Updated .