This file is an Exhibit Line Item Numbers (ELIN) pricing template for a Wastewater Treatment contract for Norfolk Naval Shipyard (NNSY) in Portsmouth, VA. The solicitation (N4008525R2667) covers a base period and four option periods, with each period including recurring and non-recurring work elements. Key recurring work involves wastewater treatment emergent work and operation services, including 25 emergent work events annually and 40,000,000 gallons of treatment during the base period, with quantities slightly reduced in the final option period.

Non-recurring work includes unit-priced labor hours, direct materials, construction equipment, industrial wastewater treatment, and wastewater treatment emergent work. Notably, the 5th option period includes a six-month continuation of services with reduced inventory requirements. The contract is issued by the Department of the Navy Naval Facilities Engineering Command (NAVFAC), with pricing to be negotiated by the Contracting Officer for specific task orders. Specific line items include provisions for labor hours, material costs, equipment costs, and various wastewater treatment services across different contract periods.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Summary

NOTE 1: (EA Annually) and (XX EA) in ELINs to refer to Annex 0200000 Management and Administration Section J Acronyms and Definitions.
NOTE 2: The 5th Option shall include a continuation of services for all inventory covered by this contract for a six month period and shall be priced for six months similar to the Base and the previous Options to cover the scheduled work . The Contractor shall continue to provide maintenance and/or services according to the Contractor’s schedule for the inventory equipment requiring those services in the six month period. The Government’s requirement under the 5th Option period is not for the Contractor to perform 12 months’ worth of the contracted services on 100% of the inventory equipment within a 6 month period of time.
OptionRecurringNon-RecurringTotal
BASE
OPTION 1
OPTION 2
OPTION 3
OPTION 4
OPTION 5

Total

CLIN 0001 - Base Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0001 - Recurring Work - Base Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs A001
ELIN/
Sub-ELINAnnex/Sub-annex
Spec ItemDescriptionSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeQuantityUnit of MeasureUnit PriceTotal Price
A0011604000Wastewater
Wastewater Treatment Emergent Work
A001AA16040003.1Wastewater Treatment Emergent Work (25 EA Annually)12MO
Operation
A001AB16040003.2Operation (40,000,000 GL)12MO

Total Recurring Work:

CLIN 0002 - Base Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0002 - Non-Recurring Work - Base Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN/Sub-ELINs A700 through A703
ELINProduct Name (120 Characters)Description ExtendedSpec Item 4
Labor HoursSpec Item 4
Labor CostSpec Item 4
Material CostSpec Item 4
Equipment CostSpec Items 1 and 2

On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeEstimated QuantityUnit of MeasureUnit PriceExtended Price
A700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.200LH$$ - 0
A701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.50,000EA$ 1.00$ 50,000.00
A702Industrial Wastewater TreatmentProvide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.310,000,000GL$ - 0$ - 0
A703Wastewater Treatment Emergent WorkDevelop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.125EA$ - 0$ - 0

Total Non-recurring Work:

CLIN 0003 - 1st Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0003 - Recurring Work - First Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs B001
ELIN/
Sub-ELINAnnex/Sub-annex
Spec ItemDescriptionSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeQuantityUnit of MeasureUnit PriceTotal Price
B0011604000Wastewater
Wastewater Treatment Emergent Work
B001AA16040003.1Wastewater Treatment Emergent Work (25 EA Annually)12MO
Operation
B001AB16040003.2Operation (40,000,000 GL)12MO

Total Recurring Work:

CLIN 0004 - 1st Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0004 - Non-Recurring Work - First Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN/Sub-ELINs B700 through B703
ELINProduct Name (120 Characters)Description ExtendedSpec Item 4
Labor HoursSpec Item 4
Labor CostSpec Item 4
Material CostSpec Item 4
Equipment CostSpec Items 1 and 2

On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeEstimated QuantityUnit of MeasureUnit PriceExtended Price
B700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.200LH$ - 0$ - 0
B701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.50,000EA$ 1.00$ 50,000.00
B702Industrial Wastewater TreatmentProvide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.310,000,000GL$ - 0$ - 0
B703Wastewater Treatment Emergent WorkDevelop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.125EA$ - 0$ - 0

Total Non-recurring Work:

CLIN 0005 - 2nd Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0005 - Recurring Work - Second Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs C001
ELIN/
Sub-ELINAnnex/Sub-annex
Spec ItemDescriptionSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeQuantityUnit of MeasureUnit PriceTotal Price
C0011604000Wastewater
Wastewater Treatment Emergent Work
C001AA16040003.1Wastewater Treatment Emergent Work (25 EA Annually)12MO
Operation
C001AB16040003.2Operation (40,000,000 GL)12MO

Total Recurring Work:

CLIN 0006 - 2nd Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0006 - Non-Recurring Work - Second Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN/Sub-ELINs C700 through C703
ELINProduct Name (120 Characters)Description ExtendedSpec Item 4
Labor HoursSpec Item 4
Labor CostSpec Item 4
Material CostSpec Item 4
Equipment CostSpec Items 1 and 2

On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeEstimated QuantityUnit of MeasureUnit PriceExtended Price
C700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.200LH$ - 0$ - 0
C701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.50,000EA$ 1.00$ 50,000.00
C702Industrial Wastewater TreatmentProvide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.310,000,000GL$ - 0$ - 0
C703Wastewater Treatment Emergent WorkDevelop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.125EA$ - 0$ - 0

Total Non-recurring Work:

CLIN 0007 - 3rd Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0007 - Recurring Work - Third Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs D001
ELIN/
Sub-ELINAnnex/Sub-annex
Spec ItemDescriptionSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeQuantityUnit of MeasureUnit PriceTotal Price
D0011604000Wastewater
Wastewater Treatment Emergent Work
D001AA16040003.1Wastewater Treatment Emergent Work (25 EA Annually)12MO
Operation
D001AB16040003.2Operation (40,000,000 GL)12MO

Total Recurring Work:

CLIN 0008 - 3rd Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0008 - Non-Recurring Work - Third Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN/Sub-ELINs D700 through D703
ELINProduct Name (120 Characters)Description ExtendedSpec Item 4
Labor HoursSpec Item 4
Labor CostSpec Item 4
Material CostSpec Item 4
Equipment CostSpec Items 1 and 2

On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeEstimated QuantityUnit of MeasureUnit PriceExtended Price
D700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.200LH$ - 0$ - 0
D701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.50,000EA$ 1.00$ 50,000.00
D702Industrial Wastewater TreatmentProvide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.310,000,000GL$ - 0$ - 0
D703Wastewater Treatment Emergent WorkDevelop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.125EA$ - 0$ - 0

Total Non-recurring Work:

CLIN 0009 - 4th Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0009 - Recurring Work - Fourth Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs E001
ELIN/
Sub-ELINAnnex/Sub-annex
Spec ItemDescriptionSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeQuantityUnit of MeasureUnit PriceTotal Price
E0011604000Wastewater
Wastewater Treatment Emergent Work
E001AA16040003.1Wastewater Treatment Emergent Work (25 EA Annually)12MO
Operation
E001AB16040003.2Operation (40,000,000 GL)12MO

Total Recurring Work:

CLIN 0010 - 4th Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0010 - Non-Recurring Work - Fourth Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN/Sub-ELINs E700 through E703
ELINProduct Name (120 Characters)Description ExtendedSpec Item 4
Labor HoursSpec Item 4
Labor CostSpec Item 4
Material CostSpec Item 4
Equipment CostSpec Items 1 and 2

On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeEstimated QuantityUnit of MeasureUnit PriceExtended Price
E700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.200LH$ - 0$ - 0
E701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.50,000EA$ 1.00$ 50,000.00
E702Industrial Wastewater TreatmentProvide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.310,000,000GL$ - 0$ - 0
E703Wastewater Treatment Emergent WorkDevelop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.125EA$ - 0$ - 0

Total Non-recurring Work:

CLIN 0011 - 5th Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0011 - Recurring Work - Fifth Option Period
Provide Prices for Recurring Work in accordance with Section C, Spec Item 3
ELIN/Sub-ELINs F001
ELIN/
Sub-ELINAnnex/Sub-annex
Spec ItemDescriptionSpec Item 3
Labor HoursSpec Item 3
Labor CostSpec Item 3
Material CostSpec Item 3
Equipment CostSpec Items

1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeQuantityUnit of MeasureUnit PriceTotal Price
F0011604000Wastewater
Wastewater Treatment Emergent Work
F001AA16040003.1Wastewater Treatment Emergent Work (12 EA Annually)12MO
Operation
F001AB16040003.2Operation (20,000,000 GL)12MO

Total Recurring Work:

CLIN 0012 - 5th Opt Period

Attachment J-0200000-09
Exhibit Line Item Numbers
Solicitation/Contract No.: N40085-25-R-2667
Line Item 0012 - Non-Recurring Work - Fifth Option Period
Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4
ELIN/Sub-ELINs F700 through F703
ELINProduct Name (120 Characters)Description ExtendedSpec Item 4
Labor HoursSpec Item 4
Labor CostSpec Item 4
Material CostSpec Item 4
Equipment CostSpec Items 1 and 2

On-Site Labor Hours Spec Items 1 and 2 On-Site

CostOff-Site
CostProfit/FeeEstimated QuantityUnit of MeasureUnit PriceExtended Price
F700Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO.The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.

Task order completion times will be specified on each task order.100LH$ - 0$ - 0
F701Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO.The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order.

Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.

Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.

Task order completion times will be specified on each task order.25,000EA$ 1.00$ 25,000.00
F702Industrial Wastewater TreatmentProvide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.35,000,000GL$ - 0$ - 0
F703Wastewater Treatment Emergent WorkDevelop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.112EA$ - 0$ - 0

Total Non-recurring Work:

NAVFAC UOM

NAVFAC - Units of Measure
ACAcreFRFramePDPad
AMAmpouleFTFootPGPackage
ATAssortmentFVFivePIPillow
AYAssemblyFYFiftyPMPlate
BABallGGGreat GrossPRPair
BDBundleGIGillPTPint
BEBaleGLGallonPXPellet
BFBoard FootGMGramPZPacket
BGBagGNGrainQTQuart
BKBookGPGroupRARation
BLBarrelGRGrossRDRound
BOBoltHDHundredRLReel
BQBriquetHFHundred FeetRMReam
BRBarHKHankRORoll
BTBottleHPHundred PoundsRXThousand Rounds
BXBoxHRHoursSBSquare Mile
CACartridgeHSHundred Square FeetSCSquare Centimeters
CBCarboyHWHundred WeightSDSkid
CCCubic CentimeterHYHundred YardsSESet
CDCubic YardINInchSFSquare Foot
CEConeJRJarSHSheet
CFCubic FootKGKilogramSISquare Inch
CGCentigramKMKilometerSKSkein
CICubic InchKRCaratSLSpool
CKCakeKTKitSMSquare Meter
CLCoilLBPoundSOShot
CMCentimeterLFLinear FootSPStrip
CNCanLGLengthSQSquare
COContainerLHLabor HoursSXStick
CUCurieLILiterSYSquare Yard
CYCylinderLMLinear MeterTCTruckload
CZCubic MeterLOLotTDTwenty-Four
DADaysLSLump SumTETen
DCDecagramLYLinear YardTFTwenty-Five
DEDecimeterMCThousand Cubic FeetTGGross Ton
DGDecigramMEMealTNTon
DLDeciliterMFThousand FeetTOTroy Ounce
DMDramMGMilligramTSThirty-Six
DODollarsMIMileTTTablet
DRDrumMLMilliliterTUTube
DWPennyweightMMMillimeterUNUnit
DZDozenMOMonthsUSUS U.S.P Unit
EAEachMRMeterVIVial
ENEach CollectionMXThousandWKWeek
EXExposureOTOutfitYDYard
FDFoldOZOunceYRYears

File details come from the government source that posted it. Updated .