J-0200000-09 ELINS.xlsx
XLSX spreadsheet 58 KB Posted
- Solicitation number
- N4008525R2667
About this file
This file is an Exhibit Line Item Numbers (ELIN) pricing template for a Wastewater Treatment contract for Norfolk Naval Shipyard (NNSY) in Portsmouth, VA. The solicitation (N4008525R2667) covers a base period and four option periods, with each period including recurring and non-recurring work elements. Key recurring work involves wastewater treatment emergent work and operation services, including 25 emergent work events annually and 40,000,000 gallons of treatment during the base period, with quantities slightly reduced in the final option period.
Non-recurring work includes unit-priced labor hours, direct materials, construction equipment, industrial wastewater treatment, and wastewater treatment emergent work. Notably, the 5th option period includes a six-month continuation of services with reduced inventory requirements. The contract is issued by the Department of the Navy Naval Facilities Engineering Command (NAVFAC), with pricing to be negotiated by the Contracting Officer for specific task orders. Specific line items include provisions for labor hours, material costs, equipment costs, and various wastewater treatment services across different contract periods.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Summary
| NOTE 1: (EA Annually) and (XX EA) in ELINs to refer to Annex 0200000 Management and Administration Section J Acronyms and Definitions. |
| NOTE 2: The 5th Option shall include a continuation of services for all inventory covered by this contract for a six month period and shall be priced for six months similar to the Base and the previous Options to cover the scheduled work . The Contractor shall continue to provide maintenance and/or services according to the Contractor’s schedule for the inventory equipment requiring those services in the six month period. The Government’s requirement under the 5th Option period is not for the Contractor to perform 12 months’ worth of the contracted services on 100% of the inventory equipment within a 6 month period of time. |
| Option | Recurring | Non-Recurring | Total |
| BASE | |||
| OPTION 1 | |||
| OPTION 2 | |||
| OPTION 3 | |||
| OPTION 4 | |||
| OPTION 5 |
Total
CLIN 0001 - Base Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0001 - Recurring Work - Base Period | |||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||
| ELIN/Sub-ELINs A001 | |||
| ELIN/ | |||
| Sub-ELIN | Annex/Sub-annex | ||
| Spec Item | Description | Spec Item 3 | |
| Labor Hours | Spec Item 3 | ||
| Labor Cost | Spec Item 3 | ||
| Material Cost | Spec Item 3 | ||
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||
| A001 | 1604000 | Wastewater | |||||
| Wastewater Treatment Emergent Work | |||||||
| A001AA | 1604000 | 3.1 | Wastewater Treatment Emergent Work (25 EA Annually) | 12 | MO | ||
| Operation | |||||||
| A001AB | 1604000 | 3.2 | Operation (40,000,000 GL) | 12 | MO |
Total Recurring Work:
CLIN 0002 - Base Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0002 - Non-Recurring Work - Base Period | ||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||
| ELIN/Sub-ELINs A700 through A703 | ||||
| ELIN | Product Name (120 Characters) | Description Extended | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||
| Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| A700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 200 | LH | $ | $ - 0 | |||
| A701 | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
| Task order completion times will be specified on each task order. | 50,000 | EA | $ 1.00 | $ 50,000.00 | ||||||
| A702 | Industrial Wastewater Treatment | Provide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.3 | 10,000,000 | GL | $ - 0 | $ - 0 | ||||
| A703 | Wastewater Treatment Emergent Work | Develop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.1 | 25 | EA | $ - 0 | $ - 0 |
Total Non-recurring Work:
CLIN 0003 - 1st Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0003 - Recurring Work - First Option Period | |||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||
| ELIN/Sub-ELINs B001 | |||
| ELIN/ | |||
| Sub-ELIN | Annex/Sub-annex | ||
| Spec Item | Description | Spec Item 3 | |
| Labor Hours | Spec Item 3 | ||
| Labor Cost | Spec Item 3 | ||
| Material Cost | Spec Item 3 | ||
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||
| B001 | 1604000 | Wastewater | |||||
| Wastewater Treatment Emergent Work | |||||||
| B001AA | 1604000 | 3.1 | Wastewater Treatment Emergent Work (25 EA Annually) | 12 | MO | ||
| Operation | |||||||
| B001AB | 1604000 | 3.2 | Operation (40,000,000 GL) | 12 | MO |
Total Recurring Work:
CLIN 0004 - 1st Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0004 - Non-Recurring Work - First Option Period | ||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||
| ELIN/Sub-ELINs B700 through B703 | ||||
| ELIN | Product Name (120 Characters) | Description Extended | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||
| Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| B700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 200 | LH | $ - 0 | $ - 0 | |||
| B701 | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
| Task order completion times will be specified on each task order. | 50,000 | EA | $ 1.00 | $ 50,000.00 | ||||||
| B702 | Industrial Wastewater Treatment | Provide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.3 | 10,000,000 | GL | $ - 0 | $ - 0 | ||||
| B703 | Wastewater Treatment Emergent Work | Develop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.1 | 25 | EA | $ - 0 | $ - 0 |
Total Non-recurring Work:
CLIN 0005 - 2nd Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0005 - Recurring Work - Second Option Period | |||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||
| ELIN/Sub-ELINs C001 | |||
| ELIN/ | |||
| Sub-ELIN | Annex/Sub-annex | ||
| Spec Item | Description | Spec Item 3 | |
| Labor Hours | Spec Item 3 | ||
| Labor Cost | Spec Item 3 | ||
| Material Cost | Spec Item 3 | ||
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||
| C001 | 1604000 | Wastewater | |||||
| Wastewater Treatment Emergent Work | |||||||
| C001AA | 1604000 | 3.1 | Wastewater Treatment Emergent Work (25 EA Annually) | 12 | MO | ||
| Operation | |||||||
| C001AB | 1604000 | 3.2 | Operation (40,000,000 GL) | 12 | MO |
Total Recurring Work:
CLIN 0006 - 2nd Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0006 - Non-Recurring Work - Second Option Period | ||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||
| ELIN/Sub-ELINs C700 through C703 | ||||
| ELIN | Product Name (120 Characters) | Description Extended | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||
| Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| C700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 200 | LH | $ - 0 | $ - 0 | |||
| C701 | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
| Task order completion times will be specified on each task order. | 50,000 | EA | $ 1.00 | $ 50,000.00 | ||||||
| C702 | Industrial Wastewater Treatment | Provide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.3 | 10,000,000 | GL | $ - 0 | $ - 0 | ||||
| C703 | Wastewater Treatment Emergent Work | Develop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.1 | 25 | EA | $ - 0 | $ - 0 |
Total Non-recurring Work:
CLIN 0007 - 3rd Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0007 - Recurring Work - Third Option Period | |||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||
| ELIN/Sub-ELINs D001 | |||
| ELIN/ | |||
| Sub-ELIN | Annex/Sub-annex | ||
| Spec Item | Description | Spec Item 3 | |
| Labor Hours | Spec Item 3 | ||
| Labor Cost | Spec Item 3 | ||
| Material Cost | Spec Item 3 | ||
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||
| D001 | 1604000 | Wastewater | |||||
| Wastewater Treatment Emergent Work | |||||||
| D001AA | 1604000 | 3.1 | Wastewater Treatment Emergent Work (25 EA Annually) | 12 | MO | ||
| Operation | |||||||
| D001AB | 1604000 | 3.2 | Operation (40,000,000 GL) | 12 | MO |
Total Recurring Work:
CLIN 0008 - 3rd Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0008 - Non-Recurring Work - Third Option Period | ||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||
| ELIN/Sub-ELINs D700 through D703 | ||||
| ELIN | Product Name (120 Characters) | Description Extended | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||
| Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| D700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 200 | LH | $ - 0 | $ - 0 | |||
| D701 | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
| Task order completion times will be specified on each task order. | 50,000 | EA | $ 1.00 | $ 50,000.00 | ||||||
| D702 | Industrial Wastewater Treatment | Provide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.3 | 10,000,000 | GL | $ - 0 | $ - 0 | ||||
| D703 | Wastewater Treatment Emergent Work | Develop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.1 | 25 | EA | $ - 0 | $ - 0 |
Total Non-recurring Work:
CLIN 0009 - 4th Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0009 - Recurring Work - Fourth Option Period | |||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||
| ELIN/Sub-ELINs E001 | |||
| ELIN/ | |||
| Sub-ELIN | Annex/Sub-annex | ||
| Spec Item | Description | Spec Item 3 | |
| Labor Hours | Spec Item 3 | ||
| Labor Cost | Spec Item 3 | ||
| Material Cost | Spec Item 3 | ||
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||
| E001 | 1604000 | Wastewater | |||||
| Wastewater Treatment Emergent Work | |||||||
| E001AA | 1604000 | 3.1 | Wastewater Treatment Emergent Work (25 EA Annually) | 12 | MO | ||
| Operation | |||||||
| E001AB | 1604000 | 3.2 | Operation (40,000,000 GL) | 12 | MO |
Total Recurring Work:
CLIN 0010 - 4th Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0010 - Non-Recurring Work - Fourth Option Period | ||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||
| ELIN/Sub-ELINs E700 through E703 | ||||
| ELIN | Product Name (120 Characters) | Description Extended | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||
| Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| E700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 200 | LH | $ - 0 | $ - 0 | |||
| E701 | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
| Task order completion times will be specified on each task order. | 50,000 | EA | $ 1.00 | $ 50,000.00 | ||||||
| E702 | Industrial Wastewater Treatment | Provide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.3 | 10,000,000 | GL | $ - 0 | $ - 0 | ||||
| E703 | Wastewater Treatment Emergent Work | Develop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.1 | 25 | EA | $ - 0 | $ - 0 |
Total Non-recurring Work:
CLIN 0011 - 5th Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0011 - Recurring Work - Fifth Option Period | |||
| Provide Prices for Recurring Work in accordance with Section C, Spec Item 3 | |||
| ELIN/Sub-ELINs F001 | |||
| ELIN/ | |||
| Sub-ELIN | Annex/Sub-annex | ||
| Spec Item | Description | Spec Item 3 | |
| Labor Hours | Spec Item 3 | ||
| Labor Cost | Spec Item 3 | ||
| Material Cost | Spec Item 3 | ||
| Equipment Cost | Spec Items |
1 and 2 On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||||
| Cost | Profit/Fee | Quantity | Unit of Measure | Unit Price | Total Price | ||
| F001 | 1604000 | Wastewater | |||||
| Wastewater Treatment Emergent Work | |||||||
| F001AA | 1604000 | 3.1 | Wastewater Treatment Emergent Work (12 EA Annually) | 12 | MO | ||
| Operation | |||||||
| F001AB | 1604000 | 3.2 | Operation (20,000,000 GL) | 12 | MO |
Total Recurring Work:
CLIN 0012 - 5th Opt Period
| Attachment J-0200000-09 |
| Exhibit Line Item Numbers |
| Solicitation/Contract No.: N40085-25-R-2667 |
| Line Item 0012 - Non-Recurring Work - Fifth Option Period | ||||
| Provide Prices for Non-Recurring Work in accordance with Section C, Spec Item 4 | ||||
| ELIN/Sub-ELINs F700 through F703 | ||||
| ELIN | Product Name (120 Characters) | Description Extended | Spec Item 4 | |
| Labor Hours | Spec Item 4 | |||
| Labor Cost | Spec Item 4 | |||
| Material Cost | Spec Item 4 | |||
| Equipment Cost | Spec Items 1 and 2 |
On-Site Labor Hours Spec Items 1 and 2 On-Site
| Cost | Off-Site | ||||
| Cost | Profit/Fee | Estimated Quantity | Unit of Measure | Unit Price | Extended Price |
| F700 | Unit Priced Labor Hour Work - MUST BE NEGOTIATED BY KO. | The Contractor shall perform all UPL work in accordance with the scope and delivery schedule negotiated per each task order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.1 Labor Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Unit Priced Labor (UPL) Hour.
| Task order completion times will be specified on each task order. | 100 | LH | $ - 0 | $ - 0 | |||
| F701 | Direct Material and Construction Equipment - MUST BE NEGOTIATED BY KO. | The Contractor shall provide all materials and construction equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. |
Refer to: Section C, Annex 0200000 Managmenent and Administration, Specification Items 2.15.2 Unit Priced Labor (UPL)Work (Negotiated) for description of UPL Work and 2.15.2.1.2 Direct Material and Construction Equipment Requirements.
Refer to: Section J, Annex 0200000 Managmenent and Administration, Attachment J-0200000-01 Definitions and Acronyms for description of Direct Material Costs and Construction Equipment.
| Task order completion times will be specified on each task order. | 25,000 | EA | $ 1.00 | $ 25,000.00 | ||||||
| F702 | Industrial Wastewater Treatment | Provide all labor, material, testing, and analysis to treat Industrial Wastewater as provided by NNSY Environmental Department Code 106.3 | 5,000,000 | GL | $ - 0 | $ - 0 | ||||
| F703 | Wastewater Treatment Emergent Work | Develop and Implement Wastewater Treatment Emergent Work orders per respective requirements in Annex 1604000, Wastewater Treatment Emegent Work, Spec Item 3.1 | 12 | EA | $ - 0 | $ - 0 |
Total Non-recurring Work:
NAVFAC UOM
| NAVFAC - Units of Measure | |||||
| AC | Acre | FR | Frame | PD | Pad |
| AM | Ampoule | FT | Foot | PG | Package |
| AT | Assortment | FV | Five | PI | Pillow |
| AY | Assembly | FY | Fifty | PM | Plate |
| BA | Ball | GG | Great Gross | PR | Pair |
| BD | Bundle | GI | Gill | PT | Pint |
| BE | Bale | GL | Gallon | PX | Pellet |
| BF | Board Foot | GM | Gram | PZ | Packet |
| BG | Bag | GN | Grain | QT | Quart |
| BK | Book | GP | Group | RA | Ration |
| BL | Barrel | GR | Gross | RD | Round |
| BO | Bolt | HD | Hundred | RL | Reel |
| BQ | Briquet | HF | Hundred Feet | RM | Ream |
| BR | Bar | HK | Hank | RO | Roll |
| BT | Bottle | HP | Hundred Pounds | RX | Thousand Rounds |
| BX | Box | HR | Hours | SB | Square Mile |
| CA | Cartridge | HS | Hundred Square Feet | SC | Square Centimeters |
| CB | Carboy | HW | Hundred Weight | SD | Skid |
| CC | Cubic Centimeter | HY | Hundred Yards | SE | Set |
| CD | Cubic Yard | IN | Inch | SF | Square Foot |
| CE | Cone | JR | Jar | SH | Sheet |
| CF | Cubic Foot | KG | Kilogram | SI | Square Inch |
| CG | Centigram | KM | Kilometer | SK | Skein |
| CI | Cubic Inch | KR | Carat | SL | Spool |
| CK | Cake | KT | Kit | SM | Square Meter |
| CL | Coil | LB | Pound | SO | Shot |
| CM | Centimeter | LF | Linear Foot | SP | Strip |
| CN | Can | LG | Length | SQ | Square |
| CO | Container | LH | Labor Hours | SX | Stick |
| CU | Curie | LI | Liter | SY | Square Yard |
| CY | Cylinder | LM | Linear Meter | TC | Truckload |
| CZ | Cubic Meter | LO | Lot | TD | Twenty-Four |
| DA | Days | LS | Lump Sum | TE | Ten |
| DC | Decagram | LY | Linear Yard | TF | Twenty-Five |
| DE | Decimeter | MC | Thousand Cubic Feet | TG | Gross Ton |
| DG | Decigram | ME | Meal | TN | Ton |
| DL | Deciliter | MF | Thousand Feet | TO | Troy Ounce |
| DM | Dram | MG | Milligram | TS | Thirty-Six |
| DO | Dollars | MI | Mile | TT | Tablet |
| DR | Drum | ML | Milliliter | TU | Tube |
| DW | Pennyweight | MM | Millimeter | UN | Unit |
| DZ | Dozen | MO | Months | US | US U.S.P Unit |
| EA | Each | MR | Meter | VI | Vial |
| EN | Each Collection | MX | Thousand | WK | Week |
| EX | Exposure | OT | Outfit | YD | Yard |
| FD | Fold | OZ | Ounce | YR | Years |
File details come from the government source that posted it. Updated .