NAVFAC LID Waiver Form v4.docx
DOCX document 115 KB Posted
- Attached to
- N4008525R0070 DESIGN-BUILD (DB), REPAIR CVN BULKHEAD Q8, Naval Station Norfolk, Norfolk, Virginia
- Solicitation number
- N4008525R0070
About this file
The document is a Navy Low Impact Development (LID) Waiver Form with detailed instructions for completing the form when LID implementation is not feasible for a construction or renovation project. The form is specifically designed for Navy and Marine Corps projects with new construction exceeding $750,000 or renovations over $5 million with a stormwater component.
The waiver process requires submission of the form along with supporting documentation like DD 1391, design basis, drawings, and specifications. The form must be completed by the Contractor/Designer of Record and requires review and approval from the Regional Engineer (FEC Commander). Key requirements include providing project details, explaining why LID is not appropriate (technical, mission, or other reasons), and obtaining signature from the NAVFAC FEC Commanding Officer. The waiver is not required if LID is implemented to the Unified Facilities Criteria (UFC) 3-210-10 standards, and requests are discouraged except in compelling circumstances.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25R0070 Amendment 0009.pdf | ||
| 25R0070 Amendment 0007.pdf | ||
| 25R0070 Amendment 0006.pdf | ||
| 25R0070 Amendment 0005.pdf | ||
| 25R0070 Amendment 0004.pdf | ||
| 25R0070 Bulkhead Q8 Site Visit Log.pdf | ||
| 25R0070 Amendment 0003.pdf | ||
| 25R0070 Amendment 0002.pdf | ||
| PROD_Form.docx | DOCX document | |
| NAVFAC LID Data Card v3.0.pdf | ||
| HR-SOP.pdf | ||
| Utility Connection Permit Application.pdf | ||
| 25R0070 Amendment 0001.pdf | ||
| 1513553-SPC-5of5.pdf | ||
| 1513553-SPC-3of5.pdf | ||
| 1513553-SPC-1of5.pdf | ||
| 1513553-SPC-2of5.pdf | ||
| 1513553-SPC-4of5.pdf | ||
| 25R0070 General Requirements.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LID WAIVER FORM INSTRUCTIONS
| 1. DATE SUBMITTED |
| 2. DATE RECEIVED |
3. WON
4. PROJECT NUMBER
5. PROJECT TITLE
6. FISCAL YEAR OF PROJECT
| 7. NEW CONSTRUCTION GREATER THAN $750K |
| 8. RENOVATION GREATER THAN $5M |
| · YES |
| · NO |
| · YES |
| · NO |
9. DESIGN/CONSTRUCTION ORGANIZATION NAME, ADDRESS AND TELEPHONE NUMBER/EMAIL ADDRESS
9a. RESPONSIBLE PERSON/TITLE (print)
9b. SIGNATURE OF RESPONSIBLE PERSON/DATE
| 10. OFFICE (FEC/IPT//PWD/OICC/ROICC etc.) |
| 10a. CONTRACT NUMBER/TASK ORDER NUMBER (if applicable) |
| 10b. NAME OF RESPONSIBLE PERSON/TITLE |
| 10c. TELEPHONE NUMBER/EMAIL ADDRESS |
11. PROJECT SUMMARY
12. REASON LID IS NOT APPROPRIATE
| · TECHNICAL |
| · MISSION |
| · OTHER |
13. SIGNATURE
COMMENTS
Commanding Officer Date
· APPROVED
· DISAPPROVED
LOW IMPACT DEVELOPMENT WAIVER FORM
Page 2 of 3 08/2012
Navy Low Impact Development (LID) Policy (commonly referred to as the Penn Memo) authorized a waiver process to be used in those infrequent situations where LID is not appropriate given the characteristics of the site. This waiver process is required to include Regional Engineer (FEC Commander) level review and approval.
Navy and Marine Corps projects are required to comply with Navy LID policy. The Navy LID policy sets a goal of no net increase in stormwater and sediment or nutrient loading from major renovation and construction projects. Major renovation projects are defined as having a stormwater component and exceeding $5 million. Major construction projects are defined as exceeding $750,000. If LID is not implemented to the METF as defined in UFC 3-210-10, a Navy LID policy waiver must be obtained from the Regional Engineer. Coordinate waiver review and approval with the Government’s civil technical discipline coordinator (TDC).
Note: If LID is implemented to the METF as defined in UFC 3-210-10 a waiver is not required.
Request for waivers are discouraged except in those infrequent cases where there are compelling reasons. The waiver process is time consuming and waiver requests should be submitted as early as possible in the development of the project to avoid delays. Submit the LID waiver form along with DD 1391, basis of design, drawings, and specifications. For Post Award Design Build projects, the construction contractor is responsible for making the submittal to the Construction Manager (CM). For Pre Award Design Build and Design Bid Build projects, the Designer of Record (DOR) 1 is responsible for making the submittal to the Project Manager (PM). Refer to the FC 1-300-09N Navy and Marine Corps Design Procedures for additional criteria.
Note: The Navy LID Waiver is not applicable where LID is required in accordance with EISA Section 438. UFC 3-210-10 addresses DoD requirements for complying with EISA Section 438. Use UFC 3-210-10 paragraph titled Applicability to determine when LID is required to comply with EISA Section 438.
Block 1. Enter date submitted to the CM/PM by the Contractor/DOR. Date format is DD/MM/YYYY.
Block 2. The NAVFAC CM/PM shall enter the date received by the Contractor/DOR. Date format is DD/MM/YYYY.
Block 3. Enter project Work Order Number (WON).
1. The Architectural/Engineering firm or the design manager can be substituted as the DOR for pre award design build projects.
Block 4. Enter project number. Example: P-999
Block 5. Enter project title.
Block 6. Enter the fiscal year of the project.
Block 7. Indicate if the project is new construction greater than $750,000.
Block 8. Indicate if project is renovation greater than $5,000,000 with a stormwater component.
Note: If 7 and 8 are no, the Navy LID policy does not apply and a LID waiver is not required.
Block 9. Enter name, address, telephone number and email address of the Contractor/DOR.
Block 9a. Print the name of the responsible person and position title (Lead Engineer, Manager, President, etc). This information is especially important to ensure any questions related to the project and site design can be quickly directed to the appropriate point of contact, avoiding delays in processing.
Block 9b. Include signature and date of the responsible person.
Block 10. Enter the office (FEC, PWD, IPT, OICC, ROICC, etc.) in responsible charge of the project.
Block 10a. Enter the contract number. Include the task order number if applicable.
Block 10b. Enter name of the CM/PM for office indicated in block 10.
Block 10c. Enter the office phone number and email address for the person indicated in block 10b.
Block 11. Provide a brief summary of the project. Be sure to included details such as the project location, and size. The final approval authority should fully understand what the project is and why this project is necessary.
Block 12. Indicate the reason LID is not practical for this project, (e.g., conflicts with existing state or local regulations, site is contaminated, etc.) and select the appropriate check box.
Block 13. The Project Manager shall make the FEC CI Business Line Coordinator (CI BLC) aware of the waiver request and obtain approval or disapproval and signature of NAVFAC FEC Commanding Officer. Return the signed waiver to the PM who must add the signed waiver as an internal note in eProjects.
image1.jpeg
File details come from the government source that posted it. Updated .