DESIGN-BID-BUILD, X-132 CORRECT NETWORK INFRASTRUCTURE DEFICIENCIES, NAVAL STATION NORFOLK, NORFOLK, VIRGINIA
Solicitation number
N4008524R2770
Issued by

About this file

This document is an amendment to a federal solicitation for the X-132 Correct Network Infrastructure Deficiencies project at Naval Station Norfolk. The amendment provides responses to pre-proposal inquiries 6-11, with responses to inquiries 1-5 to be provided in a future amendment. The amendment also provides additional attachments including a specification and previously approved door hardware. Key details include:

The solicitation is for a design-bid-build project to correct network infrastructure deficiencies at X-132 at Naval Station Norfolk, Virginia. The solicitation is only open to 8(a) Design-Build/Design-Bid-Build, Indefinite Delivery/Indefinite Quantity, Firm Fixed Price, Multiple Award Construction Contract holders for a specific set of contract numbers. The amendment addresses questions related to door/frame replacement, window requirements, hardware specifications, and acceptable frame types. The agency is the Department of the Navy, Naval Facilities Engineering Command.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

N40085-24-R-2770

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

AMENDMENT 0002

The purpose of this amendment is to provide the following:

1. Provide the responses to pre-proposal inquiries 6-11. Government responses to PPIs 1-5 will be posted in forthcoming Amendment 0003.

X-132 Correct Network Infrastructure Deficiencies, Naval Station Norfolk, Virginia

PPI # Date Submitted

Question Government Response

1 7/31/24 The doors and frames being demolished are in areas of high security and high traffic. Are these doors and frames and windows to be removed and replaced in one shift during normal business hours, 6:00 AM to 5:00 PM?

2 7/31/24 The vestibule window, room 106, being replaced is directly next to the active security officer responsible for incoming and outgoing personnel and visitors. Full access to this room will be needed to replace the door and window. Will this be the entrance used by X-132 during execution of this contract? If so, could the government please provide details for the coordination effort required?

3 7/31/24 Can the government use vestible 122 for access control while work is being performed in vestible 106 and vice versa?

4 7/31/24 Removing the frames for the doors creates potential issues with the fitting of the new doors as the replacement frames will likely need to be re-fitted. Removing the frames also increases the time necessary to reinstall the security measures.

During the walk through, the exterior frames appeared to be in good shape. Would the government consider keeping the existing frames at the vestible locations?

5 7/31/24 Will these doors, frames at the vestible locations need to be completely removed and replaced in one shift to ensure security measures are kept in place?

6 7/31/24 Sheet AE-602 shows multiple window types. Could the government please clarify that only the window (Type-C) located in the vestible area is being replaced and the others are just boiler plate details.

Type C1 and Type C5 are the window types to replace. The remaining types are to show where to provide window film.

7 7/31/24 A specification doesn’t appear to be available fof the C1 & C5 bullet resistant windows and glazing.

Could you provide one please?

Add Spec Sections 08 34 02 Bullet- Resistant Components and 08 51 69.10 Aluminum Storm (Bullet Resistant) Windows to the Table of Contents. Sections attached to this response.

8 7/31/24 To quote this project accurately and correctly, can you provide information on the existing hardware in use at the above mentioned project. Per the drawings it indicates to match existing as well as indicates mortised devices where the schedule indicates rim devices.

Provide hardware per the schedule. For reference only:

approved submittal of door hardware from recent project on JECC side of X-132 attached to this response.

9 8/01/24 The Hollow Metal Specification calls out Welded and Knock–down frames. Which will be required for this project?

Knock-down.

10 8/01/24 The Hollow Metal Specification calls out terminated stops, will these be required for this project?

No.

11 8/01/24 The frame elevations on sheet AE604 show a drywall frame and state that the walls are existing, Knock-down frames will be the only ones that can be installed without redoing the walls. The elevations also shows a welded steel stud anchor, you will have to redo the walls to use these anchors. Please advise if a knock-down drywall

Knock-down drywall frame with compression anchors are acceptable.

frame with compression anchors are acceptable to use on this project?

2. Provide Attachment 1736577_Spec.

3. Provide Attachment Hardware For-Reference-Only.

24R2770 Amendment 0002 DRAFT
24R2770 Amendment 0001
23R2656 Amendment 0001
23R2656 Amendment 0004
Pages from 23R2541 Amendment 0003-2

Amendment 0002 continuation page

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0002
Code[0]: N40085
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: SEE SF 30 BLOCK CONTIUATION PAGE
FacilityCode[0]:
Code[2]:
IssuedBy[0]: NAVFACYSCOM MID-ATLANTIC

PWD NORFOLK

FACILITIES ENGINEERING & ACQ DIV

9324 VIRGINIA AVENUE

NORFOLK, VA 23511-3095

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: N4008524R2770
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 4
EffectiveDate[0]: 08/06/2024
Dated9B[0]: 07/16/2024
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: 1
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]: 1

File details come from the government source that posted it. Updated .