Amend 0006.pdf
PDF 520 KB Posted
- Attached to
- P1594 Repair by Replacement RR1
- Solicitation number
- N4008524R2708
About this file
This document is an Amendment to a Solicitation for a federal contract opportunity. The amendment provides answers to questions received regarding the project, clarifies proposal submission instructions, and makes other administrative changes to the original solicitation.
Key details:
- Amendment 0006 to Solicitation N40085-24-R-2708 for the P1594 Repair by Replacement RR1 project at MCB Camp Lejeune
- Provides answers to questions related to the geotechnical report, proposal submission instructions, subcontractor listing, electrical metering requirements, signage requirements, and other administrative matters
- Confirms proposal shall be submitted via email to the specified email address
- States that the provided proposal form does not need to be used, and contractors should provide pricing on the pricing sheet
- Provides additional details on electrical metering, signage requirements, and other technical specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003 Cont Pages.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| N4008521B0036 Specs.pdf | ||
| 21-0036 FFE Binder.pdf | ||
| 21-0036 SID Binder.pdf | ||
| N4008521B0036 Dwgs.pdf | ||
| 21-0036 AppendixD.pdf | ||
| 21-0036 DM-NEPA LE22021.PDF | ||
| RFP 21-0036.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 7
AMENDMENT NO. 0006 06/21/24 21-0036
N40085
NAVFAC Mid-Atlantic Resident Officer in Charge of Construction 1005 Michael Road Camp Lejeune, NC 28547-2521
See Item 6
✘ N40085-24-R-2708
05/29/24
21-0036, P1594 Repair by Replacement RR1, MCB Camp Lejeune
Amendment 0006, RFI answers.
This amendment should be acknowledged when your proposal is submitted. Failure to acknowledge the amendment may constitute grounds for rejection of a proposal.
See Continuation Page(s)
N40085-24-R-2708 Amendment 0006
CONTINUATION SHEET
1. QUESTION: Page 1599-1672, P1594 Geotechnical Report. Were the borings for the geotechnical report taken before the demolition contractor of the old building backfilled and compacted the site? If so this report does not capture material used and of which will be worked for the new construction and those proctor reports, submittals and place of origin of the material should be provided.
ANSWER: The Geotechnical Investigation performed as a part of MBFA's design was completed prior to demolition of the building.
ADDITIONAL ANSWER (FOR INFORMATION ONLY): Per CONTRACT N62470-19-D- 8023, TASK ORDER N4008520F4699, PROJECT #19-0085, RR1 demo drawings (PCO-008 IFC set) state on sheet CS504 for backfilling of utility trenches, “BACKFILL PLACED IN 6"
LIFTS (COMPACTED TO 95% MAXIMUM DENSITY (MODIFIED PROCTOR)) “
Per Basis of Design dated September 2022 of the same contract:
1. Demolish all the underground and overhead utilities back to the main.
2. No soil is to leave the construction sites.
3. Provide appropriate type and amount of approved fill material.
Per Specification SECTION 02 41 00 – DEMOLITION, dated October 2020 of the same contract:
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures. Fill material shall be waste products from demolition or deconstruction until all waste appropriate for this purpose is consumed.
b. Fill material shall conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
Soil classification AASHTO M 145
Moisture-density relations AASHTO T 180, Method B or D
2. QUESTION: The RFP does not state how to submit the propoal (via email, PIEE, etc.). Please confirm how proposal shall be delivered.
3. ANSWER: Provide proposal via email to kyle.l.vaughan2.civ@us.navy.mil.
4. QUESTION: The RFP provides a letter template that has space to list Subcontractor(s) To Be Used. Firm commitments are not typically made with subcontractors until after project award.
Please confirm that Subcontractors do not need to be listed.
ANSWER: Disregard the proposal form provided in the RFP. Use the pricing sheet to provide your price.
N40085-24-R-2708 Amendment 0006
5. QUESTION: Section 25 00 00 a) Please clarify what the base standard for electrical metering is.
B) Does is required SCADA connectivity or just a standard KWH meter?
ANSWER: Please see attached cutsheet.
6. QUESTION: Will the Government please confirm if the use of fiberglass cross arms for the fused cutouts and arresters would be acceptable in lieu of wood with braces?
ANSWER: Not preferred, but acceptable.
7. QUESTION: Section 27 10 00 1.10.1 The Base has recently asked for a copy of the EIA/TIA Standards for the Operation and Maintenance Manuals. Is a copy of the Operation and Maintenance Manuals required for this project?
ANSWER: 27 10 00 Spec calls for - 1.10.1 Operation and Maintenance Manuals Commercial off the shelf manuals shall be furnished for operation, installation, configuration, and maintenance of products provided as a part of the telecommunications cabling and pathway system. Drawings are conceptual in nature. They DO NOT show the exact locations of components or all system components. Contractors MUST provide additional components for a Properly Installed and Functional Telecommunications System in accordance with applicable specifications and standards.
8. QUESTION: A4/A-509; Please confirm if this sign is building mounted and confirm the location and quantity of this signage. Further, is freestanding building sign is required to be furnished under this contract. If so provide those requirements.
ANSWER: KTR is to provide one (1) Unit Sign per Detail A4/A-509. Final location on building to be confirmed during construction with the CM.
ADDITIONAL ANSWER: Sign is building mounted. (Typically adjacent to main building entrance). (1) at front entry and (1) at back entry.
9. QUESTION: A3/A-509; Please confirm the locations and quantity of this signage. Typically this is found on 1 or 2 sides of the building but also can be added to other features like Mechanical Yards, etc. These locations are not indicated from what we can find.
ANSWER: KTR is to provide one (1) Building Identification Sign per Detail A3/A-509. Final location on building to be confirmed during construction with the CM.
ADDITIONAL ANSWER: Sign is building mounted. Building number signs (1) building mounted on left hand side of the building at main road and (1) building mounted on left hand side of the building at main parking lot. 7’-0” to bottom of sign from ground. 6” of edge of the building unless it is not clearly legible from that street/parking lot in that location.
10. All other terms and conditions remain unchanged.
CENTRON®
Polyphase CP3S With this solid-state meter, Itron presents a platform for commercial and industrial (C&I) metering that has the fl exibility to adapt as your communication needs expand and change. The CENTRON
Polyphase CP3S solid-state meter with current transformer technology measures extended polyphase energy consumption. It is available as an energy meter with an LCD register. As an option, the meter is available with interchangeable personality modules, including demand, time-of-use (TOU) and load profi le.
FLEXIBLE PLATFORM
» The CENTRON Polyphase meter can easily be upgraded to any of the option modules available.
» All calibration data is permanently stored in the base of the meter on the CENTRON Polyphase metrology board.
PERSONALITY MODULES
» The interchangeable personality modules are part of a snap-in register assembly.
» The personality modules house all register or communication functions.
ENHANCED PERFORMANCE
» 0.2 accuracy class
» Flexible platform
» Auto-ranging power supply
SPECIFICATIONS
STANDARD FEATURES
» Electronic LCD register
» Polycarbonate cover
» Test LED
» Voltage indicators
» Service detection
» Expansion port
OPTION MODULE UPGRADES
» Demand module (CP3SD)
» TOU with demand module (CP3ST)
» Load profi le with TOU and demand module (CP3SL)
» R400 900 MHz RF module (CP3SR)
» R400CD/CD3 module
OPTION AVAILABILITY
» R400CD/CD3
» Identifi cation/Accounting aids
TECHNICAL DATA
Meets applicable standards:
» ANSI C12.1 - 2014
» ANSI C12.10 - 2011
» ANSI C12.18 -1996
» ANSI C12.19 - 1997
» ANSI C12.20 (Class 0.2) -2015
» FCC Part 15, Class B
» FCC Part 15, Subpart C
REFERENCE INFORMATION
» CENTRON Polyphase Technical Reference Guide
» CENTRON Polyphase CP3SD, T, L Specifi cation Sheet
» CENTRON R400CD/CD3 Specifi cation Sheet
» Electricity Price Bulletin
» Hardware Specifi cation Form
» ZRO-C2A/B Handheld Meter Resetter Instructions
» Meter Pocket Guide
SPECIFICATIONS
Product Availability
Metrology Class Elements Wires Voltage Amps
1S 100 1 2 120-480
2S 200 1.5 3 120-480
2S 320 1.5 3 120-480
3S 20 1 2 120-480
4S 20 2 3 120-480
9S (8S) 20 3 4 120-480
9S (8S)/36S 20 3 4 120-480
45S/5S 20 2 3 120-480
12S 200 2 3 120-480
12S 320 2 3 120-480
16S (14S, 15S, 17S) 200 3 4 120-480
16S (14S, 15S, 17S) 320 3 4 120-480
Load profi le with TOU and demand module (CP3SL)
» R400 900 MHz RF module (CP3SR)
R400CD/CD3 module
R400CD/CD3
Dimensions
Polycarbonate
A B C D E F
6.31” 6.95” 5.04” 5.85” 6.86” 7.30
16 cm 17.7 cm 12.8 cm 14.9 cm 17.4 cm 18.5 cm
Shipping Weights
Polycarbonate
4 meter cartons Approx. 12 lbs. 5.44 kg
96 meter pallets Approx. 323 lbs. 146.51 kg
Specifi cations
Power Requirements Voltage rating: 120V-480V
Frequency: 60 Hz, 50Hz
Operating voltage: ±20% (60 Hz); ±10% (50 Hz)
Operating range: ±3 Hz
Operating Environment Temperature: -40˚ to +85˚C
Humidity: 0% to 95% non-condensing
Transient/
Surge Suppression
IEC 61000-4-4
ANSI C62.45-1992
Accuracy ANSI C12.20 0.2 Accuracy Class
General LCD Display Five-Digit liquid crystal display
Data digit height: 0.4”
Annunciator height: 0.088”
Electronic load indicator
Characteristic Data Starting current: 5 mA (Class 20)
Starting current: 20 mA (Class 200/320)
Temperature Rise
Specifi cations Meets ANSI C12.1 section 4.7.2.
A
C
D E
B
While Itron strives to make the content of its marketing materials as timely and accurate as possible, Itron makes no claims, promises, or guarantees about the accuracy, completeness, or adequacy of, and expressly disclaims liability for errors and omissions in, such materials. No warranty of any kind, implied, expressed, or statutory, including but not limited to the warranties of non-infringement of third party rights, title, merchantability, and fi tness for a particular purpose, is given with respect to the content of these marketing materials.
© Copyright 2018 Itron. All rights reserved. 100654PO-09 11/18
Join us in creating a more resourceful world.
To learn more visit itron.com
CORPORATE HQ
2111 North Molter Road
Liberty Lake, WA 99019 USA
Phone: 1.800.635.5461
Fax: 1.509.891.3355
File details come from the government source that posted it. Updated .