21-0036 SID Binder.pdf
PDF 2 MB Posted
- Attached to
- P1594 Repair by Replacement RR1
- Solicitation number
- N4008524R2708
About this file
This document is a Structural Interior Design (SID) package for the P1594 Building RR1 Repair by Replacement project at Marine Corps Base Camp Lejeune in North Carolina. The SID package outlines the proposed interior design requirements, including finish materials, colors, and specifications for flooring, walls, ceilings, doors, windows, and signage. Key details include the use of durable, low-maintenance finishes such as epoxy resinous flooring, porcelain tile, and acoustical ceiling tiles. The package also includes meeting minutes, finish plans, elevations, details, and finish boards. The related federal contract opportunity is Solicitation N4008524R2708 for the P1594 Repair by Replacement RR1 project, which is open only to IDQC MACC Contractors in the ROICC Camp Lejeune area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amend 0008.pdf | ||
| Amend 0007.pdf | ||
| Amend 0006.pdf | ||
| Amend 0005.pdf | ||
| Amend 0004.pdf | ||
| Amend 0003 Cont Pages.pdf | ||
| Amend 0003.pdf | ||
| Amend 0002.pdf | ||
| Amend 0001.pdf | ||
| N4008521B0036 Specs.pdf | ||
| 21-0036 FFE Binder.pdf | ||
| N4008521B0036 Dwgs.pdf | ||
| 21-0036 AppendixD.pdf | ||
| 21-0036 DM-NEPA LE22021.PDF | ||
| RFP 21-0036.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
interior design within
P1594 Building RR1 Repair By Replacement
Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package Final Submittal April 2023
P1594 Building RR1 Repair By Replacement MCB Camp Lejeune, NC Structural Interior Design Package interior design within
Table of Contents
1. Point of Contact List
2. Narrative of Interior Design Objectives
3. Meeting Minutes
4. Manufacturers List
5. Finish Plans & Schedules
6. Finish Boards
Structural Interior Design Package interior design within
Point of Contact List Executive Officer Brian K. Pensak United States Marine Corps Weapons Training Battalion Marine Corps Base, Camp Lejeune
(910) 440-2703 brian.pensak@usmc.mil
Operations Branch Allen D. Cook United States Marine Corps Supply Management Division Marine Corps Base, Camp Lejeune
(910) 451-7636 allen.cook@usmc.mil
Architectural Supervisor, Design Branch Kelly E. Root, RA, NCARB United States Marine Corps Public Works Division Marine Corps Base, Camp Lejeune
(910) 238-6476 kelly.root@usmc.mil
A&E Project Manager Raymond Layton MBF Architects 317-C Pollock Street New Bearn, NC 28560
(252) 637-6373 layton@mbfarchitects.com
A&E Interior Designer Jamie Kissel, NCIDQ Within Interior Design 1008 Granby Street Norfolk, VA 23510
(757) 224-0489 jkissel@withindesigns.com
A&E Junior Designer Alexis Greene Within Interior Design 1008 Granby Street Norfolk, VA 23510
(757) 224-0489 agreene@withindesigns.com
Structural Interior Design Package interior design within
SID Narrative This Basis of Design Narrative outlines the proposed Structural Interior Design requirements for P1594 Building RR1 Repair by Replacement at United States Marine Corps Base, Camp Lejeune.
The interior finishes are the most exposed interior elements in a building and must be durable to withstand the daily traffic and demands of the environment. To meet these objectives, the SID package will use all the general requirements for interior finishes that have been applied in similar facilities recently constructed at MCB Camp Lejeune, as well as best practices recommended by manufacturers for areas requiring enhanced durability. Structural finishes in accordance with the following guidelines will provide longevity and timeless aesthetics without compromising the functional integrity of the facility.
Finishes were selected because of their high durability and low maintenance requirements. Squad bays will receive epoxy resinous flooring while private office will recieve carpet tile. Porcelain tile will cover the floors in the head/shower rooms. The laundry rooms and corridors on both floors will receive a standard resinous flooring.
Interior partitions will be painted CMU & drywall. Accent walls painted in geometric shapes will be used in the Squad Bays to break up the large open spaces and provide visual variety. Offices will recieve a solid accent wall while toilet rooms will recieve porcelain tile with a glazed ceramic tile accent band. All wall finishes will be cohesive to adjacent spaces and provide a fresh and upgraded look.
Acoustical ceiling tiles on a suspended grid provide high quality sound absorption in designated areas with easy access to mechanical and plumbing above. The square lay in tiles are a moisture resistant mineral fiber and have a minimum NRC of 0.85, CAC of 35, and a light reflectance of
0.86. Ceilings in shop areas will be exposed with a painted finish.
INTERIOR DESIGN CRITERIA
Interior Design work will comply with the latest edition of the following codes and standards:
FC 1-300-09N NAVY & MARINE CORPS DESIGN PROCEDURES
FC 4-721-10N NAVY & MARINE CORPS UNACCOMPANIED HOUSING
UFC 1-200-01 DOD BUILDING CODE
UFC 3-120-01 DESIGN: SIGN STANDARDS
UFC 3-120-10 INTERIOR DESIGN
UFC 3-190-06 PROTECTIVE COATINGS & PAINTS
Structural Interior Design Package interior design
Meeting Minutes
1 | P a g e
1008 Granby Street | Norfolk, VA 23510 | 757.224.0489
MEETING MINUTES
Meeting: Design Charrette Date: October 6th – 7th, 2022 Location: Bus Station, MCB Camp Lejeune, NC Project: P1594 Building RR1 BEQ Repair by Replacement
PROJECT TEAM IN ATTENDANCE:
Robert Stevens MCB Camp Lejeune Project Manager Chad Lambert MCB Camp Lejeune Facility Planner Architecture MBF Architects (252) 637-6373 Geotechnical ECS Southeast (919) 861-9910 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856 Cost Estimating Aiken Cost Consultants (864) 232-9342 Interior Design Within Interior Design (757) 224-0489
Below are the items that were addressed during the Design Charrette.
GENERAL NOTES
• New construction of two story barracks with separate ID Card Center.
• Existing building will be demolished & replaced with newly constructed replica of original building.
• Able body only facility – No ADA requirements with exception of ID Card Center.
• Newly constructed building components will meet requirements for third party green building certification.
FF&E REQUIREMENTS
ID CARD CENTER
• Waiting Area o Approximately (20) Waiting Chairs o Wall Clock o GFGI Wall Mounted TV & Bracket o Cork Board
• (2) Private Offices o U-Shaped Desk o (2) Guest Chairs o GFGI Wall Mounted TV & Bracket o Marker Board o Wall Clock
2 | P a g e
• (1) STG Office o (1) Workstation o GFGI Wall Mounted TV & Bracket o Marker Board o Wall Clock
SQUAD BAYS
• Sleeping Area – 1st & 2nd Floors o Double Bunks with Wardrobe at foot to accommodate approximately 140 Marines.
• Open Office Area – 1st & 2nd Floors o (2) L-Shaped Desks o (1) Guest Chair for each desk o Marker Boards o GFGI Wall Mounted TV & Bracket o Wall Clock o (2) 4-High Filing Cabinets o (1) Bookshelf
• Laundry Room – 1st & 2nd Floors o (5) Washers o (5) Dryers
SID REQUIREMENTS
• Epoxy Resinous Floors throughout all areas unless noted otherwise below
• Carpet in Office Areas
• Epoxy Resinous Floor in ID Card Waiting Area
• Epoxy Resinous Cove Base
• Tile on floor & walls of Bathrooms
• Wood interior doors
• Double Roller Shades at windows – One layer blackout and one layer light filtering.
• Metal at stair tread & risers
• HDPE Toilet Partitions
• Solid Surface Shower Surrounds & Shower Pan
ACTION ITEMS
1. 35% Submittal Costing Set due to MBF 10/27
Meeting: 35% Review Meeting Date: December 1st, 2022 Location: Webex Meeting Project: P1594 Building RR1 BEQ Repair by Replacement
PROJECT TEAM IN ATTENDANCE:
Robert Stevens MCB Camp Lejeune Project Manager Chad Lambert MCB Camp Lejeune Facility Planner Architecture MBF Architects (252) 637-6373 Geotechnical ECS Southeast (919) 861-9910 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856
Below are the items that were addressed during the 35% Review Meeting.
GENERAL NOTES
• No Review Comments for Interiors.
• WID to provide full FF&E package for review at 65% “stop and plot” submittal.
• Activity to provide WID with list of preferred manufacturers for the bunk units in sleeping bays.
ACTION ITEMS
1. 65% Submittal due to MBF by COB on 12/13.
2. Activity to send list of manufacturers for bunk units by Friday 12/22.
Meeting: Prefinal Design Review Meeting Date: February 16th, 2023 Location: Bus Station, MCB Camp Lejeune, NC Project: P1594 Building RR1 BEQ Repair by Replacement
PROJECT TEAM IN ATTENDANCE:
Robert Stevens MCB Camp Lejeune Project Manager Chad Lambert MCB Camp Lejeune Facility Planner Kelly Root MCB Camp Lejeune Architectural Supervisor Architecture MBF Architects (252) 637-6373 Geotechnical ECS Southeast (919) 861-9910 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856
Below are the items that were addressed during the Prefinal Review Meeting.
90% REVIEW COMMENT DISCUSSION
KELLY ROOT
8. A-401 – Should there be shelves in the shower?
Response: Activity confirmed that showers should have shelves. MBF to provide details.
13. I-101 & I-102 – Should there be shelves in stg 106, 131, 202 & 205?
Response: Each storage room will have freestanding shelves. They will be heavy duty and must have a plywood surface on each shelf.
14. I-103 – Concerned about the interior stairs finish being sealed concrete because of slip resistance per NFPA. Maybe rubber stair treads?
Response: Stairs will be finished in a textured, light brushed concrete. There will be an embedded tactile surface at the nosing of each stair. Stairs can also be finished in a non-slip epoxy if preferred.
17. I-502 – Details should be keyed back.
Response: Floor drains and transition detail locations will be called out on overall plans.
18. I-601 – Finish Schedule Keynotes call out shower pan and shower walls as SS. Are there shower installation details?
Response: MBF confirmed that they will be providing detail drawings for showers.
2 | P a g e
22. FFE Binder PG 35 & 36 – Was there any discussion on C2 & C3 being the same chair?
Response: Activity confirmed they would like the waiting room chairs and the guest chairs in the private offices to both be the same – Something similar to C3 chair except with sled base instead.
FF&E DISCUSSION NOTES
• Remove hutch at desks in private offices.
• Add a mobile pedestal at each desk.
• Confirm that the rear side of task chair backs has bumper protection.
• Send new guest/waiting chair options with sled base.
• Change all shelving and file cabinet finishes to be laminate to match the office desks.
• Change 36” lockers at the foot of each bunk to be two 18”W lockers instead.
• Change underbed storage to be drawers with padlock in lieu of coffin style storage with gas springs.
SID DISCUSSION NOTES
• Either change blue bathroom accent tile from scheme 2 to matte finish or use accent tile from Scheme 1.
• Keep paint finish PNT-3 from Scheme 1.
• Keep paint finish PNT-4 from Scheme 1.
• Keep darker epoxy finish from Scheme 1.
• Keep rubber base RB-1 from Scheme 1.
• Possibly choose a lighter wood finish for the doors – Activity would prefer a natural finish.
• Add whiteboards to front of doors at main entrance to each squad bay – 9 total.
• Look into male/female slider for restroom signage.
• Change tackboard in waiting area to be information display case with lockable doors.
• Place additional information display cases across from stairs on both ends of the corridors on each floor.
• Add double roller shades at each window – one layer with 5% openness and the other layer blackout.
• Add shelving to storage room 101.
ACTION ITEMS
1. WID to send package of physical SID samples to Kelly Root for review.
2. MBF to send details regarding shelving requirements in storage room 101.
Meeting: Final Design Review Meeting Date: April 13th, 2023 Location: 1016 Jacksonville Pkwy, Jacksonville, NC Project: P1594 Building RR1 BEQ Repair by Replacement
PROJECT TEAM IN ATTENDANCE:
Robert Stevens MCB Camp Lejeune Project Manager Chad Lambert MCB Camp Lejeune Facility Planner Kelly Root MCB Camp Lejeune Architectural Supervisor Architecture MBF Architects (252) 637-6373 Geotechnical ECS Southeast (919) 861-9910 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856
Below are the items that were addressed during the Final Review Meeting.
FINAL REVIEW COMMENT DISCUSSION
KELLY ROOT
1. A-103 – ACT in restrooms should be moisture resistant. Separate type. Epoxy would be preferred to keep in consistent with what is in the halls and barracks.
Response: ACT-2 (moisture resistant) has been added to the finish legend. HEAD 122, 116, 219 and 213 will be changed to epoxy flooring. SHOWER 123, 115, 220, and 212 will also change to Epoxy unless this is not preferred. (WID)FF&E Discussion Notes
Clarification: Per Kelly – The stairs should be changed to Epoxy. All restrooms will have Porcelain tile floors.
ACTION ITEMS
1. WID to update finish schedule to include ACT-2 (Moisture Resistant)
2. WID to update floor finish plans and room finish schedule to show EP-1 in the stairs.
Structural Interior Design Package interior design
Finish Plans & Schedules
CPT-1
FLOOR FINISH KEY
EP-1
T-1
SC-1
SQUAD BAY
MECH
SQUAD BAY
CORRIDOR
CORRIDOR
SQUAD BAY
SPRINKLER
MECH
SQUAD BAY
STG
SOUTH STAIR
COMM
OFFICE
STG
NORTH STAIR
STG
SHOWER
HEAD
HEAD
SHOWER
LAUNDRY
CORRIDOR
CORRIDOR
MECH
ELECT
HOT MECH
UNISEX
STG
OFFICE
OFFICE
WAITING
JAN
A1/I-502 B1/I-502
A1/I-502
B1/I-502 A1/I-502
A1/I-502
A2/I-502
A2/I-502
A2/I-502
B1/I-502
A1/I-502
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C
Fi le
Pr in t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:4
PM
FI
R
ST
F
LO
O
R F
IN
IS
H P
LA
N
I-103
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038109
WID JK AG
RKS
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
SCALE: 3/32" = 1'-0"A1 FIRST FLOOR FINISH PLAN
FLOOR FINISH NOTES
A. HATCH PATTERN DOES NOT INDICATE DIRECTION OR
METHOD OF FLOORING INSTALLATION.
B. SEE I-601 FOR FINISH LEGEND.
0' 6' 12' 18' 3/32" =1'-0"
GRAPHIC SCALE:
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
CPT-1
FLOOR FINISH KEY
EP-1
T-1
SC-1
SQUAD BAY
MECH
CORRIDOR
SQUAD BAY
SOUTH STAIR
STG
OFFICE
STG
NORTH STAIR
SHOWER
HEAD
HEAD
SHOWER
LAUNDRY
CORRIDOR
ELEC
MECH
SQUAD BAY
SQUAD BAY
CORRIDOR
210CORRIDOR
MECH
SQUAD BAY
JAN
A1/I-502 B1/I-502A1/I-502 B1/I-502 A1/I-502
A2/I-502
A1/I-502 A1/I-502
A1/I-502
A1/I-502
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM
SE
C
O N
D F
LO
O
R F
IN
IS
H P
LA
N
I-104
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038110
WID JK AG
RKS
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
SCALE: 3/32" = 1'-0"A1 SECOND FLOOR FINISH PLAN
FLOOR FINISH NOTES
A. HATCH PATTERN DOES NOT INDICATE DIRECTION OR
METHOD OF FLOORING INSTALLATION.
B. SEE I-601 FOR FINISH LEGEND.
0' 6' 12' 18' 3/32" =1'-0"
GRAPHIC SCALE:
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
SQUAD BAY
MECH
SQUAD BAY
CORRIDOR
124 CORRIDOR
SQUAD BAY
SPRINKLER
MECH
SQUAD BAY
STG
SOUTH STAIR
COMM
OFFICE
104 STG
NORTH STAIR
STG
SHOWER
HEAD
HEAD
SHOWER
LAUNDRY
CORRIDOR
CORRIDOR
MECH
ELECT
HOT MECH
UNISEX
132 STG
OFFICE
OFFICE
129WAITING
JAN
S4M S2
S6
S2
S2 S2
S2 S2S2S2S6
S2
S2
S1 S1
S1
S1 S2S5
S2
S2 S2
S2 S7S7
S3S3
S2
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
I-201
C1
I-202
A1
I-201
A1
I-201
B1
I-202
A1
I-202
B1
I-202
C1
I-201
A1
PN
T-
3 PN
T-
PN
T-
PNT-7
1 1
2 2
S8
S8
S4M
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM
FI
R
ST
F
LO
O
R W
AL
L
FI
N
IS
H
S
IG
N
AG
E
PL
AN
I-105
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038111
WID AG JK
RKS
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
SIGNAGE NOTES
A. SIGNAGE TO FOLLOW GUIDELINES FROM UFC 3 120 01
B. ALL SIGN TYPES, TEXT WORDING AND ROOM NUMBERS TO
BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC
INTERIOR DESIGNER PRIOR TO FABRICATION.
C. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY
SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF
THE GLASS.
D. SEE ELEVATION A1/I-203 FOR MOUNTING HEIGHT OF ACRYLIC
SIGNAGE.
E. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.
F. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE
FINISHES.
INTERIOR SIGNAGE
TYPE DESCRIPTION QTY
S1 ROOM IDENTIFICATION SIGN 6
S2 PERMANENT ROOM IDENTIFICATION SIGN 29
S3 WORKSTATION IDENTIFICATION SIGN 4
S4M MENS RESTROOM & SHOWER IDENTIFICATION SIGN 4
S5 UNISEX RESTROOM IDENTIFICATION SIGN 1
S6 STAIR IDENTIFICATION SIGN 4
S7 LARGE DIRECTIONAL SIGN 4
S8 HEADS SLIDER SIGN 4
SCALE: 3/32" = 1'-0"A1 FIRST FLOOR WALL FINISH & SIGNAGE PLAN
48"W X 36"H MARKER BOARD
6"W X 48"H INFORMATION DISPLAY CASE
18"W X 24"H DOOR MOUNTED MARKER BOARD
KEYNOTES
0' 6' 12' 18' 3/32" =1'-0"
GRAPHIC SCALE:
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
SQUAD BAY
MECH
CORRIDOR
SQUAD BAY
SOUTH STAIR
STG
OFFICE
STG
NORTH STAIR
SHOWER
HEAD
HEAD
SHOWER
LAUNDRY
CORRIDOR
ELEC
MECH
SQUAD BAY
SQUAD BAY
CORRIDOR
CORRIDOR
MECH
SQUAD BAY
JAN
S7 S7
S6 S6S2S1S1
S2S4M
S4M
S2
S2 S2
S2
S2
S2
S2
S2
S2
S2 S2
S3S3
I-201
B1
I-201
A1
I-202
B1
I-202
A1
I-201
C1
I-202
C1
I-203
B1
I-203
C1
I-201
A1
I-202
A1
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8 PNT-5/-PNT-6/PNT-7/PNT-8
PNT-5/-PNT-6/PNT-7/PNT-8
PNT-7
1 1
2 2
3 3
S8
S8
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM SE
C
O N
D F
LO
O
R W
AL
L
FI
N
IS
H
S
IG
N
AG
E
PL
AN
I-106
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038112
WID AG JK
RKS
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
INTERIOR SIGNAGE
TYPE DESCRIPTION QTY
S1 ROOM IDENTIFICATION SIGN 6
S2 PERMANENT ROOM IDENTIFICATION SIGN 29
S3 WORKSTATION IDENTIFICATION SIGN 4
S4M MENS RESTROOM & SHOWER IDENTIFICATION SIGN 4
S5 UNISEX RESTROOM IDENTIFICATION SIGN 1
S6 STAIR IDENTIFICATION SIGN 4
S7 LARGE DIRECTIONAL SIGN 4
S8 HEADS SLIDER SIGN 4
SCALE: 3/32" = 1'-0"A1 SECOND FLOOR WALL FINISH & SIGNAGE PLAN
SIGNAGE NOTES
A. SIGNAGE TO FOLLOW GUIDELINES FROM UFC 3 120 01
B. ALL SIGN TYPES, TEXT WORDING AND ROOM NUMBERS TO
BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC
INTERIOR DESIGNER PRIOR TO FABRICATION.
C. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY
SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF
THE GLASS.
D. SEE ELEVATION A1/I-203 FOR MOUNTING HEIGHT OF ACRYLIC
SIGNAGE.
E. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.
F. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE
FINISHES.
0' 6' 12' 18' 3/32" =1'-0"
GRAPHIC SCALE:
48"W X 36"H MARKER BOARD
6"W X 48"H INFORMATION DISPLAY CASE
18"W X 24"H DOOR MOUNTED MARKER BOARD
KEYNOTES
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
.0
0°
135.00°
.0
0°
90.00°
45.00° 45 .0
0°
135.00°
PNT-7
PNT-6
PNT-5
PNT-8PNT-8
EP-1
COVE
BASE
4" 4"
PNT-4
METAL
DOOR
PNT-4
DOOR
FRAME
13'-0"
11'-4"
5' -3
15'-4"
5' -3
17'-0"
.0
0°
90.00°
135.00°
45.00°
.0
0°
135.00°
45.00°
PNT-7
PNT-6
PNT-5
4"
4"
PNT-8PNT-8
PNT-4
METAL
DOOR
PNT-4
DOOR
FRAME
EP-1
COVE
BASE
8'-0"
16'-2"
2' -0
4"4"
PNT-5
PNT-7
PNT-6
90.00°
135.00°
45.00°
135.00°
.0
0°
.0
0° 45.00°
PNT-8PNT-8
EP-1
COVE
BASE
WD-1
DOOR
PNT-3
DOOR
FRAME
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM
IN
TE
R
IO
R E
LE
VA
TI
O
N S
I-201
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038113
WID JK AG
RKS
SCALE: 1/2" = 1'-0"C1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
SCALE: 1/2" = 1'-0"B1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL
SCALE: 1/2" = 1'-0"A1 ACCENT WALL ELEVATION @ SQUAD BAY ENTRY WALL
1' 2' 4'0'
1/2" =1'-0"
GRAPHIC SCALE:
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
PNT-5
PNT-7
PNT-6
PNT-8PNT-8
EP-1
COVE
BASE
WD-1
DOOR
PNT-3
DOOR
FRAME
135.00°
.0
0°
90.00°
.0
0°
.0
0°
45.00°
135.00°
8'-0"
16'-2"
2' -0
.0
0°
135.00°
.0
0°
90.00°
45.00° 45 .0
0°
135.00°
PNT-7
PNT-6
PNT-5
PNT-8PNT-8
PNT-4
METAL
DOOR
PNT-4
DOOR
FRAME
EP-1
COVE
BASE
17'-0"
15'-4"
5' -3
4" 4"
.0
0°
90.00°
135.00°
45.00°
.0
0°
135.00°
45.00°
PNT-7
PNT-6
PNT-5
4"
4"
PNT-8PNT-8
EP-1
COVE
BASE
PNT-4
METAL
DOOR
PNT-4
DOOR
FRAME
13'-0"
11'-4" 5'
-3
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM
IN
TE
R
IO
R E
LE
VA
TI
O
N S
I-202
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038114
WID JK AG
RKS
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
SCALE: 1/2" = 1'-0"A1 ACCENT WALL ELEVATION @ SQUAD BAY ENTRY WALL
SCALE: 1/2" = 1'-0"B1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL
SCALE: 1/2" = 1'-0"C1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL
1' 2' 4'0' 1/2" =1'-0"
GRAPHIC SCALE:
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
T-2
TS-6
PNT-1
TS-4
C2 I-502
B2 I-502
SIGNAGE
3"
4'- 6"
ADA RANGE
4'- 0"
M
IN
5'- 0"
M
AX
C
O U
R
SE
S
C O
U R
SE
S
TO
C
EI
LI
N G
T-3
T-2
TS-4
T-2
B2 I-502
9'-8"
6' -0
PNT-7
PNT-6
PNT-5
.0
0° 135.00°
45.00°
90.00°
.0
0°
135.00°135.00°
45.00°
1'-6"
4"
4"
4"
EP-1
COVE
BASE
PNT-8
PNT-8
PNT-7
PNT-6
PNT-5
PNT-8
2' -0
90.00°
.0
0°
45.00°
45.00°
135.00°
.0
0°
45.00°
PNT-8
13'-0"
21'-2"
WD-1
DOOR
PNT-3
DOOR
FRAME
EP-1
COVE
BASE
4"
4"
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM
IN
TE
R
IO
R E
LE
VA
TI
O
N S
I-203
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038115
WID JK AG
RKS
SCALE: 1/2" = 1'-0"A3 TYP. JANITOR TILE ELEVATION
SCALE: 1/2" = 1'-0"A1 TYPICAL SIGNAGE LOCATION
SCALE: 1/2" = 1'-0"A2 TYP. RESTROOM TILE ELEVATION
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
SIGNAGE NOTES
A. SIGNAGE TO FOLLOW GUIDELINES FROM UFC 3 120 01
B. ALL SIGN TYPES, TEXT WORDING AND ROOM NUMBERS TO
BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC
INTERIOR DESIGNER PRIOR TO FABRICATION.
C. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY
SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF
THE GLASS.
D. SEE ELEVATION A1/I-203 FOR MOUNTING HEIGHT OF ACRYLIC
SIGNAGE.
E. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.
F. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE
FINISHES.
SCALE: 1/2" = 1'-0"B1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL
SCALE: 1/2" = 1'-0"C1 ACCENT WALL ELEVATION @ SQUAD BAY ENTRY WALL
1' 2' 4'0' 1/2" =1'-0"
GRAPHIC SCALE:
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
9"
1'- 3"
3" 9"
3"
S4M
MEN
S2
ROOM
1 1/2" HELVETICA
MEDIUM TACTILE
ROOM NUMBER
WITH GRADE 2
BRAILLE
9"
ROOM
ROOM 6"
3"
9"
1/4" 8 1/2" 1/4"
3/4" HELVETICA
MEDIUM TACTILE
ROOM NUMBER
WITH GRADE 2
BRAILLE
REMOVABLE END
CAPS
1/4" 8 1/2" 1/4"
1 1/2" HELVETICA
MEDIUM TACTILE
ROOM NUMBER
WITH GRADE 2
BRAILLE
6" SYMBOL
1" HELVETICA
MEDIUM TACTILE
ROOM
DESCRIPTION
WITH GRADE 2
BRAILLE
S1
ROOM
1 1/2" HELVETICA
MEDIUM TACTILE
ROOM NUMBER WITH
GRADE 2 BRAILLE
9"
6" 3"
9"
1/4" 8 1/2" 1/4"
REMOVABLE END
CAPS
ROOM
ROOM
ROOM
PRINTED PAPER
INSERT WITH
ROOM
DESCRIPTION
S5
9"
1'- 2"
3" 8"
3" RESTROOM
1/4" 8 1/2" 1/4"
OPTIONAL 1 1/2"
HELVETICA
MEDIUM TACTILE
ROOM NUMBER
WITH GRADE 2
BRAILLE
6" SYMBOLS
3/4" HELVETICA
MEDIUM TACTILE
ROOM
DESCRIPTION
WITH GRADE 2
BRAILLE
UNISEX RESTROOM IDENTIFICATION SIGN
PERMANENT ROOM IDENTIFICATION SIGNROOM IDENTIFICATION SIGN
S6
9" 1'-
1"
3" 8"
2" EXIT
1/4" 8 1/2" 1/4"
STAIR A
1 1/2" HELVETICA
MEDIUM TACTILE ROOM
NUMBER WITH GRADE 2
BRAILLE
6" SYMBOL
1" HELVETICA
MEDIUM TACTILE
ROOM
DESCRIPTION
WITH GRADE 2
BRAILLE
STAIR IDENTIFICATION SIGN
1'-8"
2'- 6"
1/4" 1'-7 1/2" 1/4"
3" MESSAGE
INSERT PANELS
WITH 1 1/2"
ARROWS AND 1"
MESSAGE TEXT IN
HELVETICA
MEDIUM1000 - 1299
COMMAND FINANCE
PAY INQUIRIES
1800 - 1999
COMMERCIAL ACCOUNTS
TRAVEL ACCOUNTS
S7
LARGE DIRECTIONAL SIGNMENS RESTROOM & SHOWER IDENTIFICATION SIGN
1'-0"
1/4" 11 1/2" 1/4"
STAIR B
S3
MEDIUM DIRECTIONAL SIGN
ROOMS 201-256
1' 0"
FLOOR
5" CHARACTER
1 1/2" HELVETICA
MEDIUM TACTILE
ROOM NUMBER
WITH GRADE 2
BRAILLE
1" HELVETICA
MEDIUM TACTILE
ROOM
DESCRIPTION
1" HELVETICA
MEDIUM TACTILE
ROOM
DESCRIPTION
HEADS SLIDER SIGN
10"
2" WOMENS MENS
SLIDER PLATE
S8
3/4" HELVETICA
MEDIUM TACTILE
TEXT
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM
SI
G
N
AG
E D
ET
AI
LS
I-501
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038116
WID AG JK
RKS
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
SCALE: 3" = 1'-0"A1 TYPICAL SIGNAGE DETAILS
INTERIOR SIGNAGE
TYPE DESCRIPTION QTY
S1 ROOM IDENTIFICATION SIGN 6
S2 PERMANENT ROOM IDENTIFICATION SIGN 29
S3 WORKSTATION IDENTIFICATION SIGN 4
S4M MENS RESTROOM & SHOWER IDENTIFICATION SIGN 4
S5 UNISEX RESTROOM IDENTIFICATION SIGN 1
S6 STAIR IDENTIFICATION SIGN 4
S7 LARGE DIRECTIONAL SIGN 4
S8 HEADS SLIDER SIGN 4
0' 6" 3" =1'-0"
GRAPHIC SCALE:
3" 9"
SIGNAGE NOTES
A. SIGNAGE TO FOLLOW GUIDELINES FROM UFC 3 120 01
B. ALL SIGN TYPES, TEXT WORDING AND ROOM NUMBERS TO
BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC
INTERIOR DESIGNER PRIOR TO FABRICATION.
C. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY
SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF
THE GLASS.
D. SEE ELEVATION A1/I-203 FOR MOUNTING HEIGHT OF ACRYLIC
SIGNAGE.
E. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.
F. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE
FINISHES.
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
DRAIN
CUT SLAB ON DIAGONAL
AND INSTALL ON SLOPE
FOR WATER TO DRAIN
SOLID SURFACE
INSTALL BLOCKING,
LEVEL AND PLUMB
FASTENERS
BRACKET, 2 1/4" UNI MOUNT
10# CLUTCH
TUBE ROLLER
CHAIN 6"
SHORTER THAN
SHADE HEIGHT
SHADE FABRIC, WS-1
HEM POCKET
SH
AD
E H
EI
G
H T
FASCIA FINISHED IN SATIN
INSTALL BLOCKING,
LEVEL AND PLUMB
FASTENERS
BRACKET, 2 1/4" UNI MOUNT
10# CLUTCH
TUBE ROLLER
CHAIN 6"
SHORTER THAN
SHADE HEIGHT
SHADE FABRIC, WS-1
HEM POCKET
SH
AD
E H
EI
G
H T
FASCIA FINISHED IN SATIN
SHADE FABRIC, WS-2
EPOXY FLOOR
SUBSTRATE
GRIND DOWN SUBSTRATE
SO EPOXY HAS A FLUSH
TRANSITION
TS-1
EPOXY FLOOR
TS-2
CARPET
FLOOR TILE
SUBSTRATE
TS-3
FILL WITH GROUT
EPOXY FLOOR
WALL TILE
TS-4
FLOOR OR WALL TILE
SUBSTRATE
FILL WITH GROUT
SUBSTRATE
TS-5
WALL TILE
FILL W/ GROUT
WALL TILE
FILL W/ GROUT PAINTED GYP
TS-6
WALL TILE
FILL WITH GROUT
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM
IN
TE
R
IO
R D
ET
AI
LS
I-502
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038117
WID JK AG
RKS
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,
OR MANUFACTURED STONE WALLS.
I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.
AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE
INTEGRAL RESINOUS COVE BASE.
J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW
NO CONDENSATION TO PENETRATE THROUGH FINISHED
SURFACE.
K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE
INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL
HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED
(PNT-3) UNLESS OTHERWISE INDICATED.
L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).
M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).
N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER
MANUFACTURER'S INSTALLATION REQUIREMENTS.
4"0' 1 1/2" =1'-0"
GRAPHIC SCALE:
8" 1'-4"
SCALE: 1 1/2" = 1'-0"A3 FLOOR DRAIN DETAIL
SCALE: 3" = 1'-0"B3 SINGLE WINDOW SHADE DETAIL
0' 6" 3" =1'-0"
3" 9"
12" = 1'-0" 0" 1/2" 1" 3"
SCALE: 3" = 1'-0"C3 DOUBLE WINDOW SHADE DETAIL
SCALE: 12" = 1'-0"A1 EPOXY TO CONCRETE DETAIL
SCALE: 12" = 1'-0"A2 EPOXY TO CARPET DETAIL
SCALE: 12" = 1'-0"B1 EPOXY TO FLOOR TILE DETAIL
SCALE: 12" = 1'-0"B2 INSIDE CORNER TILE DETAIL
SCALE: 12" = 1'-0"C1 OUTSIDE CORNER TILE DETAIL
SCALE: 12" = 1'-0"C2 WALL TILE TO GWB DETAIL
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
SATISFACTORY TO
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
EPROJECT NO.:
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G C
O M
M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
DE
SI
GN
A
ND
C
ON
ST
RU
CT
IO
N
(D C)
C
OR
E
NA
VA
L
ST
AT
IO
N
-N
OR
FO
LK
, V A
M
AR
IN
E
C O
R
PS
B
AS
E C
AM
P
LE
JE
U N
E, N
C t
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
M
ID
AT
LA
N
TI
C
AS INDICATED
W :\2
P1
Bu ild in g R
R
R ep ai r\R ev it\
_P
W
ID
_R
.rv t 4/
/2
7:
:5
PM
SC
H
ED
U
LE
S
LE
G
EN
D S
I-601
P-
B
U
IL
D
IN
G R
R
R
EP
AI
R
B Y
R
EP
LA
C
EM
EN
T
60038118
WID JK AG
RKS
GENERAL FINISH NOTES
A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN
TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT
CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER
INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION
OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.
PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED
AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF
RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND
APPROVED BY THE CONTRACTING OFFICER.
B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO
ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S
RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO
AVOID DELAYS.
C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL
DRAWINGS AND CONSTRUCTION MANAGER. INSTALL
THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT
SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER
OF A WALL.
D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND
EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.
PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE
E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.
FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST
BE CENTERED UNDER DOOR.
F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,
EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM
CLASS A RATING.
G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST
INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE
CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR
AND WALL TILE WHERE APPLICABLE FOR A COMPLETE
INSTALLATION.
H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE
CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.
CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT
AND SHOULD NOT BE USED…
This is the start of the file's text. The full file is on GovTribe.