This document is a Structural Interior Design (SID) package for the P1594 Building RR1 Repair by Replacement project at Marine Corps Base Camp Lejeune in North Carolina. The SID package outlines the proposed interior design requirements, including finish materials, colors, and specifications for flooring, walls, ceilings, doors, windows, and signage. Key details include the use of durable, low-maintenance finishes such as epoxy resinous flooring, porcelain tile, and acoustical ceiling tiles. The package also includes meeting minutes, finish plans, elevations, details, and finish boards. The related federal contract opportunity is Solicitation N4008524R2708 for the P1594 Repair by Replacement RR1 project, which is open only to IDQC MACC Contractors in the ROICC Camp Lejeune area.

View the file

Other files

File Type Posted
Amend 0008.pdf PDF
Amend 0007.pdf PDF
Amend 0006.pdf PDF
Amend 0005.pdf PDF
Amend 0004.pdf PDF
Amend 0003 Cont Pages.pdf PDF
Amend 0003.pdf PDF
Amend 0002.pdf PDF
Amend 0001.pdf PDF
N4008521B0036 Specs.pdf PDF
21-0036 FFE Binder.pdf PDF
N4008521B0036 Dwgs.pdf PDF
21-0036 AppendixD.pdf PDF
21-0036 DM-NEPA LE22021.PDF PDF
RFP 21-0036.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

interior design within

P1594 Building RR1 Repair By Replacement

Marine Corps Base, Camp Lejeune, NC Structural Interior Design Package Final Submittal April 2023

P1594 Building RR1 Repair By Replacement MCB Camp Lejeune, NC Structural Interior Design Package interior design within

Table of Contents

1. Point of Contact List

2. Narrative of Interior Design Objectives

3. Meeting Minutes

4. Manufacturers List

5. Finish Plans & Schedules

6. Finish Boards

Structural Interior Design Package interior design within

Point of Contact List Executive Officer Brian K. Pensak United States Marine Corps Weapons Training Battalion Marine Corps Base, Camp Lejeune

(910) 440-2703 brian.pensak@usmc.mil

Operations Branch Allen D. Cook United States Marine Corps Supply Management Division Marine Corps Base, Camp Lejeune

(910) 451-7636 allen.cook@usmc.mil

Architectural Supervisor, Design Branch Kelly E. Root, RA, NCARB United States Marine Corps Public Works Division Marine Corps Base, Camp Lejeune

(910) 238-6476 kelly.root@usmc.mil

A&E Project Manager Raymond Layton MBF Architects 317-C Pollock Street New Bearn, NC 28560

(252) 637-6373 layton@mbfarchitects.com

A&E Interior Designer Jamie Kissel, NCIDQ Within Interior Design 1008 Granby Street Norfolk, VA 23510

(757) 224-0489 jkissel@withindesigns.com

A&E Junior Designer Alexis Greene Within Interior Design 1008 Granby Street Norfolk, VA 23510

(757) 224-0489 agreene@withindesigns.com

Structural Interior Design Package interior design within

SID Narrative This Basis of Design Narrative outlines the proposed Structural Interior Design requirements for P1594 Building RR1 Repair by Replacement at United States Marine Corps Base, Camp Lejeune.

The interior finishes are the most exposed interior elements in a building and must be durable to withstand the daily traffic and demands of the environment. To meet these objectives, the SID package will use all the general requirements for interior finishes that have been applied in similar facilities recently constructed at MCB Camp Lejeune, as well as best practices recommended by manufacturers for areas requiring enhanced durability. Structural finishes in accordance with the following guidelines will provide longevity and timeless aesthetics without compromising the functional integrity of the facility.

Finishes were selected because of their high durability and low maintenance requirements. Squad bays will receive epoxy resinous flooring while private office will recieve carpet tile. Porcelain tile will cover the floors in the head/shower rooms. The laundry rooms and corridors on both floors will receive a standard resinous flooring.

Interior partitions will be painted CMU & drywall. Accent walls painted in geometric shapes will be used in the Squad Bays to break up the large open spaces and provide visual variety. Offices will recieve a solid accent wall while toilet rooms will recieve porcelain tile with a glazed ceramic tile accent band. All wall finishes will be cohesive to adjacent spaces and provide a fresh and upgraded look.

Acoustical ceiling tiles on a suspended grid provide high quality sound absorption in designated areas with easy access to mechanical and plumbing above. The square lay in tiles are a moisture resistant mineral fiber and have a minimum NRC of 0.85, CAC of 35, and a light reflectance of

0.86. Ceilings in shop areas will be exposed with a painted finish.

INTERIOR DESIGN CRITERIA

Interior Design work will comply with the latest edition of the following codes and standards:

FC 1-300-09N NAVY & MARINE CORPS DESIGN PROCEDURES

FC 4-721-10N NAVY & MARINE CORPS UNACCOMPANIED HOUSING

UFC 1-200-01 DOD BUILDING CODE

UFC 3-120-01 DESIGN: SIGN STANDARDS

UFC 3-120-10 INTERIOR DESIGN

UFC 3-190-06 PROTECTIVE COATINGS & PAINTS

Structural Interior Design Package interior design

Meeting Minutes

1 | P a g e

1008 Granby Street | Norfolk, VA 23510 | 757.224.0489

MEETING MINUTES

Meeting: Design Charrette Date: October 6th – 7th, 2022 Location: Bus Station, MCB Camp Lejeune, NC Project: P1594 Building RR1 BEQ Repair by Replacement

PROJECT TEAM IN ATTENDANCE:

Robert Stevens MCB Camp Lejeune Project Manager Chad Lambert MCB Camp Lejeune Facility Planner Architecture MBF Architects (252) 637-6373 Geotechnical ECS Southeast (919) 861-9910 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856 Cost Estimating Aiken Cost Consultants (864) 232-9342 Interior Design Within Interior Design (757) 224-0489

Below are the items that were addressed during the Design Charrette.

GENERAL NOTES

• New construction of two story barracks with separate ID Card Center.

• Existing building will be demolished & replaced with newly constructed replica of original building.

• Able body only facility – No ADA requirements with exception of ID Card Center.

• Newly constructed building components will meet requirements for third party green building certification.

FF&E REQUIREMENTS

ID CARD CENTER

• Waiting Area o Approximately (20) Waiting Chairs o Wall Clock o GFGI Wall Mounted TV & Bracket o Cork Board

• (2) Private Offices o U-Shaped Desk o (2) Guest Chairs o GFGI Wall Mounted TV & Bracket o Marker Board o Wall Clock

2 | P a g e

• (1) STG Office o (1) Workstation o GFGI Wall Mounted TV & Bracket o Marker Board o Wall Clock

SQUAD BAYS

• Sleeping Area – 1st & 2nd Floors o Double Bunks with Wardrobe at foot to accommodate approximately 140 Marines.

• Open Office Area – 1st & 2nd Floors o (2) L-Shaped Desks o (1) Guest Chair for each desk o Marker Boards o GFGI Wall Mounted TV & Bracket o Wall Clock o (2) 4-High Filing Cabinets o (1) Bookshelf

• Laundry Room – 1st & 2nd Floors o (5) Washers o (5) Dryers

SID REQUIREMENTS

• Epoxy Resinous Floors throughout all areas unless noted otherwise below

• Carpet in Office Areas

• Epoxy Resinous Floor in ID Card Waiting Area

• Epoxy Resinous Cove Base

• Tile on floor & walls of Bathrooms

• Wood interior doors

• Double Roller Shades at windows – One layer blackout and one layer light filtering.

• Metal at stair tread & risers

• HDPE Toilet Partitions

• Solid Surface Shower Surrounds & Shower Pan

ACTION ITEMS

1. 35% Submittal Costing Set due to MBF 10/27

Meeting: 35% Review Meeting Date: December 1st, 2022 Location: Webex Meeting Project: P1594 Building RR1 BEQ Repair by Replacement

PROJECT TEAM IN ATTENDANCE:

Robert Stevens MCB Camp Lejeune Project Manager Chad Lambert MCB Camp Lejeune Facility Planner Architecture MBF Architects (252) 637-6373 Geotechnical ECS Southeast (919) 861-9910 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856

Below are the items that were addressed during the 35% Review Meeting.

GENERAL NOTES

• No Review Comments for Interiors.

• WID to provide full FF&E package for review at 65% “stop and plot” submittal.

• Activity to provide WID with list of preferred manufacturers for the bunk units in sleeping bays.

ACTION ITEMS

1. 65% Submittal due to MBF by COB on 12/13.

2. Activity to send list of manufacturers for bunk units by Friday 12/22.

Meeting: Prefinal Design Review Meeting Date: February 16th, 2023 Location: Bus Station, MCB Camp Lejeune, NC Project: P1594 Building RR1 BEQ Repair by Replacement

PROJECT TEAM IN ATTENDANCE:

Robert Stevens MCB Camp Lejeune Project Manager Chad Lambert MCB Camp Lejeune Facility Planner Kelly Root MCB Camp Lejeune Architectural Supervisor Architecture MBF Architects (252) 637-6373 Geotechnical ECS Southeast (919) 861-9910 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856

Below are the items that were addressed during the Prefinal Review Meeting.

90% REVIEW COMMENT DISCUSSION

KELLY ROOT

8. A-401 – Should there be shelves in the shower?

Response: Activity confirmed that showers should have shelves. MBF to provide details.

13. I-101 & I-102 – Should there be shelves in stg 106, 131, 202 & 205?

Response: Each storage room will have freestanding shelves. They will be heavy duty and must have a plywood surface on each shelf.

14. I-103 – Concerned about the interior stairs finish being sealed concrete because of slip resistance per NFPA. Maybe rubber stair treads?

Response: Stairs will be finished in a textured, light brushed concrete. There will be an embedded tactile surface at the nosing of each stair. Stairs can also be finished in a non-slip epoxy if preferred.

17. I-502 – Details should be keyed back.

Response: Floor drains and transition detail locations will be called out on overall plans.

18. I-601 – Finish Schedule Keynotes call out shower pan and shower walls as SS. Are there shower installation details?

Response: MBF confirmed that they will be providing detail drawings for showers.

2 | P a g e

22. FFE Binder PG 35 & 36 – Was there any discussion on C2 & C3 being the same chair?

Response: Activity confirmed they would like the waiting room chairs and the guest chairs in the private offices to both be the same – Something similar to C3 chair except with sled base instead.

FF&E DISCUSSION NOTES

• Remove hutch at desks in private offices.

• Add a mobile pedestal at each desk.

• Confirm that the rear side of task chair backs has bumper protection.

• Send new guest/waiting chair options with sled base.

• Change all shelving and file cabinet finishes to be laminate to match the office desks.

• Change 36” lockers at the foot of each bunk to be two 18”W lockers instead.

• Change underbed storage to be drawers with padlock in lieu of coffin style storage with gas springs.

SID DISCUSSION NOTES

• Either change blue bathroom accent tile from scheme 2 to matte finish or use accent tile from Scheme 1.

• Keep paint finish PNT-3 from Scheme 1.

• Keep paint finish PNT-4 from Scheme 1.

• Keep darker epoxy finish from Scheme 1.

• Keep rubber base RB-1 from Scheme 1.

• Possibly choose a lighter wood finish for the doors – Activity would prefer a natural finish.

• Add whiteboards to front of doors at main entrance to each squad bay – 9 total.

• Look into male/female slider for restroom signage.

• Change tackboard in waiting area to be information display case with lockable doors.

• Place additional information display cases across from stairs on both ends of the corridors on each floor.

• Add double roller shades at each window – one layer with 5% openness and the other layer blackout.

• Add shelving to storage room 101.

ACTION ITEMS

1. WID to send package of physical SID samples to Kelly Root for review.

2. MBF to send details regarding shelving requirements in storage room 101.

Meeting: Final Design Review Meeting Date: April 13th, 2023 Location: 1016 Jacksonville Pkwy, Jacksonville, NC Project: P1594 Building RR1 BEQ Repair by Replacement

PROJECT TEAM IN ATTENDANCE:

Robert Stevens MCB Camp Lejeune Project Manager Chad Lambert MCB Camp Lejeune Facility Planner Kelly Root MCB Camp Lejeune Architectural Supervisor Architecture MBF Architects (252) 637-6373 Geotechnical ECS Southeast (919) 861-9910 Civil Engineer Avolis Engineering (252) 633-0068 Structural Engineer Kaydos-Daniels Engineers (919) 828-4966 Mechanical/Electrical/Plumbing Crenshaw Consulting (919) 871-1070 Fire Protection Jensen Hughes (757) 213-6856

Below are the items that were addressed during the Final Review Meeting.

FINAL REVIEW COMMENT DISCUSSION

KELLY ROOT

1. A-103 – ACT in restrooms should be moisture resistant. Separate type. Epoxy would be preferred to keep in consistent with what is in the halls and barracks.

Response: ACT-2 (moisture resistant) has been added to the finish legend. HEAD 122, 116, 219 and 213 will be changed to epoxy flooring. SHOWER 123, 115, 220, and 212 will also change to Epoxy unless this is not preferred. (WID)FF&E Discussion Notes

Clarification: Per Kelly – The stairs should be changed to Epoxy. All restrooms will have Porcelain tile floors.

ACTION ITEMS

1. WID to update finish schedule to include ACT-2 (Moisture Resistant)

2. WID to update floor finish plans and room finish schedule to show EP-1 in the stairs.

Structural Interior Design Package interior design

Finish Plans & Schedules

CPT-1

FLOOR FINISH KEY

EP-1

T-1

SC-1

SQUAD BAY

MECH

SQUAD BAY

CORRIDOR

CORRIDOR

SQUAD BAY

SPRINKLER

MECH

SQUAD BAY

STG

SOUTH STAIR

COMM

OFFICE

STG

NORTH STAIR

STG

SHOWER

HEAD

HEAD

SHOWER

LAUNDRY

CORRIDOR

CORRIDOR

MECH

ELECT

HOT MECH

UNISEX

STG

OFFICE

OFFICE

WAITING

JAN

A1/I-502 B1/I-502

A1/I-502

B1/I-502 A1/I-502

A1/I-502

A2/I-502

A2/I-502

A2/I-502

B1/I-502

A1/I-502

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C

Fi le

Pr in t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:4

PM

FI

R

ST

F

LO

O

R F

IN

IS

H P

LA

N

I-103

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038109

WID JK AG

RKS

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

SCALE: 3/32" = 1'-0"A1 FIRST FLOOR FINISH PLAN

FLOOR FINISH NOTES

A. HATCH PATTERN DOES NOT INDICATE DIRECTION OR

METHOD OF FLOORING INSTALLATION.

B. SEE I-601 FOR FINISH LEGEND.

0' 6' 12' 18' 3/32" =1'-0"

GRAPHIC SCALE:

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CPT-1

FLOOR FINISH KEY

EP-1

T-1

SC-1

SQUAD BAY

MECH

CORRIDOR

SQUAD BAY

SOUTH STAIR

STG

OFFICE

STG

NORTH STAIR

SHOWER

HEAD

HEAD

SHOWER

LAUNDRY

CORRIDOR

ELEC

MECH

SQUAD BAY

SQUAD BAY

CORRIDOR

210CORRIDOR

MECH

SQUAD BAY

JAN

A1/I-502 B1/I-502A1/I-502 B1/I-502 A1/I-502

A2/I-502

A1/I-502 A1/I-502

A1/I-502

A1/I-502

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM

SE

C

O N

D F

LO

O

R F

IN

IS

H P

LA

N

I-104

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038110

WID JK AG

RKS

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

SCALE: 3/32" = 1'-0"A1 SECOND FLOOR FINISH PLAN

FLOOR FINISH NOTES

A. HATCH PATTERN DOES NOT INDICATE DIRECTION OR

METHOD OF FLOORING INSTALLATION.

B. SEE I-601 FOR FINISH LEGEND.

0' 6' 12' 18' 3/32" =1'-0"

GRAPHIC SCALE:

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

SQUAD BAY

MECH

SQUAD BAY

CORRIDOR

124 CORRIDOR

SQUAD BAY

SPRINKLER

MECH

SQUAD BAY

STG

SOUTH STAIR

COMM

OFFICE

104 STG

NORTH STAIR

STG

SHOWER

HEAD

HEAD

SHOWER

LAUNDRY

CORRIDOR

CORRIDOR

MECH

ELECT

HOT MECH

UNISEX

132 STG

OFFICE

OFFICE

129WAITING

JAN

S4M S2

S6

S2

S2 S2

S2 S2S2S2S6

S2

S2

S1 S1

S1

S1 S2S5

S2

S2 S2

S2 S7S7

S3S3

S2

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

I-201

C1

I-202

A1

I-201

A1

I-201

B1

I-202

A1

I-202

B1

I-202

C1

I-201

A1

PN

T-

3 PN

T-

PN

T-

PNT-7

1 1

2 2

S8

S8

S4M

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM

FI

R

ST

F

LO

O

R W

AL

L

FI

N

IS

H

S

IG

N

AG

E

PL

AN

I-105

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038111

WID AG JK

RKS

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

SIGNAGE NOTES

A. SIGNAGE TO FOLLOW GUIDELINES FROM UFC 3 120 01

B. ALL SIGN TYPES, TEXT WORDING AND ROOM NUMBERS TO

BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC

INTERIOR DESIGNER PRIOR TO FABRICATION.

C. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY

SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF

THE GLASS.

D. SEE ELEVATION A1/I-203 FOR MOUNTING HEIGHT OF ACRYLIC

SIGNAGE.

E. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.

F. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE

FINISHES.

INTERIOR SIGNAGE

TYPE DESCRIPTION QTY

S1 ROOM IDENTIFICATION SIGN 6

S2 PERMANENT ROOM IDENTIFICATION SIGN 29

S3 WORKSTATION IDENTIFICATION SIGN 4

S4M MENS RESTROOM & SHOWER IDENTIFICATION SIGN 4

S5 UNISEX RESTROOM IDENTIFICATION SIGN 1

S6 STAIR IDENTIFICATION SIGN 4

S7 LARGE DIRECTIONAL SIGN 4

S8 HEADS SLIDER SIGN 4

SCALE: 3/32" = 1'-0"A1 FIRST FLOOR WALL FINISH & SIGNAGE PLAN

48"W X 36"H MARKER BOARD

6"W X 48"H INFORMATION DISPLAY CASE

18"W X 24"H DOOR MOUNTED MARKER BOARD

KEYNOTES

0' 6' 12' 18' 3/32" =1'-0"

GRAPHIC SCALE:

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

SQUAD BAY

MECH

CORRIDOR

SQUAD BAY

SOUTH STAIR

STG

OFFICE

STG

NORTH STAIR

SHOWER

HEAD

HEAD

SHOWER

LAUNDRY

CORRIDOR

ELEC

MECH

SQUAD BAY

SQUAD BAY

CORRIDOR

CORRIDOR

MECH

SQUAD BAY

JAN

S7 S7

S6 S6S2S1S1

S2S4M

S4M

S2

S2 S2

S2

S2

S2

S2

S2

S2

S2 S2

S3S3

I-201

B1

I-201

A1

I-202

B1

I-202

A1

I-201

C1

I-202

C1

I-203

B1

I-203

C1

I-201

A1

I-202

A1

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8 PNT-5/-PNT-6/PNT-7/PNT-8

PNT-5/-PNT-6/PNT-7/PNT-8

PNT-7

1 1

2 2

3 3

S8

S8

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM SE

C

O N

D F

LO

O

R W

AL

L

FI

N

IS

H

S

IG

N

AG

E

PL

AN

I-106

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038112

WID AG JK

RKS

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

INTERIOR SIGNAGE

TYPE DESCRIPTION QTY

S1 ROOM IDENTIFICATION SIGN 6

S2 PERMANENT ROOM IDENTIFICATION SIGN 29

S3 WORKSTATION IDENTIFICATION SIGN 4

S4M MENS RESTROOM & SHOWER IDENTIFICATION SIGN 4

S5 UNISEX RESTROOM IDENTIFICATION SIGN 1

S6 STAIR IDENTIFICATION SIGN 4

S7 LARGE DIRECTIONAL SIGN 4

S8 HEADS SLIDER SIGN 4

SCALE: 3/32" = 1'-0"A1 SECOND FLOOR WALL FINISH & SIGNAGE PLAN

SIGNAGE NOTES

A. SIGNAGE TO FOLLOW GUIDELINES FROM UFC 3 120 01

B. ALL SIGN TYPES, TEXT WORDING AND ROOM NUMBERS TO

BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC

INTERIOR DESIGNER PRIOR TO FABRICATION.

C. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY

SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF

THE GLASS.

D. SEE ELEVATION A1/I-203 FOR MOUNTING HEIGHT OF ACRYLIC

SIGNAGE.

E. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.

F. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE

FINISHES.

0' 6' 12' 18' 3/32" =1'-0"

GRAPHIC SCALE:

48"W X 36"H MARKER BOARD

6"W X 48"H INFORMATION DISPLAY CASE

18"W X 24"H DOOR MOUNTED MARKER BOARD

KEYNOTES

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

.0

0°

135.00°

.0

0°

90.00°

45.00° 45 .0

0°

135.00°

PNT-7

PNT-6

PNT-5

PNT-8PNT-8

EP-1

COVE

BASE

4" 4"

PNT-4

METAL

DOOR

PNT-4

DOOR

FRAME

13'-0"

11'-4"

5' -3

15'-4"

5' -3

17'-0"

.0

0°

90.00°

135.00°

45.00°

.0

0°

135.00°

45.00°

PNT-7

PNT-6

PNT-5

4"

4"

PNT-8PNT-8

PNT-4

METAL

DOOR

PNT-4

DOOR

FRAME

EP-1

COVE

BASE

8'-0"

16'-2"

2' -0

4"4"

PNT-5

PNT-7

PNT-6

90.00°

135.00°

45.00°

135.00°

.0

0°

.0

0° 45.00°

PNT-8PNT-8

EP-1

COVE

BASE

WD-1

DOOR

PNT-3

DOOR

FRAME

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM

IN

TE

R

IO

R E

LE

VA

TI

O

N S

I-201

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038113

WID JK AG

RKS

SCALE: 1/2" = 1'-0"C1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

SCALE: 1/2" = 1'-0"B1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL

SCALE: 1/2" = 1'-0"A1 ACCENT WALL ELEVATION @ SQUAD BAY ENTRY WALL

1' 2' 4'0'

1/2" =1'-0"

GRAPHIC SCALE:

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

PNT-5

PNT-7

PNT-6

PNT-8PNT-8

EP-1

COVE

BASE

WD-1

DOOR

PNT-3

DOOR

FRAME

135.00°

.0

0°

90.00°

.0

0°

.0

0°

45.00°

135.00°

8'-0"

16'-2"

2' -0

.0

0°

135.00°

.0

0°

90.00°

45.00° 45 .0

0°

135.00°

PNT-7

PNT-6

PNT-5

PNT-8PNT-8

PNT-4

METAL

DOOR

PNT-4

DOOR

FRAME

EP-1

COVE

BASE

17'-0"

15'-4"

5' -3

4" 4"

.0

0°

90.00°

135.00°

45.00°

.0

0°

135.00°

45.00°

PNT-7

PNT-6

PNT-5

4"

4"

PNT-8PNT-8

EP-1

COVE

BASE

PNT-4

METAL

DOOR

PNT-4

DOOR

FRAME

13'-0"

11'-4" 5'

-3

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM

IN

TE

R

IO

R E

LE

VA

TI

O

N S

I-202

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038114

WID JK AG

RKS

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

SCALE: 1/2" = 1'-0"A1 ACCENT WALL ELEVATION @ SQUAD BAY ENTRY WALL

SCALE: 1/2" = 1'-0"B1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL

SCALE: 1/2" = 1'-0"C1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL

1' 2' 4'0' 1/2" =1'-0"

GRAPHIC SCALE:

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

T-2

TS-6

PNT-1

TS-4

C2 I-502

B2 I-502

SIGNAGE

3"

4'- 6"

ADA RANGE

4'- 0"

M

IN

5'- 0"

M

AX

C

O U

R

SE

S

C O

U R

SE

S

TO

C

EI

LI

N G

T-3

T-2

TS-4

T-2

B2 I-502

9'-8"

6' -0

PNT-7

PNT-6

PNT-5

.0

0° 135.00°

45.00°

90.00°

.0

0°

135.00°135.00°

45.00°

1'-6"

4"

4"

4"

EP-1

COVE

BASE

PNT-8

PNT-8

PNT-7

PNT-6

PNT-5

PNT-8

2' -0

90.00°

.0

0°

45.00°

45.00°

135.00°

.0

0°

45.00°

PNT-8

13'-0"

21'-2"

WD-1

DOOR

PNT-3

DOOR

FRAME

EP-1

COVE

BASE

4"

4"

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM

IN

TE

R

IO

R E

LE

VA

TI

O

N S

I-203

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038115

WID JK AG

RKS

SCALE: 1/2" = 1'-0"A3 TYP. JANITOR TILE ELEVATION

SCALE: 1/2" = 1'-0"A1 TYPICAL SIGNAGE LOCATION

SCALE: 1/2" = 1'-0"A2 TYP. RESTROOM TILE ELEVATION

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

SIGNAGE NOTES

A. SIGNAGE TO FOLLOW GUIDELINES FROM UFC 3 120 01

B. ALL SIGN TYPES, TEXT WORDING AND ROOM NUMBERS TO

BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC

INTERIOR DESIGNER PRIOR TO FABRICATION.

C. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY

SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF

THE GLASS.

D. SEE ELEVATION A1/I-203 FOR MOUNTING HEIGHT OF ACRYLIC

SIGNAGE.

E. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.

F. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE

FINISHES.

SCALE: 1/2" = 1'-0"B1 ACCENT WALL ELEVATION @ SQUAD BAY BACK WALL

SCALE: 1/2" = 1'-0"C1 ACCENT WALL ELEVATION @ SQUAD BAY ENTRY WALL

1' 2' 4'0' 1/2" =1'-0"

GRAPHIC SCALE:

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

9"

1'- 3"

3" 9"

3"

S4M

MEN

S2

ROOM

1 1/2" HELVETICA

MEDIUM TACTILE

ROOM NUMBER

WITH GRADE 2

BRAILLE

9"

ROOM

ROOM 6"

3"

9"

1/4" 8 1/2" 1/4"

3/4" HELVETICA

MEDIUM TACTILE

ROOM NUMBER

WITH GRADE 2

BRAILLE

REMOVABLE END

CAPS

1/4" 8 1/2" 1/4"

1 1/2" HELVETICA

MEDIUM TACTILE

ROOM NUMBER

WITH GRADE 2

BRAILLE

6" SYMBOL

1" HELVETICA

MEDIUM TACTILE

ROOM

DESCRIPTION

WITH GRADE 2

BRAILLE

S1

ROOM

1 1/2" HELVETICA

MEDIUM TACTILE

ROOM NUMBER WITH

GRADE 2 BRAILLE

9"

6" 3"

9"

1/4" 8 1/2" 1/4"

REMOVABLE END

CAPS

ROOM

ROOM

ROOM

PRINTED PAPER

INSERT WITH

ROOM

DESCRIPTION

S5

9"

1'- 2"

3" 8"

3" RESTROOM

1/4" 8 1/2" 1/4"

OPTIONAL 1 1/2"

HELVETICA

MEDIUM TACTILE

ROOM NUMBER

WITH GRADE 2

BRAILLE

6" SYMBOLS

3/4" HELVETICA

MEDIUM TACTILE

ROOM

DESCRIPTION

WITH GRADE 2

BRAILLE

UNISEX RESTROOM IDENTIFICATION SIGN

PERMANENT ROOM IDENTIFICATION SIGNROOM IDENTIFICATION SIGN

S6

9" 1'-

1"

3" 8"

2" EXIT

1/4" 8 1/2" 1/4"

STAIR A

1 1/2" HELVETICA

MEDIUM TACTILE ROOM

NUMBER WITH GRADE 2

BRAILLE

6" SYMBOL

1" HELVETICA

MEDIUM TACTILE

ROOM

DESCRIPTION

WITH GRADE 2

BRAILLE

STAIR IDENTIFICATION SIGN

1'-8"

2'- 6"

1/4" 1'-7 1/2" 1/4"

3" MESSAGE

INSERT PANELS

WITH 1 1/2"

ARROWS AND 1"

MESSAGE TEXT IN

HELVETICA

MEDIUM1000 - 1299

COMMAND FINANCE

PAY INQUIRIES

1800 - 1999

COMMERCIAL ACCOUNTS

TRAVEL ACCOUNTS

S7

LARGE DIRECTIONAL SIGNMENS RESTROOM & SHOWER IDENTIFICATION SIGN

1'-0"

1/4" 11 1/2" 1/4"

STAIR B

S3

MEDIUM DIRECTIONAL SIGN

ROOMS 201-256

1' 0"

FLOOR

5" CHARACTER

1 1/2" HELVETICA

MEDIUM TACTILE

ROOM NUMBER

WITH GRADE 2

BRAILLE

1" HELVETICA

MEDIUM TACTILE

ROOM

DESCRIPTION

1" HELVETICA

MEDIUM TACTILE

ROOM

DESCRIPTION

HEADS SLIDER SIGN

10"

2" WOMENS MENS

SLIDER PLATE

S8

3/4" HELVETICA

MEDIUM TACTILE

TEXT

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM

SI

G

N

AG

E D

ET

AI

LS

I-501

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038116

WID AG JK

RKS

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

SCALE: 3" = 1'-0"A1 TYPICAL SIGNAGE DETAILS

INTERIOR SIGNAGE

TYPE DESCRIPTION QTY

S1 ROOM IDENTIFICATION SIGN 6

S2 PERMANENT ROOM IDENTIFICATION SIGN 29

S3 WORKSTATION IDENTIFICATION SIGN 4

S4M MENS RESTROOM & SHOWER IDENTIFICATION SIGN 4

S5 UNISEX RESTROOM IDENTIFICATION SIGN 1

S6 STAIR IDENTIFICATION SIGN 4

S7 LARGE DIRECTIONAL SIGN 4

S8 HEADS SLIDER SIGN 4

0' 6" 3" =1'-0"

GRAPHIC SCALE:

3" 9"

SIGNAGE NOTES

A. SIGNAGE TO FOLLOW GUIDELINES FROM UFC 3 120 01

B. ALL SIGN TYPES, TEXT WORDING AND ROOM NUMBERS TO

BE VERIFIED WITH END USER AND REVIEWED BY NAVFAC

INTERIOR DESIGNER PRIOR TO FABRICATION.

C. SIGNS THAT MOUNT TO GLASS SHALL INCLUDE AN EQUALLY

SIZED BLANK SIGN PANEL ALIGNED TO OPPOSITE SIDE OF

THE GLASS.

D. SEE ELEVATION A1/I-203 FOR MOUNTING HEIGHT OF ACRYLIC

SIGNAGE.

E. REFER TO SHEET I-501 FOR SIGNAGE DETAILS.

F. REFER TO SHEET I-601 FINISH LEGEND FOR SIGNAGE

FINISHES.

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

DRAIN

CUT SLAB ON DIAGONAL

AND INSTALL ON SLOPE

FOR WATER TO DRAIN

SOLID SURFACE

INSTALL BLOCKING,

LEVEL AND PLUMB

FASTENERS

BRACKET, 2 1/4" UNI MOUNT

10# CLUTCH

TUBE ROLLER

CHAIN 6"

SHORTER THAN

SHADE HEIGHT

SHADE FABRIC, WS-1

HEM POCKET

SH

AD

E H

EI

G

H T

FASCIA FINISHED IN SATIN

INSTALL BLOCKING,

LEVEL AND PLUMB

FASTENERS

BRACKET, 2 1/4" UNI MOUNT

10# CLUTCH

TUBE ROLLER

CHAIN 6"

SHORTER THAN

SHADE HEIGHT

SHADE FABRIC, WS-1

HEM POCKET

SH

AD

E H

EI

G

H T

FASCIA FINISHED IN SATIN

SHADE FABRIC, WS-2

EPOXY FLOOR

SUBSTRATE

GRIND DOWN SUBSTRATE

SO EPOXY HAS A FLUSH

TRANSITION

TS-1

EPOXY FLOOR

TS-2

CARPET

FLOOR TILE

SUBSTRATE

TS-3

FILL WITH GROUT

EPOXY FLOOR

WALL TILE

TS-4

FLOOR OR WALL TILE

SUBSTRATE

FILL WITH GROUT

SUBSTRATE

TS-5

WALL TILE

FILL W/ GROUT

WALL TILE

FILL W/ GROUT PAINTED GYP

TS-6

WALL TILE

FILL WITH GROUT

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM

IN

TE

R

IO

R D

ET

AI

LS

I-502

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038117

WID JK AG

RKS

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED ON CMU WALLS, TILED WALLS,

OR MANUFACTURED STONE WALLS.

I. CARPETED AREAS TO RECEIVE RESILIENT COVE BASE.

AREAS RECEIVING EPOXY RESINOUS FLOORING TO RECIEVE

INTEGRAL RESINOUS COVE BASE.

J. FINISHED CONCRETE FLOORS MUST BE SEALED TO ALLOW

NO CONDENSATION TO PENETRATE THROUGH FINISHED

SURFACE.

K. ALL WALLS TO BE PAINTED (PNT-1) UNLESS OTHERWISE

INDICATED. ALL GWB CEILINGS TO BE PAINTED (PNT-2). ALL

HOLLOW METAL DOORS AND DOOR FRAMES TO BE PAINTED

(PNT-3) UNLESS OTHERWISE INDICATED.

L. INTERIOR WOOD DOORS TO BE FINISHED (WD-1).

M. ALL WINDOW SILLS TO BE SOLID SURFACE (SS-2).

N. ALL MATERIALS/PRODUCTS ARE TO BE INSTALLED PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

4"0' 1 1/2" =1'-0"

GRAPHIC SCALE:

8" 1'-4"

SCALE: 1 1/2" = 1'-0"A3 FLOOR DRAIN DETAIL

SCALE: 3" = 1'-0"B3 SINGLE WINDOW SHADE DETAIL

0' 6" 3" =1'-0"

3" 9"

12" = 1'-0" 0" 1/2" 1" 3"

SCALE: 3" = 1'-0"C3 DOUBLE WINDOW SHADE DETAIL

SCALE: 12" = 1'-0"A1 EPOXY TO CONCRETE DETAIL

SCALE: 12" = 1'-0"A2 EPOXY TO CARPET DETAIL

SCALE: 12" = 1'-0"B1 EPOXY TO FLOOR TILE DETAIL

SCALE: 12" = 1'-0"B2 INSIDE CORNER TILE DETAIL

SCALE: 12" = 1'-0"C1 OUTSIDE CORNER TILE DETAIL

SCALE: 12" = 1'-0"C2 WALL TILE TO GWB DETAIL

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

SATISFACTORY TO

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

EPROJECT NO.:

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G C

O M

M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

DE

SI

GN

A

ND

C

ON

ST

RU

CT

IO

N

(D C)

C

OR

E

NA

VA

L

ST

AT

IO

N

-N

OR

FO

LK

, V A

M

AR

IN

E

C O

R

PS

B

AS

E C

AM

P

LE

JE

U N

E, N

C t

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

M

ID

AT

LA

N

TI

C

AS INDICATED

W :\2

P1

Bu ild in g R

R

R ep ai r\R ev it\

_P

W

ID

_R

.rv t 4/

/2

7:

:5

PM

SC

H

ED

U

LE

S

LE

G

EN

D S

I-601

P-

B

U

IL

D

IN

G R

R

R

EP

AI

R

B Y

R

EP

LA

C

EM

EN

T

60038118

WID JK AG

RKS

GENERAL FINISH NOTES

A. FINISHES INDICATED ARE THE APPROVED BASIS OF DESIGN

TO CONVEY COLOR, PATTERN, TEXTURE AND SALIENT

CHARACTERISTICS ONLY. THE LISTING OF MANUFACTURER

INFORMATION IS NOT INTENDED TO LIMIT THE SELECTION

OF PRODUCTS PROVIDED BY OTHER MANUFACTURERS.

PRODUCTS MEETING THESE CRITERIA WILL BE CONSIDERED

AND MUST BE REVIEWED BY THE INTERIOR DESIGNER OF

RECORD (IDOR) AND THE NAVFAC INTERIOR DESIGNER AND

APPROVED BY THE CONTRACTING OFFICER.

B. FINISH ITEMS ARE NOT TO BE SUBSTITUTED DUE TO

ORDERING LEAD TIMES. IT IS THE CONTRACTOR’S

RESPONSIBILITY TO ORDER ALL MATERIALS IN TIME TO

AVOID DELAYS.

C. COORDINATE THERMOSTAT LOCATIONS WITH MECHANICAL

DRAWINGS AND CONSTRUCTION MANAGER. INSTALL

THERMOSTATS NEAR A CORNER OF THE ROOM OR BY LIGHT

SWITCHES. DO NOT INSTALL THERMOSTATS IN THE CENTER

OF A WALL.

D. SPRAY PAINT ELECTRICAL PANELS, ACCESS PANELS, AND

EXPANSION JOINTS TO MATCH THE ADJACENT WALL COLOR.

PANELS PAINTED BY BRUSH ARE NOT ACCEPTABLE

E. ALL FLOORING TRANSITIONS MUST MEET ABA GUIDELINES.

FLOORING TRANSITIONS OCCURRING UNDER DOORS MUST

BE CENTERED UNDER DOOR.

F. ALL WALL AND CEILING FINISHES IN VERTICAL EXIT WAYS,

EXIT LOBBIES, AND EXIT CORRIDORS MUST MEET MINIMUM

CLASS A RATING.

G. ROOMS IDENTIFIED TO RECEIVE TILE ON WALLS MUST

INCLUDE METAL TRANSITIONS ON ALL OUTSIDE AND INSIDE

CORNERS AS WELL AS THE INTERSECTION BETWEEN FLOOR

AND WALL TILE WHERE APPLICABLE FOR A COMPLETE

INSTALLATION.

H. INSTALL CORNER GUARDS (CG-1) ON ALL OUTSIDE

CORNERS. INSTALL END CAPS ON ALL OPEN EDED WALLS.

CORNER GUARDS AND END CAPS MUST BE FULL HEIGHT

AND SHOULD NOT BE USED…

This is the start of the file's text. The full file is on GovTribe.