This document appears to be a Submittal Register for a federal construction contract. It lists a variety of submittal items required for the "Maintenance & Repair Multiple Award Construction Contract (MACC)" solicitation, including preconstruction submittals, shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions, operation and maintenance data, and closeout submittals. The submittal items cover a range of construction trades and materials such as concrete, roofing, insulation, doors and windows, plumbing, HVAC, and electrical work. The contract is for maintenance and repair construction projects primarily located at Marine Corps Installations East facilities in North Carolina, and is being administered by the Naval Facilities Engineering Command.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 25 PAGES
AS2818 Repair Heads
01 14 00 SD-01 Preconstruction Submittals
1.3.1.1List of Contact Personnel
01 20 00 SD-01 Preconstruction Submittals
1.3 GSchedule of Prices
01 30 00 SD-01 Preconstruction Submittals
1.3View Location Map
1.4Progress and Completion
Pictures
01 31 23.13 20 SD-01 Preconstruction Submittals
1.4.2 GList of Contractor's Personnel
01 31 50 SD-11 Closeout Submittals
1.2Interim DD-1354, Transfer &
Acceptance of Military Real
Property
01 32 16.00 20 SD-01 Preconstruction Submittals
1.2 GBaseline Construction Schedule
SD-07 Certificates
1.4Monthly Updates
01 33 00 SD-11 Closeout Submittals
1.4.1Submittal register
1.6.1Complete Submittal Package
01 35 26 SD-01 Preconstruction Submittals
1.8.1 GAPP - Construction
1.17 GDive Operations Plan
1.8 GAccident Prevention Plan (APP)
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 25 PAGES
01 35 26 1.4Monthly Exposure Reports
1.13Notifications and Reports
1.13.2 GAccident Reports
1.13.3LHE Inspection Reports
SD-07 Certificates
1.5Contractor Safety Self-Evaluation
Checklist
1.7.1.5Crane Operators/Riggers
1.8.3.2 GStandard Lift Plan
1.8.3.3 GCritical Lift Plan
1.8.3.4 GNaval Architecture Analysis
1.9Activity Hazard Analysis (AHA)
1.10.1Confined Space Entry Permit
1.10.1Hot Work Permit
1.13.4Certificate of Compliance
1.13.5Third Party Certification of
Floating Cranes and
Barge-Mounted Mobile Cranes
1.15License Certificates
1.15.1 GRadiography Operation Planning
Work Sheet
1.15.1 GPortable Gauge Operations
Planning Worksheet
01 35 29.13 SD-02 Shop Drawings
3.9.1 GWork Zones
3.10.1 GDecontamination Facilities
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 25 PAGES
01 35 29.13 SD-03 Product Data
1.4 GAmendments to the APP/SSHP
3.5Exposure Monitoring/Air
Sampling Program
3.9.2Site Control Log
1.8SSHO's Daily Inspection Logs
SD-07 Certificates
1.7Certificate Of Worker/Visitor
Acknowledgement
SD-11 Closeout Submittals
1.9 GSafety And Health Phase-Out
Report
01 45 10 SD-11 Closeout Submittals
1.6QC PLAN
01 50 00 SD-01 Preconstruction Submittals
3.4.1Traffic Control Plan
SD-03 Product Data
1.3Backflow Preventers
SD-06 Test Reports
3.5Backflow Preventer Tests
SD-07 Certificates
1.3.1Backflow Tester
1.3Backflow Preventers
01 57 19 SD-01 Preconstruction Submittals
1.6.1Environmental Protection Plan
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 25 PAGES
01 57 19 3.7.1Abrasive blasting
SD-11 Closeout Submittals
1.4.1Solid waste disposal permit
1.4.2Disposal permit for hazardous waste
1.2Environmental training documentation
1.4.3Permit to transport hazardous waste
1.4.4Hazardous waste certification
1.6.3Environmental Plan Review
2.1Annual Report of Products
Containing Recovered Materials
01 78 00 SD-03 Product Data
1.6.1Warranty Management Plan
1.6.4Warranty Tags
3.4Final Cleaning
1.5Spare Parts Data
SD-08 Manufacturer’s Instructions
1.6.1Instructions
SD-10 Operation and Maintenance
Data
3.3 GOperation and Maintenance
Manuals
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 25 PAGES
01 78 00 3.2 GRecord Drawings
1.6.1As-Built Record of Equipment and Materials
3.6Final Approved Shop Drawings
Construction Contract
Specifications
2.1 GCertification of EPA Designated
Items
2.2 GCertification Of USDA Designated
Items
3.5 GInterim DD FORM 1354
3.5 GChecklist for DD FORM 1354
01 78 23 SD-10 Operation and Maintenance
Data
GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 78 24.00 20 SD-11 Closeout Submittals
1.4.1 GeOMSI, Progress Submittal
1.4.2 GeOMSI, Prefinal Submittal
1.4.3 GeOMSI, Final Submittal
01 78 30.00 22 SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 25 PAGES
01 78 30.00 22 1.3.9 GGIS Data Deliverables
02 82 16 SD-06 Test Reports
1.5.2Air sampling results
1.5.3Pressure differential recordings for local exhaust system
3.3.3.2Clearance sampling
SD-07 Certificates
1.5.1Asbestos hazard abatement plan
SD-11 Closeout Submittals
1.5.4Asbestos Waste Shipment
Record N.C. (DHHS-HHCU) Form
1.5.5Daily log
1.5.6North Carolina permit
1.5.7Modifications to the North
Carolina permit
1.5.8Asbestos Inspection Reporting
Form
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 25 PAGES
03 30 00 Maturity Method Data
SD-02 Shop Drawings
Complete colored concrete flooring system
SD-03 Product Data
2.2.5Joint Sealants
Concrete bonding agent; G
2.1.1Cementitious Materials
Vapor Barrier; G
Concrete Curing Materials; G
Liquid Chemical Floor Hardeners and Sealers; G
Admixtures; G
Reinforcing Fibers; G
1.6.3.2Pumping Concrete
Finishing Plan; G
Nonshrink Grout; G
SD-04 Samples
Slab Finish Sample, G
Surface Finish Samples; G
SD-05 Design Data
1.6.1.1 GConcrete Mix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.2Slag Cement
1.6.4.3Aggregates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 25 PAGES
03 30 00 1.6.4.4 GFiber-Reinforced Concrete
GCompressive Strength Tests
Unit Weight of Structural
Concrete
Chloride Ion Concentration
Air Content
3.9.2.1Slump Tests
2.1.2Water
SD-07 Certificates
1.6.3.5VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.6Safety Data Sheets
1.6.7.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
Liquid Chemical Floor Hardeners and Sealers
2.2.5Joint Sealants
2.2.1Curing Compound
07 22 00 SD-02 Shop Drawings
1.3 GInsulation Board Layout
1.3 GVerification of Existing Conditions
SD-03 Product Data
2.1 GInsulation
1.4 GCover Board
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 25 PAGES
07 22 00 2.5 GFasteners
2.3 GSheathing Paper
2.4 GMoisture Control
1.10.1 GAsphalt
2.1.2Recycled Content For Insulation
SD-06 Test Reports
1.8.1 GFlame Spread Rating
SD-07 Certificates
1.6 GInstaller Qualifications
1.6 GCertificates Of Compliance For
Felt Materials
2.1.3Indoor Air Quality For Insulation
SD-08 Manufacturer’s Instructions
2.5 GFasteners
2.1 GInsulation
07 27 10.00 10 SD-02 Shop Drawings
2.1 GAir Barrier System Shop
Drawings
SD-03 Product Data
2.1 GAir Barrier System Product Data
SD-04 Samples
3.1.2 GMock-Up
2.1 GMaterial Samples For Air Barrier
System
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 25 PAGES
07 27 10.00 10 1.8 GDesign Data And Calculations
For The Air Barrier System
SD-06 Test Reports
1.8 GDesign Review Report
3.1.3 GTesting and Inspection
SD-07 Certificates
1.7 GAir Barrier Inspector
07 27 19.01 SD-01 Preconstruction Submittals
1.7.1 GQualifications of Manufacturer
1.7.2 GQualifications of Installer
SD-02 Shop Drawings
1.4 GSelf-adhering Air Barrier
SD-03 Product Data
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
1.4.2 GSafety Data Sheets
SD-04 Samples
1.4 GSelf-adhering Air Barrier
SD-06 Test Reports
1.6 GField Peel Adhesion Test
1.4.4 GFlame Propagation of Wall
Assemblies
1.4.4 GFlame Spread and Smoke
Developed Index Ratings
GSite Inspections and Testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 25 PAGES
07 27 19.01 1.4 GSelf-adhering Air Barrier
SD-08 Manufacturer’s Instructions
1.4 GSelf-adhering Air Barrier
2.2 GPrimers, Adhesives, and Mastics
07 27 36 SD-01 Preconstruction Submittals
1.10.1 GQualification of Manufacturer
1.10.2 GQualification of Installer
1.11 GQuality Control Plan
1.11 GSafety Plan
1.9.1 GFire Prevention Plan
1.9.2 GRespirator Plan
SD-02 Shop Drawings
1.5Spray Foam Air Barrier
1.11 GFoam Air Barrier System
1.5.1 GFire-Rated Assemblies
SD-03 Product Data
2.1.2 GClosed Cell
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
2.5 GSealants
1.5.2 GSafety Data Sheets
2.1.1 GThermal Barrier Materials
GIgnition Barrier Coatings
GAccessories
SD-04 Samples
1.5 GSpray Foam Air Barrier
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 25 PAGES
07 27 36 SD-06 Test Reports
3.4.1 GSite Inspections
SD-07 Certificates
2.1.2 GClosed cell
2.2 GTransition Membrane
2.1.5 GIndoor Air Quality for Spray Foam
Air Barrier
SD-08 Manufacturer’s Instructions
1.6.1 GSPF Handling, Storage, and
Spray Procedures
3.2.1 GSubstrate Preparation
1.5.1 GThermal Barrier
GIgnition Barrier
2.2 GTransition Membrane
2.3 GPrimers, Adhesives, and Mastics
SD-09 Manufacturer’s Field
Reports
1.11Core Samples
3.3.3Daily Work Record
07 60 00 SD-02 Shop Drawings
2.2.1 GExposed Sheet Metal
3.1.15 GGutters
3.1.16 GDownspouts
3.1.22 GExpansion Joints
2.2.1 GGravel Stops and fascia
3.1.19 GSplash Pans
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 25 PAGES
07 60 00 3.1.17 GFlashing for Roof Drains
3.1.9 GBase Flashing
3.1.10 GCounterflashing
3.1.23 GFlashing at Roof Penetrations
and Equipment Supports
2.2.10 GReglets
GScuppers
GCopings
3.1.14 GDrip Edges
3.1.18 GConductor Heads
GOpen Valley Flashing
3.1.20 GEave Flashing
SD-04 Samples
GFinish Samples for color selection
SD-08 Manufacturer’s Instructions
1.4.3 GInstructions for Installation
3.5 GQuality Control Plan
SD-10 Operation and Maintenance
Data
1.4.3 GCleaning and Maintenance
07 61 15.00 20 SD-02 Shop Drawings
2.1 GRoofing Panels
GGutter/Downspout System
SD-03 Product Data
2.1 GRoofing Panels
2.2 GAttachment Clips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 25 PAGES
07 61 15.00 20 2.3.1Closures
2.3Accessories
2.4Underlayment
2.3.2Fasteners
2.3.4Sealant Tape
Gaskets
2.3.3Sealant
Sealing Compounds
1.8 GWarranty
SD-04 Samples
2.1Roofing panels
2.3Accessories
SD-05 Design Data
1.5 GLoad calculations
SD-06 Test Reports
GStructural performance
GPanel Finish (Color)
Leakage Test Report
Wind Uplift Test Report
Factory Finish And Color
Performance Requirements
3.5 GManufacturer's field inspection
SD-07 Certificates
1.6.2Technical representative
1.6.3Qualification of Installer
2.1.1.5Coil stock
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 25 PAGES
07 61 15.00 20 SD-08 Manufacturer’s Instructions
2.3.3Sealant
3.3Installation
SD-11 Closeout Submittals
3.7Information card
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
SIndoor Air Quality For Interior
Floor Joint Sealants
SIndoor Air Quality For Interior
Acoustical Sealants
2.5 SIndoor Air Quality For Interior
Caulking
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
GFrames and Flashing
Accessories
2.4 GFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 25 PAGES
08 11 13 SD-03 Product Data
2.1 GDoors
2.4 GFrames
Accessories
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.6Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.2.6.1 GHardware
2.2.2 GFasteners
1.7 GWindow Performance
2.3 GThermal-Barrier Windows
2.4 GMullions
GScreens
2.1.4 GWeatherstripping
2.2.6 GAccessories
2.2.3Adhesives
1.7.4 GThermal Performance
SD-04 Samples
Finish Sample for color selection
GMock-Ups including Flashing
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
GDesign Analysis
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 25 PAGES
08 51 13 SD-06 Test Reports
1.3.4Minimum Condensation
Resistance Factor
GStandard Airblast Test
1.7.6Windborne-Debris-Impact
Performance
SD-10 Operation and Maintenance
Data
2.1 GWindows
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.4 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.3Insulating Glass
1.3Glazing Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 25 PAGES
08 81 00 2.4.3.1Sealants
2.4.4Joint Backer
SD-04 Samples
2.3Insulating Glass
2.4.2Glazing Compound
2.4.6Tape
2.4.6Sealing Tapes
SD-07 Certificates
2.3Insulating Glass
SD-08 Manufacturer’s Instructions
2.4Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
2.2Metal Wall Louvers
SD-03 Product Data
2.2 GMetal Wall Louvers
SD-04 Samples
2.2 GMetal Wall Louvers
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1.1 GPorcelain Tile
GGauged Porcelain Tile
GQuarry Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 25 PAGES
09 30 10 GMosaic Tile
GLarge Format Glass Tile
GGlazed Ceramic Wall Tile
2.1 GTransition Strips
2.5.1 GMetal Strips
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
2.2.6Reinforcing Wire Fabric
2.6 GWaterproof Membrane
GCrack Isolation Membrane
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
2.5.1 GMetal Strips
2.4.4 GGrout
SD-08 Manufacturer’s Instructions
3.8Manufacturer's Approved
Cleaning Instructions
SD-10 Operation and Maintenance
Data
GGauged Porcelain Tile
2.1.1 GPorcelain Tile
GQuarry Tile
GMosaic Tile
GLarge Format Glass Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 25 PAGES
09 30 10 GGlazed Ceramic Wall Tile
2.1 GTransition Strips
2.5.1 GMetal Strips
09 67 23.13 SD-03 Product Data
1.2.1Manufacturer's Catalog Data
SD-04 Samples
1.5.2Hardboard Mounted
SD-05 Design Data
1.2.2Design Mix Data
SD-07 Certificates
1.5.1Listing of Product Installations
1.5Referenced Standards
Certificates
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-02 Shop Drawings
Piping Identification
SD-03 Product Data
2.1 GCoating
2.1Product Data Sheets
3.2.5Sealant
SD-04 Samples
2.2 GColor
SD-07 Certificates
1.5.3Indoor Air Quality for Paints and
Primers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 25 PAGES
09 90 00 Indoor Air Quality for
Consolidated Latex Paints
SD-08 Manufacturer’s Instructions
3.3.1Application Instructions
2.1Mixing
1.7.1Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
10 28 13 SD-02 Shop Drawings
2.1 GProduct Schedule
SD-03 Product Data
2.1.3 GItem A4995
2.1.4 GItem A5030
2.1.5 GItem A50001A
2.1.6 GItem A5080
2.1.8 GItem A5082
2.1.9 GItem A5109
2.1.10 GItem A5110
2.1.11 GItem A5140
2.1.12 GItem A5170
2.1.13 GItem A5200
2.1.14 GItem A5205
SD-07 Certificates
1.3.1Baby Changing Stations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 25 PAGES
22 00 00 SD-02 Shop Drawings
3.9.1 GPlumbing System
SD-03 Product Data
2.4Fixtures
GDrinking-water coolers
Water heaters; G
2.5 GBackflow prevention assemblies
3.9.1.1 GBackflow prevention assemblies
Shower Faucets; G
2.4.1 GAutomatic Controls
2.4.5 GLaundry Sink/Utility Tub
2.4.6 GOutdoor Service Sink
2.4.4 GCountertop Lavatories
2.4.3 GFlush Valve Urinals
2.4.2 GFlush Valve Water Closets
2.4.7 GOutdoor Drinking Fountain
2.3.3 GYard Hydrant
2.6.1 GFloor And Shower Drains
2.5.1 GBackflow Device Enclosure
SD-06 Test Reports
3.9Tests, Flushing and Disinfection
3.9.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
2.1.1Bolts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 25 PAGES
22 00 00 SD-10 Operation and Maintenance
Data
3.9.1 GPlumbing System
2.4.7Outdoor Drinking Fountain
23 05 93 SD-01 Preconstruction Submittals
1.3Records Of Existing Conditions
1.3.2Records Of Existing Conditions
1.5.1 GIndependent Tab Agency And
Personnel Qualifications
1.4.1 GPre-Field Tab Engineering Report
DALT and TAB Work Execution
Schedule
SD-02 Shop Drawings
1.3.2 GTab Schematic Drawings And
Report Forms
SD-06 Test Reports
3.2.7 GPre-Final Tab Report
3.2.8.1 GTab Field Acceptance Testing
3.2.9 GFinal Tab Report
SD-07 Certificates
1.5.1 GIndependent Tab Agency And
Personnel Qualifications
23 07 00 SD-03 Product Data
2.1 GPiping Insulation
2.1.10Piping insulation finishes
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 25 PAGES
23 07 00 2.2 GHeating, Ventilating, And Air
Conditioning Systems Insulation
2.2.6Duct insulation finishes
2.5Accessory materials
2.4Adhesives, sealants, and coating compounds
23 73 33 SD-02 Shop Drawings
1.3.1Temperature control systems
SD-03 Product Data
2.1.2 GExhaust Fans
2.3.3Dampers
2.3.4 GDiffusers, Registers, And Grilles
2.1.1 GCove Unit Heater
SD-10 Operation and Maintenance
Data
2.1.2Exhaust fans
2.1.1Cove Unit Heater
26 20 00 SD-06 Test Reports
3.4.2600-volt Wiring Test
3.4.4Grounding System Test
3.4.3Ground-fault Receptacle Test
SD-09 Manufacturer’s Field
Reports
Transformer Factory Tests
26 51 00 SD-03 Product Data
2.2Luminaires
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 25 PAGES
26 51 00 1.5.1Luminaire Warranty
Switches
Occupancy/Vacancy Sensors
Photosensors
SD-06 Test Reports
1.4.3ANSI/IES LM-79 Test Report
1.4.4ANSI/IES LM-80 Test Report
1.4.5ANSI/IES TM-21 Test Report
1.4.6ANSI/IES TM-30 Test Report
3.2.1.1Occupancy/Vacancy Sensor
Verification Test
3.2.1.1Photosensor Verification Test
SD-10 Operation and Maintenance
Data
Lighting System
33 71 01 SD-03 Product Data
Conductors
SD-06 Test Reports
Field Test Plan
3.2Field Quality Control
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
File details come from the government source that posted it. Updated .