J-1502000-12 AST Inventory Rev 6-2022.xlsx
XLSX spreadsheet 80 KB Posted
- Attached to
- Northern Sites Multi-Services Support contract for multiple buildings within the PWD-ME AOR
- Solicitation number
- N4008522R2636
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QTY SUMMARY
| # OF TANKS | |
| PNSY | 47 |
| CUTLER | 31 |
| PROSPECT | 10 |
| RANGELEY/SERE | 22 |
| GREAT POND | 4 |
| WRJ | 2 |
| 116 |
PNSY
| Building | Unique ID Num | Tank Capacity (gallons) | Tank Manufacturer | Tank Type (U/L) | Tank Const Method | Secondary containment type | Outage Required | Contents | Emergency Generator Base tank? | Remote Fill? | CRDM | Overfill Prev Type | |||||
| See abbreviations at bottom | Overfill Prev Type | ||||||||||||||||
| See abbreviations at bottom | STI CAT | STI Inspection Req | Governing Fire Code | Additional ME Req | Commodity Owner | Contract Info | Testing Required | Comments | Misc Notes | Misc Notes |
| Funding | Maint UIC | Maint UIC Desc | Periodic- Annual, P, Last done | Periodic- Annual, P, Next Due | Portable | ATG Annual Certification | Leak Test Due | Leak Test Due | Formal External, E (STI) | STI Formal External Next Due | Formal External, E (API In-Service) | API External (In-Service) | ||||||||||||||||||||||||||||||
| Next Due | Formal Internal, I (Out of Service) | Formal Internal Due | External (UT) | Piping API 570 UT | Piping API 570 Visual | Piping Insp Due | ||||||||||||||||||||||||||||||||||||
| PNSY- Portsmouth Naval Shipyard | ||||||||||||||||||||||||||||||||||||||||||
| 14 | A-094-BLDG14 | CIA | 145 | United Power | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | Need info | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N39040* see note | NSEASYSCOM | CCI Construction Services | 7/18/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | North B14, by CIA Gate 2 | Jay says this is CNIC, but MUIC is NAVSEA | Diesel generator | ||
| 29 | A-097-BLDG29 | NON CIA | 600 | Caterpillar | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | Need info | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | East B29 | Diesel generator | |||||||||||||||||||||||
| 72 | A-100-01-BLDG72 | |||||||||||||||||||||||||||||||||||||||||
| Portable Lube Oil Dispenser | UEM | 65 | Eagle | Need info | Single Walled AST | Berm and drip pan | NO | Lube Oil | NO | Need info | YES | YES | Sight glass | 1 | P(1) monthly | |||||||||||||||||||||||||||
| Portable | NFPA 30 | CNRMA? | ||||||||||||||||||||||||||||||||||||||||
| NAVFAC? | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/17/19 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | Turbine, basement, northwest corner B72, interior | Steam Plant | 1 0f 8 lube oil Eagle Tanks, 65 gallons each (see hiden rows) | ||||||||||||||||||||
| 72 | A-100-02-BLDG72 | |||||||||||||||||||||||||||||||||||||||||
| Portable Lube Oil Dispenser | UEM | 65 | Eagle | Need info | Single Walled AST | Berm and drip pan | NO | Lube Oil | NO | Need info | YES | YES | Sight glass | 1 | P(1) monthly | |||||||||||||||||||||||||||
| Portable | NFPA 30 | CNRMA? | ||||||||||||||||||||||||||||||||||||||||
| NAVFAC? | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/17/19 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | Turbine, basement, northwest corner B72, interior | Steam Plant | 1 0f 8 lube oil Eagle Tanks, 65 gallons each | ||||||||||||||||||||
| 72 | A-100-03-BLDG72 | |||||||||||||||||||||||||||||||||||||||||
| Portable Lube Oil Dispenser | UEM | 65 | Eagle | Need info | Single Walled AST | Berm and drip pan | NO | Lube Oil | NO | Need info | YES | YES | Sight glass | 1 | P(1) monthly | |||||||||||||||||||||||||||
| Portable | NFPA 30 | CNRMA? | ||||||||||||||||||||||||||||||||||||||||
| NAVFAC? | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/17/19 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | Turbine, basement, northwest corner B72, interior | Steam Plant | 1 0f 8 lube oil Eagle Tanks, 65 gallons each | ||||||||||||||||||||
| 72 | A-100-04-BLDG72 | |||||||||||||||||||||||||||||||||||||||||
| Portable Lube Oil Dispenser | UEM | 65 | Eagle | Need info | Single Walled AST | Berm and drip pan | NO | Lube Oil | NO | Need info | YES | YES | Sight glass | 1 | P(1) monthly | |||||||||||||||||||||||||||
| Portable | NFPA 30 | CNRMA? | ||||||||||||||||||||||||||||||||||||||||
| NAVFAC? | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/17/19 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | Turbine, basement, northwest corner B72, interior | Steam Plant | 1 0f 8 lube oil Eagle Tanks, 65 gallons each | ||||||||||||||||||||
| 72 | A-100-05-BLDG72 | |||||||||||||||||||||||||||||||||||||||||
| Portable Lube Oil Dispenser | UEM | 65 | Eagle | Need info | Single Walled AST | Berm and drip pan | NO | Lube Oil | NO | Need info | YES | YES | Sight glass | 1 | P(1) monthly | |||||||||||||||||||||||||||
| Portable | NFPA 30 | CNRMA? | ||||||||||||||||||||||||||||||||||||||||
| NAVFAC? | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/17/19 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | Turbine, basement, northwest corner B72, interior | Steam Plant | 1 0f 8 lube oil Eagle Tanks, 65 gallons each | ||||||||||||||||||||
| 72 | A-100-06-BLDG72 | |||||||||||||||||||||||||||||||||||||||||
| Portable Lube Oil Dispenser | UEM | 65 | Eagle | Need info | Single Walled AST | Berm and drip pan | NO | Lube Oil | NO | Need info | YES | YES | Sight glass | 1 | P(1) monthly | |||||||||||||||||||||||||||
| Portable | NFPA 30 | CNRMA? | ||||||||||||||||||||||||||||||||||||||||
| NAVFAC? | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/17/19 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | Turbine, basement, northwest corner B72, interior | Steam Plant | 1 0f 8 lube oil Eagle Tanks, 65 gallons each | ||||||||||||||||||||
| 72 | A-100-07-BLDG72 | |||||||||||||||||||||||||||||||||||||||||
| Portable Lube Oil Dispenser | UEM | 65 | Eagle | Need info | Single Walled AST | Berm and drip pan | NO | Lube Oil | NO | Need info | YES | YES | Sight glass | 1 | P(1) monthly | |||||||||||||||||||||||||||
| Portable | NFPA 30 | CNRMA? | ||||||||||||||||||||||||||||||||||||||||
| NAVFAC? | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/17/19 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | Turbine, basement, northwest corner B72, interior | Steam Plant | 1 0f 8 lube oil Eagle Tanks, 65 gallons each | ||||||||||||||||||||
| 72 | A-100-08-BLDG72 | |||||||||||||||||||||||||||||||||||||||||
| Portable Lube Oil Dispenser | UEM | 65 | Eagle | Need info | Single Walled AST | Berm and drip pan | NO | Lube Oil | NO | Need info | YES | YES | Sight glass | 1 | P(1) monthly | |||||||||||||||||||||||||||
| Portable | NFPA 30 | CNRMA? | ||||||||||||||||||||||||||||||||||||||||
| NAVFAC? | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/17/19 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | Turbine, basement, northwest corner B72, interior | Steam Plant | 1 0f 8 lube oil Eagle Tanks, 65 gallons each | ||||||||||||||||||||
| 72 | A-101-BLDG72 | UEM | 60,000 | Eagle | API 650 | Single Walled Steel, FCT | Concrete Berm, OWS | NO | No. 2 Fuel Oil | NO | Need info | YES | YES | Electronic level indicator system | 1 | API | NFPA 30 | UEM | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/19/19 | FY20 | X | X | X | X | X | X | Done Sept 2015 E(5) | ||||||||||||
| API 653 | UTIL due FY17 | I(10) | ||||||||||||||||||||||||||||||||||||||||
| API 653 | UTIL due FY17 | Done Sept 2015 | Done Oct 2015 UT(10) | Done Oct 2015 API 570 V (10) | UTIL due FY25 | Between B72 (east side) & 7, exterior | Out of Service inspection is required immediately. When OOS inspection is performed, it will reset the Formal External Clock. |
| Double check tank owner responsibility- MUIC is NAVFAC | Day Tank #1 | ||||||||||||||||||||||||||||||
| 72 | A-102-BLDG72 | UEM | 60,000 | Eagle | API 650 | Single Walled Steel, FCT | Concrete Berm, OWS | NO | No. 2 Fuel Oil | NO | Need info | YES | YES | Electronic level indicator system | 1 | API | NFPA 30 | UEM | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/19/19 | FY20 | X | X | X | X | X | X | Done Sept 2015 E(5) | |
| API 653 | UTIL due FY17 | I(10) | |||||||||||||||||||||||||||||
| API 653 | UTIL due FY17 | Done Sept 2015 | Done Oct 2015 UT(10) | Done Oct 2015 API 570 V (10) | UTIL due FY25 | Between B72 (east side) & 7, exterior | Out of Service inspection is required immediately. When OOS inspection is performed, it will reset the Formal External Clock. |
| Double check tank owner responsibility- MUIC is NAVFAC | Day Tank #2 | |||||||||||||||||||||||||||||||||||||||||
| 79 | A-107-BLDG79 | CIA | 145 | United Power Products | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N39040 | NSEASYSCOM | CCI Construction Services | 7/18/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | SOUTH B45, by CIA Gate 2 | Jay says this is CNRMA, not NAVSEA but MUIC is NAVSEA. Since this is EG, likely CNRMA | ||||
| 167 | A-120-BLDG167 | NON CIA | 275 | Onan | UL 142 | Double walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | B167, east side, exterior | Commissary | |||||||||||||||||||||||
| 264 | A-130-BLDG264 | NON CIA | 381 | Olympian | United Kingdom | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | North B264, South B59 | ||||||||||||||||||||||||
| 298 | A-133-BLDG298 | NON CIA | 2,000 | Highland | UL 2085 | Double Walled Steel | Double Walled AST | NO | Heating Oil | NO | NO | YES | YES | ATG, but not working, VW | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | X | CNRMA due FY17 | X | X | X | X | X | North corner, B298, exterior | |||||||||||||||||||||||||||||||
| 373 | A-151-BLDG373 | NON CIA | 109 | Cummins | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Southwest of B373 inside fenced area | Possibly replaced and relabeled as A-271 | |||||||||||||||||||||||
| 387 | A-153-BLDG387 | NON CIA | 500 | Containment Solutions | UL 2085 | Double Walled Steel | Double Walled AST | NO | Gasoline | NO | NO | YES | YES | LG, ATG, but not operating correctly | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | X | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | Berth 2 1/2 North of B387 boat house on a concrete slab | ||||||||||||||||||||||||
| 387 | A-154-BLDG387 | NON CIA | 1,000 | Containment Solutions | UL 2085 | Double Walled Steel | Double Walled AST? | NO | Diesel | NO | Need info | YES | YES? | ATG, LG, but not working properly | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | X | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | Berth 2 1/2 North of B387 boat house on a concrete slab | ||||||||||||||||||||||||
| 154 | A-181-BLDG154 | |||||||||||||||||||||||||||||||||||||||||
| Portable | NON CIA | 120 | Need info | Need info | Single Walled steel | Berm with weatherproof enclosure | NO | Diesel | NO | Need info | YES | NO | Need info | 3 | P(1) monthly portable | NFPA 30 | NAVFAC TRANS | N40085 | NAVFAC MID ATLANTIC TRANSPORTATION | CCI Construction Services | 2/12/20 | FY20 | Steel Portable recert every 12 years- Not due if Cat 1 or 2 | X | X | X | X | X | X | X | X | X | X | X | X | X | B154, interior | Double Check responsible owner | ||||
| 243 | A-185-BLDG243 | UEM | 275 | Busby Marine and Tank Co | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | NO | YES | YES | YES | VW but can't test; LG, but cant see from remote fill | Currently CAT 3, needs overfill configured immediately to make CAT 1 | P(1) | NFPA 30 | UEM | N40085 | NAVFAC MID ATLANTIC UTILITIES | CCI Construction Services | 7/22/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | B243, inside conex box located between B240 & B300 | Configure overfill immediately | |||
| 337 | A-187-BLDG337 | NON CIA | 100 | Sauk Technologies | UL 142 | Double Walled Steel | Double Walled AST | YES | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/22/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Southeast side of B337 | ||||||||||||||||||||||||
| 298 | A-193-BLDG298 | NON CIA | 729 | Global Power Components | UL 142 | Double Walled Steel | Double Walled AST + Concrete Berm | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/22/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | B298, exterior west side | ||||||||||||||||||||||||
| 374 | A-199-BLDG374 | CIA | 200 | Global Power | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | NO | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | ||||||||||||||||||||||||
| N39040* see note | NSEASYSCOM | CCI Construction Services | 7/22/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | East B374 | Jay says this is CNRMA, but MUIC is NAVSEA | ||||||||||||||||||||||
| 374 | A-200-BLDG374 | CIA | 1,000 | Rugby | UL 2085 | Double Walled Steel | Double Walled AST | NO | Diesel | NO | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | ||||||||||||||||||||||||
| N39040* see note | NSEASYSCOM | CCI Construction Services | 7/18/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | East B374 | Jay says this is CNRMA, but MUIC is NAVSEA | ||||||||||||||||||||||
| 395 | A-201-BLDG395 | NON CIA | 55 | Caterpillar Generac | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Exterior B395 | ||||||||||||||||||||||||
| 396 | A-205-BLDG396 | |||||||||||||||||||||||||||||||||||||||||
| Fire Pump Tank | NON CIA | 120 | Patterson | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | NO | YES | YES | NO | LG, but cant see from remote fill | Currently CAT 3, needs overfill configured immediately to make CAT 1 | P(1) | NFPA 20 | CNRMA | N32446 | CNIC MID ATLANTIC | |||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | B396 fire pump building for B170 | Install Vent Whistle or other overfill device to make CAT 1 tank immediately! | |||||||||||||||||||||||
| 33 | A-211-BLDG33 | NON CIA | 284 | Caterpillar | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Exterior, NE of B33 | ||||||||||||||||||||||||
| 79 | A-212-BLDG79 | CIA | 146 | Caterpillar | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | B79 exterior northend near CIA turnstile | MUIC says NAVSEA, but since it's an EG, likely CNRMA | New Emergency Generator | ||||||||||||||||||||||
| 292 | A-213-BLDG292 | UEM | 508 | Sauk Technologies | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | NO | LG NOT READING CORRECTLY | Currently CAT 3, needs overfill configured immediately to make CAT 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | South of B292 Sewage Lift Station | MUIC says NAVFAC but since it's an EG, likely CNRMA | New Emergency Generator | ||||||||||||||||||||||
| 43 | A-214-BLDG43 | NON CIA | 410 | Caterpillar | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | ATG, LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Northwest corner of B43 | MUIC says NAVFAC but since it's an EG, likely CNRMA | New Emergency Generator | ||||||||||||||||||||||
| 174 | A-215-BLDG174 | CIA | 146 | Caterpillar | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/22/19 | FY20 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Southeast corner of B174 at LC2 | MUIC says NAVSEA, but since it's an EG, likely CNRMA | New Emergency Generator | ||||||||||||||||||||||
| 154 | A-217-BLDG154 | NON CIA | 260 | Need info | Need info | Need info | Metal secondary containment berm for tanks and nozzles. Drip pans also in area. | NO | Motor oil and anti-freeze | NO | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Mid B154 interior along NE wall | ||||||||||||||||||||||||
| 154 | A-218-BLDG154 | NON CIA | 6,000 | Fireguard | UL 2085 | Need info | Double wall UL 2085 Fireguard Tank | NO | E85 Gasoline | NO | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Southeast of B154 exterior | ||||||||||||||||||||||||
| 163 | A-219-BLDG163 | UEM | 354 | Caterpillar | UL 142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | West of B163 water tower pump building | ||||||||||||||||||||||||
| 154 | A-234-BLDG154 | NON CIA | 1,000 | Need info | Need info | Double Walled Steel | Double Walled AST | NO | Gasoline | NO | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Southeast of B154 exterior | ||||||||||||||||||||||||
| 154 | A-235-BLDG154 | NON CIA | 4,000 | Need info | Need info | Double Walled Steel | Double Walled AST | NO | Diesel | NO | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Southeast of B154 exterior | ||||||||||||||||||||||||
| 296 | A-241-BLDG296 | UEM | 164 | Sauk Technologies | Need info | Double Walled Steel | Double Walled AST | NO | Diesel | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | B296 sewage lift station | ||||||||||||||||||||||||
| 363 | A-242-BLDG363 | NON CIA | 100 | Safe-T-Tank | Need info | Double Walled Steel | Double Walled AST | NO | Diesel | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Connex box located next to Salt Storge Shed | ||||||||||||||||||||||||
| 72 | A-244-BLDG72 | UEM | 330 | Need info | Need info | Need info | Drum Spill Pallet | NO | Hydraulic Fluid, 2110-TH; Mobil DTE Oil, Light | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Basement | ||||||||||||||||||||||||||
| 72 | A-099-BLDG72 | UEM | 500 | Pryco Inc. | UL | Double Walled Steel | Double Walled AST | Diesel | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N40085* see note | NAVFAC MID ATLANTIC UTILITIES* | CCI Construction Services | 7/17/19 | FY21 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Turbine basement, east side B72, interior | THIS TANK IS A PLANNED CONSTRUCTION | ||||
| 86A | A-260-BLDG86A- Fire Pump Tank | CIA | 250 | Highland Tank | UL 142 | Double Walled Steel | Double Walled AST | YES | Diesel | Need info | Need info | Need info | Need info | Need info | Need info | Need info | NFPA 20 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | East B86A, 1st floor, machine room, interior | Replaced tank A-108-BLDG86A- Fire Pump Tank | |||||||||||||||||||||||
| 306 | A-261(A-142)-BLDG306 | CIA | 137 | Highland Tank | UL 142 | Double Walled Steel | Double Walled AST | YES | Diesel | Need info | Need info | Need info | Need info | Need info | Need info | Need info | NFPA 20 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/18/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | B306, South wall, interior | Replaced tank A-142-BLDG306 - Fire Pump Tank | |||||||||||||||||||||||
| 341 | A-263(A-146)-BLDG341 | |||||||||||||||||||||||||||||||||||||||||
| Fire Pump Tank | NON CIA | 250 | Highland Tank | UL 142 | Double Walled Steel | Double Walled AST | YES | Diesel | Need info | Need info | Need info | Need info | Need info | Need info | Need info | NFPA 20 | CNRMA | N40085* see note | NAVFAC MID ATLANTIC UTILITIES* | CCI Construction Services | 7/19/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | B341, interior, fire pump bldg | Replaced tank A-146-BLDG341 Fire Pump Tank | ||||
| 343 | A-264-BLDG343 | |||||||||||||||||||||||||||||||||||||||||
| Fire Pump Tank | CIA | 250 | Highland Tank | UL 142 | Double Walled Steel | Double Walled AST | YES | Diesel | Need info | Need info | Need info | Need info | Need info | Need info | Need info | NFPA 20 | CNRMA | N39040* see note | NSEASYSCOM | CCI Construction Services | 7/19/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | B343, 1st floor, interior | Replaced tank A-149-BLDG343 Fire Pump Tank | ||||
| 384 | A-265-BLDG384 | NON CIA | 275 | Granby Steel Tanks | UL-142 | Double Walled Steel | Double Walled AST | NO | Heating Oil | Need info | Need info | Need info | Need info | Need info | Need info | Need info | NFPA 30 | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | CCI Construction Services | 7/19/19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | B384 basement | Replaced tank A-152-BLDG384 | |||||||||||||||||||||||
| Portable | A-266-PHAR Trailer (port) | NON CIA | 300 | Busby Marine and Tank Inc | UL-142 | Double Walled Steel | Double Walled AST | YES | Heating Oil | NO | Need info | Need info | Need info | Need info | Need info | Need info | Need info | CNRMA | N32446 | CNIC MID ATLANTIC | ||||||||||||||||||||||
| NSY PORTSMOUTH | New Tank 19 | FY20 | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info | Need info |
| PNSY Total # tanks = | 143,938 | =total tank storage >55 gal | Total Inspections for FY19 | 45 | 0 | 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||
| 47 | 2 | =#ASTs >= 20,000 gal | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 2 | 0 | 2 | 0 | 0 | 0 | 0 | |||||||||||
| Total NAVFAC TRANSPORTATION Inspections for FY20 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||
| Total NSEASYSCOM Tanks | 5 | ||||||||||||||||||||||||
| Total CNIC MID ATLANTIC Tanks | 28 | ||||||||||||||||||||||||
| VW= Vent Whistle | Total NAVFAC MID ATLANTIC UTILITIES Tanks | 13 | |||||||||||||||||||||||
| LG= Level Gauge | Total Transportation Tanks | 1 | |||||||||||||||||||||||
| Total Tanks | 47 |
Cutler
| Unique ID Num | Tank Capacity (gallons) | Tank Manufacturer | Tank Type (U/L) | Tank Const Method | Secondary containment type | Outage Required | Contents | Emergency Generator Base tank? | Remote Fill? | CRDM | Overfill Prev Type | |||
| See abbreviations at bottom | Overfill Prev Type | |||||||||||||
| See abbreviations at bottom | STI CAT | STI Inspection Req | Governing Fire Code | Additional ME Req | Commodity Owner | Contract Info | Testing Required | Comments | Misc Notes |
| Maint UIC | Maint UIC Desc | Periodic- Annual, P, Last done | Periodic- Annual, P, Next Due | Portable | ATG Annual Certification | Leak Test Due | Leak Test Due | Formal External, E (STI) | STI Formal External Next Due | Formal External, E (API In-Service) | API External (In-Service) | ||||||||||||||||||
| Next Due | Formal Internal, I (Out of Service) | Formal Internal Due | External (UT) | Piping API 570 UT | Piping API 570 Visual | Piping Insp Due | |||||||||||||||||||||||
| NCTAMS Cutler | |||||||||||||||||||||||||||||
| CU-100-AST-01 | 4,000 | Highland | UL 142 | Double Walled Steel | Double Walled AST | Dielectric Oil | NO | NO | YES | YES | LG- Clock gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P and E) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | Done Dec 2014 (FY15) | NCTAMS due FY19 | X | X | X | X | Done Nov 2013 (FY14) E(10), but not required | X | X | X | X | X | X | X | X | X | Communications Building- Dielectric | Received Final STI in FY 16 | |||
| CU-100-AST-10 | 6,000 | Highland | UL 142 | Double Walled Steel | Double Walled AST | Kerosene | NO | NO | YES | YES | LG, ATG | 1 | P(1), E(20) | NFPA 30 | CNRMA | N32446 | NCTS CUTLER VLF AREA | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET (for P) N40085-14-D-8122-0011 9/18/18 CNRMA due FY19 X CNRMA due FY19 X X E(20) CNRMA due FY30 X X X X N/A- DW Tank X X X Communications Building- Heating Supply CAPE missed this tank in FY14.
Based on conversations with Dave Bowery (NCTAMS) and John Wyeth (PWD Cutler), this tank provides bulk storage for heating supply and is a CNRMA asset
Date of next external based on install date of 2010 and tank size CU-103-AST-01- Transit tank 15,422 Unknown FCT Single Walled Steel Open top lined earthen berm Diesel NO YES YES YES ATG 1 P(1), E(20) NFPA 30 NCTAMS N63038 NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) SDC/ CAPE (for P and E)
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P) N40085-14-D-8122-0011 9/17/18 NCTAMS due FY19 X NCTAMS due FY19 X X Done Nov 2013 (FY14) E(20) NCTAMS due FY34 X X X X X X X X Power Plant- Transit Tank NCTAMS contracted P and E under MOD
Tank is welded, but still meets STI requirements
One ATG for all four transit tanks CU-103-AST-02- Transit tank 15,422 Unknown FCT Single Walled Steel Open top lined earthen berm Diesel NO YES YES YES ATG 1 P(1), E(20) NFPA 30 NCTAMS N63038 NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) SDC/ CAPE (for P and E)
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P) N40085-14-D-8122-0011 9/17/18 NCTAMS due FY19 X X X Done Nov 2013 (FY14) E(20) NCTAMS due FY34 X X X X X X X X Power Plant- Transit Tank NCTAMS contracted P and E under MOD
Tank is welded, but still meets STI requirements
One ATG for all four transit tanks CU-103-AST-03- Transit tank 15,422 Unknown FCT Single Walled Steel Open top lined earthen berm Diesel NO YES YES YES ATG 1 P(1), E(20) NFPA 30 NCTAMS N63038 NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) SDC/ CAPE (for P and E)
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P) N40085-14-D-8122-0011 9/17/18 NCTAMS due FY19 X X X Done Nov 2013 (FY14) E(20) NCTAMS due FY34 X X X X X X X X Power Plant- Transit Tank NCTAMS contracted P and E under MOD
Tank is welded, but still meets STI requirements
One ATG for all four transit tanks CU-103-AST-04- Transit tank 15,422 Unknown FCT Single Walled Steel Open top berm Diesel NO YES YES YES ATG 1 P(1), E(20) NFPA 30 NCTAMS N63038 NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) SDC/ CAPE (for P and E)
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P) N40085-14-D-8122-0011 9/17/18 NCTAMS due FY19 X X X Done Nov 2013 (FY14) E(20) NCTAMS due FY34 X X X X X X X X Power Plant- Transit Tank NCTAMS contracted P and E under MOD
Tank is welded, but still meets STI requirements
One ATG for all four transit tanks CU-103-AST-13 300 Unknown Unknown Single Walled Steel Building 103 Diesel NO YES YES YES Hard-piped Overflow routes back to Transits 3 and 4 1 P(1)- Process tank NFPA 1 NCTAMS N63038 NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) SDC/ CAPE (for P)
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Process Tank | NCTAMS contracted P under MOD | |||
| CU-103-AST-14 | 800 | Pryco | UL 142 | Single Walled Steel | Integral dike | Diesel | NO | YES | YES | YES | LG and hardpipe overflow | 1 | P(1)- Process tank | NFPA 1 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/17/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Process Tank | NCTAMS contracted P under MOD | |||
| CU-103-AST-15 | 300 | Unknown | Unknown | Single Walled Steel | Building 103 | Diesel | NO | YES | YES | YES | overflow cutoff switch | 1 | P(1)- Process tank | NFPA 1 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE |
(for P)
| N40085-13-D-7715-0006-01 (NCTAMS MOD) | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Process Tank | NCTAMS contracted P under MOD | |||
| CU-103-AST-17 | 300 | Unknown | Unknown | Single Walled Steel | Building 103 | Diesel | NO | YES | YES | YES | Mercoid cutoff switch | 1 | P(1)- Process tank | NFPA 1 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Process Tank | NCTAMS contracted P under MOD | |||
| CU-103-AST-18 | 300 | Unknown | Unknown | Single Walled Steel | Building 103 | Diesel | NO | YES | YES | YES | Mercoid cutoff switch | 1 | P(1)- Process tank | NFPA 1 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Process Tank | NCTAMS contracted P under MOD | |||
| CU-103-AST-19 | 300 | Unknown | Unknown | Single Walled Steel | Building 103 | Diesel | NO | YES | YES | YES | Mercoid cutoff switch | 1 | P(1)- Process tank | NFPA 1 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Process Tank | NCTAMS contracted P under MOD | |||
| CU-103-AST-20 | 300 | Unknown | Unknown | Single Walled Steel | Building 103 | Diesel | NO | YES | YES | YES | Mercoid cutoff switch | 1 | P(1)- Process tank | NFPA 1 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Process Tank | NCTAMS contracted P under MOD | |||
| CU-103-AST-21 | 1,500 | Unknown | Unknown | Insulated Single Walled Steel | Building 103- Lube oil room | Lube Oil | NO | YES | YES | YES | glass sight gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/19/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Lube Oil supply | NCTAMS contracted P under MOD | |||
| CU-103-AST-22 | 1,500 | Unknown | Unknown | Single Walled Steel | Building 103- Lube oil room | Lube Oil | NO | YES | YES | YES | glass sight gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Lube Oil supply | NCTAMS contracted P under MOD | |||
| CU-103-AST-23 | 1,500 | Unknown | Unknown | Single Walled Steel | Building 103- Lube oil room | Lube Oil | NO | YES | YES | YES | glass sight gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Lube Oil supply | NCTAMS contracted P under MOD | |||
| CU-103-AST-24 | 1,500 | Unknown | Unknown | Single Walled Steel | Building 103- Lube oil room | Lube Oil | NO | YES | YES | YES | glass sight gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Lube Oil supply | NCTAMS contracted P under MOD | |||
| CU-103-AST-25 | 600 | Unknown | Unknown | Single Walled Steel | Building 103 | Used Lube Oil | NO | YES | YES | YES | glass sight gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Lube Oil supply | NCTAMS contracted P under MOD | |||
| CU-103-AST-26 | 2,000 | Unknown | Unknown | Single Walled Steel | Building 103 | Lube Oil | NO | YES | YES | YES | glass sight gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Used Oil | NCTAMS contracted P under MOD | |||
| CU-103-AST-27 | 1,000 | Unknown | Unknown | Single Walled Steel | Building 103 | Used Lube Oil | NO | YES | YES | YES | glass sight gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | SDC/ CAPE (for P) |
N40085-13-D-7715-0006-01 (NCTAMS MOD)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Lube Oil supply | NCTAMS contracted P under MOD | |||||||||||||||||||||
| CU-103-AST-30 | 1,000 | Southern Tank and Manufacturing ID# A60497209 | UL 142 | Double Walled Steel | Double Walled AST | Sludge Tank | NO | NO | YES | YES | glass sight gauge | 1 | P(1) | NFPA 30 | NCTAMS | N63038 | NCTAMS (Formerly FLTFORCOM CNAVNETWARCOM) | New Tank | 9/18/18 | NCTAMS due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Power Plant- Used Oil/ Sludge Tank | New Tank installed 6/15 | |||
| CU-123-AST-02 | 180 | Patterson | |||||||||||||||||||||||||||||||||||||
| ID #214638-010 | UL 142 | ||||||||||||||||||||||||||||||||||||||
| ID# C716833 | Double Walled Steel | Double Walled AST | Diesel | NO | YES | YES | YES | LG, VW | 1 | P(1) | NFPA 20 | CNRMA | N32446 | NCTS CUTLER VLF AREA | SDC/ DATANET (for P) | ||||||||||||||||||||||||
| N40085-14-D-8122-0011 | 9/18/18 | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Fire Pump tank | PWD ME should have had this tank under contract for Periodic Annual Inspection | |||||||||||||||||||||
| CU-125-AST-01 | 315,000 | FCT | Single Walled Steel | Open top berm | Diesel | NO | YES | YES | YES | ATG | API | API: | |||||||||||||||||||||||||||
| P(1), E(5), I(10) | NFPA 30 | CNRMA | N32446 | NCTS CUTLER VLF AREA | SDC/ CAPE |
(for API 570)
N40085-13-D-7715-0006 (CNIC)
| API 653 contracted by others | X | X | CNRMA due FY19 | X | X | X | X | Done April 2016 | CNRMA due FY21 | Done April 2016 | CNRMA due FY26 | CNRMA due FY21 | Done Nov 2013 (FY14) API 570 UT (10) | Done Nov 2013 (FY14) API 570 V for Class 3 piping (10) | CNRMA due FY24 | Bulk Supply | |
| Piping does not have adequate overpressure protection. Piping is not grounded IAW NFPA 30. | *Note: External UT inspection frequency may be NMT 15 years. An Out of Service inspection can substitute external UT measurements if the internal inspection internval is = or < than than 15 yrs (or UT corr rate) See API 653 6.3.3.2 |
Internal Inspection Intervals- 6.4.2- w/ known corrosion rates--> NMT 20 years
Alternative Internal Inspection Interval- 6.4.3- risk-based inspection proedures- RBI assessment every 10 years
| CU-126-AST-01 | 315,000 | FCT | Single Walled Steel | Open top berm | Diesel | NO | YES | YES | YES | ATG | API | API: | ||
| P(1), E(5), I(10) | NFPA 30 | CNRMA | N32446 | NCTS CUTLER VLF AREA | SDC/ CAPE |
(for API 570)
N40085-13-D-7715-0006 (CNIC)
| API 653 contracted by others | X | X | CNRMA due FY19 | X | X | X | X | Done March 2016 | CNRMA due FY21 | Done March 2016 | CNRMA due FY26 | CNRMA due FY21 | Done Nov 2013 (FY14) API 570 UT (10) | Done Nov 2013 (FY14) API 570 V for Class 3 piping (10) | CNRMA due FY24 | Bulk Supply | |
| Piping does not have adequate overpressure protection. Piping is not grounded IAW NFPA 30. | *Note: External UT inspection frequency may be NMT 15 years. An Out of Service inspection can substitute external UT measurements if the internal inspection internval is = or < than than 15 yrs (or UT corr rate) See API 653 6.3.3.2 |
Internal Inspection Intervals- 6.4.2- w/ known corrosion rates--> NMT 20 years
Alternative Internal Inspection Interval- 6.4.3- risk-based inspection proedures- RBI assessment every 10 years
| CU-127-AST-01 | 210,000 | FCT | Single Walled Steel | Open top berm | Diesel | NO | YES | YES | YES | ATG | API | API: | ||
| P(1), E(5), I(10) | NFPA 30 | CNRMA | N32446 | NCTS CUTLER VLF AREA | SDC/ CAPE |
(for API 570)
| N40085-13-D-7715-0006 (CNIC) | X | X | CNRMA due FY19 | X | X | X | X | E(5)- When tank is brought back into service | 5/2016- Plan to mothball tank- CNRMA due FY16 | I(10)- When tank is brought back into service | 5/2016- Plan to mothball tank- CNRMA due FY16 | When tank is brought back into service | Done Nov 2013 (FY14) API 570 UT (10) | Done Nov 2013 (FY14) API 570 V for Class 3 piping (10) | CNRMA due FY24 | Bulk Supply | |
| Piping does not have adequate overpressure protection. Piping is not grounded IAW NFPA 30. | *Note: External UT inspection frequency may be NMT 15 years. An Out of Service inspection can substitute external UT measurements if the internal inspection internval is = or < than than 15 yrs (or UT corr rate) See API 653 6.3.3.2 |
Internal Inspection Intervals- 6.4.2- w/ known corrosion rates--> NMT 20 years
Alternative Internal Inspection Interval- 6.4.3- risk-based inspection proedures- RBI assessment every 10 years CU-132-AST-01 1,000 Highland UL 142 Double Walled Steel Double Walled AST Kerosene NO YES YES YES ATG, LG, VW 1 P(1) NFPA 30 CNRMA N32446 NCTS CUTLER VLF AREA SDC/ CAPE
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | 9/18/18 | CNRMA due FY19 | X | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | ATG is an OMNTEC | PWD ME has this tank under contract for Periodic Annual Inspection | |||
| CU-135-AST-02 | 1,000 | Highland Tank | UL 2085 | Double Walled Steel | Double Walled AST | Diesel | NO | NO | YES | YES | Unreadable LG | 1 | P(1) | NFPA 30A | NCTAMS | N63038 | NCTS CUTLER VLF AREA | SDC/ CAPE |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | NEW TANK 2018/2919 | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Riggers- Fleet Fueling | ||||||||
| Tank needs new level gauge to meet minimum overfill prevention requirements | NCTAMS TANK - PWD ME has this tank under contract for Periodic Annual Inspection | ||||||||||||||||||||||||
| CU-140-AST-01 | 500 | Highland Tank | UL 2085 | Double Walled Steel | Double Walled AST | Diesel | NO | NO | YES | YES | NFPA 30A | CNRMA | N32446 | NCTS CUTLER VLF AREA | NEW TANK 2018/2019 | CNRMA due FY19 | PWD ME Tank (installed under FY 17 project - Luong) | Not installed as of 11/19/18 | |||||||
| CU-135-AST-04 | 275 | Highland Tank | UL 142 | Double Walled Steel in Concrete | Double Walled AST | Kerosene | NO | YES | YES | YES | LG, VW | 1 | P(1) | NFPA 31 | CNRMA | N32446 | NCTS CUTLER VLF AREA | SDC/ CAPE (for L and E) |
N40085-13-D-7715-0006 (CNIC)
SDC/ CAPE (for P)
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET (for P)
| N40085-14-D-8122-0011 | NEW TANK 2018/2019 | CNRMA due FY19 | X | X | Done Nov 2013 (FY14) L(10) | CNRMA due FY24 | Done Nov 2013 (FY14) E(10) | CNRMA STI due FY24 | X | X | X | X | X | X | X | X | Riggers- Heating supply | PWD ME has this tank under contract for Periodic Annual Inspection. CNIC contracted L and E | |||
| CU-400-AST-01- Tank Temp out of service | 1,000 | Highland | UL 142 | Double Walled Steel | Double Walled AST | Kerosene | NO | YES | YES | YES | ATG, LG, VW | 1 | P(1) | NFPA 30 | CNRMA | N32446 | NCTS CUTLER | SDC/ CAPE | |||
| N40085-13-D-7715-0010 (PWD ME) | Done Dec 2014 (FY15) | CNRMA due FY19 | X | Tank currently Out of Service, but due upon re-use | X | X | X | X | X | X | X | X | X | X | X | X | VLF- Heating Supply | ||||
| Falls under NFPA 30 vice 31 due to tank size | PWD ME has this tank under contract for Periodic Annual Inspection. |
Based on conversations with Dave Bowery (NCTAMS) and John Wyeth (PWD Cutler), this tank provides bulk storage for heating supply and is a CNIC asset
| CU-503-AST-01 | 1,000 | Highland | UL 142 | Double Walled Steel | Double Walled AST | Kerosene | NO | YES | YES | YES | ATG, LG, VW | 1 | P(1) | NFPA 30 | CNRMA | N32446 | NCTS CUTLER VLF AREA | SDC/ CAPE | ||||||||||||||||||
| N40085-13-D-7715-0010 (PWD ME) | 9/18/18 | CNRMA due FY19 | X | CNRMA due FY19 | X | X | X | X | X | X | Fire Department heating supply. NFPA 30 vice NFPA 31 because of tank size | PWD ME Tank | ||||||||||||||||||||||||
| Cutler | ||||||||||||||||||||||||||||||||||||
| Total # tanks = | 929,843 | =total tank storage >55 gal | Total FY19 CNRMA Inspections | CNRMA | 8 | 0 | 6 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||
| 31 | 3 | #ASTs >=20,000 gal | Total FY19 NCTAMS Inspections | NCTAMS | 20 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||
| Four tanks are temporarily out of service | ||||||||||||||||||||||||||||||||||||
| Total CNIC MID ATLANTIC Tanks | 10 | |||||||||||||||||||||||||||||||||||
| ATG- Automatic Tank Gauge | Total NCTAMS Tanks | 21 | ||||||||||||||||||||||||||||||||||
| VW= Vent Whistle | Total Tanks | 31 | ||||||||||||||||||||||||||||||||||
| LG= Level Gauge |
Prospect Harbor
| Unique ID Num | Tank Capacity (gallons) | Tank Manufacturer | Tank Type (U/L) | Tank Const Method | Secondary containment type | Outage Required | Outage Required | Emergency Generator Base tank? | Remote Fill? | CRDM | Overfill Prev Type | |||
| See abbreviations at bottom | Overfill Prev Type | |||||||||||||
| See abbreviations at bottom | STI CAT | STI Inspection Req | Governing Fire Code | Additional ME Req | Commodity Owner | Contract Info | Testing Required | Comments | Misc Notes |
| Maint UIC | Maint UIC Desc | Periodic- Annual, P, Last done | Periodic- Annual, P, Next Due | Portable | ATG Annual Certification | Leak Test Due | Leak Test Due | Formal External, E (STI) | STI Formal External Next Due | Formal External, E (API In-Service) | API External (In-Service) | |||||||||||||||||
| Next Due | Formal Internal, I (Out of Service) | Formal Internal Due | External (UT) | Piping API 570 UT | Piping API 570 Visual | Piping Insp Due | ||||||||||||||||||||||
| Prospect Harbor | ||||||||||||||||||||||||||||
| PH-49-K-01- Lightkeepers Home | 275 | Highland | UL 142 | Double Walled Steel in Basement | Double Walled AST | Kerosene | NO | YES | YES | YES | VW | 1 | P(1) | NFPA 31 | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
| N40085-14-D-8122-0011 | Done Dec 2015 (FY16) | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | BLDG 49- Lightkeeper's Home heating supply | Received Final STI Report in FY16 | ||||||||||||||||
| PH-101-K-01 | 500 | Highland | UL 2085 | Double Walled Steel | Double Walled AST | Kerosene | NO | NO | YES | YES | LG | Tank is UST and needs replacement with AST | P(1) | NFPA 31 | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Replaced as part of eproj#1356714 |
BLDG 101- heating supply PH-102-D-01- COMM Bldg 2,000 Highland UL 2085 Double Walled Steel Double Walled AST Diesel NO NO YES YES ATG, LG 1 P(1) NFPA 30 CNRMA due FY19 X CNRMA due FY19 X X X X X X X X X X X X Replaced as part of eproj#1356714 BLDG 102- EG Supply
| PH-102-DT-01- COMM Bldg | 55 | Pryco | Single Walled steel | Integral Rupture Basin | Diesel | NO | YES | YES | YES | LG | 1 | P(1) | NFPA 30 | P(1) | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | BLDG 102- Day Tank | New Tank replaced Day tank that was inspected in 2015 | |
| PH-102-GEN-01- COMM Bldg | 546 | Sauk Technologies | UL 2085 | Double Walled Steel | Double Walled AST | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | P(1) | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | BLDG 102- Emergency Generator | New |
| PH-104-K-01 | 275 | Highland | UL 2085 | Double Walled Steel | Double Walled AST | Kerosene | NO | NO | YES | YES | VW | 1 | P(1) | NFPA 31 | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Replaced as part of eproj#1356714 |
BLDG 104- heating supply PH-105-K-01 275 Highland UL 2085 Double Walled Steel Double Walled AST Kerosene NO NO YES YES LG 1 P(1) NFPA 31 CNRMA due FY19 X X X X X X X X X X X X X X Replaced as part of eproj#1356714 BLDG 105- heating supply PH-110-K-01- MWR 275 Highland UL 142 Double Walled Steel Double Walled AST Kerosene NO YES YES YES VW 1 P(1) NFPA 31 SDC/ CAPE (for P)
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
| N40085-14-D-8122-0011 | Done Dec 2014 (FY15) | CNRMA due FY19 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | BLDG 110- heating supply | Received Final STI Report in FY16 | ||
| PH-110-K-02- MWR | Need Info | Need Info | Need Info | Need Info | Need Info | Kerosene | NO | YES | YES | YES | VW | 1 | P(1) | NFPA 31 | CNRMA due FY19 | New addition as part of eproj#1356714 |
BLDG 110- heating supply (additional) PH-112-K-01 500 Highland UL 2085 Double Walled Steel Double Walled AST Kerosene NO NO YES YES LG Tank is UST and needs replacement with AST P(1) NFPA 31 CNRMA due FY19 X X X X X X X X X X X X X X Replaced as part of eproj#1356714 BLDG 112- heating supply
| Prospect Harbor | ||||||||||||||||||
| Total # tanks = | 4,701 | =total tank storage >55 gal | Total CNRMA STI Inspections for FY19 | 10 | 0 | 1 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 10 | ||||||||||||||||||
| ATG- Automatic Tank Gauge | ||||||||||||||||||
| VW= Vent Whistle | ||||||||||||||||||
| LG= Level Gauge |
SERE School
| Unique ID Num | Tank Capacity (gallons) | Tank Manufacturer | Tank Type (U/L) | Tank Const Method | Secondary containment type | Outage Required | Contents | Emergency Generator Base tank? | Remote Fill? | CRDM | Overfill Prev Type | |||
| See abbreviations at bottom | Overfill Prev Type | |||||||||||||
| See abbreviations at bottom | STI CAT | STI Inspection Req | Governing Fire Code | Additional ME Req | Commodity Owner | Contract Info | Testing Required | Comments | Misc Notes |
| Maint UIC | Maint UIC Desc | Periodic- Annual, P, Last done | Periodic- Annual, P, Next Due | Portable | ATG Annual Certification | Leak Test Due | Leak Test Due | Formal External, E (STI) | STI Formal External Next Due | Formal External, E (API In-Service) | API External (In-Service) | ||||||||||||||||||
| Next Due | Formal Internal, I (Out of Service) | Formal Internal Due | External (UT) | Piping API 570 UT | Piping API 570 Visual | Piping Insp Due | |||||||||||||||||||||||
| SERE School Rangeley | |||||||||||||||||||||||||||||
| SERE-80-K-01 | 300 | Highland Tank | UL 2085 | Double Walled Steel | Double Walled AST | NO | Kerosene | NO | NO | YES | YES | VW | 1 | P(1) | NFPA 30 | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
N40085-14-D-8122-0011 8/7/18 CNRMA due FY17 X X X X X X X X X X X X X Repplaced as part of eProj#1360400 PW Garage- Heating Supply SERE-82-K-01 1,000 Fedco Maf Corp UL 142 Double Walled Steel Double Walled AST NO Kerosene NO NO YES- Needs configuring for direct vision YES VW 1 P(1) NFPA 30 SDC/ CAPE (for P)
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
| N40085-14-D-8122-0011 | 8/8/18 | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | X | Needs Interstice reconfiguring to make a strong CAT 1 tank. | Received STI Report in FY16 | ||
| SERE-89-K-01 | 300 | Highland Tank | UL 142 | Double Walled Steel | Double Walled AST | NO | Kerosene | NO | NO | YES | YES | VW | 1 | P(1) | NFPA 30 | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
N40085-14-D-8122-0011 8/7/18 CNRMA due FY17 X X X X X X X X X X X X X Repplaced as part of eProj#1360400 EVOC Garage SERE-90-K-01 500 Need info Need info Double Walled Steel Double Walled AST NO Kerosene NO NO YES YES VW 1 P(1) NFPA 31 SDC/ CAPE (for P)
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
| N40085-14-D-8122-0012 | 8/7/18 | CNRMA due FY17 | |||||||||||||||
| SERE-116-D-01 | 250 | Hoover Containment Systems | UL 2085 | Double Walled Steel | Double Walled AST | NO | Diesel | NO | NO | YES- Needs configuring for direct vision | YES | Fueling procedure that includes sticking the tank, but no LG | 1 | P(1) | NFPA 30A | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
N40085-14-D-8122-0011 8/7/18 CNRMA due FY17 X X X X X X X X X X X X X Alpha Bldg- Fleet Fueling Needs Interstice reconfiguring to make a strong CAT 1 tank.
SERE-116-K-01 300 Highland Tank UL 2085 Double Walled Steel Double Walled AST NO Kerosene NO NO YES YES VW 1 P(1) NFPA 31 SDC/ CAPE (for P)
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
N40085-14-D-8122-0011 8/7/18 CNRMA due FY17 X X X X X X X X X X X X X Repplaced as part of eProj#1360400 Alpha Bldg- Heating Supply SERE-121-K-01 300 Highland Tank UL 2085 Double Walled Steel Double Walled AST NO Kerosene NO NO YES YES VW 1 P(1) NFPA 31 SDC/ CAPE (for P)
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
N40085-14-D-8122-0011 8/8/18 CNRMA due FY17 X X X X X X X X X X X X X Repplaced as part of eProj#1360400 Search Bldg- Heating Supply
| SERE-565-K-01 (or SERE-565-D-01) | 140 | Mass Engineering | UL 142 | Single Walled steel | Highland Tank Dike (207 Gal) | YES | Diesel | NO | YES | YES | YES | Remote fill w overfill protection | 1 | P(1), E(10), L(10) | NFPA 20 | SDC/ CAPE (for P) | |||
| N40085-13-D-7715-0010 (PWD ME) | 8/7/18 | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | X | Fire Pump AST. | Datanet did not inspect in FY16 | ||
| SERE-566-K-01 | 2,000 | Fedco Maf Corp | UL 142 | Double Walled Steel | Double Walled AST | NO | Kerosene | NO | NO | YES | NO | VW, LG | Need into | P(1), [E&L(5), I (10)] or [L(2), E(5)] | NFPA 30 | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
| N40085-14-D-8122-0011 | 8/7/18 | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | X | *If plans to re-configure to CAT 1 tank, only plan for P. If no plans to re-configure, plan for L and E immediately | ||
| SERE-567-D-01 | 500 | Need info | UL 142 | Single Walled steel | Integral dike | NO | Diesel | NO | YES | YES | YES | VW | 1 | P(1) | NFPA 30 | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
| N40085-14-D-8122-0011 | 8/7/18 | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | X | Generator Bldg | ||
| SERE-569-D-01 | 250 | Hoover Containment Systems | UL 2085 | Double Walled Steel | Double Walled AST | NO | Diesel | NO | NO | YES | YES | VW | 1 | P(1) | NFPA 30A | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
| N40085-14-D-8122-0011 | 8/7/18 | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | X | PW Shed- Fleet Fueling | ||
| SERE-571-K-01 | 500 | Highland Tank | UL 2085 | Double Walled Steel | Double Walled AST | NO | Kerosene | NO | NO | YES | YES | VW | 1 | P(1) | NFPA 31 | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
| N40085-14-D-8122-0011 | 8/7/18 | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Repplaced as part of eProj#1360400 | |
| Log Cabin | SERE-570-K-01 was removed and combined with this tank. | |||||||||||||||||
| SERE-573-K-01 | 300 | Highland Tank | UL 2085 | Double Walled Steel | Double Walled AST | NO | Kerosene | NO | NO | YES | YES | VW | 1 | P(1) | NFPA 31 | SDC/ CAPE (for P) |
N40085-13-D-7715-0010 (PWD ME)
SDC/ DATANET
N40085-14-D-8122-0011 8/8/18 CNRMA due FY17 X X X X X X X X X X X X X X Repplaced as part of eProj#1360400 Hard Sell Bldg
| SERE-574-GEN-01 | 354 | UL142 | Double Walled Steel | Double Walled AST | NO | Diesel | YES | NO | YES | YES | LG | 1 | P(1) | NFPA 30 | New | 8/8/18 | CNRMA due FY17 | X | X | X | X | X | X | X | X | X | X | X | X | X | X | Segeant Major Bldg |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .