J-1502000-06a NCTAMS Ice Shield Inspect Specs.pdf

PDF 129 KB Posted

Attached to
Northern Sites Multi-Services Support contract for multiple buildings within the PWD-ME AOR
Solicitation number
N4008522R2636
Issued by

View the file

Other files

File Type Posted
N4008522R2636 Amendment 0003_SF30.pdf PDF
ATTACH_N4008522R2636 Amendment 0003.pdf PDF
J-1502000-12 AST Inventory Rev 6-2022.xlsx XLSX spreadsheet
J-1503060-03 Site Maps Rev 6-2022.pdf PDF
N4008522R2636 Amendment 0002.pdf PDF
ATTACH_N4008522R2636 Amendment 0001.pdf PDF
N4008522R2636 Amendment 0001_SF30.pdf PDF
J-1502000-12 AST Inventory.xlsx XLSX spreadsheet
J-1602000-03 Equipment Inventory Table.xlsx XLSX spreadsheet
J-1502000-17 Columbia Winch Maintenance.pdf PDF
J-0200000-09 ELINs N. Sites MSS.xls XLS spreadsheet
J-0200000-03 N. SITES ACCESS REQUEST FORM (ALF 103 Rev K).pdf PDF
RFP N4008522R2636.pdf PDF
J-1502000-09 Water Mist.pdf PDF
J-1502000-04 P. Hbr OH Doors.pdf PDF
J-1602000-04 Electrical Maintenance Frequencies.xlsx XLSX spreadsheet
J-0200000-07 PNSY Contractor Crane.pdf PDF
J-0200000-11 Past Performance Questionnaire.pdf PDF
J-1503010-04 floor plans.pdf PDF
J-0200000-12 PNSY Station Regulations.pdf PDF
J-0200000-05 Invoice Form.pdf PDF
J-1503010-05 Custodial Inventory.xls XLS spreadsheet
J-0200000-10 Corporate Experience Data Sheet.pdf PDF
J-1502000-03 OH Door CUTLER.pdf PDF
J-1502000-10 Boiler Tune-up.pdf PDF
J-1503060-03 Site Maps.pdf PDF
J-1502000-06b NCTAMS Ice Shield Locations.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Inspection and Repair Specifications for Cutler Ice Shield K-Connection Welds:

The inspection/repair services specified below are to be provided at the Cutler Naval Telecommunications Facility in Cutler Maine at the North and South Helix Houses. The North and South Helix Houses are available on a rotating yearly schedule as maintenance outside of this specification is being done on one house while the other house is operating. The Helix House that is non-operational for maintenance outside of this specification will be available for this inspection/repair specification Monday through Friday. However, the operational Helix House will ONLY be available on Mondays from 8:30 to 2:30. It is recommended that the contractor be through the gate by 8:00am in order to facilitate a prompt start time once the Helix House becomes available on Monday.

There is one 20amp circuit for 110VAC power at ground level, however history has proven that the number of extension cords required causes the circuit to become overloaded and is not reliable.

Therefore, the Contractor should have a generator on hand. There is no water at this site, therefore the Contractor shall supply water, if needed, at no additional cost to the government as indicated in 0200000 C.

The Contractor can only use a government approved laydown area.

1. Inspection/Repair Process:

1.1. The inspection/repair services are to be provided for each K-connection (12 in total). These inspection/repair services are to be completed once every 12 months by July 20 for all Option Years. Advanced coordination with your contract administrator is necessary in order to get the necessary equipment outages and to gain access to the facility. These inspections/repairs may require more than one mobilization to the site since the K-connections are located on two buildings, which will likely not be available for inspection/repairs at the same times. For the year 2022, the North Helix House will be available Monday through Friday and the South Helix House will be available from 8:30am-2:30pm Mondays ONLY. The following year 2023, the South Helix House will be available Monday through Friday and the North Helix House will be available from 8:30am -2:30pm Mondays ONLY. This will be a rotating yearly schedule, unless otherwise stated by the government.

1.2. Provide a visual inspection of the entire length of weld indicated on Attachment 1. Look for visual signs of cracking including visible cracks, chipped paint, and linear rust stain indications.

Photo-document each weld with special emphasis given to any crack indications.

1.3. Where cracks are suspected, remove the paint coatings around the suspect area and provide a

Magnetic Particle Inspection (MT) per ASTM E 709. Photo document the indications found using MT. IF no indications are found using MT, then recoat the area the using metal coating specifications provided in Section 2.

1.4. If cracks are confirmed using MT inspection, then immediately notify your contract administrator. Do not re-coat the area.

1.5. For each annual inspection provide a written report which includes the status of each K-connection. The report must reference K connections using the naming nomenclature provided in J-1502000-06B per Section F, and include the name and contact information for any companies involved in the inspection or repair of the K connection welds. The report must also include:

1.5.1. Photos of each weld inspected

1.5.2. Photos of each weld with a positive MT indication (i.e. image of the crack being shown with

MT ferro-magnetic powder)

1.5.3. Documentation MT testing performed.

2. Metal Coating Specifications:

2.1. Clean the surface of any contaminants per SSPC SP-1. Remove any loose and peeling paint per

SSPC SP2/SP3. Feather sand the edges smooth and sand the area to create a profile. Blow or wipe sanded debris from material.

2.2. Apply one coat of Polyamide epoxy primer at 4-6 mils DFT which meets the performance criteria listed below. Apply primer within 12 hours after surface preparation as recommended by the primer coating manufacturer. Cure schedule shall be as recommended by the manufacturer. Primer shall have a one year re-coat window for application of the finish coat.

NOTE: The existing primer is Sherwin-Williams Recoatable Epoxy Primer B58 Series.

2.3. Apply one coat of high performance polysiloxane coating at 4-6 DFT over the primer coating which meets the performance criteria listed below. Top coat color: Fed-STD-595C 26380.

NOTE: The existing top coat on the structure is Sherwin-Williams Sherloxane 800 Polysiloxane B80 Series.

2.4. Primer Performance Requirements:

2.4.1. Primer shall be certified OTC/VOC compliant at less than 2.8 lbs/gal and conform to EPA and local requirements.

2.4.2. Abrasion Resistance: ASTM D4060 (CS17 Wheel, 1,000 grams load) 1kg load, 200 mg loss.

2.4.3. Adhesion: ASTM D4541, 1,050 psi.

2.4.4. Corrosion Weathering: ASTM D5894, 13 cycles, 4,368 hours, 10 per

2.4.5. ASTM D714 for blistering; 7 per ASTM D610 for rusting.

2.4.6. Direct Impact Resistance: ASTM D2794, 160 in.-lbs.

2.4.7. Flexibility: ASTM D522, 180 degrees bend, 1 inch mandrel, Passes.

2.4.8. Pencil Hardness: ASTM D3363, 3H.

2.4.9. Moisture Condensation Resistance: ASTM D4585, 100 degrees F, 2,000 hours. Passes no cracking or delamination.

2.4.10. Dry Heat Resistance: ASTM D2485, 250 degrees F.

2.4.11. Accelerated Weathering: QUV-ASTM D4587 QUV A 5,000 Hours: Passes.

2.4.12. Salt Fog Resistance: ASTM B117, 5,600 hours. No cracking or blisters.

2.5. Finish Coat Performance Requirement:

2.5.1. Abrasion Resistance: ASTM D4060, CS17 wheel, 1,000 cycles, 1 kg load, 119 mg loss

2.5.2. Adhesion: ASTM D4541, 3,494 psi.

2.5.3. Dry Heat Resistance: ASTM D2485, 275 deg F.

2.5.4. Flexibility: ASTM D522, 180 deg bend, 1/8-inch mandrel-Passes.

2.5.5. Pencil Hardness: ASTM D3363, 5H.

2.5.6. Corrosion Weathering: ASTM D5894, 10 Cycles, 3,360 hours-Rating 10 per ASTM D714 for

Blistering, Rating 10 per ASTM D610 for Rusting.

2.5.7. Submit color sample for approval by the Contracting Officer and the PWD ME Cultural

Resources Manager. Color shall match the "silver" color of the Helix Houses.