This amendment modifies a solicitation for the demolition of various buildings as part of an infrastructure reset project. The Navy seeks demolition services at Camp LeJeune in accordance with the provided plans and specifications. Bidders must acknowledge this amendment by the response deadline in order to be considered. Within 10 days of award, the successful bidder must furnish performance and payment bonds each valued at 100% of the contract price. The amendment provides responses to received questions confirming that the Navy's asbestos and environmental reports fully address abatement and remediation requirements at the identified buildings. No additional testing will be necessary prior to commencing the specified demolition work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EMD Decision Memorandum.pdf | ||
| N4008521B2509 Amendment07.pdf | ||
| N4008521B2509 Amendment06.pdf | ||
| Amended Section 01 35 29 Safety and Occupational Health Requirements.pdf | ||
| Amended Section 02 82 16 Removal of Asbestos Materials.pdf | ||
| N4008521B2509 Amendment05.pdf | ||
| N4008521B2509 Amendment04.pdf | ||
| N4008521B2508 Amendment04.pdf | ||
| N4008521B2509 Amendment03.pdf | ||
| N4008521B2509 Amendment02.pdf | ||
| Contractor_Environmental_Guide.pdf | ||
| N4008521B2509 Amendment01.pdf | ||
| N4008521B2509 Solicitation.pdf | ||
| N4008521B2509LeadSurveyReport.pdf | ||
| N4008521B2509 Dwgs.pdf | ||
| N4008521B2509AsbestosSurveyReport.pdf | ||
| N4008521B2509 Specs.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
210005
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
N4008521B2509 Infrastructure Reset Demo Buildings – Package E
Amendment 0008
This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge may constitute grounds for rejection of a bid.
See Continuation Page(s)
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-May-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521B2509
X 9B. DATED (SEE ITEM 11)
18-Mar-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-May-2021
CODE
NAVFACSYSCOM MID-ATLANTIC
ROICC CAMP LEJEUNE
1005 MICHAEL ROAD
CAMP LEJEUNE NC 28547-2521
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008521B2509
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND 0008
This amendment is issued to provide the following information:
1. Delete the Notice of Bonding Requirements from the original solicitation and replace with the following.
NOTICE OF BONDING REQUIREMENTS
Within 10 days of receipt of award, the bidder/offeror to whom the award is made shall furnish the following bond(s) each with satisfactory security:
X Performance Bond (Standard Form 25). The performance bond shall be in a penal sum equal to 100% of the contract price.
X Payment Bond (Standard Form 25A). The payment bond shall be in a penal sum equal to 100% of the contract price.
Any surety company holding a certificate of authority from the Secretary of Treasury as an acceptable Surety on Federal bonds will be accepted. Individual sureties will be permitted as prescribed in FAR 28.203. Alternative types of security in lieu of furnishing sureties on performance and/or payment bonds will be permitted as prescribed in FAR 28.204, and will be held for at least one year after the completion of the contract. Additional bond security may be required as prescribed in FAR 52.228-2. Bonds shall be accompanied by a document authenticating the agent’s authority to sign bonds for the surety company.
The contract time for purposes of finishing the completion date, default and liquidated damages shall begin to run 360 days from the date of award, regardless of when performance and payment bonds or deposits in lieu of surety are executed.
2. RFI responses are provided below.
3. All other terms and conditions remain unchanged.
RFIs Amendment 0008
N4008521B2509
1. Will we be required to verify if there is ACM at the buildings that were not identified to have ACM prior to demolition?
Answer: The base’s per building ACM reports show all ACM present.
2. For buildings that contain ACM according to the survey and drawings, will we be required to verify the quantities?
Answer: No, quantities will be stated on the building ACM report.
3. It does not state there is contaminated soil present at any of the buildings. Will we be required to test the soil before starting demolition?
Answer: No, All soil issues are addressed in the base’s Environmental Division decision memorandum. All guidelines in the said document shall be followed.
(End of Summary of Changes)