Contractor_Environmental_Guide.pdf
PDF 3 MB Posted
- Attached to
- Infrastructure Reset Demo Buildings - Package E Federal contract opportunity
- Solicitation number
- N4008521B2509
About this file
This federal contract opportunity solicitation is for demolition services at various buildings in accordance with provided plans and specifications. The solicitation was issued by the Department of the Navy Naval Facilities Engineering Command for the Infrastructure Reset Demo Buildings package E project. Contractors will demolish multiple buildings on site following the demolition plans and ensuring all regulatory and environmental requirements are met. The response due date is not provided in the solicitation description. The awarded contractor will be responsible for removing all debris from the site and obtaining any necessary permits for the work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4008521B2509 Amendment08.pdf | ||
| EMD Decision Memorandum.pdf | ||
| N4008521B2509 Amendment07.pdf | ||
| N4008521B2509 Amendment06.pdf | ||
| Amended Section 01 35 29 Safety and Occupational Health Requirements.pdf | ||
| Amended Section 02 82 16 Removal of Asbestos Materials.pdf | ||
| N4008521B2509 Amendment05.pdf | ||
| N4008521B2509 Amendment04.pdf | ||
| N4008521B2508 Amendment04.pdf | ||
| N4008521B2509 Amendment03.pdf | ||
| N4008521B2509 Amendment02.pdf | ||
| N4008521B2509 Amendment01.pdf | ||
| N4008521B2509 Specs.pdf | ||
| N4008521B2509AsbestosSurveyReport.pdf | ||
| N4008521B2509 Solicitation.pdf | ||
| N4008521B2509LeadSurveyReport.pdf | ||
| N4008521B2509 Dwgs.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
March 2016
Version Number 3
CAMP LEJEUNE CONTRACTOR ENVIRONMENTAL GUIDE
FINAL
PAGE INTENTIONALLY BLANK
i
TABLE OF CONTENTS
Table of Contents .......................................................................... i
Record of Changes ...................................................................... ix
Certification Page........................................................................ xi
List of Acronyms and Abbreviations ........................................ xiii
Contractor’s Phone Directory ................................................... xix
1.0 Contractor Environmental Guide Overview ................... 1-1
1.1. Key Definitions and Concepts ..................................... 1-3
1.1.1. Key Definitions ................................................. 1-3
1.1.2. Key Concepts .................................................... 1-4
1.2. Installation Background .............................................. 1-5
1.2.1. Environmental Management Division and
Environmental Affairs Department................... 1-6
1.2.2. Expectations ...................................................... 1-7
1.3. Overview of Requirements .......................................... 1-8
1.3.1. Contractor Environmental Guide ...................... 1-9
1.3.2. Environmental and EMS Training .................. 1-10
1.4. Points of Contact ....................................................... 1-12
1.5. Overview Map ........................................................... 1-13
2.0 Environmental Management System .............................. 2-1
2.1. Key Definition and Concepts ...................................... 2-2
2.1.1. Key Definitions ................................................. 2-2
2.1.2. Key Concepts .................................................... 2-3
2.2. Overview of Requirements .......................................... 2-5
2.3. Environmental Management System ........................... 2-6
2.4. EMS Responsibilities .................................................. 2-8
2.5. Contractor Environmental Guide and EMS ................ 2-9 ii
3.0 Training .......................................................................... 3-1
3.1. Key Definitions and Concepts ..................................... 3-2
3.1.1. Key Definitions ................................................. 3-2
3.1.2. Key Concepts .................................................... 3-3
3.1.3. Environmental Management System ................ 3-4
3.2. Overview of Requirements .......................................... 3-4
3.3. Training Requirements ................................................ 3-4
3.3.1. General Environmental Awareness ................... 3-4
3.3.2. Environmental Management System ................ 3-5
3.3.3. Recordkeeping .................................................. 3-5
4.0 Air Quality ...................................................................... 4-1
4.1. Key Definitions and Concepts ..................................... 4-1
4.1.1. Key Definitions ................................................. 4-1
4.1.2. Key Concepts .................................................... 4-2
4.1.3. Environmental Management System ................ 4-3
4.2. Overview of Requirements .......................................... 4-4
4.3. Permit Requirements ................................................... 4-5
4.4. Additional Activities of Concern ................................ 4-6
5.0 Environmental Emergency Planning and Response ....... 5-1
5.1. Key Definitions and Concepts ..................................... 5-1
5.1.1. Key Definitions ................................................. 5-2
5.1.2. Key Concepts .................................................... 5-3
5.1.3. Environmental Management System ................ 5-4
5.2. Overview of Requirements .......................................... 5-4
5.3. Spill Notification ......................................................... 5-6
5.3.1. POL/Hazardous Materials Spill Notification
Procedures ......................................................... 5-6
5.3.2. Wastewater Spill and Water Line Break
Notification ....................................................... 5-8
5.4. Follow-Up ................................................................... 5-9
6.0 Cultural Resources ......................................................... 6-1
6.1. Key Definitions and Concepts ..................................... 6-1 iii
6.1.1. Key Definitions ................................................. 6-1
6.1.2. Key Concepts .................................................... 6-3
6.1.3. Environmental Management System ................ 6-3
6.2. Overview of Requirements .......................................... 6-4
6.3. Procedures ................................................................... 6-7
7.0 Hazardous Materials/Hazardous Waste Management .... 7-1
7.1. Key Definitions and Concepts ..................................... 7-1
7.1.1. Key Definitions ................................................. 7-2
7.1.2 Key Concepts .................................................... 7-5
7.1.3 Environmental Management System ................ 7-8
7.2. Overview of Requirements ........................................ 7-11
7.3. Hazardous Materials Requirements ........................... 7-14
7.4. Universal Waste Requirements ................................. 7-16
7.5. Hazardous Waste Requirements ................................ 7-18
7.5.1. Storage ............................................................ 7-19
7.5.2. Manifesting and Disposal ............................... 7-21
7.6. Non–RCRA-Regulated Waste Requirements ........... 7-22
7.6.1. Used Oil and Oil Filters .................................. 7-22
7.6.2. Used Antifreeze .............................................. 7-24
7.6.3. Petroleum-Contaminated Wipes and Oily Rags . 7-
7.6.4. Used Electronic Equipment ............................ 7-25
7.6.5. New and Used Batteries (Not Regulated as
Universal Waste) ............................................. 7-25
8.0 Asbestos .......................................................................... 8-1
8.1. Key Definitions and Concepts ..................................... 8-1
8.1.1. Key Definitions ................................................. 8-1
8.1.2. Key Concepts .................................................... 8-3
8.1.3. Environmental Management System ................ 8-4
8.2. Overview of Requirements .......................................... 8-5
8.3. Responsibilities Before a Demolition or Renovation
Project .......................................................................... 8-6
8.3.1. Identification of ACM and PACM ................... 8-7 iv
8.3.2. Notification ....................................................... 8-8
8.3.3. Removal ............................................................ 8-8
8.3.4. Training ............................................................. 8-9
8.4. Responsibilities During a Demolition or Renovation
Project .......................................................................... 8-9
8.5. Disposal of ACM Waste ............................................ 8-10
9.0 Lead-Based Paint ............................................................ 9-1
9.1. Key Definitions and Concepts ..................................... 9-1
9.1.1. Key Definitions ................................................. 9-1
9.1.2. Key Concepts .................................................... 9-3
9.1.3. Environmental Management System ................ 9-3
9.2. Overview of Requirements .......................................... 9-4
9.3. Responsibilities Before Renovation or Demolition ..... 9-6
9.4. Permits ......................................................................... 9-8
9.5. Disposal ....................................................................... 9-8
9.6. Training ....................................................................... 9-9
10.0 Natural Resources ......................................................... 10-1
10.1. Key Definitions and Concepts ................................... 10-1
10.1.1. Key Definitions ............................................... 10-2
10.1.2. Key Concepts .................................................. 10-3
10.1.3. Environmental Management System .............. 10-5
10.2. Overview of Requirements ........................................ 10-6
10.3. National Environmental Policy Act ........................ 10-10
10.4. Timber ..................................................................... 10-11
10.5. Threatened and Endangered Species ....................... 10-13
10.6. Wetlands .................................................................. 10-14
10.6.1. Avoidance ..................................................... 10-14
10.6.2. Permits .......................................................... 10-15
10.6.3. Impacts .......................................................... 10-18
10.6.4. Mitigation ...................................................... 10-19
10.7. Temporary Construction .......................................... 10-20 v
11.0 Stormwater ................................................................... 11-1
11.1. Key Definitions and Concepts ................................... 11-1
11.1.1. Key Definitions ............................................... 11-2
11.1.2. Key Concepts .................................................. 11-5
11.1.3. Environmental Management System .............. 11-8
11.2. Overview of Requirements ........................................ 11-9
11.3. Prior to Site Work .................................................... 11-11
11.3.1. Construction Notifications ............................ 11-12
11.3.2. Familiarity with the Stormwater Phase I Industrial
Permit ............................................................ 11-12
11.3.3. Familiarity with the Stormwater Phase II
Municipal Permit .......................................... 11-13
11.3.4. Project-Specific Construction Permits .......... 11-13
11.4. Responsibilities During Site Work .......................... 11-16
12.0 Solid Waste, Recycling, and Pollution Prevention (P2) . 12-
12.1. Key Definitions and Concepts ................................... 12-1
12.1.1. Key Definitions ............................................... 12-2
12.1.2. Key Concepts .................................................. 12-3
12.1.3. Environmental Management System .............. 12-4
12.2. Overview of Requirements ........................................ 12-5
12.3. Solid Waste Requirements ........................................ 12-7
12.3.1. MCB Camp Lejeune Landfill Acceptable Waste
Streams ............................................................ 12-9
12.4. Recycling Requirements .......................................... 12-14
12.4.1. Recycling Center ........................................... 12-15
12.4.2. Other Recyclables ......................................... 12-16
12.5. Pollution Prevention and Green Procurment ........... 12-17
13.0 Potential Discovery of Undocumented Contaminated
Sites .............................................................................. 13-1
13.1. Key Definitions and Concepts ................................... 13-2
13.1.1. Key Definitions ............................................... 13-2
13.1.2. Key Concepts .................................................. 13-3 vi
13.1.3. Environmental Management System .............. 13-3
13.2. Overview of Requirements ........................................ 13-3
13.3. Unforeseen Site Condition Procedures ...................... 13-4
13.3.1. Petroleum, Oil, and Lubricants ....................... 13-5
13.3.2. Munitions and Ordnance ................................. 13-6
14.0 Permitting ..................................................................... 14-1
14.1. Key Definitions and Concepts ................................... 14-1
14.1.1. Key Definitions ............................................... 14-1
14.1.2. Key Concepts .................................................. 14-2
14.1.3. Environmental Management System .............. 14-3
14.2. Overview of Requirements ........................................ 14-3
14.3. Project Permits and Approvals .................................. 14-3
14.3.1. Stormwater (Section 11.0) .............................. 14-4
14.3.2. Asbestos (Section 8.0) .................................... 14-5
14.3.3. Lead-Based Paint (Section 9.0)....................... 14-5
14.3.4. Air Quality (Section 4.0) ................................. 14-6
14.3.5. Wetlands (Section 10.6) .................................. 14-7
14.3.6. Drinking Water/Wastewater ........................... 14-8 vii
List of Tables
Table 1-1. Contacts in Case of a Spill ..................................... 1-13
Table 2-1. Practices Identified Under MCB Camp Lejeune’s
EMS ..................................................................... 2-10
Table 5-1. Environmental Emergency Response Contacts ....... 5-3
Table 12-1. Base Landfill Requirements .............................. 12-11
List of Figures
Figure 1-1. Environmental Management Division (MCB Camp
Lejeune) Organization Chart ................................. 1-7
Figure 1-2. Environmental Affairs Department (MCAS New
River) Organization Chart .................................... 1-7
Figure 1-3. Overview Map ...................................................... 1-14
Figure 2-1. Plan, Do, Check, Act Cycle ................................... 2-4
Figure 2-2. Potential Interactions of Construction and Demolition
Activities with the Environment ............................ 2-7
Figure 6-1. Possible Cultural Resource Discovery Flow Chart 6-8
Figure 7-1. Diamond Hazard Label .......................................... 7-7
Attachments and Appendix
Attachment 2-1 MCB Camp Lejeune’s Environmental Policy
Statement
Attachment 3-1 Spill Reporting Form
Attachment 4-1 Weekly Hazardous Waste (HW) Site
Inspection Form MCB Camp Lejeune
Attachment 4-2 Weekly Hazardous Waste (HW) Site
Inspection Form MCAS New River
Appendix General EMS & Environmental Awareness
Training for Contractors & Vendors viii ix
RECORD OF CHANGES
Date Description of
Changes Page # Name/Initials x xi
CERTIFICATION PAGE
I certify that I have read, understood, and accept this document and all attachments, and that all those within my party working on a job site within Marine Corps Base Camp Lejeune and/or
Marine Corps Air Station New River will comply with the environmental policies and regulations herein. I am aware that there are penalties for not complying with this Guide.
Signature
Date xii xiii
LIST OF ACRONYMS AND
ABBREVIATIONS
ACM Asbestos-Containing Material
AHERA Asbestos Hazard and Emergency Response
Act
AHPA Archaeological and Historic Preservation
Act
ARPA Archeological Resource Protection Act
ASHARA Asbestos School Hazard Abatement
Reauthorization Act
ASD Accumulation Start Date
ASO Air Station Order
BMP Best Management Practice
BO Base Order
C&D Construction and Demolition
CAA Clean Air Act
CAMA Coastal Area Management Act
CERCLA Comprehensive Environmental Response, Compensation, and Liability
CETEP Comprehensive Environmental Training and
Education Program
CFC Chlorofluorocarbon
CFR Code of Federal Regulations
CG Commanding General
CWA Clean Water Act
CZMA Coastal Zone Management Act
DHHS Department of Health and Human Services
DLADS Defense Logistics Agency Disposition
Services
DM Decision Memorandum xiv
DMM Discarded Military Munitions
DoD Department of Defense
DoN Department of Navy
DOT Department of Transportation
DRMS Defense Reutilization and Marketing
Service
EA Environmental Assessment
EAD Environmental Affairs Department
ECON Environmental Conservation Branch
EISA Energy Independence and Security Act
EHS Extremely Hazardous Substances
ELLAP Environmental Lead Laboratory
Accreditation Program
EMD Environmental Management Division
EMS Environmental Management System
EO Executive Order
EOD Explosives and Ordnance Disposal
EPA Environmental Protection Agency
EPR Extended Producer Responsibility
EPCRA Emergency Planning and Community Right-to-Know Act
EPEAT Electronic Product Environmental
Assessment Tool
FAR Federal Acquisition Regulation
FIFRA Federal Insecticide, Fungicide, and
Rodenticide Act
FSC Facilities Support Contracts
FWS Fish and Wildlife Service
GIS Geographic Information System
GP Green Procurement
HAP Hazardous Air Pollutants xv
HCFC Hydrochlorofluorocarbon
HCS Hazard Communication Standard
HHCU Health Hazards Control Unit (North
Carolina)
HM Hazardous Material
HMTA Hazardous Materials Transportation Act
HQMC Headquarters Marine Corps
HQW High Quality Water
HVAC Heating, Ventilation, and Air Conditioning
HW Hazardous Waste
HWMP Hazardous Waste Management Plan
IGI&S Installation Geospatial Information &
Services
INRMP Integrated Natural Resources Management
Plan
IRP Installation Restoration Program
LBP Lead-Based Paint
LDA Land-Disturbing Activities
LQG Large Quantity Generator
MAG Marine Aircraft Group
MCAS Marine Corps Air Station
MCB Marine Corps Base
MCM Minimum Control Measure
MCIEAST Marine Corps Installations East
MCO Marine Corps Order
MEC Munitions and Explosives of Concern
MEF Marine Expeditionary Force
MRF Materials Recovery Facility
MS4 Municipal Separate Storm Sewer Systems
MSW Municipal Solid Waste
NAPL Non-Aqueous Phase Liquid xvi
NC North Carolina
NCAC North Carolina Administrative Code
NCDAQ North Carolina Department of Air Quality
NCDCM North Carolina Division of Coastal
Management
NCDEQ North Carolina Department of
Environmental Quality
NCDFR North Carolina Division of Forest Resources
NCDMS North Carolina Division of Mitigation
Services
NCDWR North Carolina Division of Water Resources
NEPA National Environmental Policy Act
NESHAP National Emission Standards for Hazardous
Air Pollutants
NHPA National Historic Preservation Act
NPDES National Pollutant Discharge Elimination
System
NPL National Priorities List
NRC National Response Center
NRHP National Register of Historic Places
ODS Ozone-Depleting Substance
OPA Oil Pollution Act
ORW Outstanding Resource Water
OSHA Occupational Safety and Health
Administration
OWS Oil-Water Separator
P2 Pollution Prevention
PACM Presumed Asbestos-Containing Material
PCB Polychlorinated biphenyl
POC Point of Contact
POL Petroleum, Oil, and Lubricant
PPA Pollution Prevention Act ppm Parts Per Million xvii
PPV Public-Private Venture
PWD Public Works Division
QRP Qualified Recycling Program
RACM Regulated Asbestos-Containing Material
RCRA Resource Conservation and Recovery Act
RCRS Resource Conservation and Recovery
Section
ROICC Resident Officer in Charge of Construction
RRP Renovation, Repair, and Painting
SAA Satellite Accumulation Area
SARA Superfund Amendments & Reauthorization
Act
SDS Safety Data Sheet
SHPO State Historic Preservation Officer
SPCC Spill Prevention Control and
Countermeasures
SSPP Strategic Sustainability Performance Plan
SWDA Solid Waste Disposal Act
SWPPP Stormwater Pollution Prevention Plan (Also referred to as SPPP in NC)
T&P Treatment and Processing
TCLP Toxic Characteristic Leaching Procedure
TSD Treatment, Storage, and Disposal
TSI Thermal System Insulation
ULCP Unit Level Contingency Plan
USC United States Code
USACE United States Army Corps of Engineers
USMC United States Marine Corps
UW Universal Waste xviii
UXO Unexploded Ordnance
XRF X-Ray Fluorescence xix
CONTRACTOR’S PHONE DIRECTORY
In the event of an emergency, refer to the emergency numbers below. All non-emergency contractor inquiries regarding the operations at Marine Corps Base (MCB) Camp
Lejeune and Marine Corps Air Station New River should be directed to the Resident Officer in Charge of Construction
(ROICC) or Contract Representative. The ROICC or
Contract Representative will either directly contact or refer contractors to the appropriate Division or Organization.
Emergency and Important Non-Emergency Numbers
Fire and Emergency Services Division 911
Ambulance 911
Hearing Impaired (910) 451-4444
CHEMTREC (Emergency 24-hour/Outside MCB Camp
Lejeune) (800) 424-9300
Hazardous Chemical Spill 911
Military Police 911
National Response Center (Outside MCB Camp
Lejeune) (202) 372-2428
Toll Free (800) 424-8802
Provost Marshall Office 911
Marine Corps Base Camp Lejeune
Operator/ Directory Assistance (910) 451-1113
Confined Space Program Manager (910) 451-5725
Environmental Management Division (910) 451-5003
-Environmental Compliance Branch (910) 451-5837 xx
Asbestos Management
Resource Conservation and Recovery Section
(910) 451-1482
Hazardous Material Consolidation Site/Free Issue
(910) 451-1482
Recycling Center, Building 982 (910) 451-4214
-Environmental Conservation Branch (910) 451-5063
Fish & Wildlife
Forestry Management
NEPA
Conservation Law Enforcement
................................................ (910) 451-2196/5226
-Environmental Quality Branch (910) 451-5068
Air Quality
Underground Storage Tanks
Water Quality
Explosives and Ordnance Disposal (910) 451-0558
Public Works Division (910) 451-5307
-Construction Project Managers (910) 451-2583
-Contracts Branch (910) 451-2582
-Officer In Charge of Construction (Main) (910) 451-2581
-Public Works Base Utility Director (910) 451-5024
Water Line Break/Wastewater Line Break (910)
451-7190 (x225)
-Public Works Solid Waste Division/Landfill
(910) 451-2946
Range Control (910) 451-3064
Regional Geospatial Information & Services (Installation
Manager) (910) 451-8915
Safety Department (910) 451-5725 xxi
Marine Corps Air Station New River
Confined Space Program (910) 449-4964
Consolidated Hazardous Material Reutilization and
Inventory Management Program (910) 449-4531/4533
Environmental Affairs Department
(Director) (910) 449-5441
-Environmental Affairs Department (Environmental
Manager) (910) 449-5442
-Environmental Affairs Department (GIS
Manager) (910) 449-6144
-Environmental Affairs Department (Hazardous
Waste) (910) 449-5997
-Conservation Law Enforcement (910) 449-0108
Explosives Safety Officer (910) 449-5443
Military Police (Non-Emergency) (910) 449-4248/4249
Public Works Division (910) 449-6506
-Officer In Charge of Construction (910) 449-5587
Safety Department (910) 449-4527
1-1
1-1
1.0 CONTRACTOR
ENVIRONMENTAL GUIDE
OVERVIEW
Environmental protection is an integral part of the Marine
Corps mission in order to protect public health, preserve environmental quality, comply with regulatory requirements, and develop and strengthen relationships between the Marine Corps community and external stakeholders. The purpose of the MCB Camp Lejeune
Contractor Environmental Guide is to assist contractors working aboard Marine Corps Installations East’s
(MCIEAST’s) Marine Corps Base (MCB) Camp Lejeune and Marine Corps Air Station (MCAS) New River in maintaining the mission by complying with Federal and
State environmental laws and regulations, as well as the
United States Marine Corps
(USMC) and installation environmental policies. This guide is written in accordance with Marine Corps Order
(MCO) P5090.2A and designed to answer many of the environmental questions that arise, as well as to provide pertinent information on environmental topics and training requirements.
NOTE: This document should be used only as a guide to the environmental issues contractors may face while working
This document should be used only as a guide to the environmental issues contractors may face while working aboard MCB Camp Lejeune and MCAS New River.
This document should be used only as a guide to the environmental issues contractors may face while working aboard MCB Camp Lejeune and MCAS New River.
1-2 aboard MCB Camp Lejeune and MCAS New River. It is expected that contractors will work closely with the
Environmental Management Division (EMD) at MCB Camp
Lejeune, the Environmental Affairs Department (EAD) at
MCAS New River, and Contract Representatives regarding environmental management issues, concerns, and/or questions. Should the need arise, this guide provides contractors with EMD, EAD, and emergency response points of contact (POCs). All initial inquiries should be directed to the Resident Officer in Charge of
Construction (ROICC) or
Contract Representative, who will either direct the contractor or contact the appropriate environmental office if additional clarification regarding an environmental issue is necessary.
NOTE: It is very important to note that this guide is designed to provide requirements specific to MCB Camp Lejeune-issued contracts. It is the contractor’s responsibility to know and comply with all Federal, State, and local regulations.
MCB Camp Lejeune environmental personnel will assist contractors with compliance issues; however, the primary burden of regulatory identification, familiarity, and compliance lies with the contractor. This training does not replace any required regulatory environmental training or certification as per contract requirements. All required environmental training should be completed prior to working at MCIEAST installations.
Contact the ROICC or Contract Representative with any questions.
1-3
NOTE: It is the contractor’s responsibility to review the project-specific contract and specifications. Additional environmental requirements, submissions, and/or meetings not documented in this guide may be required.
1.1. KEY DEFINITIONS AND CONCEPTS
The following key definitions and concepts are used throughout this guide. If you have any questions about these definitions or concepts, please consult the ROICC or
Contract Representative, who will contact the appropriate environmental office if additional clarification is necessary.
1.1.1. Key Definitions
Environment. Surroundings, to include all surface water, groundwater, drinking water supply, land surface or subsurface area, or ambient air within the
United States or under the jurisdiction of the United
States, including manmade structures, indoor air environments, natural resources, and archeological and cultural resources.
Environmental Management Division. MCB
Camp Lejeune’s division responsible for environmental issues and compliance at MCB Camp
Lejeune.
Environmental Affairs Department. MCAS New
River’s department responsible for environmental issues and compliance at MCAS New River.
Environmental Management System (EMS). A systematic approach for integrating environmental
1-4 considerations and accountability into day-to-day decisionmaking and long-term planning processes across all missions, practices, and functions. The
EMS institutionalizes processes for continual environmental improvement and reducing risks to mission through ongoing planning, review, and preventive or corrective action.
1.1.2. Key Concepts
Environmental Requirement. A defined standard pertaining to environmental compliance, pollution prevention (P2), or natural/cultural resources, subject to uniform application. Environmental requirements may be in the form of a law, regulation, Executive
Order (EO), policy, ordinance, permit, Base Order
(BO), or other form that prescribes a standard.
Executive Order. Legally binding orders given by the President, as head of the Executive Branch, to direct Federal agencies and officials in their execution of congressionally established laws or policies.
MCB Camp Lejeune. Throughout this document, MCB Camp Lejeune includes all MCB Camp
Lejeune real property and contracts for work performed at MCAS New River and all outlying fields associated with MCB Camp Lejeune.
Marine Corps Order. A directive of continuing authority or information, meant to be a permanent reference and requiring continuing action, issued by
Headquarters Marine Corps (HQMC). In accordance
1-5 with MCO 5215.1K (10 May 2007), all MCOs shall, where applicable: establish, describe, or change existing policy, programs and major activities, and organizations; define missions; assign responsibilities; issue procedural guidance; and be written in standardized format.
Resident Officer In Charge of Construction. The
ROICC administers construction contracts and is the contractor’s first line of contact with the government.
Regulatory Requirements. Government (including
Federal, State, and local) environmental regulations implemented by environmental statutes. Federal regulations often establish minimum standards for
State and local governments’ implementing programs.
Statutory Requirements. Federal environmental statutes are laws that generally require compliance by U.S. Department of Defense (DoD) installations.
1.2. INSTALLATION BACKGROUND
MCB Camp Lejeune was established in 1941 in Onslow
County, along the southern coast of North Carolina (NC).
MCB Camp Lejeune is just south of MCAS New River.
MCB Camp Lejeune takes advantage of 156,000 acres and
11 miles of beach capable of supporting amphibious operations, 32 gun positions, 48 tactical landing zones, three state-of-the-art training facilities, and 80 live fire ranges for its training mission.
1-6
The primary function of MCB Camp Lejeune is national defense, providing a home installation for the II Marine
Expeditionary Force (MEF), 2nd Marine Division, 2nd
Force Service Support Group, and other combat units and support commands. MCB Camp Lejeune’s mission is to maintain combat-ready units for expeditionary deployment.
MCB Camp Lejeune maintains and utilizes supply warehouses, maintenance shops, hazardous material storage, nonhazardous and hazardous waste storage, bulk fuel storage and transfer facilities, fleet parking, housing areas, recreational areas, two golf courses, and a marina.
MCAS New River is the principal USMC helicopter operating location on the East Coast and supports aircrew training in the H-53 helicopter. It is also the evaluation and prospective bed-down site for the V-22 Osprey. The mission of MCAS New River is to provide the necessary support for its Marine Aircraft Group (MAG) tenant units, MAG-26 and
MAG-29.
1.2.1. Environmental Management Division
and Environmental Affairs Department
MCB Camp Lejeune’s EMD, within the Installation and
Environment Department, is responsible for all natural resource and environmental matters aboard the installation.
EMD works closely with MCB Camp Lejeune personnel, educating and training them to comply with environmental laws while accomplishing the military mission.
The EAD at MCAS New River works closely with the EMD on environmental compliance and protection matters. Due to
1-7 various joint operations, MCB Camp Lejeune and MCAS
New River participate together in one EMS. See Figure 1-1 and Figure 1-2 for organization charts of EMD and EAD.
Figure 1-1. Environmental Management Division (MCB
Camp Lejeune) Organization Chart
Figure 1-2. Environmental Affairs Department (MCAS New
River)
Organization Chart
1.2.2. Expectations
Contractors aboard the installation, which are committed to strict compliance with environmental laws and regulations, 1-8 assist MCB Camp Lejeune in providing the best possible training facilities for today’s Marines and Sailors, while honoring our environmental responsibilities and objectives.
Violation of environmental laws may result in severe civil or criminal penalties and fines.
1.3. OVERVIEW OF REQUIREMENTS
Contractors operating aboard MCB Lejeune and MCAS
New River must be aware of and adhere to all applicable environmental regulations and requirements, which include but may not be limited to the following:
EO 12088, Federal Compliance with Pollution
Control Standards (October 13, 1978). Requires all facilities owned by or leased to or by the military to be designed, operated, and maintained in compliance with all applicable environmental standards. Military and civilian personnel must cooperate with Federal, State, and local environmental protection agencies and comply with applicable standards and criteria issued by these agencies to the extent permitted by law.
EO 13423, Strengthening Federal Environmental, Energy, and Transportation Management.
Requires Federal agencies to comply with applicable
Federal, State, local, and host nation environmental laws and regulations. Additionally, requirements include more widespread use of EMSs as the framework for sustainability management.
http://www.archives.gov/federal-register/codification/executive-order/12088.html http://www.archives.gov/federal-register/codification/executive-order/12088.html http://www.gpo.gov/fdsys/pkg/FR-2007-01-26/pdf/07-374.pdf
1-9
EO 13514, Federal Leadership in Environmental, Energy, and Economic Performance. Requires
Federal agencies to meet various sustainability goals, to include the reduction of greenhouse gas emissions.
Applicable provisions for meeting these goals are to be included in acquisition and service contracts.
MCO P5090.2A, Environmental Compliance and
Protection Manual (26 August 2013). USMC policies and responsibilities for compliance with environmental statutes and regulations, as well as the management of USMC environmental programs.
1.3.1. Contractor Environmental Guide
This guide consists of the following information:
MCB Camp Lejeune Contractor Environmental
Guide
EMS overview and requirements
Environmental program-specific requirements
MCB Camp Lejeune General EMS and
Environmental Awareness Training for Contractors and Vendors
Signature Page https://www.fedcenter.gov/programs/eo13514/ https://www.fedcenter.gov/programs/eo13514/ http://www.dodnaturalresources.net/MCO_P5090_2A_W_CH_1-3_2013.pdf http://www.dodnaturalresources.net/MCO_P5090_2A_W_CH_1-3_2013.pdf
1-10
Prior to beginning work onsite, or within 30 days of beginning work onsite, all contractors and their employees performing work aboard MCB Camp
Lejeune must review these materials and complete EMS and
General Environmental
Awareness training. This guide summarizes the EMS and environmental programs at
MCB Camp Lejeune, as well as key requirements associated with the various environmental issues contractors may encounter while performing work aboard the installation.
Contractors are expected to work with their ROICC or Contract
Representatives and EMD/EAD when environmental concerns or issues arise.
1.3.2. Environmental and EMS Training
In accordance with Department of Defense (DoD) instructions and MCOs, EMD has implemented a
Comprehensive Environmental Training and Education
Program (CETEP). The goal of the CETEP is to ensure that appropriate environmental instruction and related information are provided to all levels of the Marine Corps in the most effective and efficient manner to achieve full compliance with all applicable environmental training
Prior to beginning work onsite, or within 30 days of beginning work onsite, all contractors and their employees performing work aboard MCB Camp Lejeune must review these materials and complete EMS and General Environmental Awareness training.
Prior to beginning work onsite, or within 30 days of beginning work onsite, all contractors and their employees performing work aboard MCB Camp Lejeune must review these materials and complete EMS and General Environmental Awareness training.
1-11 requirements. A major component of the CETEP is to provide general environmental awareness training to all individuals associated with the installation, including contractors.
In addition to CETEP requirements, MCB Camp
Lejeune has implemented an installation-wide EMS. The
EMS highlights the fact that the authority and principal responsibility for controlling environmental impacts belong to those commands, units, offices, and personnel (including contractors) whose activities have the potential to impact the environment.
All contractors are required to receive both EMS and general environmental awareness training at the level necessary for their job function. This guide satisfies these training requirements (See the Appendix).
As such, contractors working aboard MCB Camp Lejeune will do the following:
Conduct job responsibilities in compliance with environmental regulations and in conformance with
EMS requirements.
Complete all applicable environmental training and maintain associated records as per contract requirements.
All contractors are required to receive both EMS and general environmental awareness training at the level necessary for their job function.
1-12
Complete EMS and general environmental awareness training, and be aware of and understand the MCB Camp Lejeune Environmental Policy.
Contact their ROICC or Contract Representative immediately regarding environmental and/or EMS issues.
Prior to beginning work onsite or within 30 days, all contractors must sign and date the signature page and return it to the installation Contract Representative. Anyone who works on a contract at any point during the contract period must receive this information and training.
1.4. POINTS OF CONTACT
EMD Branches and phone numbers are found in the
Contractor’s Phone Directory on pages xv and xvi of this
Guide. All initial inquiries regarding an environmental issue should be directed to the ROICC or Contract Representative, who will either directly contact or refer the contractor to the appropriate environmental office if additional clarification is necessary. In the case of a spill or environmental emergency, immediately dial 911. Additional emergency response procedures are provided in Section 5.0 of this Guide.
1-13
Table 1-1. Contacts in Case of a Spill
1.5. OVERVIEW MAP
Figure 1-3 provides an overview map that displays the locations of installation facilities discussed throughout this
Guide.
For spills of: Call:
Follow-up:
Hazardous waste 911 Spill
Report
Unknown materials 911 Spill
Report
Material on a permeable surface
Spill
Report
Any amount of a POL or Hazardous Material
Spill
Report
Material that reaches stormwater inlets or waterways
Nonhazardous waste (910)
451-1482
1-14
Figure 1-3. Overview Map
2-1
2.0 ENVIRONMENTAL
MANAGEMENT SYSTEM
MCB Camp Lejeune and MCAS
New River jointly operate an
EMS, which provides a systematic way of continually implementing environmental requirements and evaluating performance. The EMS is founded on the principles of
MCB Camp Lejeune’s
Environmental Policy, which is endorsed by the Commanding
General (CG). Three key principles of the Environmental
Policy are to:
Comply with relevant environmental laws and regulations;
Prevent pollution; and
Continually improve the EMS.
The EMS promotes sustained mission readiness through actively identifying and implementing opportunities for efficient resource use. The USMC implements EMS at all levels to continually improve environmental compliance programs and meet evolving EOs and DoD requirements for mission sustainability. The EMS highlights the fact that the authority and principal responsibility for controlling environmental impacts belong to those commands, units, Three key principles of the Environmental Policy are to comply with relevant environmental laws and regulations, prevent pollution, and continually improve our EMS.
2-2 offices, and personnel (including contractors and vendors) whose activities have the potential to impact the environment.
2.1. KEY DEFINITION AND CONCEPTS
The following key definitions and concepts are associated with an EMS. Please consult the
ROICC or Contract
Representative with any questions about these definitions or concepts.
2.1.1. Key Definitions
Environment. Surroundings in which an organization operates, including air, water, land, natural resources, flora, fauna, humans, and their interrelation.
Environmental Aspect. A characteristic of an organization’s activities, products, or services that may cause, in normal operation or upset mode, an impact to an environmental or other resource. Each practice may have several aspects.
Environmental Impact. An effect, beneficial or adverse, of a practice’s aspect on an environmental or other resource. Each practice may have several impacts.
Environmental Resources. Sensitive environmental receptors (e.g., air, water, natural
Please consult the ROICC or Contract Representative with any questions.
Please consult the ROICC or Contract Representative with any questions.
2-3 resources) or cultural or historic assets at MCB Camp
Lejeune or MCAS New River, in the surrounding community, within the ecosystem, or beyond, that may be impacted by the operation of practices.
Practice. A unit process that supports a military mission and may impact environmental resources. (It is the ability to impact an environmental resource that is key to defining a practice. However, practices may also impact other resources.)
Practice Owner. Person(s) responsible for control of practices. EMS procedures use the term practice owner when the assignment of more specific responsibilities is left to the owning organizations.
Requirement. Legislation, regulation, or policy issued by any Executive, Federal, State, local, DoD, Department of Navy (DoN), or USMC authority that addresses environmental considerations and requires action.
2.1.2. Key Concepts
Environmental Management System. A systematic approach for integrating environmental considerations and accountability into day-to-day decisionmaking and long-term planning processes across all missions, activities, and functions. The
EMS institutionalizes processes for continual environmental improvement and for reducing risks to mission through ongoing planning, review, and preventive or corrective action.
2-4
Environmental Policy. Public commitment by senior leaders to the management of the installation’s environmental affairs, including environmental compliance, pollution prevention, natural/cultural resource management, cleanup, risk to mission, and continual improvement of the EMS.
Plan, Do, Check, Act. Four-step model by which the
EMS carries out change – Plan: establish objectives and processes; Do: implement and execute the plan;
Check: study and analyze the results; Act: take action based on what you learned.
Figure 2-1. Plan, Do, Check, Act Cycle
2-5
2.2. OVERVIEW OF REQUIREMENTS
Contractors operating aboard MCB Camp Lejeune and
MCAS New River must be aware of and adhere to all applicable regulations and requirements concerning EMS, which include but may not be limited to the following:
EO 13148, Greening the Government Through
Leadership in Environmental Management.
Mandates that environmental management considerations must be an integral component of
Federal Government policies, operations, planning, and management, with the primary goal for each agency to promote the sustainable management of
Federal facility lands through the implementation of cost-effective, environmentally sound practices, and programs to reduce adverse impacts to the natural environment.
EO 13423, Strengthening Federal Environmental, Energy, and Transportation Management.
Establishes the EMS as the primary management approach for addressing environmental aspects, including energy and transportation aspects, and as the reporting mechanism for communicating progress on meeting performance goals.
EO 13514, Leadership in Environmental, Energy, and Economic Performance. Requires continuing implementation of formal EMSs at all appropriate organizational levels to support the sustainability performance requirements of the Order.
http://energy.gov/sites/prod/files/nepapub/nepa_documents/RedDont/Req-EO13148envtlmgmt.pdf http://energy.gov/sites/prod/files/nepapub/nepa_documents/RedDont/Req-EO13148envtlmgmt.pdf http://www.gpo.gov/fdsys/pkg/FR-2007-01-26/pdf/07-374.pdf http://www.gpo.gov/fdsys/pkg/FR-2007-01-26/pdf/07-374.pdf https://www.fedcenter.gov/programs/eo13514/ https://www.fedcenter.gov/programs/eo13514/
2-6
2.3. ENVIRONMENTAL MANAGEMENT
SYSTEM
An EMS is a systematic way to identify and eliminate or minimize the installation’s environmental risk-to-mission.
MCB Camp Lejeune’s EMS identifies practices and their aspects as a starting point for prioritizing environmental management initiatives. Each installation practice, such as construction/renovation/demolition, equipment operation/maintenance/disposal, landscaping, or pesticide/herbicide management and application, has one or more environmental aspects. Figure 2-2 illustrates the simplified potential interactions of one practice, construction/renovation/demolition, with the environment.
2-7
Figure 2-2. Potential Interactions of Construction and
Demolition Activities with the Environment
2-8
2.4. EMS RESPONSIBILITIES
Contractors are expected to understand that the practices they support on the installation may interact with and have the potential to impact the environment. Therefore, it is expected that contractors will do the following:
Review the Contractor
Environmental Guide.
Be aware of the
Environmental Policy
(Attachment 2-1).
Conduct practices in a way that avoids and/or minimizes impacts to the environment by complying with all applicable
Federal, State, and local environmental regulations and BOs.
Be familiar with spill response procedures.
Report all environmental emergencies and spills.
Report any environmental problems or concerns promptly, and notify the ROICC or Contract
Representative.
Respond to data collection efforts upon request.
Contractors are expected to understand that the activities performed on the installation may interact with the environment and have the potential to impact the environment.
Contractors are expected to understand that the activities performed on the installation may interact with the environment and have the potential to impact the environment.
2-9
2.5. CONTRACTOR ENVIRONMENTAL
GUIDE AND EMS
The sections of this Contractor Environmental Guide are categorized based on the type of environmental requirements routinely encountered by contractors at MCB Camp
Lejeune. The following matrix is derived from MCB Camp
Lejeune’s EMS Working Group sessions and relates the contents of this guide to the practices aboard MCB Camp
Lejeune. It is provided to assist contractors in narrowing down specific requirements that may apply to onsite activities.
2-10
Table 2-1. Practices Identified Under MCB Camp Lejeune’s
EMS
MCB Camp Lejeune 2015 Practices E n v E m e rg e n c y R e s p o n s e
S p il l
R e s p o n s e S e c ti o n
.0
H M
/H W
S e c ti o n
P o te n ti a l D is c o v e ry o f
U n d o c u m e n te d
C n ta m in a te d S it e s
S e c ti o n
A s b e s to s
S e c ti o n
L a d
-B a s e d P a in t, c ti o n to rm w a r, c ti o n li d
W a s te R e c y c li n g a n d P
S e c ti o n
T ra in in g c ti o n u lt u ra l R e s o u rc e c ti o n rm it ti n c ti o n ir
Q u a li ty c ti o n
N a tu ra l
R e s o u rc e c ti o n
Battery management p p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u n p p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u
Boat operation/ maintenance
Boat, ramp, dock cleaning
Boiler operation Building operation/ maintenance/ repair
Channel dredging
Chlorination
Composting Construction/demo/ renovation
Cooling tower operation and
De-greasing Drinking water management
Engine operation and
Equipment operation/ maintenance/disposal
Erosion/ runoff control
Fish stocking
2-11
MCB Camp Lejeune 2015 Practices E n v E m e rg e n c y R e s p o n s e S p il l
R e s p o n s e S e c ti o n
/H c ti o n te n ti a l D is c o v e ry o f
U n d o c u m e n n ta m in a te d S it e s S e c ti o n b e s to s
S e c ti o n a d
-B a s e d P a c ti o n rm w a c ti o n li d
W a s te
R e c y c li n g a n d P
S e c ti o n in in c ti o n lt u ra l R e s o u rc e c ti o n rm it ti n c ti o n
Q u a li c ti o n tu ra l
R e s o u rc e c ti o n
Fueling and fuel mgt./ storage
A p p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u
Grease traps
Habitat management
HCP operation
HM storage
HM transportation HW disposal offsite transport
HW satellite accumulation area
HW storage (<90 days)
HW transportation
Land clearing
Landfill gas energy recovery system
Landscaping
Laundry Live fire range operation
Livestock operation
Metal working Non-destructive inspection
ODS/ halon
Packaging/unpack-aging
2-12
MCB Camp Lejeune 2015 Practices E n v E m e rg e n c y R e s p o n s e S p il l
R e s p o n s e S e c ti o n
/H c ti o n te n ti a l D is c o v e ry o f
U n d o c u m e n n ta m in a te d S it e s S e c ti o n b e s to s
S e c ti o n a d
-B a s e d P a c ti o n rm w a c ti o n li d
W a s te
R e c y c li n g a n d P
S e c ti o n in in c ti o n lt u ra l R e s o u rc e c ti o n rm it ti n c ti o n
Q u a li c ti o n tu ra l
R e s o u rc e c ti o n
Paint booth p p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u p li c a b le t o A ll P ra c ti c e s C o n d u c te d A b o a rd
M C
B C a m p L e je u
Paint gun cleaning
Paint removal
Painting
Parts replacement Pesticide/herbicide mgt. and application
Polishing Pumping station/ force main
Range residue clearance
Recreational facilities operation
Road construction and
Rock-crushing operations
Roofing kettle
Sewers
Sidewalk and road deicing
Soil excavation/grading
Solid waste collection/transportatio
Storage tank
2-13
MCB Camp Lejeune 2015 Practices E n v E m e rg e n c y R e s p o n s e S p il l
R e s p o n s e S e c ti o n
/H c ti o n te n ti a l D is c o v e ry o f
U n d o c u m e n n ta m in a te d S it e s S e c ti o n b e s to s
S e c ti o n a d
-B a s e d P a c ti o n rm w a c ti o n li d
W a s te
R e c y c li n g a n d P
S e c ti o n in in c ti o n lt u ra l R e s o u rc e c ti o n rm it ti n c ti o n
Q u a li c ti o n tu ra l
R e s o u rc e c ti o n
Stormwater collection/ conveyance
A p p li c a b le t o A ll P ra c ti c e s C o n d u c b o a rd
M C
B C a m p L e je u p li c a b le t o A ll P ra c ti c e s C o n d u c o a rd
M C
B C a m p L e je u p li c a b le t o A ll P ra c ti c e s C o n d u c o a rd
M C
B C a m p L e je u
Surface washing Swimming pool operation and
Timber management
Universal waste storage/ collection
Urban wildlife
UXO/EOD
operations
Vehicle maintenance
Vehicle parking
Wash rack
2-14
2-15
Attachment 2-1
MCB Camp Lejeune’s Environmental
Policy Statement
2-16
2-17
2-18
3-1
3.0 TRAINING
The contractor is responsible for ensuring that every employee completes a program of classroom instruction or on-the-job training that teaches the employee to perform his or her duties in compliance with
Federal, State, and local regulatory requirements.
To minimize the environmental impact of
MCB Camp Lejeune operations, all civilian and military personnel, including contractors, are required to receive both EMS and general…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .