N4008521B2509 Amendment05.pdf

PDF 218 KB Posted

Attached to
Infrastructure Reset Demo Buildings - Package E Federal contract opportunity
Solicitation number
N4008521B2509
Issued by
Department of the Navy Naval Facilities Engineering Command

About this file

This document is an amendment to a solicitation for the Infrastructure Reset Demo Buildings project at Marine Corps Base Camp Lejeune. The amendment provides responses to contractor questions to clarify the scope of work. The Navy seeks demolition of various structures in accordance with the plans and specifications, with the work including removal of asbestos-containing materials to the base landfill. The contractor must coordinate utility disconnections, dispose of hazardous materials, backfill and grade sites, and restore disturbed areas as required. Clarification was provided that the government will deactivate utilities and that the contractor is responsible for removal and disposal of storage tanks and HVAC equipment.

View the file

Other files for this federal contract opportunity

Other files attached to Infrastructure Reset Demo Buildings - Package E, newest first.
File Type Posted
N4008521B2509 Amendment08.pdf PDF
EMD Decision Memorandum.pdf PDF
N4008521B2509 Amendment07.pdf PDF
N4008521B2509 Amendment06.pdf PDF
Amended Section 01 35 29 Safety and Occupational Health Requirements.pdf PDF
Amended Section 02 82 16 Removal of Asbestos Materials.pdf PDF
N4008521B2509 Amendment04.pdf PDF
N4008521B2508 Amendment04.pdf PDF
N4008521B2509 Amendment03.pdf PDF
N4008521B2509 Amendment02.pdf PDF
Contractor_Environmental_Guide.pdf PDF
N4008521B2509 Amendment01.pdf PDF
N4008521B2509 Specs.pdf PDF
N4008521B2509 Solicitation.pdf PDF
N4008521B2509LeadSurveyReport.pdf PDF
N4008521B2509 Dwgs.pdf PDF
N4008521B2509AsbestosSurveyReport.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

210005

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

N4008521B2509 Infrastructure Reset Demo Buildings – Package E

Amendment 0005

This amendment should be acknow ledged w hen your bid is submitted. Failure to acknow ledge may constitute grounds for rejection of a bid.

See Continuation Page(s)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 7

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Apr-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008521B2509

X 9B. DATED (SEE ITEM 11)

18-Mar-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Apr-2021

CODE

NAVFACSYSCOM MID-ATLANTIC

ROICC CAMP LEJEUNE

1005 MICHAEL ROAD

CAMP LEJEUNE NC 28547-2521

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008521B2509

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMEND 0005

The purpose of this amendment is to provide the following information:

1. An amended Section 02 82 16 Removal and Disposal of Asbestos Materials has been incorporated into the specifications.

2. RFI responses are provided as follows.

3. All other terms and conditions remain unchanged.

RFIs Amendment 0005

1. It appears there are below grade crawl spaces and/or basements associated with several of the buildings.

Please provide drawings showing the square footage of the below grade crawl spaces and/or basements? If there are no drawings, please provide an estimated square footage for each building that might have one.

Answer: Assume that there are no basements for the buildings included.

2. There is no item in bid schedule for “BA152”, which are shown in drawing C‐101 & D‐126 – Package D.

Answer: The building included on the demo list is SBA152. Bid sheet will be updated to reflect this.

3. There is no item in bid schedule for “BLDG 402”, which are shown in drawing C‐105 – Package E.

Answer: Building 402 is not included in this project.

4. For removing underground utility especially underground communication service extends beyond disturbance limit with no nearby termination. Does it intend to cut, cap and remove within disturbance limit? Refer note 5 on C‐106 and similar for any other drawings.

Answer: Utility shall be demolished up to the nearest source junction.

5. Under specification 02 41 00, section 1.3.2 it states, "Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor."

Can we assume that the Government will shut off all electrical, mechanical, and water utilities? If not, can you please clarify which utilities the Government will shut off?

Answer: Yes the government will shut-off all utilities services for contractor removal.

6. Can you Confirm that the above / below m storage tanks will be pumped empty by the Government final rinse and disposal by us.

Answer: This will be the responsibility of the contractor.

7. Can you Confirm that the Government will recover / recycle all freon type coolants and liquids associated with HVAC equipment including but not limited to AC Units window type, pad mounted units, chiller equipment, water fountains, refrigerators etc.

Answer: This will be the responsibility of the contractor.

8. Can You Confirm all items identified in Spec section 02 41 00 demolition 3.1.3 , 3.1.6, 3.1.8 – 3.1.11.4 are to be salvaged and or recycled to the DRMO? If items are to be salvaged, how or where are they to stored?

Answer: All items left on site and inside the building are to be the property of the contractor.

Disposal/Salvage will be at the digression of the contractor.

9. Can You Confirm in Spec section 01 35 29 paragraph 1.7.1 Work Performed Under This Contract Shall Be Level 2?

Answer: Work shall meet Level 2 as specified.

10. Can you Confirm section 02 82 17 paragraph 1, that there is no asbestos permit required and that the work does not involve friable asbestos or non‐friable asbestos that may become friable asbestos and is non‐ regulated asbestos containing material (non‐RACM) as defined in 40 CFR 61 Part 61?

Answer: Amended specification Section 02 82 17 shall be used in place of Section 02 82 17 included in original bid documents.

11. Can you Confirm in Spec section 02 82 17 paragraph 3.1 that the Base Disposal Site is allowed for all of our asbestos work if required?

Answer: The base landfill will accept all asbestos containing materials and tightly adhered lead-based paint materials. All other generated construction and demolition debris needs to go to an off base landfill/site.

12. Can you Confirm section 01 11 00 paragraph 1.1.1 which states that sites will be backfilled leveled and seeded or do we follow N4008521B2508 Amendment 2 RFI’s Amendment 2, question #’s 17,18 & 19?

Answer: All sites will be sodded upon completion of backfill and leveling.

13. On Amendment 2‐ RFI responses #28 & 29 state SSHO has meet all 6 levels. The original specifications

1.7.1 Personnel Qualifications state that Work Performed under this contract shall meet Level 2. Do you really want to have and pay for a level 6 (CSP or CIH) on all four demo projects?

Answer: Yes

14. Being that the Asbestos is listed as NON‐RACM is a CSP, or NIH required while the Ab abatement work is being done? I didn’t see a requirement for one in SECTION 02 82 17

REMOVAL AND DISPOSAL OF NON-REGULATED ASBESTOS CONTAINING MATERIAL

Answer: Please use amended Specification Section 02 82 17 instead of one published in Construction Documents.

15. Question: Please confirm which document takes precedence for this Proposal: The specifications or the design drawings.

Answer: Contract Order of Precedence is defined in FAR 52‐236‐21. In general, treat anything mentioned in the specifications, but not shown on the drawings or shown on the drawings but not included in the specifications, as if shown or mentioned in both. In the case of discrepancies between the drawings and specifications, the specifications take precedence. (As per FC 1‐33‐09N)

16. Question: Specification indicates: That demolition should be conducted in accordance with EM385‐1‐1, and that mechanical demolition is permitted for structures less than 80‐feet in height.

EM385‐1‐1 indicates that a demolition plan is to be developed by a competent person based on the engineering survey with the intent to develop the safest methods of demolition and subsequent material management.

Assuming all ACM and universal wastes are removed from the structure, please confirm it is the Government’s intent for the contractor to utilize conventional demolition (using mechanical means/methods recommended by the Competent Person) for buildings less than 80‐feet; and, that the structural dismantling by mechanized equipment presents the safest and most efficient means to raise the structure to the ground, and methods to sort/segregate metallic debris (for scrap and recyclable materials to DRMO) and construction and demolition (C&D) debris for specified disposal.

Or, are there specific structures where dismantling is required, to be identified by the Government?

Answer: Yes, Buildings must be demolished from top to bottom.

17. Please identify the specific electrical and/or mechanical systems to be salvaged for reuse on the plans or provide a specific list by building.

Please clarify the applicability of the manual dismantlement and recovery of the mechanical, electrical, plumbing, fixtures and the other appurtenances (identified in Section 02 41 00) to mechanical demolition of the structures less than 80‐feet, as manual dismantlement of aforementioned items substantially increases the personal injury risk to workers by:

a. transitioning from safe mechanical removal to hands on labor methods;

b. increases risk of hand and back injuries from manual removal of items

c. additional time workers spend erecting/disassembling elevated work platforms

d. increased risk if fall from work on elevated platforms, manlifts, scaffolding, ladders; and,

e. increased overall duration to demolish buildings (upwards 2‐3x) duration

f. increased utilization of and hazards from crane use to remove joists/girders as whole units.

Answer: All items inside the buildings are considered to be property of the contractor upon award.

Contractor can dispose or retain these items as desired during demolition.

18. The specification includes Sections: 03 30 53 Cast In Place Concrete 31 23 00.00 20 Excavation & Fill 32 10 00 Bituminous Concrete Pavement 32 11 23 Aggregate Base Coarse 33 11 00 Water Distribution 33 30 00 Sanitary Sewers

Please clarify that these sections are included for the contractor to restore areas disturbed by demolition, or damage incurred by the contractor during demolition execution, and that new infrastructure will be placed.

Answer: Yes, correct.

19. Specific Section Questions: 31 23 00.00 20 Excavation & Fill includes a “Criteria for Bidding”

1.5 CRITERIA FOR BIDDING Base bids on the following criteria: a. Surface elevations are as indicated. b. Pipes or other artificial obstructions, except those indicated, will not be encountered. c. Ground water elevations indicated by the boring log were those existing at the time subsurface investigations were made and do not necessarily represent ground water elevation at the time of construction. d. Material character is indicated by the boring logs. e.

Hard materials and rock will not be encountered. f. Borrow material, suitable backfill and bedding material in the quantities required is not available on Government property. g. Blasting will not be permitted. Remove material in an approved manner.

Please confirm this criteria for excavation is intended to access and remove surface to subgrade water supply and sanitary sewer lines to/from the building and cap the connection below the frost line only?

Answer: Yes.

20. Does the government intend for the contractor to remove all potable water mains/sewer lines originating at the source to the building being removed, or that said utilities will be capped a specified distance from the demolished building? If the latter, please specific the distance from the building utilities will be capped and restored to ground surface.

Answer: Remove to extent shown on plans.

21. Please confirm the requirement for repaving asphalt is limited to where subgrade infrastructure was removed or disturbed by demolition.

Answer: Provide to extent shown on plans.

22. Section 01 11 00: Specs indicate that underground utilities need to be located, marked and de‐energized “in locations to be traversed by piping, ducts, and other work to be installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made”.

Question 1: Please define “new work” in the context of the demolition scope of work.

Answer: New work only as indicated on plans.

Question 2: All above grade structures are being removed per the drawings. What piping, ducts, or other work does the Navy anticipate the demolition contractor installing, if any?

Answer: Provide new work only as indicated on plans.

Question 3: Is there a requirement to re‐route underground utilities?

Answer: Only as indicated on plans.

23. Please confirm that as built drawings would be for any substructure left in place (at the direction of the Navy) or the remaining portion of a foundation, duct bank or foundation that is partially removed to specified depth, but may present a future hindrance to future construction.

Answer: Yes, as‐builts will depict items as described.

24. Please provide a list of locations for the designated items to be preserved (IE. cornerstones and document boxes).

Answer: No designated items to be preserved.

25. What is the distance from the work area for dismantlement/demolition work to the:

1) “Designated” material staging area (for the items listed in Specification section 02 41 00)

2) Distance to DRMO facility on Post

3) Distance to the Onsite Landfill

Answer:

1.) All staging areas should be on a set site close proximity to the building getting demolished.

2.) DRMO will not be required as no designated items are to be preserved. All item not removed by the government are the contractor’s property.

3.) Base landfill is located off of Piney Green Road on MCB Camp Lejeune. Distance to landfill will very per job site.

26. Drawing C101‐shows building M103 but this building M103 is not on the bid schedule. Please confirm M103 is not to be included in Package A.

Answer: M103 is not included on the demo list on any packages.

27. Drawing c‐116 is showing building M231A to be removed but the bid schedule does not indicate a separate line item for it. Is this building to be included in M231 or are we not to demo this building?

Package A.

Answer: M231A is the mechanical building for M231 and will be demolished as part of M231.

28. In the contractor environmental guide, it states that contractors can dispose of ACM waste at the MCB

Camp Lejeune Landfill. We want to confirm disposal use of the ACM at the aforementioned Landfill for this project. Are there disposal fees? Also can we contact anyone at the Landfill?

Answer: The base landfill will accept all asbestos containing materials and tightly adhered lead-based paint materials. All other generated construction and demolition debris needs to go to an off base landfill/site.

29. Will MCB Camp Lejeune Public Works perform the utility disconnections to the buildings with our coordination? If yes, is there a fee associated with this support?

Answer: See #5 Response

30. Is there a contact person we can speak to at MCB Camp Lejeune Public Works to better understand how utility disconnections are handled and the associated cost.

Answer: The specifications address the utility disconnection requirements. No associated cost will be addressed to the contractor. All coordination shall be addressed through the NAVFAC contract representatives.

31. Are there sprinkler systems associated with properties to be demolished? If yes, due to the demolition activities, are we responsible for the repair of the sprinkler system if damaged during demolition?

Answer: There are no known lawn sprinkler systems at any of the facilities.

32. Are there sprinkler systems in place to water the ground once the pavement, foundations, and sidewalks are removed?

Answer: No, Contractor to provide watering method to ensure survival of the vegetation.

33. Do you have the other testing results/surveys mentioned related to the asbestos, lead, and or PCBs?

Answer: No additional information is available.

34. Were any of the storage buildings used for ammunition and was any energetic material testing conducted?

Answer: No.

35. If materials are stated to contain less than 1% asbestos per the asbestos survey report, can those materials be disposed of along with regular demolition waste?

Answer: See Amended Specification section 02 82 16 for requirements.

RFI Statement:

The base landfill will accept all asbestos containing materials and tightly adhered lead-based paint materials.

All other generated construction and demolition debris needs to go to an off base landfill/site.

(End of Summary of Changes)