About this file

This memorandum provides details on a federal solicitation from the Department of the Navy Naval Facilities Engineering Command. Solicitation number N4008521B2509 seeks demolition services for various buildings in accordance with provided plans and specifications. Under this opportunity, the selected contractor will demolish infrastructure as part of a reset of demonstration buildings at an unspecified project site. Responses to the solicitation are due on an unspecified date, and the Navy intends to award a contract for these demolition services by an unspecified future date. No other terms or conditions are included in this brief description of the federal contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Infrastructure Reset Demo Buildings - Package E, newest first.
File Type Posted
N4008521B2509 Amendment08.pdf PDF
N4008521B2509 Amendment07.pdf PDF
N4008521B2509 Amendment06.pdf PDF
Amended Section 01 35 29 Safety and Occupational Health Requirements.pdf PDF
Amended Section 02 82 16 Removal of Asbestos Materials.pdf PDF
N4008521B2509 Amendment05.pdf PDF
N4008521B2509 Amendment04.pdf PDF
N4008521B2508 Amendment04.pdf PDF
N4008521B2509 Amendment03.pdf PDF
N4008521B2509 Amendment02.pdf PDF
Contractor_Environmental_Guide.pdf PDF
N4008521B2509 Amendment01.pdf PDF
N4008521B2509 Solicitation.pdf PDF
N4008521B2509LeadSurveyReport.pdf PDF
N4008521B2509 Dwgs.pdf PDF
N4008521B2509AsbestosSurveyReport.pdf PDF
N4008521B2509 Specs.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES MARINE CORPS

MARINE CORPS INSTALLATIONS EAST-MARINE CORPS BASE

PSC BOX 20005

CAMP LEJEUNE NC 28542-0005

13 Jan 20

From: Director, Environmental Management Division To: Director, Installation Development Division

Subj: DECISION MEMORANDUM, CATEGORICAL EXCLUSION; MULTIPLE

BUILDING-STRUCTURE HURRICANE DEMOLISH , 19M257CN, (NEPA

LE19122)

Ref: (a) MCO 5090.2

(b) 32 C.F.R. 775.6(f)

Encl: (1) Public Works - Operations Branch REIR of 12 Sep 19

(2) Supporting Documents

(3) Applicable Conditions

1. In response to enclosure (1), this document satisfies the National Environmental Policy Act (NEPA) review requirement under reference (a) and qualifies as a categorical exclusion in compliance with reference (b).

2. As outlined in enclosure (1) and (2), the proposed scope of the project is:

The following buildings and structures will be demolished.

DEMO LIST: 1203, 1307, 1315, 207, 226, 300, 307, 339, 402, 425, 429, 431,

438, 509, 524, 731, 762, AS4128, AS6001, AS6002, AS6003, AS6004, AS6005,

AS6006, AS6007, AS6008, AS6009, AS6010, AS6011, AS6012, AS6013, AS6014,

AS6015, AS6016, AS6017, AS6018, AS6019, AS6020, AS6021, AS6022, AS6023,

AS6024, AS6025, AS6026, AS6027, AS6028, AS6029, AS6030, AS6031, AS6032,

AS6033, AS6034, AS6035, AS6036, AS6037, AS849, BA128, BA130, BA137, BA153,

BA155, BA157, BA158, BA172, BB117A, BB45, BB86, FC240, G642, H85, HP407,

M103, M110, M120, M151A, M151B, M151C, M151D, M231, M234, M235, M237, M301, M302, M314, M319, M401, M402, M408, M419, RR15, RR26, RR3, RR481, RR49, RR51, RR92, S1897, S1906, S2009, SAS2812, SAS3533, SAS4127, SAS514, SBA131, SBA132, SBA149, SBA152, SFC421, SH13, SH22, SH39, SHE22, SM156, SPT32, TC754, TC1005, TC1142, TC1160, TC1161, TC562, TC608, TC775, TC805, TC811, TC813, TC828, TC837, TP445.

3. Pursuant to paragraph (35) of reference (b), this project qualifies for the following categorical exclusion: " (35) Demolition, disposal, or improvements involving buildings or structures when done in accordance with applicable regulations including those regulations applying to removal of asbestos, PCBs, and other hazardous materials.." This project will not result in any extraordinary circumstances.

4. In accordance with NEPA, this decision memorandum documents the proper level of environmental review for this project but may not constitute authority to proceed with implementation of the project. Please carefully

Subj: DECISION MEMORANDUM, CATEGORICAL EXCLUSION; MULTIPLE

BUILDING-STRUCTURE HURRICANE DEMOLISH , 19M257CN, (NEPA

LE19122)

review and follow all conditions in enclosure (3).

5. If the project changes, coordinate with the NEPA Program Manager at (910-451-4542) to determine if this decision memorandum continues to cover your proposed action.

Accepted r/s J. Baker

Receipt Acknowledged Winberry, John F 14 Jan 20

Enclosure 1: REIR

REQUEST FOR ENVIRONMENTAL IMPACT REVIEW

SECTION I - PROPONENT INFORMATION

Project Title: Multiple Building-Structure Hurricane Demolish

Short Plain English Description of Action: This project shall demolish the building/structure, associated sidewalks, pavement, utilities and associated structures and equipment that make up the said property.

Project ID: 19M257CN

Start By Date: 3-Aug-20

End By Date: 28-Jan-22

Activity Sponsor (Unit/Command): Public Works - Operations Branch

Activity Sponsor POC: Frankie Winberry

Phone/Fax: 910-451-3579

Activity Sponsor POC (Alternate):

Phone/Fax:

Base Location: Multiple Locations

Project Required To: Conduct Regular / Recurring Maintenance

Action Will Be Performed By: Contract

Project will result in permanent site improvement?: Yes

New or Modified Real Estate License Will Be Issued By Base?: N/A

Descriptive Information

Purpose and Need of Action: This project will demolish buildings and structures damaged by hurricane Florence. The buildings and structures are beyond repair.

Scope of Project: The following buildings and structures will be demolished. DEMO LIST: 1203, 1307, 1315, 207, 226, 300, 307, 339, 402, 425, 429, 431, 438, 509, 524, 731, 762, AS4128, AS6001, AS6002, AS6003, AS6004, AS6005, AS6006, AS6007, AS6008, AS6009, AS6010, AS6011, AS6012, AS6013, AS6014, AS6015, AS6016, AS6017, AS6018, AS6019, AS6020, AS6021, AS6022, AS6023, AS6024, AS6025, AS6026, AS6027, AS6028, AS6029, AS6030, AS6031, AS6032, AS6033, AS6034, AS6035, AS6036, AS6037, AS849, BA128, BA130, BA137, BA153, BA155, BA157, BA158, BA172, BB117A, BB45, BB86, FC240, G642, H85, HP407, M103, M110, M120, M151A, M151B, M151C, M151D, M231, M234, M235, M237, M301, M302, M314, M319, M401, M402, M408, M419, RR15, RR26, RR3, RR481, RR49, RR51, RR92, S1897, S1906, S2009, SAS2812, SAS3533, SAS4127, SAS514, SBA131, SBA132, SBA149, SBA152, SFC421, SH13, SH22, SH39, SHE22, SM156, SPT32, TC754, TC1005, TC1142, TC1160, TC1161, TC562, TC608, TC775, TC805, TC811, TC813, TC828, TC837, TP445.

Identify Other Alternatives Considered: N/A

Information concerning avoidance, specific best management practices,or mitigation necessary to complete the project: N/A

Preferred and Alternative Sites

Preferred Site Description: N/A

RDD or IDD Comments, Site Approval: Not Applicable

Clarify Pending status:: N/A

Towers working group coordination (if applicable): Not Applicable

Action Sponsor: Frankie Winberry

Rank: GS-11

Title: Engineer Technician

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY

a. AIR QUALITY

1. Will your project involve any of the following?: No

(Indicate all that apply, indicate "new" or "modified" as appropriate):

Abrasive Blasting:

Landfill:

Lime Storage:

Open Burning:

Painting:

Paint Booth:

Paint Gun Cleaners:

Paint Strippers:

Refrigerant Storage Recovery, and/or Recycling:

Tanks (ASTs, USTs):

Surface Coating:

Welding:

Woodworking:

Boilers:

Generators:

Engine Test Stands:

Fiberglass Repair:

Bulk Chemical Storage (liquid or solid):

Remediation:

Grinding:

Jet Engine Testing:

Fuel Dispensing:

Parts Oven:

Parts Cleaner:

Fire Training Pit:

Provide proposed construction dates, equipment size, specification, and estimated types.: N/A

2. Will pollution control equipment be involved (e.g.filter or incinerators)?: No

3. Will the project involve the use of disposal of asbestos?: Yes

4. Will project cause dust problems either temporarily during construction or over the long term?: Yes

b. LAND QUALITY

1. Number of acres involved? Indicate total project area and total disturbed area.: Less than one acre for most sites

2. Will the action require use of earthen fill material?: Yes

3. Will vegetation be cleared?: Yes

4. Will the project increase impervious area by 10,000ft squared or more?: No

5. Will wetlands be involved? How many acres? What work will be done in wetlands?': No

c. GROUNDWATER QUALITY

1. Does the project involve use of herbicides, insecticides, or pesticides?: No

2. Does the project involve installation/use of septic tanks, leach beds, or other on-site disposal of sanitary waste?: No

3. Will there be any wells dug or any excavation deeper than 20 feet?:

No

4. Will the project generate or use any toxic or hazardous/waste materials?: No

5. Are there any known Installation Restoration Program (Comprehensive Environmental Response, Compensation, and Liability Act - CERCLA or Resource Conservation Recovery Act - RCRA) sites or hazardous waste treatment, storage, and disposal (RCRA) facilities within the proposed project area?: No

6. Will there be an increase of solid waste (temporarily or permanently) caused by implementing the project/action?: No

7. Will the project or action be carried out within 100 to 500 feet of a drinking water supply well? If yes, provide distance to nearest drinking water well.: No

8. Does the project require the installation or removal of any petroleum or non-petroleum underground storage tank (UST)?: No

d. SURFACE WATER QUALITY

1. Is the project located on or in a water body or adjacent to or in the 100-year flood plain?: No

2. Will the project involve construction of drainage ditches/underground drains for purposes of lowering water table?: No

3. After construction is complete, will petroleum products including fuel, oil and lubricants be routinely stored or used (temporarily or permanently) at the site? : No

4. Does the project require the installation of any petroleum or non-petroleum above ground storage tank (AST)?: No

e. NATURAL RESOURCES

1. Will trees be removed?: Yes

Amount to be removed:: Just trees adjacent to the structures and buildings

2. Will shrubs, or other low-growing vegetation be cut?: Yes

3. Will completion of the project result in a change in land use from what is presently shown in the Base Master Plan? : No

4. Will public access for hunting, boating, fishing, ect., be restricted?: No

5. Are there potential effects on any threatened or endangered species?:

No

6. Does the project involve the transfer (purchase, sale, lease, easement or otherwise) of any real estate interest?: No

f. CULTURAL RESOURCES

1. Are there any known archaeological sites in the area of your project/action?: No

2. Are there any known historic buildings or districts affected by the project/action?: Yes

3. If known, please contact the Base Archaeologist/Cultural Resources Program Manager for assistance at (910) 451-7230.:

g. UTILITIES AND SERVICES

1. Will utilities be required? : No

If yes, please list below.: N/A

2. Will modifications to existing utilities be required? : Yes

If yes, please list below.: The utilities will be terminated at the nearest junction point.

h. SOCIAL ECONOMIC CONSIDERATIONS

1. Will the project cause an increase/decrease in on-base or off-base military population? : No

2. Will there be any increased demand on a local or state government to provide services? : No

3. Will there be any changes to traffic flow and patterns on or off base?: No

4. Will the project cause noise or safety issues that could potentially impact off-base persons or property either during construction or from the project itself?: No

i. GENERAL CONSIDERATIONS

1. Are alternative procedures, practices, or technologies available to minimize environmental impact or utility use? : No

2. Are there likely effects on the human environment that::

Explain YES answers here:: N/A

End of Form

Enclosure 2: Site Map

Image A: Ammo Storage Area; 3 Demo's

Image B: Ammo Way; 1 Demo

Image C: Camp Johnson North; 16 Demo's

Image D: Camp Johnson South; 4 Demo's

Image E: French Creek; 2 Demo's

Image F: Courthouse Bay; 3 Demo's

Image G: Camp Geiger; 15 Demo's

Image H: Hadnot Point; 22 Demo's

Image I: Paradise Point; 3 Demo's

Image J: Onslow Beach; 12 Demo's

Image K: Stone Bay; 7 Demo's

Image L: MCAS NR; 6 Demo's

Image M: MCAS NR West Cobra Loop; 37 Demo's

Image N: Camp Johnson Wetlands

Image O: Stone Bay Wetlands

Enclosure 3: Applicable Conditions

AST/UST/IR/MRP (Soil):

1. If contaminants are suspected through odors or visual observation during construction activities, immediately stop work, call 911, and contact EQB at 910-451-5878 for further instructions.

2. There are no known monitoring wells in the project areas but if an unmarked well is discovered and inadvertently damaged, immediately contact EQB at 910-451-5878 for further instructions.

3. 3R UXO Safety Awareness Training is recommended for all construction workers (available through EOD, the OICC or EMD) as a precaution given that Camp Lejeune has been an active military base since the 1940s.

Should a munitions-related item be found during construction, follow appropriate notifications as detailed in the 3R training. Any munitions related item found during project construction should additionally be reported to EMD within 10 days (K. Hiortdahl, 910-451-5878) to determine if additional evaluation and precautions are necessary (Explosives Safety Submission, UXO Tech Support, etc).

3R Safety Awareness Training is available online at the following link:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo/

5. Building Comments for Above Ground/Underground Storage Tank Concerns

1203: Former POL Clean up site at SW end of building - Potential for contaminated soils in this area

AS4128: Near active POL remediation site with known groundwater impacts. Potential for contaminated soils. Existing monitoring wells are present in this area and should be protected. If they are damaged or will need to be demolished, the wells should be properly abandoned in accordance with State regulations by a State-licensed well driller.

Replacement wells will need to be installed, please coordinate with UST Program manager for abandonment.

AS849: Former POL Clean up site - Potential for contaminated soils in this area.

BA130 Area (BA128-BE172 & SBA131, -132): Several Former POL Clean up sites - Potential for contaminated soils in this area. Active remediation site for groundwater, would only have impact if deep digging or dewatering.

FC240: Former POL Clean up site - Potential for contaminated soils in this area.

M234 & M235: Shallow groundwater contamination present. Active POL Clean up site - Potential for contaminated soils in this area.

RR15, RR51, RR49: Former POL Clean up site - Potential for contaminated soils in this area.

SAS3533: This site is located within a Land Use Restriction (LUR) for soil. Any disturbed soil within the LUR boundary must remain on-site.

If soil is to leave the site, it must be sampled and properly disposed of.

Potential soil contamination outside the LUR for this area. See attached figure.

6. If contaminated soils are encountered construction activities that require digging into the soil will require additional safety precautions (such as 40 hour HAZWOPER training) and waste management (disposal) for soils in accordance with the most current Waste Management Plan. Contact the UST Program Manager (T. Richard, 451-9461) for additional details.

7. AST Tank removal - If any removal of ASTs are included in this project please coordinate with Program Manager (T. Richard, 451-9461). Ensure the tank is properly drained and cleaned. The tank shall be triple rinsed to ensure all vapors are removed before disposal. Waste water from the rinsing shall be containerized and properly disposed of. Demolished tank information will need to be provided (Location, Size, contents, etc).

8. There are no known Installation Restoration issues associated with the subject project. However, these projects are within historic and/or known operational range areas and it is recommended (although not regulatorily required) that the area be assessed for possible surface or buried UXO before construction begins. Recommend coordinating with Range Control on appropriate safety requirements for construction.

9. Building Comments for Installation Restoration Concerns

Associated IR Site: IR-78 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-78 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

Associated IR Site: IR-78 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-78 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

Associated IR Site: IR-88 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-88 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

Associated IR Site: IR-99

Comments: No IR concerns for the demolition of this building. However, this building sits within IR-99 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

Associated IR Site: Historical Range, UXO-07 Comments: This building sits near a historical range area as well as UXO-07 which was warranted no further action. 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

Associated IR Site: IR-99 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-99 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

Associated IR Site: IR-78, UXO-08 Comments: This building sits within the IR-78 boundary which has an aquifer land use control (LUC) in place. The building also is close to UXO-08 which was warranted no further action. 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-

Staff/Environmental-Mgmt/Training-Video

Associated IR Site: Historical Range, UXO-01 Comments: This building is just outside the boundary of a historical range area as well as UXO-01 which was warranted no further action. 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

Associated IR Site: Historical Range, UXO-01 Comments: This building is near the boundary of historical range areas as well UXO-01 which was warranted no further action. 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

Associated IR Site: Historical Range, UXO-01 Comments: This building is near the boundary of historical range areas as well UXO-01 which was warranted no further action. 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

Associated IR Site: Historical Range, UXO-07 Comments: This building is near the boundary of historical range areas as well UXO-07 which was warranted no further action. 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

Associated IR Site: IR-78 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-78 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

AS4128

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6001

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6002

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6003

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control

AS6004

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6005

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6006

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6007

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6008

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6009

this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6010

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6011

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6012

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6013

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6014

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, AS6015

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6016

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6017

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6018

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6019

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will

AS6020

this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6021

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6022

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6023

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6024

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6025

Associated IR Site: IR-86

AS6026

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6027

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6028

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6029

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6030

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control

AS6031

Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6032

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6033

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6034

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6035

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS6036

need further coordination with the IR Program Manager.

AS6037

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-86 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

AS849

Associated IR Site: N/A Comments: No IR concern, however there are existing monitoring wells present in this area and should be protected. If they are damaged or will need to be demolished, the wells should be properly abandoned in accordance with State regulations by a State-licensed well driller.

Replacement wells will need to be installed.

BA128

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

BA130

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

BA137

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety

Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

BA153

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

BA155

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

BA157

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

BA158

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi

BA172

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

BB117A

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

BB45

Associated IR Site: N/A Comments: No IR concern, however there are existing monitoring wells present in this area and should be protected. If they are damaged or will need to be demolished, the wells should be properly abandoned in accordance with State regulations by a State-licensed well driller.

Replacement wells will need to be installed.

BB86

Associated IR Site: Historic Range Comments: This building sits near a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

FC240

Associated IR Site: UXO-06 Comments: The proposed project area is currently being investigated under the Munitions Response Program (UXO Site 06). Work in this area will require UXO construction support. Explosive Safety documentation will need to be submitted prior to working in this area (30-60 days prior to construction) and coordinated through the IR program. 3R UXO Safety

Awareness Training is required for all construction personnel. Training is available at http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo/.

G642

Associated IR Site: IR-35 Comments: There is known groundwater contamination (volatile organic compounds) in the vicinity of the project area (25-45 ft bgs) associated with Installation Restoration (IR) Site 35. Since the building is just being demolished, there shouldn't be an issue with the digging that deep into the ground water, however if any construction activities that do require digging that deep into the groundwater will require additional safety precautions (such as 40 hour HAZWOPER training) and waste management for groundwater and saturated soils in accordance with the most current Waste Management Plan. Since the building is within the IR-35 site boundary there is an aquifer use restriction LUC in that area.

H85

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

HP407

Associated IR Site: IR-78 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-78 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

M103

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M110

Associated IR Site: IR-86 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-16 and which has an aquifer land use control

M120

Associated IR Site: IR-16 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-16 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

M151A

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M151B

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M151C

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M151D

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M231

Associated IR Site: IR-17 Comments: No IR concerns, however the building is near IR-17 which was warranted no further action. There is shallow groundwater contamination in the vicinity of the building and there are Land Use Restrictions in place for groundwater. Any contaminated groundwater should be containerized and properly disposed of, or sampled prior to dewatering activities.

M234

Associated IR Site: IR-17/UST Concerns Comments: The building is located near IR-17 which was warranted no further action. There is shallow groundwater contamination from POLs under the building and has a Land Use Restriction (LUR) for groundwater. Any encountered groundwater within this LUR boundary must be containerized and properly disposed of, or sampled prior to dewatering activities. There are existing monitoring wells present in this area and should be protected. If they are damaged or will need to be demolished, the wells should be properly abandoned in accordance with State regulations by a State-licensed well driller. Replacement wells will need to be installed.

M235

Associated IR Site: IR-17/UST Concerns Comments: The building is located near IR-17 which was warranted no further action. There is shallow groundwater contamination from POLs under the building and has a Land Use Restriction (LUR) for groundwater. Any encountered groundwater within this LUR boundary must be containerized and properly disposed of, or sampled prior to dewatering activities. There are existing monitoring wells present in this area and should be protected. If they are damaged or will need to be demolished, the wells should be properly abandoned in accordance with State regulations by a State-licensed well driller. Replacement wells will need to be installed.

M237

Associated IR Site: IR-17 Comments: No IR concerns, however the building is near IR-17 which was warranted no further action. There is shallow groundwater contamination in the vicinity of the building and there are Land Use Restrictions in place for groundwater. Any contaminated groundwater should be containerized and properly disposed of, or sampled prior to dewatering activities.

M301

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M302

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M314

Comments: No IR concerns for the demolition of this building.

M319

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M401

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M402

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M408

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

M419

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

RR15

Associated IR Site: Historical Range Comments: This building is located in between multiple historical range areas, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

RR26

Associated IR Site: Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

RR3

Associated IR Site: Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

RR481

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

RR49

Associated IR Site: IR-68/Historical Range Comments: This building sits within IR-68 and which has an aquifer land use control (LUC) in place. The building is also located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

RR51

Associated IR Site: Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

RR92

Associated IR Site: Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

S1897

Comments: No IR concerns for the demolition of this building.

S1906

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

S2009

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

SAS2812

Associated IR Site: Ir-55/UXO-29 Comments: No IR concerns, however, the structure is in the vicinity of IR-55 which was warranted no further action. There is an active UXO site (UXO-29) approximately 1,000 feet west of the building location. It is recommended that 3R UXO Safety Awareness Training be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

SAS3533

Associated IR Site: IR-53 Comments: No IR concerns, however, the structure is in the vicinity of IR-53 which was warranted no further action. There are existing monitoring wells present in this area and should be protected. If they are damaged or will need to be demolished, the wells should be properly abandoned in accordance with State regulations by a State-licensed well driller.

Replacement wells will need to be installed.

SAS4127

Associated IR Site: UXO-30 Comments: No IR concerns, however, the structure is in the vicinity of an active UXO site (UXO-30). It is recommended that 3R UXO Safety Awareness Training be completed for all construction personnel. The 3R Training can be found at the following website:

deo

SAS514

Associated IR Site: IR-86 Comments: There is known shallow and deep groundwater contamination (volatile organic compounds) in the vicinity of the project area associated with Installation Restoration (IR) Site 86, see attachment. Any construction activities that require digging into the groundwater will require additional safety precautions (such as 40 hour HAZWOPER training) and waste management for groundwater and saturated soils in accordance with the most current Waste Management Plan. In addition, notification to the State and U.S. EPA is required a minimum 60 days prior to start of construction to ensure compliance with existing land use restrictions. The notification shall be done by the Installation's Environmental Management Division and coordinated via the construction contractor.

SBA131

Associated IR Site: IR-34/Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

The building is located near IR-34 which was warranted no further action.

SBA132

Associated IR Site: IR-34/Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo The building is located near IR-34 which was warranted no further action.

SBA149

Associated IR Site: IR-34/Historical Range

Comments: This building is located in a historical range area, 3R UXO personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

The building is located near IR-34 which was warranted no further action.

SBA152

Associated IR Site: IR-34/Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo The building is located near IR-34 which was warranted no further action.

SFC421

Associated IR Site: UXO-06 Comments: No IR concerns, however, the structure is in the vicinity of an active UXO site (UXO-06). It is recommended that 3R UXO Safety Awareness Training be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

SH13

Associated IR Site: Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

SH22

Associated IR Site: Historical Range Comments: This building is located in a historical range area, 3R UXO personnel. The 3R Training can be found at the following website:

SH39

Associated IR Site: Historical Range Comments: This building is located in a historical range area, 3R UXO Safety Awareness Training should be completed for all construction personnel. The 3R Training can be found at the following website:

http://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-Vi deo

SHE22

Associated IR Site: Historical Range Comments: No IR concerns, however, the structure is just outside a historical range boundary.

SM156

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

SPT32

Associated IR Site: UXO-28 Comments: The proposed project area is currently being investigated under the Munitions Response Program (UXO Site 28). Work in this area will require UXO construction support. Explosive Safety documentation will need to be submitted prior to working in this area (30-60 days prior to construction) and coordinated through the IR program. 3R UXO Safety Awareness Training is required for all construction personnel. Training is available at:

https://www.lejeune.marines.mil/Offices-Staff/Environmental-Mgmt/Training-V ideo/

TC754

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building

TC1005

Comments:No IR concerns for the demolition of this building

TC1142

Associated IR Site: IR-93 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-93 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

TC1160

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

TC1161

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

TC562

Associated IR Site: IR-35 Comments: There is known groundwater contamination (volatile organic compounds) in the vicinity of the project area (25-45 ft bgs) associated with Installation Restoration (IR) Site 35. Any construction activities that digging that deep into the groundwater will require additional safety precautions (such as 40 hour HAZWOPER training) and waste management for groundwater and saturated soils in accordance with the most current Waste Management Plan. Contact the IR Program (C. Delaney, 451-9385) for additional details.

M608

Associated IR Site: IR-35 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-35 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

TC775

Associated IR Site: IR-35 this building sits within IR-35 and which has an aquifer land use control need further coordination with the IR Program Manager.

TC805

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

TC811

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

TC813

Associated IR Site: IR-93 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-93 and which has an aquifer land use control (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

TC828

Associated IR Site: IR-35, IR-92 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-35 and IR-93 and which have aquifer land use controls (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

TC837

Associated IR Site: IR-35, IR83 Comments: No IR concerns for the demolition of this building. However, this building sits within IR-35 and IR-93 and which have aquifer land use controls (LUC) in place. Any requirements for digging into the groundwater will need further coordination with the IR Program Manager.

TP445

Associated IR Site: N/A Comments: No IR concerns for the demolition of this building.

***NOTE: Most of these buildings are near existing monitoring wells and those wells should be protected. If they are damaged or will need to be demolished, the wells should be properly abandoned in accordance with State regulations by a State-licensed well driller. Replacement wells will need to be installed.

Contact Info:

IR Program, 910-451-5878/9610 AST/UST Program,910-451-9641

Water Quality Program/ECB:

1. This project requires the installation/testing of backflow prevention devices on potable water lines in accordance with the Safe Drinking Water Act. Coordinate with Public Works Design Branch.

2. This project involves a water and/or wastewater line serving more than one building and will require a water or wastewater extension permit. A wastewater extension permit also requires a wastewater flow acceptance form. Coordinate this request through Utilities Director Public Works Division.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .