This is Amendment 0005 to solicitation N4008525R2557, issued by NAVFACSYSCOM Mid-Atlantic ROICC Camp Lejeune on March 5, 2025. The amendment provides questions and answers and adds FAR clause 52.223-23 Sustainable Products and Services (MAY 2024).
The Q&A clarifies that the wage determination is on page 95 of the solicitation with no collective bargaining agreement required. It explains that the $1,500 threshold includes both labor and materials, with anything above that amount being handled as an IDIQ task order. The current pricing spreadsheet is the February 24, 2025 version per Amendment 0004, with CLINs structured as either monthly or per-each basis. CLIN A001AR for the corrosion control facility was removed in Amendment 0004. The amendment does not extend the deadline for receipt of offers.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Questions and Answ ers and add clause.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Mar-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008525R2557
X 9B. DATED (SEE ITEM 11)
06-Feb-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Mar-2025
CODE
NAVFACSYSCOM MID-ATLANTIC
ROICC CAMP LEJEUNE
1107A BIRCH STREET
CAMP LEJEUNE NC 28547-2521
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008525R2557
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS 4
Add Clause 52.223-23 – Sustainable Products and Services.
Question 1: Please provide the Wage determination and collective bargaining agreement for this solicitation.
Answer 1: Wage determination is in solicitation starting on page 95 and no collective bargaining agreement for requirement.
Question 2: Q. Please provide a history of repair work so we can properly estimate the labor cost.
Q. is labor and materials included in the $1,500 or just materials?
While amendment 0003 answers the question above without repair history and equipment age we cannot properly estimate the cost of equipment failure. Please clarify the contractor’s responsibility for repair labor cost as paragraph 4. Replacement of Car Ropes, the labor alone can exceed $10,000.
Q. What is the contractor’s limit of liability for repair work?
Answer 2: $1,500 includes labor and materials, that contractor is responsible up to, everything after is an IDIQ task order. Contractor is providing the labor amount, this is IDIQ non-recurring work and will not be determined until their is a need.
Question 3: Which pricing spreadsheet is applicable?
J-0200000-07 PP ELINS Final 1 April 2025.xls or J-0200000-07 PP ELINS Final 24 February 2025.xls
CLIN A001AE , A001AK, A001AQ
Q. What work in the PWS is covered under this clin?
To develop a lump sum price, we will need the historical workload as requested above.
CLIN A001AQ unit of issue is ea. and the others are monthly?
CLIN A001AR Has a quantity of 1 for the corrosion control facility.
Answer 3: ELINS 24 February is the current one as of amendment 0004. All work is covered under the PWS.
A0001AR was removed see amendment 0004. Each ELIN is either each or monthly.
SECTION I - CONTRACT CLAUSES
The following have been added by reference:
52.223-23 Sustainable Products and Services. MAY 2024
(End of Summary of Changes)