RFP 20R0094 MCLB ALBANY FINAL.pdf
PDF 897 KB Posted
- Attached to
- FACILITY SERVICES FOR MAINTENANCE
- Solicitation number
- N4008520R0094
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 15 Feb 2021
X
A X B X C
D
EX
X G F 168 - 181
182 - 187 X H 188 - 197 brett.garnett@navy.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 197
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N40085 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and via email conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
BRETT K. GARNETT 757-341-1980
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 10
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
11 - 65 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
66 - 68 69 - 76
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 77 - 80 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 81 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
82 - 108
PART II - CONTRACT CLAUSES
NAVFACSYSCOM MID-ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
109 - 167
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
14 Jan 2021
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N4008520R0094
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1
RECURRING WORK - BASE PERIOD
FFP
The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment Services for Marine Corps Logistics Base, Albany, GA, ELIN A001.
FOB: Destination
PSC CD: S216
NET AMT
0002 1
NON-RECURRING WORK - BASE PERIOD
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELINS A700-A708
0003 1
OPTION RECURRING WORK - OPTION YEAR 1
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELIN B001.
0004 1
OPTION NON-RECURRING WORK - OPTION YEAR 1
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELINS B700-B708.
0005 1
OPTION RECURRING WORK - OPTION YEAR 2
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELIN C001.
0006 1
OPTION NON-RECURRING WORK - OPTION YEAR 2
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELINS C700-C708.
0007 1
OPTION RECURRING WORK - OPTION YEAR 3
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELIN D001.
0008 1
OPTION NON-RECURRING WORK - OPTION YEAR 3
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELINS D700-D708.
0009 1
OPTION RECURRING WORK - OPTION YEAR 4
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELIN E001.
0010 1
OPTION NON-RECURRING WORK - OPTION YEAR 4
FFP
The Contractor shall provide all labor, management, supervision, tools, material, Logistics Base, Albany, GA, ELINS E700-E708.
GENERAL INFORMATION
B.1 Contract Title: Maintenance Center Equipment Services, Marine Corps Logistics Base, Albany, Georgia
B.2 Type of Contract: This is a combination Performance – Based Facilities Support, Indefinite Delivery/Indefinite
Quantity Contract with Recurring and Non-Recurring Services as noted in Section L, Instructions, Conditions, and Notices to Offeror.
B.3 Minimum Guarantee: The Recurring Price portion of the base year only is the minimum guarantee for this contract. It can be paid in either the base year or over the entire term of the contract.
B.4 Set-Aside: This requirement is being offered as a 100% set-aside for Small Businesses.
B.5 NAICS Code: The NAICS Code assigned to this procurement is 561210 with a small business size standard of $41,500,000.00. Refer to On-Line Representations and Certifications Application (ORCA) via System for Award Management (SAM) at https://www.sam.gov/SAM .
B.6 Wage Determination (Service): Service Contract Act (SCA), and the Davis- Bacon Act (DBA) is included in this solicitation. Refer to Section J, Attachments.
B.7 Bid Guarantee/Bonding Requirements: NOT REQUIRED for this procurement.
B.8 Contract Term: This contract contains provisions for a Base Period with four Option Periods, not to exceed a total of 60 months. The Government has the option to extend the term of the contract in accordance with Section I, Contract Clauses, 52.217-9, Option to Extend the Term of the Contract-Services (Mar 2000). In the option periods, the Government will adjust the prices, if applicable, based on the new Department of Labor Wage Determination.
B.9 Period of Performance: The period of performance will be determined at the time of award.
B.10 Evaluation of Proposal: Proposers shall submit a lump sum price for Section B, CLINs 0001 through 0010 and unit prices for Exhibit A through Exhibit E, referenced in Section J. For purposes of evaluating offers for award, the Government will utilize the pricing submitted for the base year and all option periods. Refer to Section M, FAR 52.217-5, Evaluation of Options (JUL 1990).
B.11 Contract Line Items and Contract Exhibit Line Items
a. Proposers shall enter unit prices and amounts for Contract Line Items (CLINs) and Contract Exhibit line items (ELINs) as indicated in the schedules and accompanying exhibits.
b. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid and the total of the CLIN, the ELIN will be recomputed accordingly. The CLIN will also be recomputed to take into account the change in the contract ELINs. If the offeror provides a total amount for an ELIN, but fails to enter the unit price, the total amount divided by the ELIN quantity will be held to be the intended unit price.
c. The Schedule of Recurring Work (CLIN 0001, 0003, 0005, 0007 and 0009) and the Schedule of Non-
Recurring Work (CLIN 0002, 0004, 0006, 0008 and 0010) will be used as the basis for deductions in accordance with FAR Clause 52.246-4, Inspection of Services – Fixed Price, Section E.
B.12 Unit Price Adjustments In Option Periods
This contract incorporates the Service Contract Act (SCA), and the Davis- Bacon Act (DBA). The SCA Wage Determination incorporated in Section J is for the base year performance period only. The latest Wage Determination available at the time for each option exercise will be incorporated into the contract. Unit prices will ONLY be adjusted for the Service Contract Act (SCA) wage increases in accordance with FAR Clauses 52.222-43, Fair Labor Standards Act and Service Contract Act – Price Adjustment (Multiple Year and Option Contracts)(August 2018). The contractor warrants, by submission of his proposal, that the price does not include any contingency for future wage increases with the exception of Wage Rates-Construction.
B.13 Indefinite Quantity Individual Contract Line Item Quantities
Once the estimated quantities for individual line items shown in the Schedule have been ordered, additional quantities may be ordered as long as the overall not-to-exceed (NTE) amount of the contract per year is not exceeded and the Contractor agrees by signing the task order.
B.14 Unit Prices For Labor
a. A portion of the work included in the scope of this contract cannot be identified in advance in sufficient detail to be included in the Recurring portion or as a Unit Price Task in the Non-Recurring portion of the contract. Labor for this work will be ordered and paid for based on unit prices for labor proposed by the Contractor listed in the Schedule of Non-Recurring Quantity Work.
b. Estimated hours in the Schedule are a forecast of future requirements. These estimated hours are for performing "Non-Recurring Quantity Work” accomplished in the time period shown.
c. The Contractor shall enter, in the unit price proposal space, the unit price for performing composite labor. The composite labor price shall include all direct and indirect costs associated with performing an hour of work. The composite labor price should be the Contractor's hourly craft wage adjusted to allow for the offerors work force productivity (i.e., the Contractor's estimate of how its’ work force will perform in relation to the Means Facilities Cost Data and/or the Engineered Performance Standards).
The Composite Labor Rate shall include all costs for preparation of the cost proposal, job preparation, travel, pre- expended bin materials and supplies, ordering and stockpiling job material, additional material handling, profit, tools, equipment, field and home office overhead, clerical support, supervision, inspection, fees, taxes, licenses, bonds, permits, insurance, etc.
B.15 Period of Performance – Less than One Year
Offer shall be submitted for the performance of work for a period of one year. The contractor is cautioned to recognize that the initial term of the contract may be for a period of less than one year in accordance with the “Term of Contract” clause in Section F. In the event that the period of performance is less than one year, the Government will reduce the individual line item quantities to reflect work remaining in the contract term and no other adjustments to the pro-rated contract price will be made.
B.16 Government Purchase Card
Non-Recurring quantity work may be ordered at the prices offered by two ways: 1) by the issuing activity using a DD Form 1155 “Order for Supplies and Services”; 2) by an authorized Government user via a Government Purchase Card (GPC). When receiving GPC orders against Section B, the contractor shall provide the supplies and services at the offered price without additional markup or handling fee.
B.17 Contractor Support of Electronic Facilities Support Contracting (e-FSC)
This procurement allows for the use of FEDMALL for issuing orders. Refer to Section H, Special Contract Requirement.
B.18 Incorporation of Technical Proposal
a. The Contractor’s technical proposal, including revisions and amendments made prior to contract award and a copy of which is in the possession of both parties, will be incorporated into this contract upon award by reference with the same force and effect as if set forth in full text. All contractor personnel shall meet or exceed the qualification standards, experience levels, and trade backgrounds set forth in the technical proposal.
b. In the event of an inconsistency between the provisions of this contract and the technical proposal, the inconsistency shall be resolved by giving precedence in the following order: (i) the contract (excluding the technical proposal), and then (ii) the technical proposal.
B.19 Request for Proposals (RFP) Information/Clarification Questions
Contractors are required to review the entire solicitation package before submitting questions. All questions must be submitted at least 10 days before proposals are due, by email to brett.garnett@navy.mil . This is the most efficient way to ensure all questions are addressed in a timely manner.
B.20 Solicitation
This solicitation incorporates by reference a Performance Work Statement (PWS) developed by using NAVFAC performance-based specifications. The PWS consists of Annexes 1, 2, and 15. The contractor will be required to meet the specifications in those Annexes per Section C of this solicitation.
B.21 Notice to Offerors:
Offerors are required to submit Section B, Contract Line Items (CLINs) Schedule, and Section J, Exhibit Line Items (ELINs) with their proposal. The total of the CLIN is equal to the sum of the ELINs as shown below:
CLINs ELINs 0001 A001 0002 A700 through A708 0003 B001 0004 B700 through B708 0005 C001 0006 C700 through C708 0007 D001 0008 D700 through D708 0009 E001 0010 E700 through E708
B.22 Proposal Delivery
DBIDS INFORMATION:
Access to Installation: All Contractor personnel shall obtain access to the installation through enrollment and registration into the Defense Biometric Identification System (DBIDS).
The Contractor shall provide the KO with the name of their designated Service Contractor Administrator (SCA) for enrollment in DBIDS. Once enrolled, the Contractor must provide the DBIDS Registrar with an approved employee list and then direct their employees to register into DBIDS.
DBIDS Program: DBIDS is an enterprise identity management and perimeter installation access control solution in which Contractor personnel who enroll, and are approved, are subsequently granted access to the installation for a period up to three years, or the length of the contract, whichever is less, and are not required to obtain a new pass from the Base Pass and Identification Office for each visit. There are no fees associated with obtaining a DBIDS credential.
The Government performs background screening and credentialing. Throughout the year the Contractor employee must continue to meet background screening standards. Periodic background screenings are conducted to verify continued DBIDS participation and installation access privileges. DBIDS access privileges will be immediately suspended or revoked if at any time a Contractor employee becomes ineligible.
DBIDS Credentials: Contractor employees shall furnish a completed copy of the SECNAV 5512/1 form to obtain the required background check and visit the local Navy Installation Visitor Control Center to obtain a DBIDS credential once approved. The SECNAV 5512/1 form and additional information about DBIDS can be found at:
https://www.cnic.navy.mil/om/dbids.html .
The Contractor may initiate the adjudication process when a background screen failure results in disqualification from participation in DBIDS and the Contractor employees do not agree with the reason for disqualification. The Contractor may also apply for a waiver when a background screening failure results in disqualification from participation in DBIDS. The Commanding Officer will be the final waiver determination authority.
The Contractor shall immediately collect employee DBIDS credentials and notify the KO in writing:
(1) That an employee has departed the company without having properly returned or surrendered their DBIDS credentials.
(2) That there is a reasonable basis to conclude that an employee, or former employee, might pose a risk, compromise, or threat to the safety or security of the installation or anyone therein.
DBIDS Paper Passes: In the event that a visitor, vendor, or Contractor employee elects not to participate in DBIDS, the individual will be issued DBIDS paper pass from the Base Pass and Identification Office in order to access to the installation. The time standard for the validity of a pass to access an installation will be not more than thirty (30) days and may be further restricted based on local policy or by Federal, DOD, Navy, and CNIC guidance.
The Government will not be responsible for any cost or lost time associated with obtaining paper passes or added vetting or inspections incurred by non-participants in the DBIDS credentialing process.
Submitting Your Proposal
Proposals shall be sent via email to the following:
Brett Garnett Brett.garnett@navy.mil 757-341-1980
Section C - Descriptions and Specifications
GENERAL INFORMATION
0100000 – General Information Spec Item Title 1 General Information
1.1 Outline of Services
1.2 Project Location
1.3 Acquisition of Additional Work
1.4 Background Information
1.5 Verification of Workload and Conditions
1.6 Climate Patterns
1.7 Related Information
1.8 Navy Approach to Service Contracting
1.8.1 Partnering Philosophy
1.8.2 Contractor's Knowledge
1.8.3 Industry Best Practices
1.9 Standard Template
1.10 Navy PBSA Approach
1.11 Technical Proposal Certification
0100000 – General Information Spec Item Title Description 1 General Information
1.1 Outline of Services Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items necessary to provide the services outlined below and described in this Performance Work Statement (PWS) at Marine Corps Logistics Base (MCLB) Albany, Georgia (Maintenance Center). Type of contract anticipated for this procurement, is a combination Recurring Work and Non-Recurring Work Contract.
The PWS is organized into annexes. Annex 1 is "General Information".
Annex 2 contains the on-site project management and administration requirements. Annexes 3 through 18 contain the technical requirements.
The annex numbers are identified as 1 through 18 in the description column, but the full expanded annex numbers include seven digits (e.g., Annex 1 expanded number is 0100000 as shown in the header row at the top of this page).
Annex 1 General Information Annex 2 Management and Administration Annex 3 Command and Staff – N/A Annex 4 Public Safety – N/A Annex 5 Air Operations – N/A Annex 6 Port Operations – N/A Annex 7 Ordnance – N/A Annex 8 Range Operations – N/A Annex 9 Health Care Support – N/A Annex 10 Supply – N/A Annex 11 Personnel Support – N/A Annex 12 Morale, Welfare and Recreation Support – N/A Annex 13 Galley – N/A Annex 14 Housing – N/A Annex 15 Facilities Support
Sub Annex 1502000 Facility Investment Annex 16 Utilities – N/A Annex 17 Base Support Vehicles and Equipment – N/A Annex 18 Environmental – N/A
1.2 Project Location The work shall be performed at MCLB Albany, GA (Maintenance Center) at various locations and could vary from location to location. The following is an example of the dispersion of work at the various locations.
(1) Paint Booth and Oven Systems Maintenance and Repairs
(2) Blast Booth Systems Maintenance and Repairs
(3) Fast Acting Door Systems Maintenance and Repairs
(4) Machine Tools Maintenance and Repairs
(5) Dynamometer Systems Maintenance, Repairs, Certification, &
Testing
(6) Hydraulic Test Bench Systems Maintenance, Repairs, Certification, & Testing
(7) Weight Handling Equipment (WHE) Maintenance, Repairs, Inspections, Certification, & Testing
(8) Crane Trackage Maintenance, Repairs, Inspections, Certification, & Testing
(9) Compressed Air Systems Maintenance and Repairs
(10) Air Pollution Control Systems Maintenance and Repairs
(11) Steam Stall/Pit Systems Maintenance and Repairs
(12) Parts Washer Systems Maintenance and Repairs
(13) Fire Range Systems Maintenance and Repairs
1.3 Acquisition of
Additional Work
The Government reserves the right to acquire additional services at additional locations, within the scope of the annexes and areas included in Spec Item 1.1 Outline of Services, in addition to the services and locations identified in the requirements of this contract. Additional services will be incorporated into the contract in accordance with the CHANGES clause, SECTION I or ordered under the non-recurring work provisions of the contract. Items of work not covered by this contract but within the general intent are considered in the scope of this contract.
1.4 Background Information Marine Corps Logistics Base (MCLB) Albany is the proud home of Marine Corps Logistics Command and Marine Depot Maintenance Command/Production Plant Albany. MCLB Albany is dedicated to supporting the warfighter by providing high quality, cost-effective installation support services to its supported commands and agencies, particularly Marine Corps Logistics Command and its components;
Marines, Sailors, and other service members (including families); Civilian personnel; and the surrounding community. The base provides facilities infrastructure and a range of tailored support services enabling supported commands aboard the installation to accomplish their assigned missions in support of the warfighter.
MCLB Albany is also committed to providing its service members, Marines, Civilian and families, a safe and secure environment to work and live, thereby increasing quality of life for all. The base works towards being environmentally conscious and look for ways to decrease use of non-renewable energy sources, to increase security, and reduce cost where applicable. The base will reach out to the surrounding community to find ways to share common goals and values, and will build relationships that are good for the Corps and the community, which will last far into the future.
1.5 Verification of
Workload and Conditions
Throughout the PWS, the workload data is generally referred to as being located in Sections C and J. Section C provides data such as descriptions, specifications, and the statement of work. Section J provides data such as system descriptions, inventories, maps, floor plans, and tables to represent the type, quantity, and location of services to be provided.
As prescribed in FAR 52.237-1, offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
1.6 Climate Patterns The Albany Georgia area experiences long and exceedingly warm summers and short and very cool winters. The hot season lasts for 4.2 months, from May 17 to September 22, with an average daily high temperature above 86°F. The cool season lasts for 2.9 months, from November 30 to February 24, with an average daily high temperature below 66°F. Albany gets some kind of precipitation, on average, 73 days per year. Precipitation is rain, snow, sleet, or hail that falls to the ground.
The average annual precipitation is 51.47 inches. The low to high monthly precipitation ranging from 2.6 inches in October to 5.9 inches in July, and average wind speeds ranging from 8.2 and 9.1 miles per hour. Normally expected conditions can become radically impacted by sustained forced winds cause by tornadoes. March, April, and May are typically the most active months for tornadoes. Due to the location, MCLB Albany keeps an eye on the Gulf of Mexico and the Atlantic Ocean during hurricane season (June 1- November 30).
1.7 Related Information There are four types of Related Information that can be found in the Description and Related Information columns of the specification as follows:
Informational Notes as used throughout this PWS provides additional information to offerors to be used in developing a thorough understanding of the work to be performed in this contract. Any block of text marked “Informational Notes” throughout Annexes 1 through 18 is subject to this disclaimer. Offerors may not rely upon the "Informational Notes" as material representations of the Government. Information provided in "Informational Notes" does not create a contractual requirement on either party to this contract.
Clarifying Information describes client expectations in a more detailed manner than the Performance Objective and Performance standard alone.
Constraining Information describes limitations to the work performed to meet the Performance Objective and Performance Standard.
Requirement Information further describes client requirements associated with each Performance Objective.
1.8 Navy Approach to
Service Contracting
The Department of Navy (DoN) spends over $1 billion in annual obligations to meet global requirements for facility operations and maintenance provided through Facility Support Contracts (FSC) and additional billions to provide other base operations support services (OBOS). The Head of the Contracting Activity (HCA) of the Naval Facilities Engineering Command (NAVFAC) has focused increased attention on re-engineering FSC contracts in response to customer and industry feedback, budget constraints, and the impact of a variety of contracting, program management and financial management regulations.
The Navy also supports the following principles:
1.8.1 Partnering Philosophy The first principle is that the Navy views its contractors as partners and not just abstract service providers. The Navy wants its contractors to succeed because partners' success drives the Navy's successful mission completion.
Within the bounds of acquisition policy the Navy intends to work to find solutions that will be beneficial to both the Government and its partners.
1.8.2 Contractor's Knowledge The second principle is that the Navy will receive insightful management from its contractors. This management will include the knowledge, skills, authority and willingness to use contractor resources to find better ways of serving Navy clients’ strategic and operational goals and objectives. The Navy's use of performance-based objectives evidences this principle.
Although performance work statements will typically contain several levels of performance assessment, the Navy wants its contractors to exercise maximum discretion within bounds of prudent risk management to adjust processes and resources needed to reach specified objectives at the highest performance level.
1.8.3 Industry Best Practices The third principle is that the Navy will adopt industry best commercial practices and maintain state-of-the-art service delivery. To that end, the Navy's emphasis will be in evaluating performance objectives (end results).
1.9 Standard Template Key to implementing a programmatic approach is using a standard template that ensures Navy-wide consistency yet affords appropriate tailoring to meet local needs. This contract conforms to the standard template and has been tailored for this solicitation. NAVFAC intends to use this template-based approach for future service contracts. Offerors should develop an understanding of the template as part of performing due diligence in reaching an understanding of the Navy’s requirements and expectations.
The standard template contains 18 standard annexes. Annex 1 will always contain information that is relevant to the entire scope of the contract.
Annex 2 contains on-site project management and administration requirements that are relevant to the entire scope of the contract. Annexes 3 through 18 contain the technical information and requirements peculiar to that technical annex. Within each technical annex, the organization of information and requirements are also standardized. Specification Item 1 will always contain General Information. Specification Item 2 will always contain the management and administrative requirements. Specification Item 3 will always contain the Recurring Work requirements.
Specification Item 4 will always contain the Non-Recurring Work requirements. Requirements and standards for higher level specification items apply to all subordinate specification items, e.g., Specification Item 3 standards apply to all recurring work specification items. Specification Item 3.1 is applicable to all 3.1 subordinate specification items.
Specification Items 3.2 and 3.3 are not considered subordinate to 3.1. All costs associated with Annexes 1 and 2 and Specification Items 1 and 2 must be priced and their price must be allocated across the Exhibit Line Items.
1.10 Navy PBSA Approach The Navy’s approach to performance-based service acquisition (PBSA) includes four component parts which are 1) performance outcomes, 2) measurable standards, 3) consideration of incentives, and 4) performance assessment plan.
1.11 Technical Proposal
Certification
The Contractor warrants that its proposal incorporated herein by reference will meet or exceed the performance objectives set forth in this contract.
MANAGEMENT AND ADMINISTRATION
0200000 – Management and Administration Spec Item Title 2 Management and Administration
2.1 Definitions and Acronyms
2.2 General Information
2.2.1 Government Regular Working Hours
2.2.1.1 Observed Federal Holidays
2.2.1.2 Restriction to Contractor Working Hours
2.2.2 Wage Determinations
2.2.3 Requirements Hierarchy
Spec Item Title
2.3 General Administrative Requirements
2.3.1 Required Conferences and Meetings
2.3.2 Training for Maintenance and Operation of New and Replacement Systems and Equipment
2.3.3 Partnering
2.3.3.1 Informal Partnering
2.3.3.2 Contract Partnering Administration
2.3.3.3 Contract Partnering Session Attendees
2.3.4 Permits and Licenses
2.3.5 Insurance
2.3.5.1 Certificate of Insurance
2.3.5.2 Minimum Insurance Amounts
2.3.6 Protection of Government Property
2.3.7 Government Information Technology (IT) System
2.3.8 Directives, Instructions, and References
2.3.9 Invoicing Procedures
2.3.10 Forms
2.3.11 Transition
2.3.11.1 Phase-In
2.3.11.2 Phase-Out
2.4 Government-Furnished Property, Materials and Services
2.4.1 Government-Furnished Facilities (GFF)
2.4.2 Government-Furnished Utilities
2.4.3 Government-Furnished Materials (GFM)
2.4.4 Government-Furnished Equipment (GFE)
2.4.5 Government-Furnished Services (GFS)
2.5 Contractor-Furnished Items
2.6 Management
2.6.1 Work Reception
2.6.2 Work Control
2.6.3 Work Schedule
2.6.4 Deliverables
2.6.5 Service Interruptions
2.6.6 United States Marine Corps MAXIMO (USMCmax)
2.6.6.1 USMCmax Data
2.6.6.2 USMCmax Method of Data Entry
2.6.6.3 USMCmax Access
2.6.6.4 USMCmax Training
2.6.7 Quality Management System (QMS)
2.6.7.1 Quality Management (QM) Plan
2.6.7.2 Quality Inspection and Surveillance
2.6.7.3 Quality Inspection and Surveillance Report
2.6.8 Property Management Plan
2.6.9 System and Equipment Replacement
2.7 Personnel Requirements
2.7.1 Key Personnel
2.7.1.1 Project Manager (PM)
2.7.1.2 Quality Manager
2.7.1.3 Site Safety and Health Officer (SSHO)
2.7.1.4 Environmental/Energy Manager
2.7.2 Employee Requirements
2.7.2.1 Employee Certification and Training
2.7.2.2 Employee Appearance
2.7.2.3 Employee Conduct
2.7.2.4 Identification as Contractor Employee
2.7.2.5 Removal of Employees
2.7.2.6 Proof of Legal Residency
2.7.3 Enterprise-wide Contractor Manpower Reporting Application (eCMRA)
2.8 Security Requirements
2.8.1 Employee Listing
2.8.2 Vehicles
2.8.3 Passes and Badges
2.8.4 Access to Installation
2.8.4.1 DBIDS Program
2.8.4.2 DBIDS Credentials
2.8.5 Access to Buildings
2.8.6 Access Arrangements
2.8.6.1 Escort Arrangement for Secured Areas
2.8.7 Security Clearances
2.8.8 Access to Sensitive Unclassified Information
2.8.9 Employee Status
2.9 Contractor Safety Program
2.9.1 Accident Prevention Plan (APP)
2.9.2 Activity Hazard Analysis (AHA)
2.9.3 Safety and Occupational Health (SOH) Risks and Compliance Plans
2.9.3.1 Alcohol and Drug Abuse Prevention Plan
2.9.3.2 Chemical Hazard Communication Program
2.9.3.3 Confined Space Program
2.9.3.4 Critical Lift Plan
2.9.3.5 Asbestos Abatement Plan
2.9.3.6 Demolition Plan
2.9.3.7 Emergency Response Plans
2.9.3.8 Fall Prevention and Protection Plan
2.9.3.9 Fire Prevention Program
2.9.3.10 Hazardous Energy Control Program
2.9.3.11 Health Hazard Control Program and Hazard Communication Program
2.9.3.12 Heat/Cold Stress Monitoring Plan
2.9.3.13 Lead Compliance and Abatement Plan
2.9.3.14 Respiratory Protection Program
2.9.4 Crane Operations
2.9.4.1 Crane Inspections
2.9.4.2 Rigging Gear
2.9.4.3 Crane Operators
2.9.5 Accident and Damage Reporting
2.9.5.1 Accident Reporting and Notification Criteria
2.9.6 Fire Protection
2.9.7 Monthly On-Site Labor Report
2.9.8 OSHA Citations and Violations
2.9.9 Safety Inspections and Monitoring
2.9.10 Safety Certification
2.9.11 Safety Apparel on Jobsites
2.9.12 Emergency Medical Treatment
2.10 Environmental Management and Sustainability
2.10.1 Energy Management Program
2.10.1.1 Water Conservation Plan
2.10.1.2 Energy Efficient Products
2.10.2 Environmental Protection
2.10.2.1 Non-Hazardous Waste Disposal
2.10.2.2 Hazardous Waste Disposal
2.10.2.3 Spill Prevention, Containment, and Clean-up
2.10.2.4 Hazardous Material Management
2.10.2.5 Protection of Endangered and Threatened Species (Flora and Fauna)
2.10.2.6 Noise Control
2.10.2.7 Salvage
2.10.2.8 Asbestos Containing Material (ACM)
2.10.3 Sustainable Procurement and Practices
2.10.3.1 Environmentally Preferable Products
2.10.3.2 Use of Recovered Materials
2.10.3.3 Use of Biobased Products
2.11 Disaster Preparedness
2.12 Technical Library
2.13 Warranty Management
2.14 Recurring Work Procedures
2.14.1 Notification to the Government for Work Above the Recurring Work Limitations
2.14.2 Recurring Work Exhibit Line Item Numbers (ELINs)
2.15 Non-Recurring Work
2.15.1 Unit Priced Task (UPT) Work (Non-Negotiated)
2.15.1.1 Acceptance and Performance
2.15.1.2 Invoicing and Receiving Payment
2.15.2 Unit Priced Labor (UPL)Work (Negotiated)
2.15.2.1 Non-recurring Preparation of Proposals
2.15.2.1.1 Labor Requirements
2.15.2.1.2 Manufacturer Tech
2.15.2.1.3 Material and Equipment Requirements
2.15.2.2 Issuance of Final Task Order
2.15.3 Non-Recurring Work ELINS
0200000 - Management and Administration
2 Management and
Administration
2.1 Definitions and
Acronyms
Definitions and Acronyms are listed in J-0200000-01.
2.2 General
Information
2.2.1 Government
Regular Working Hours
The Government's regular working hours are from 0600-1800, five days per week, Monday through Friday, except observed Federal holidays. Exceptions to the regular hours of operation are detailed in subsequent sections of this PWS. Work in certain annexes or sub-annexes require Contractor continuous operations, 24 hours a day, every day of the year including holidays. The performance of other work requirements shall be accomplished within the Government’s regular working hours unless the specific work requirement specified herein necessitates otherwise. Any other work outside Government regular working hours requires prior KO approval.
2.2.1.1 Observed Federal
Holidays
The Government observes the following holidays: New Year’s Day, Martin Luther King Jr.’s Birthday, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving Day, and Christmas Day.
2.2.1.2 Restriction to
Contractor Working Hours
If the Contractor wishes to work outside of the Government's regular working hours for the Contractor’s convenience, the Contractor shall submit a written Request to Work Outside Government’s Regular Working Hours per Section F. Excludes work to be performed during specified hours.
2.2.2 Wage
Determinations
Wage Determinations are included in J-0200000-02.
2.2.3 Requirements
Hierarchy
Requirements or definitions specified in each spec item of this contract apply to subordinate paragraphs. For example, requirements shown in spec item 3.1 would apply to spec items 3.1.1, 3.1.2, 3.1.2.1 and so on.
Likewise, Performance Standards specified at a lower digit level (i.e. spec item 3.1.1, 3.1.2, 3.1.2.1) apply when performance is assessed at a higher tier (i.e., spec item 3.1) based on the composite work requirements.
2.3 General
Administrative Requirements
2.3.1 Required
Conferences and Meetings
The Contractor shall attend administrative and coordination meetings including the weekly status meeting with MDMC Engineering. The Contractor shall provide weekly status reports per spec item 2.15.1.1 and Annex 1502000 spec item 3.1.
2.3.2 Training for
Maintenance and Operation of New and Replacement Systems and Equipment
When construction, renovation, or repair work is performed by means other than this contract, the Contractor shall attend Government provided training, as applicable, for maintenance and operation of new and replacement systems and equipment at no additional cost to the Government.
2.3.3 Partnering To increase the likelihood of successful performance of this contract, the Government requires cohesive partnerships with its Contractors and subcontractors. Key stakeholders, including the supported commands who will receive services, principal individuals from NAVFAC, the performance assessment team, and representative(s) of the installation(s) will be invited to participate in the partnering process. Key members of the prime and sub-contractor teams, including senior management personnel must participate.
The partnership will draw on the strength of each organization in an effort to achieve quality contract services done right the first time, within the contract price, as scheduled, and without any safety mishaps.
Partnering should accomplish three goals:
- The first goal is to develop a cohesive team with common purpose, commitment and established communication processes.
- The second goal of partnering is contract specific, identifying risks and opportunities for the team to address.
- The third goal is to sustain the Partnership throughout the contract by identifying and addressing issues that affect the Partnership.
2.3.3.1 Informal Partnering The Contracting Officer shall organize the initial Partnering Meeting with key personnel of the project team, including Contractor's personnel and Government personnel. The initial session will be scheduled concurrent with the Pre-Performance Conference and held no later than 30 days after award and will be held at a Government provided facility as designated by the KO.
The Initial Informal Partnering Session will be conducted and facilitated using electronic media (a video and accompanying forms) provided by Contracting Officer. The senior Government stakeholder present will lead the meeting, however, the Contractor’s PM or senior representative is encouraged to participate as co-lead.
The Partners will determine the frequency of the follow-on sessions.
2.3.3.2 Contract Partnering
Administration
Upon award, the ACO will contact the Contractor, supported command(s), Region, and Installation(s) stakeholders, and the performance assessment team to discuss implementation of partnering. Commence discussions with the Contractor to select a facilitator and location that are acceptable to both partners. A partnership agreement, The Charter, should be in place as early as possible so issues arising, even before work begins, can be resolved using the issues resolution process. Replacement of Core Management Team members (stakeholders who attended the initial session and manage the contract work day-to-day) is discouraged since it will disrupt the synergy that has been developed. If replacement of a team member proves to be unavoidable, a follow-on partnering session must be held to officially turn the responsibilities of the position over to the new member.
The Core Management Team consisting of the attendees below must be present during the initial and all follow-on partnering sessions. These are the core mandatory attendees. Other stakeholders may attend if they desire or as recommended by the partners.
2.3.3.3 Contract Partnering
Session Attendees
The Contractor shall bring the necessary personnel to successfully partner on this contract. Asterisk indicates mandatory personnel.
President/Vice President
* Project Manager
* Quality Manager Site Safety and Health Officer Environmental/Energy Manager
2.3.4 Permits and
Licenses
The Contractor shall obtain all required permits, licenses, and authorizations to perform work under this contract and comply with all the applicable Federal, state and local laws and regulations. The Contractor shall submit copies of Permits and Licenses per Section F.
2.3.5 Insurance The Contractor shall submit a Certificate of Insurance per Section F as evidence of the existence of the following insurance coverage in amounts not less than the amounts specified below in accordance with the FAR Clause
52.228-5, INSURANCE – WORK ON A GOVERNMENT
INSTALLATION. This insurance must be maintained during the performance period.
2.3.5.1 Certificate of
Insurance
The Certificate of Insurance shall provide for at least 30 calendar days written notice to the KO by the insurance company prior to cancellation or material change in policy coverage. Other requirements and information are contained in the aforementioned insurance clause.
2.3.5.2 Minimum
Insurance Amounts
The Contractor shall procure and maintain, during the entire period of performance under this contract, the following minimum insurance coverage:
Comprehensive General Liability: $500,000 per occurrence
Automobile Liability: $200,000 per person, $500,000 per occurrence, $20,000 per occurrence for property damage
Workmen's Compensation: As required by Federal and state worker's compensation and occupational disease statutes
Employer's Liability coverage: $100,000, except in states where worker's compensation may not be written by private carriers
Other as required by state law.
2.3.6 Protection of
Government Property
During execution of the work, the Contractor shall protect Government property. The Contractor shall return areas damaged as a result of negligence under this contract to their original condition at no cost to the Government.
2.3.7 Government
Information Technology (IT) System
The Marine Corps IT system is Marine Corps Enterprise Network (MCEN).
2.3.8 Directives, Instructions, and References
Department of Defense (DoD), Secretary of the Navy (SECNAV), Chief of Naval Operations (OPNAV), and other applicable Directives, Instructions, and References are listed in J-0200000-03. The Contractor shall comply with the most current version of directives, instructions, and references including versions published during the term of the contract.
2.3.9 Invoicing
Procedures
Refer to Section G for invoicing instructions. Refer to Invoice Form in J- 0200000-04 for sample.
2.3.10 Forms Forms referenced in this Annex, e.g. accident reporting, and damage reporting are included among the Forms in J-0200000-05.
2.3.11 Transition In order to ensure a smooth transition to the start of the new contract and to prevent possible decreases in productivity, the Government intends to provide for a 30 day transition period prior to the contract start date. During this period, the KO will make available to key Contractor personnel, Government representatives versed in the operations of the functions to be performed.
This service is being made available to explain procedures for conducting Government business and show the Contractor the various worksites, introduce the Contractor to activity representatives, etc.
2.3.11.1 Phase-In The Contractor shall assume responsibility for services on the day of takeover. There will be a 30-day Phase-In period prior to takeover when the new Contractor will be allowed access to facilities to become familiar with Government interfaces and procedures. Contractor access will be limited to management personnel and shall not interfere with the incumbent’s ability to provide services until the end of the current contract.
2.3.11.2 Phase-Out The Contractor shall cooperate with the follow-on contractor and the
Government in ensuring a smooth transition to the new contract. Not less than 30 days before completion of the contract, the contractor shall provide a certified list of all service employees working under the contract and its subcontracts during the last month of performance. All contractor provided equipment and materials must be removed from Government facilities within three working days of contract completion. The Contractor shall cooperate with the follow-on contractor and the Government in ensuring a smooth transition to the new contract
2.4 Government-
Furnished Property, Materials and Services
In accordance with Section H, paragraph H.10 Government-Furnished Property and the following paragraphs, the Government will furnish or make available to the Contractor certain Government-owned facilities utilities, materials, equipment and services for use in connection with this contract as stated below.
A list of Government Furnished Property, Materials, and Services is provided in J-0200000-06.
2.4.1 Government-
Furnished Facilities (GFF)
The Government will provide a lay-up area where the contractor will be allowed to accommodate a nominal sized portable facility/Trailer and storage area/facility. Portable facility/Trailer will have to be tied down and have permanent approved electrical/water/sewage connection. All utility connects shall be metered. The government will not provide the trailer/facility/storage facility. The Contractor will be responsible for all utility connections including water, sewage, and electricity. The water and electrical consumption will be metered by the government via an approved and contractor supplied metering device.
2.4.2 Government-
Furnished Utilities
With the exception of contractor provided offices and storage spaces, the Government will furnish water and electricity at existing outlets required for the work to be performed under the contract at no cost to the Contractor.
Information concerning the location of existing outlets may be secured from the KO. The Contractor shall provide and maintain, at its expense, the necessary service lines from the existing Government outlets to the work site.
Provide and maintain backflow prevention devices on connections to domestic water lines and electrical transformer provisions on connections to electric lines. Meet all Federal, State, local, and installation codes and regulations for backflow prevention devices and electrical transformer provisions. Services required by the Contractor, for which there are no available Government outlets, shall be provided by the Contractor at no cost to the Government.
2.4.3 Government-
Furnished Materials (GFM)
The Government will provide a limited amount of materials to the Contractor for use in performing this contract. See J-0200000-06 for a tentative list of materials provided by the Government. The Attachment does not reflect a 100 percent accurate inventory list. The Government will not be responsible for any material that is no longer in stock. Once the existing stock is depleted, the Government will not replenish the stock. The contractor is not required to replenish the Government Furnished Material, but is responsible for furnishing the necessary items/parts to accomplish the contract requirements.
The items listed under Government Furnished Materials are simply the existing stock at the site. The Government has made the determination to turnover this remaining stock to the contractor; it will become contractor property.
The Government reserves the right to purchase material for equipment under the contract. If the Government purchases any additional material and provides it to the Contractor, the Contractor will be required to use it.
2.4.4 Government-
Furnished Equipment (GFE)
GFE will not be provided.
2.4.5 Government-
Furnished Services
(GFS)
GFS will not be provided.
2.5 Contractor-
Furnished Items
Except for items identified as Government Furnished, the Contractor shall provide all equipment, materials, parts, supplies, components, and facilities to perform the requirements of this contract. The KO may inspect Contractor-furnished items for adequacy and compliance with contract requirements.
Inadequate or unsafe items shall be removed and replaced by the Contractor at no cost to the Government. Materials containing asbestos, lead, and polychlorinated biphenyls (PCBs) shall not be brought onsite. Energy efficient tools and equipment shall be used when available. The KO may at any time require Samples, Safety Data Sheets (SDS) or Manufacturer’s Data Cut Sheets of Materials used in this contract.
2.6 Management The Contractor shall manage the total work effort associated with the services required herein to meet the performance objectives and standards. Such management includes but is not limited to planning, scheduling, cost accounting, report preparation, establishing and maintaining records, and quality assurance. The Contractor shall provide a staff with the necessary management expertise to ensure performance objectives and standards are met.
2.6.1 Work Reception The Contractor shall provide the capability to receive, prioritize, correspond, and respond to service calls and task orders during Government regular working hours and provide a point of contact at a local or toll free number who can perform the above function…