1502000 – Facility Investment Table of Content
| Spec Item |
| Title |
| 1 |
| General Information |
| 1.1 |
| Concept of Operations |
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| 2.2 |
| Personnel |
| 2.2.1 |
| Certification, Training, and Licensing |
| 2.3 |
| Special Requirements |
| 2.3.1 |
| Workmanship and Material Standards |
| 2.3.2 |
| Historical Preservation |
| 2.4 |
| References and Technical Documents |
| 3 |
| Recurring Work |
| 3.1 |
| Service Orders |
| 3.1.1 |
| Emergency Service Orders |
| 3.1.2 |
| Urgent Service Orders |
| 3.1.3 |
| Routine Service Orders |
| 3.1.4 |
| Major Service Orders |
| 3.2 |
| Preventive Maintenance (PM) Program |
| 3.2.1 |
| Paint Booths and Ovens Systems |
| 3.2.2 |
| Blast Booth Systems |
| 3.2.3 |
| Fast Acting Doors |
| 3.2.4 |
| Machine Tools |
| 3.2.5 |
| Dynamometer Systems |
| 3.2.6 |
| Hydraulic Test Bench Systems |
| 3.2.7 |
| Weight Handling Equipment (WHE) |
| 3.2.8 |
| Crane Trackage |
| 3.2.9 |
| Compressed Air Systems |
| 3.2.10 |
| Air Pollution Control Systems |
| 3.2.11 |
| Steam Stall/Pit Systems |
| 3.2.12 |
| Parts Washer Systems |
| 3.2.13 |
| Firing Range Systems |
| 3.3 |
| Inspection, Testing, and Certification Program |
| 3.3.1 |
| Weight Handling Equipment (WHE) |
| 3.3.2 |
| Crane Trackage |
| 3.3.3 |
| Dynamometer Systems |
| 4 |
| Non-Recurring Work |
1502000 – Facility Investment
| Spec Item |
| Title |
| Description |
| 1 |
| General Information |
| The Contractor shall provide all labor, management, supervision, tools, material, and equipment required to perform Facility Investment services for facilities, ground structures, and installed equipment and systems at Marine Corps Logistics Base Albany, GA (Maintenance Center). |
| 1.1 |
| Concept of Operations |
| The intent of 1502000 Facility Investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions only. The Facility Investment requirements within this sub-annex primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that is accomplished through other Navy programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Investment. |
The Contractor shall perform maintenance, repair, alteration, demolition and minor construction for the following:
Production Equipment and Associated Building Systems to include, but not limited to:
-Compressed Air Systems -Weight Handling Equipment (WHE) -Paint Booth and Oven Systems -Blast Booth Systems -Fast Acting Door Systems -Dynamometer Systems -Hydraulic Test Bench Systems -Air Pollution Control System -Steam Stall/ Pit Systems -Parts Washer Systems
Miscellaneous:
-Machine Tools -Fire Range Systems
Trackage:
-Crane
The following services are not included in this Template:
· Infrastructure Condition Assessment Program (ICAP) services including asset updates and condition assessment is covered under 1501000 Facility Management.
· Stand-by electrical power generators located within the electrical power generation plant or which serve more than one facility are covered under 1602000 Electrical. Facility Investment includes maintenance only for auxiliary generators serving individual facilities.
· Service orders from the Utilities Annexes (1602000, 1603000, 1604000, 1605000, 1606000, and 1610000) are covered under 1601000, Utility Management.
1502000 – Facility Investment
| Spec Item |
| Title |
| Description |
| 2 |
| Management and Administration |
| 2.1 |
| Definitions and Acronyms |
| Definitions and Acronyms are listed in J-1502000-01. |
| 2.2 |
| Personnel |
| The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required for efficient operations within the FI function. |
| 2.2.1 |
| Certification, Training, and Licensing |
| All maintenance and repair shall be performed by personnel trained and certified by the OEM. |
Personnel calibrating equipment shall be qualified per MDMC-Q17.6-QL0059
Personnel maintaining, repairing, inspecting, testing, operating, or rigging WHE shall be qualified per NAVFAC P-307.
Personnel inspecting and testing crane shall be qualified per NAVFACINST 11230.1.
Personnel working with or on electrical or electronic equipment must be trained and certified per NAVFAC MO-200.
All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.
The Contractor shall submit proof of all certification, training, and licensing requirements per Section F.
Specific certifications and training requirements are addressed in Spec Item 3.
| 2.3 |
| Special Requirements |
| 2.3.1 |
| Workmanship and Material Standards |
| The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements identified within this technical sub-annex. |
Workmanship for maintenance and repair shall include all work necessary to complete facility and system restoration, including touch-up painting and operational checks. Upon completion of work, the Contractor shall ensure all facilities, systems, and equipment are free of missing components or defects which would affect the safety, appearance, or habitability of the facilities and structures or would prevent any electrical, mechanical, plumbing or structural system from functioning in accordance with design intent. Repairs shall be made in accordance with the manufacturers’ specifications and guidelines, and standard building codes. The quality of repairs shall meet the applicable standards and shall prevent any malfunction reoccurrences caused by poor workmanship or other contractor inadequacies. The quality of the repaired areas shall be fully compatible with adjacent surfaces or equipment. Except where otherwise specified, replacements shall match existing in dimensions, finish, color, design, and functionality and shall have an appearance similar to the original finished appearance with only minor unobjectionable deterioration resulting from normal use.
The Contractor shall not allow debris to spread unnecessarily into adjacent areas nor accumulate in the work area. All such debris, excess material, and parts shall be cleaned up and removed at the completion of the job and at the end of each day work is in progress. Upon completion of work, any stains and other unsightly marks shall be removed.
| 2.3.2 |
| Historical Preservation |
| Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations. |
| 2.4 |
| References and Technical Documents |
| References and Technical Documents are listed in J-1502000-02. |
1502000 – Facility Investment
| Spec Item |
| Title |
| Performance Objective |
| Related Information |
| Performance Standard |
| 3 |
| Recurring Work |
| The Contractor shall maintain, repair, and alter facilities, ground, structures, installed equipment and systems to ensure they are fully functional, in normal working condition, and meet or exceed the OEM’s specifications and capabilities. |
| The Contractor shall develop, implement, and execute a Service Order, Preventative Maintenance Program, Inspection, Testing, and Certification Program, and Other Recurring Service Program to maintain and repair facilities, ground structures, and installed equipment and systems. |
The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library and United States Marine Corps MAXIMO (USMCmax) in accordance with Annex 2.
The Contractor shall provide all labor, material test instruments, equipment, and tools required to perform maintenance and repair.
Critical Equipment is identified in Section J inventory lists. The contractor shall provide a monthly critical equipment availability report for critical equipment per Section F.
Personal property equipment, and installed equipment and systems are in normal working condition and function properly in accordance with specified standards.
| 3.1 |
| Service Orders |
| The Contractor shall perform service order work in a timely manner and ensure equipment and systems are restored to a safe, normal working condition and function properly. |
| The Contractor shall receive service orders in accordance with the work reception requirements in Annex 2. |
Contractor shall be able to respond to multiple service orders simultaneously.
The Contractor shall schedule and perform service orders in a way that minimizes disruptions to customers and Government operations.
Service order work may include repairs to existing facility assets and equipment as well as newly installed facility assets and equipment, work to facilities and structures located on the installation, but not listed in the facilities listing, facilities and equipment that are not maintained through a recurring work schedule or program, labor hour support for non-contract projects, and any work requirements typical to the annexes and sub-annexes contained in this PWS.
Service orders are not limited to work performed on existing facilities, structures and equipment identified in the respective Section J attachments or spec items for each Annex. Additional facilities, structures and equipment added during the course of the contract will become part of the service order program at no additional cost to the Government.
Samples of required work and historical service order workload are provided in J-1502000-04. Historical data and supporting information provided is intended to illustrate the volume of service orders issued and examples of work that has been performed in the past and is not to be construed as a limiting factor to services ordered and performed in the future.
Descriptions of the classifications of service orders (emergency, urgent, and routine) are provided in the Definitions and Acronyms in J-1502000-01. These descriptions are provided for reference and the Contractor shall perform service orders per the requirements below based on the classification assigned by the Government.
The Contractor shall maintain sufficient materials and equipment on hand to support service order work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service order work within the time limits specified.
The contractor shall provide a critical spare parts list per Section F. The Government may request adjustments to the critical spare parts list at any time. The Contractor shall abide by any requests made by the Government at no additional cost. Critical spare parts shall be available at all times. The Contractor shall maintain sufficient materials and equipment on hand to support service orders work requirements. Lack of availability of material or equipment will not relieve the Contractor from the requirement to complete service orders work within the time limits specified.
The Government may combine multiple repair requirements received for the same trade in the same building or structure at the same time into one service order as long as the service order threshold is not exceeded. Or the Government may combine multiple trades for a single task into one service order as long as the service order threshold is not exceeded.
The Contractor shall notify the KO upon identification that the service orders will exceed the liability limits in accordance with reporting requirements in Annex 2. If non-recurring work is issued for repairs, the Government will only pay for the portion of labor and/or material that exceeds the service orders limits.
As part of the service order, the Contractor has full responsibility for any work up to recurring work limit of liability of $2,500 in direct labor and material cost per service order.
The Contractor shall notify the KO upon identification that the service order will exceed the liability limits in accordance with reporting requirements in Annex 2. Non-recurring work may be issued for work exceeding the service order limit. If non-recurring work is issued, the Government will only pay for the portion that exceeds the service order recurring work limit of liability. Materials that exceed $2,500 in costs will either be drawn from GFM or procured under the non-recurring work guidance of this contract.
The Contractor shall submit a weekly summary of completed service orders per Section F. Service order report format will be provided to the contractor at the start of the contract. Report formats may change any time at no additional cost to the Government.
The Contractor shall update all completed service orders in USMCMax per Section F.
Service order work is responded to and completed within the specified time.
Equipment and systems are restored to normal working condition, including recertification if applicable.
When repair is complete the equipment and system does not present danger to personnel or equipment.
Work is accomplished per Spec Item 2.3.1 Workmanship and Material Standards.
Systems and equipment are restored to operable condition and function properly in accordance with OEM specifications.
Critical spare parts are available at all times.
| 3.1.1 |
| Emergency Service Orders |
| The Contractor shall respond to emergency service orders, complete emergency service orders, and arrest emergent conditions to minimize and mitigate damage to equipment and systems and danger to personnel. |
| The Contractor shall perform emergency service orders 24 hours a day, seven days a week throughout the contract period. |
The Contractor shall respond to emergency service orders with the appropriate service personnel and equipment to commence work immediately.
Emergency service order limit of liability is $2,500 in direct labor and material cost per service order.
The Contractor shall remain at the work site until the emergency has been arrested.
The Government may issue an urgent or routine service order or non-recurring work task order for the follow-on work required to repair/restore the equipment and system.
Emergency service orders are responded to within 30 minutes of receipt of call.
Emergency service orders are arrested within 24 hours of receipt of call.
Work is continued without interruption until emergent condition is arrested.
Work accomplished per Spec Item 2.3.1, Workmanship and Material Standards.
Systems and equipment are restored to operable condition and function properly in accordance with OEM specifications
When repair is complete the system or equipment does not present any hazard or danger to personnel.
| 3.1.2 |
| Urgent Service Orders |
| The Contractor shall complete urgent service orders in a timely manner and ensure equipment and systems are restored to a safe, normal working condition and function properly. |
| The Contractor shall perform urgent service orders to repair deficiencies without extended delay, therefore preventing further damage to equipment and systems. |
The Contractor shall perform urgent service orders 24 hours a day, seven days a week throughout the contract period.
Urgent service order limit of liability is $2,500 in direct labor and material cost per service order.
Urgent service orders are responded to within one hour of receipt of call.
Urgent service orders are completed within 24 hours.
Work is accomplished per Spec Item 2.3.1, Workmanship and Material Standards.
Systems and equipment are restored to operable condition and function properly in accordance with OEM specifications.
When repair is complete the system or equipment does not present any hazard or danger to personnel.
| 3.1.3 |
| Routine Service Orders |
| The Contractor shall complete routine service orders in a timely manner and ensure equipment and systems are restored to a safe, normal working condition and function properly. |
| The Contractor shall perform routine service orders to repair deficiencies and return equipment and systems to normal working condition. |
Routine service order limit of liability is $2,500 in direct labor and material cost per service order.
Performance of routine service orders is not required outside of Government regular working hours.
Routine service orders are responded to within 24 hours of receipt of call.
Routine service orders are completed within three calendar days.
Work is accomplished per Spec Item 2.3.1, Workmanship and Material Standards.
Systems and equipment are restored to operable condition and function properly in accordance with OEM specifications.
When repair is complete the system or equipment does not present nay hazard or danger to personnel.
| 3.1.4 |
| Major Service Orders |
| The Contractor shall perform Major Service Order work in a timely manner and ensure equipment and systems are restored to a safe, normal working condition and function properly. |
Major Service Orders can be classified as Emergency, Urgent, and Routine service orders and consists of maintenance and repair of facilities, structures, equipment, or other work requirement(s) specified herein that is not anticipated and requires a maximum of $10,000 in total direct labor and material costs to accomplish. These Major Service Orders are initiated when the Government determines that the work will exceed the limits of a service order. Once the Major Service order has been initiated the initial service order will be put back into queue for future use.
The contractor response time for each Major Service Order is dependent on its designation.
The response and completion times are the same as those associated with Emergency, Urgent and Routine Services Orders.
Major Service Order work is responded to and completed within the specified time.
Equipment and systems are restored to normal working condition, including recertification if applicable.
When repair is complete the equipment and system does not present danger to personnel or equipment.
| 3.2 |
| Preventive Maintenance (PM) Program |
| The Contractor shall develop and implement a PM program for equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life. |
| The Contractor shall develop and submit a PM program per Section F. |
The contractor shall provide a critical spare parts list per Section F. The Government may request adjustments to the critical spare parts list at any time. The Contractor may be required to modify the critical spare parts at the request of the Government to meet and maintain service and repair requirements of mission critical equipment for parts with long lead times that are not maintained on site. Critical spare parts shall be available at all times.
The Contractor is fully responsible for and shall perform any repairs, including replacement, discovered during scheduled maintenance work up to a total of $500 per occurrence in direct material and labor cost under recurring work portion of the contract. Incidental repair work performed under maintenance are not considered a service order.
Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO within two hours of identification. Service orders or non-recurring work may be issued for repairs exceeding the incidental repairs limit.
The Contractor shall not use breakdown maintenance as part of the PM program.
The PM program shall provide an economical approach manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties and keep equipment and systems in normal working condition.
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. These changes will be made at no additional cost to the Government.
The Contractor shall submit a monthly PM work schedule per Section F.
Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.
PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.
All required schedules and reports are submitted per Section F.
Critical spare parts are available at all times.
| 3.2.1 |
| Paint Booths and Ovens Systems |
| The Contractor shall maintain paint booth and oven systems to ensure proper operation, to minimize breakdowns, and to maximize useful life. |
| The paint booth and oven systems description and inventory is provided in J-15020000-05. |
The Contractor’s PM program shall be developed based on the OEM’s recommended procedures and OEM standards.
The Contractor shall provide a schedule for changing Paint Booth and Make-Up Filters that is similar in format and meets the requirements as shown in J-1502000-06 per Section F.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
The Contractor shall provide a schedule for changing Paint Booth and Make-Up Filters that is similar in format and meets the requirements as shown in J-1502000-06 per Section F.
| 3.2.2 |
| Blast Booth Systems |
| The Contractor shall maintain blast booth systems to ensure proper operation, to minimize breakdowns, maximize useful life and ensure compliance with all EPA, Georgia EPD, and Base Environmental directives. |
| The blast booth systems description and inventory is provided in J-1502000-07. |
The Contractor’s PM program shall be developed based on the OEM’s recommended procedures, OEM standards, EPA requirements, Georgia EPD requirements, and base environmental directives.
Blast Booth dust collector filters and make-up air filters shall be changed in accordance with the OEM Standards.
Blast Cabinets not located in Building 2236 will have minimum PM services. All repairs on gloves, glass, and hoses will be performed under a service order.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
All EPA, Georgia EPD, and environmental base requirements are met.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Blast booth dust collector filters and make-up air filters shall be changed in accordance with the OEM Standards.
| 3.2.3 |
| Fast Acting Doors |
| The Contractor shall maintain fast acting door systems to ensure proper operation, to minimize breakdowns, and to maximize useful life. |
| The fast acting door systems description and inventory is provided in J-1502000-08. |
The Contractor’s PM program shall be developed based on manufacturers’ recommended procedures and OEM standards.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
| 3.2.4 |
| Machine Tools |
| The Contractor shall maintain machine tools and associated equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life. |
| The machine tools description and inventory is provided in J-1502000-09. |
The Contractor’s PM program shall be developed based on manufacturers’ recommended procedures and OEM standards.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
| 3.2.5 |
| Dynamometer Systems |
| The Contractor shall maintain engine and transmission dynamometer systems to ensure proper operation, minimize breakdowns and to maximize useful life. |
| The Dynamometer systems inventory is provided in J-1502000-10. |
The Contractor’s PM program shall meet or exceed the OEM’s recommended procedures and OEM standards.
Calibration services shall be included in the maintenance of dynamometers.
The Contractor shall submit a calibration program per Section F. The calibration program will have to be certified by the Marine Depot Maintenance Command per the attached MDMC-Q17.6-QL0059, ANSI/Z540-1 (American National Standard for Calibration), and the Marine Corps Order MCO 4733.1 (Marine Corps Test, Measurement, and Diagnostic Equipment (TMDE)).
When calibrating the Dynamometer Systems, the Contractor shall comply by the guidelines as set forth in MDMC-Q17.6-QL0059, ANSI/Z540-1, and the MCO 4733.1.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Calibration Program is submitted per Section F.
Calibration comply MDMC-Q17.6-QL0059, ANSI/Z540-1 and the MCO 4733.1.
| 3.2.6 |
| Hydraulic Test Bench Systems |
| The Contractor shall perform PM on electric hydraulic test systems to ensure proper operation, to minimize breakdowns, and maximize useful life. |
| The hydraulic test bench systems description and inventory is provided in Attachment J-1502000-11. |
The Contractor’s PM program shall meet or exceed the OEM’s recommended procedures and OEM standards.
Calibration services shall be included in the maintenance of the hydraulic test bench systems.
The Contractor shall submit a calibration program per Section F. The calibration program will have to be certified by the Marine Depot Maintenance Command per the attached MDMC-Q17.6-QL0059, ANSI/Z540-1 (American National Standard for Calibration), and the Marine Corps Order MCO 4733.1 (Marine Corps test, Measurement, and Diagnostic Equipment (TMDE)).
When calibrating the Hydraulic Test Bench Systems, the Contractor shall comply by the guidelines as set forth in MDMC-QI7.6-QL0059, ANSI/Z540-1 and the MCO 4733.1.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Calibration Program is submitted per Section F.
Calibrations comply MDMC-QI7.6-QL0059, ANSI/Z540-1 and the MCO 4733.1.
| 3.2.7 |
| Weight Handling Equipment (WHE) |
| The Contractor shall perform maintenance on WHE to ensure proper operation, to minimize breakdowns, and to maximize useful life. |
| The WHE description and inventory is provided in J-1502000-12. |
The Contractor shall maintain WHE in accordance with manufacturers’ recommended procedures, OEM standards, and NAVFAC P-307.
Where performance of maintenance or associated repairs requires testing or recertification of WHE, refer to the Spec Item below for inspection, testing, and certification of WHE.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
| 3.2.8 |
| Crane Trackage |
| The Contractor shall perform maintenance on crane trackage to ensure safe, reliable, uninterrupted service. |
| The Contractor shall maintain trackage in accordance with NAVFACINST 11230.1. |
| Maintenance is performed in accordance with Contractor’s PM program and work schedule. |
Maintenance is performed in accordance with NAVFACINST 11230.1.
| 3.2.9 |
| Compressed Air Systems |
| The Contractor shall perform maintenance on compressed air distribution system and associated equipment to ensure safe, reliable, uninterrupted service. |
| The Air Compressors inventory is provided in J-1502000-13. |
The Contractor shall maintain compressed air systems in accordance with the OEM, and NAVFAC MO-209.
Maintenance shall be performed by factory trained technicians. Contractor shall use environmentally friendly nontoxic lubricants and OEM parts.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with the NAVFAC MO-209 and the OEM standards.
Compressed Air Systems operate as designed.
| 3.2.10 |
| Air Pollution Control Systems |
| The Contractor shall perform maintenance on air pollution control systems, and associated equipment to ensure safe, reliable, uninterrupted service. |
| The Air Pollution Control Systems inventory is provided in J-1502000-14. |
The Contractor shall maintain Air Pollution Control Systems in accordance with the OEM.
Maintenance shall be performed by factory trained technicians.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Air Pollution Control Systems operate as designed.
| 3.2.11 |
| Steam Stall/Pit Systems |
| The Contractor shall clean pits and maintain associated equipment to ensure proper operation, to minimize breakdowns, and to maximize useful life. |
| The Steam Stall/Pit Systems inventory is provided in J-1502000-15. |
Remove all drainage grates and steel plate.
Pressure wash all surrounding concrete, washing debris down into the drainage trough.
Pressure wash all debris in the trough down to the pump.
Existing pneumatic pump will remove the liquid.
Once liquid has been successfully pumped out, remove all solid debris from the trough and around the pump.
All solids shall be disposed of off of the Installation.
Replace all drainage grates and steel plates.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Steam Stalls/Pits shall be cleaned and maintained monthly.
Steam Stall/Pit Systems operate as designed.
| 3.2.12 |
| Parts Washer Systems |
| The Contractor shall maintain parts washer systems to ensure proper operation, minimize breakdowns and to maximize useful life. |
| The Parts Washer Systems inventory is provided in J-1502000-16. |
The Contractor’s PM program shall be developed based on the OEM’s recommended procedures and OEM standards.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Parts Washer Systems operate as designed.
| 3.2.13 |
| Fire Range Systems |
| The Contractor shall maintain firing range systems to ensure proper operation, minimize breakdowns, and to maximize useful life. |
| The Firing Range Systems inventory is provided in J-1502000-17. |
The Contractor’s PM program shall be developed based on the OEM’s recommended procedures and OEM standards.
Maintenance is performed in accordance with Contractor’s PM program and work schedule.
Maintenance is performed in accordance with manufacturers’ recommended procedures and OEM standards.
Fire Range Systems operate as designed.
| 3.3 |
| Inspection, Testing, and Certification Program |
| The Contractor shall provide inspection, testing, and certification services to ensure they are safe, fully functional, and operational. |
| The Contractor shall develop an inspection, testing, and certification program |
The Contractor shall submit an inspection, testing, and certification program plan per Section F.
The Contractor shall submit an inspection, testing, and certification program summary report per Section F.
The Contractor shall submit an inspection, testing and certification schedule and a copy of all the equipment certifications per Section F.
The Contractor is fully responsible for and shall perform any repairs, including replacement, discovered during inspection, testing, and certification work up to $500 per occurrence under PM program. Incidental repairs work performed are not considered a service order.
All certifications are current.
Testing, inspection, and certification services performed and completed in accordance with the inspection, testing, and certification program and schedule.
Testing, inspection, and certification services performed in accordance with applicable references.
| 3.3.1 |
| Weight Handling Equipment (WHE) |
| The Contractor shall prepare and operate WHE to support certification. |
| The Contractor shall comply with all Federal requirements and NAVFAC P-307 to properly test and maintain the WHE. |
The Contractor shall perform all certification testing in the presence of the Government certifying official. The Contractor shall provide five working days advance notification to the KO when WHE is ready for testing and certification for coordination with the Government provided inspector.
The Contractor shall submit the Certification of Load Test and Condition Inspection Form per Section F.
The Contractor shall submit the Crane Condition Inspection Record.
The WHE inventory is provided in J-1502000-12.
Testing, inspection, and certification of WHE performed and completed in accordance with the Inspection, Testing, and Certification Program and Schedule.
WHE prepared for inspection and certification in accordance with NAVFAC P-307.
| 3.3.2 |
| Crane Trackage |
| The Contractor shall perform operations of crane trackage to support certification. |
| The Contractor shall comply with NAVFACINST 11230.1 for the inspection, certification, and audit of crane trackage. |
The Contractor shall perform all certification testing in the presence of the Government certifying official.
The Contractor shall provide five working days advance notification to the KO when crane trackage is ready for testing and certification for coordination with the Government provided inspector.
Testing, inspection, and certification of crane trackage performed and completed in accordance with the inspection, testing, and certification program and schedule.
Crane trackage are prepared for inspection and certification in accordance with NAVFACINST 11230.1.
| 3.3.3 |
| Dynamometer Systems |
| The Contractor shall perform operations of Dynamometer to support certification. |
| The Contractor shall submit a calibration program per Section F. The calibration program will have to be certified by the Marine Depot Maintenance Command per the attached MDMC-QI7.6-QL0059, ANSI/Z540-1 (American National Standard for Calibration), and the Marine Corps Order MCO 4733.1 |
The Dynamometer systems inventory is provided in J-1502000-10.
Testing, inspection, and certification of Dynamometer performed and completed in accordance with the inspection, testing, and certification program and schedule.
Calibration Program is submitted per Section F. Calibrations comply MDMC-QI7.6-QL0059, ANSI/Z540-1 and the MCO 4733.1.
1502000 – Facility Investment
| Spec Item |
| Title |
| Performance Objective |
| Related Information |
| Performance Standard |
| 4 |
| Non-Recurring Work |
| Non-recurring work may be ordered utilizing DoD FEDMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order. |
| Refer to Non-recurring work ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for Non-recurring work will be the same as those in Spec Item 3 where applicable. |