REVISED J-020000-08_ELINs_BID schedule.xlsx
XLSX spreadsheet 262 KB Posted
- Attached to
- ROOFING IDIQ IN SUPPORT OF PWD PENNSYLVANIA
- Solicitation number
- N4008520R0082
About this file
This is a solicitation for an indefinite delivery, indefinite quantity roofing contract to provide services at various Department of the Navy sites in Pennsylvania. The contractor will be required to furnish all labor, materials, equipment, transportation, supervision, quality control, and management necessary to complete roofing repair work at the Philadelphia Naval Business Center, Naval Support Activity Philadelphia, and Naval Support Activity Mechanicsburg. The work includes repairs for Building 77H and new locations. The government anticipates awarding one contract under this solicitation to provide roofing services on an as-needed basis.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Option Year
| ROOFING CONTRACT 20-D-XXXX ELINs | |
| INDEFINITE QUANTITY WORK ITEMS - CLIN 0001 | |
| SCHEDULE OF PRICES - BASE OPTION YEAR |
| ELIN Number | Supplies/Services | Est. | Unit | Unit Price | Total |
| Quantity | |||||
| ROOF DECKS |
| A0001 | Remove existing metal roof decks (ALL OR PARTIAL) | 3 | SQ | X | $0.00 |
| and replace with new steel roof decking, shall include | |||||
| all closures and accessories |
| Remove existing wood roof deck and replace with |
| new wood decking |
| A0002 | 1" nominal T & G (treated) | 40 | BF | X | $0.00 |
| A0003 | 2" nominal T & G (treated) | 40 | BF | X | $0.00 |
| A0004 | 3/4" plywood | 40 | SF | X | $0.00 |
| A0005 | 1/2" plywood | 25 | SF | X | $0.00 |
ROOF INSULATION
Remove and replace rigid roof insulation in conjunction with roofing systems specified herein.
| A0006 | Reserved |
| A0007 | Reserved |
A0008 Remove and replace polyisocyanurate tapered insulation panels 10 SQ X $0.00
A0009 Remove and replace tapered roof insulation 10 SQ X $0.00
| A0010 | Remove and replace vapor barrier in conjunction | 10 | SQ | X | $0.00 |
| with built up roofing system |
A0011 Remove and replace resin sized building paper (5 lb) 5 SQ X $0.00
| A0012 | Remove existing cants and replace | 10 | LF | X | $0.00 |
| with new fiberboard cants 4 x 4 |
| A0013 | Remove existing cants and replace | 30 | LF | X | $0.00 |
| with new treated wood cants 4 x 4 |
| A0014 | Remove existing nailers and replace | 100 | BF | X | $0.00 |
| with new treated 2" x 6" wood |
| SHINGLED ROOF SYSTEMS |
| Remove existing composition shingles and replace |
| with new composition shingles, shall include starter |
| strips, ridges & hips |
| A0015 | Twenty Five Year (3 tab ) | 10 | SQ | X | $0.00 |
| A0016 | Thirty Year (architectual) | 6 | SQ | X | $0.00 |
| A0017 | Forty Year (architectual) | 6 | SQ | X | $0.00 |
| A0018 | Remove and dispose of existing composition shingles | ||||
| (all types)(where new shingles are not | 6 | SQ | X | $0.00 | |
| going to be installed) |
A0019 Remove and dispose of existing slate shingles. 6 SQ X $0.00
| A0020 | Remove and re-install existing | 2 | SQ | X | $0.00 |
| slate shingles (All or Partial) |
| A0021 | Install new slate shingles (Weathering | 3 | SQ | X | $0.00 |
| green, Vermont)(All or Partial) |
A0022 Install new slate shingles (Buckingham)(All or Partial) 3 SQ X $0.00
| Remove existing preformed metal (All or Partial) roofing |
| and replace with new preformed metal roofing |
| A0023 | Coated steel | 3 | SQ | X | $0.00 |
| A0024 | Coated aluminum | 3 | SQ | X | $0.00 |
| ROOF COATING (ALUMINUM PIGMENTED FIBERED |
| BITUMINOUS ROOF COATING) |
| A0025 | Coat roofing with aluminum pigmented | 6 | SQ | X | $0.00 |
| fibered bitumen roof coating |
Field paint roof mounted equipment
| A0026 | Up to 25 SF X in surface area X | 12 | SF | X | $0.00 |
| A0027 | Over 25 SF X in surface area X | 12 | SF | X | $0.00 |
BUILT UP ROOF
| Remove existing roof system and replace with new |
| aggregate surfaced BU roofing system |
A0028 System GAA (Gravel) 6 SQ X $0.00
| Remove existing roof system and replace with new |
| smooth surfaced BU roofing system. |
A0029 System Gas 6 SQ X $0.00
| Remove existing roof system and |
| replace with new single ply reinforced |
| modified bitumen sheet roofing system |
| A0030 | Torch Applied | 6 | SQ | X | $0.00 |
| A0031 | Mop Applied | 6 | SQ | X | $0.00 |
| A0032 | Remove existing base flashing and replace with | 50 | SF | X | $0.00 |
| new 2 ply glass felt base flashing |
| A0033 | Remove existing base flashing and replace with | 12 | SF | X | $0.00 |
| new 3-ply bituminous base flashing |
| A0034 | Remove existing base flashing and | 12 | SF | X | $0.00 |
| replace with new single ply reinforced | |||||
| modified, bitumen sheet roofing | |||||
| flashing |
| A0035 | Remove and Dispose of Second layer | 10 | SQ | X | $0.00 |
| of Built up roof |
A0036 (1) Walkway/Asphalt Planks 100 SF X $0.00
ROOF AND PARAPET WALL DAMPROOFING
A0037 Coat Existing BU Roof or Parapet Wall 50 SF X $0.00
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new |
| E.P.D.M. Roof System over Existing Built-up Roof) |
| A0038 | Ballasted System | 10 | SQ | X | $0.00 |
| A0039 | Mechanically Fastened System | 10 | SQ | X | $0.00 |
| A0040 | Full Adhered System | 10 | SQ | X | $0.00 |
Remove existing roof system and replace with new E.P.D.M. roof system
| A0041 | Ballasted System | 10 | SQ | X | $0.00 |
| A0042 | Mechanically Fastened System | 10 | SQ | X | $0.00 |
| A0043 | Full Adhered System | 10 | SQ | X | $0.00 |
| A0044 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $0.00 |
| A0045 | Install Rubber Pipe Vents | 5 | EA | X | $0.00 |
| A0046 | Install Termination Bars. Shall include caulking | 12 | LF | X | $0.00 |
| A0047 | Reserved |
A0048 Install E.P.D.M Walk Pads 5 EA X $0.00
| Remove existing roof system and replace with new |
| Thermoplastic alloy roof system (TPA) |
| A0049 | Mechanically Fastened | 5 | SQ | X | $0.00 |
| A0050 | Ballasted | 5 | SQ | X | $0.00 |
| A0051 | Install new TPA wall/curb flashing | 25 | SF | X | $0.00 |
| A0052 | Install new TPA pipe vent flashing | 5 | EA | X | $0.00 |
| Remove existing metal base flashing and replace |
| with new metal base flashing |
| A0053 | Copper | 25 | SF | X | $0.00 |
| A0054 | Aluminum | 25 | SF | X | $0.00 |
| A0055 | Aluminum/various colors | 25 | SF | X | $0.00 |
| A0056 | Stainless Steel | 25 | SF | X | $0.00 |
| Remove existing metal step flashing and replace |
| with new metal step flashing |
| A0057 | Copper | 25 | SF | X | $0.00 |
| A0058 | Aluminum | 25 | SF | X | $0.00 |
| A0059 | Aluminum/various colors | 25 | SF | X | $0.00 |
| A0060 | Stainless Steel | 25 | SF | X | $0.00 |
| Remove existing metal counter flashing |
| and replace with new metal counter |
| flashing, shall include caulking |
| A0061 | Copper | 6 | SF | X | $0.00 |
| A0062 | Aluminum | 6 | SF | X | $0.00 |
| A0063 | Aluminum/various colors | 6 | SF | X | $0.00 |
| A0064 | Stainless Steel | 6 | SF | X | $0.00 |
| Remove existing metal gravel stop and replace with |
| new metal gravel stop (up to 6" high) |
| A0065 | Copper | 6 | LF | X | $0.00 |
| A0066 | Aluminum | 6 | LF | X | $0.00 |
| A0067 | Aluminum/various colors | 6 | LF | X | $0.00 |
| A0068 | Stainless Steel | 6 | LF | X | $0.00 |
| Remove existing metal gravel stop and replace with |
| new metal gravel stop (up to 12" high) |
| A0069 | Copper | 6 | LF | X | $0.00 |
| A0070 | Aluminum | 6 | LF | X | $0.00 |
| A0071 | Aluminum/various colors | 6 | LF | X | $0.00 |
| A0072 | Stainless Steel | 6 | LF | X | $0.00 |
| Remove existing and install new metal coping. |
| Shall include caulking. |
| A0073 | Copper | 6 | SF | X | $0.00 |
| A0074 | Aluminum | 6 | SF | X | $0.00 |
| A0075 | Aluminum/various colors | 6 | SF | X | $0.00 |
| A0076 | Stainless Steel | 6 | SF | X | $0.00 |
| Remove metal drip edge and replace |
| with new metal drip edge |
| A0077 | Copper | 6 | LF | X | $0.00 |
| A0078 | Aluminum | 6 | LF | X | $0.00 |
| A0079 | Aluminum/various colors | 6 | LF | X | $0.00 |
| A0080 | Stainless Steel | 6 | LF | X | $0.00 |
METAL GUTTERS AND DOWNSPOUTS
Install Metal Gutters
| A0081 | Copper/5" ogee | 6 | LF | X | $0.00 |
| A0082 | Copper/6" ogee | 6 | LF | X | $0.00 |
A0083 Copper/6" half round 6 LF X $0.00
| A0084 | Copper/6" box | 6 | LF | X | $0.00 |
| A0085 | Copper/8" box | 6 | LF | X | $0.00 |
| A0086 | Prefinish Alum/5" ogee | 6 | LF | X | $0.00 |
| A0087 | Prefinish Alum/6" ogee | 6 | LF | X | $0.00 |
| A0088 | Prefinish Alum/6" Box | 6 | LF | X | $0.00 |
| A0089 | Prefinish Alum/8" Box | 6 | LF | X | $0.00 |
| A0090 | Stainless steel/6" box | 6 | LF | X | $0.00 |
| A0091 | Stainless steel/8" box | 6 | LF | X | $0.00 |
Install Metal Downspouts
| A0092 | Copper 2" x 3" | 6 | LF | X | $0.00 |
| A0093 | Copper 3" x 4" | 6 | LF | X | $0.00 |
| A0094 | Copper/3" round | 6 | LF | X | $0.00 |
| A0095 | Copper/4" round | 6 | LF | X | $0.00 |
| A0096 | Copper/6" round | 6 | LF | X | $0.00 |
| A0097 | Prefinish alum 2" x 3" | 6 | LF | X | $0.00 |
| A0098 | Prefinish alum 3" x 4" | 6 | LF | X | $0.00 |
A0099 Stainless Steel 3" x 4" 6 LF X $0.00
| A0100 | Provide and place new concrete splash block | 5 | EA | X | $0.00 |
| (standard commercial size) |
Remove Gutters and/or downspouts
| A0101 | Remove and dispose of existing | 16 | LF | X | $0.00 |
| gutters and/or downspouts |
| A0102 | Remove and reinstall existing gutters and/or | 10 | LF | X | $0.00 |
| downspouts. Reseal all joints |
| A0103 | Realign and resecure existing gutters | 10 | LF | X | $0.00 |
| and/or downspouts (Replace hangers, | |||||
| fasteners and straps) as needed. | |||||
| Reseal all joints. |
| A0104 | Resolder broken gutter joints | 3 | EA | X | $0.00 |
| A0105 | Reseal, broken gutter joints | 3 | EA | X | $0.00 |
| A0106 | Clean and dispose of debris in existing gutters | 75 | LF | X | $0.00 |
| Remove existing metal open valley flashing and |
| replace with new metal valley flashing |
| A0107 | Copper | 25 | SF | X | $0.00 |
| A0108 | Aluminum | 25 | SF | X | $0.00 |
| A0109 | Aluminum/various colors | 25 | SF | X | $0.00 |
| A0110 | Stainless Steel | 25 | SF | X | $0.00 |
| Remove existing metal flashing/miscellaneous |
| shapes and replace with new |
| A0111 | Copper | 15 | SF | X | $0.00 |
| A0112 | Aluminum | 15 | SF | X | $0.00 |
| A0113 | Aluminum/various colors | 15 | SF | X | $0.00 |
| A0114 | Stainless Steel | 15 | SF | X | $0.00 |
| A0115 | Compatible w/EPDM & CPE | 15 | SF | X | $0.00 |
Remove existing pitch pocket and 'replace with new
| A0116 | Copper | 1 | SF | X | $0.00 |
| A0117 | Aluminum | 1 | SF | X | $0.00 |
| A0118 | Stainless steel | 1 | SF | X | $0.00 |
| DRAINS, STRAINERS, SCUPPERS, |
| CONDUCTOR HEADS & SPLASH HEADS |
A0119 Clean and clear roof drains 5 EA X $0.00
| Remove existing roof drain sumps and |
| replace with new roof drain sumps |
A0120 6-Pound Lead 1 EA X $0.00
TPA EPDM roof drain Sumps
A0121 TPA EPDM roof drain sumps (removal only) 2 EA X $0.00
Provide and install TPA EPDM roof 'drain sumps
A0122 TPA EPDM roof drain sumps (provide and install only) 1 EA X $0.00
A0123
Remove existing stainers
| A0124 | Metal Strainers | 2 | EA | X | $0.00 |
| A0125 | PVC Strainers | 2 | EA | X | $0.00 |
Furnish and Install New Strainers
| A0126 | Metal Strainers | 2 | EA | X | $0.00 |
| A0127 | PVC Strainers | 2 | EA | X | $0.00 |
| Remove existing metal scupper lining and replace with |
| new metal scupper lining |
| A0128 | Copper | 2 | EA | X | $0.00 |
| A0129 | Stainless Steel | 2 | EA | X | $0.00 |
| Remove existing metal conductor heads |
| and replace with new metal conductor heads |
| A0130 | Copper | 1 | EA | X | $0.00 |
| A0131 | Stainless Steel | 1 | EA | X | $0.00 |
Install new metal splash pans
| A0132 | Copper | 1 | EA | X | $0.00 |
| A0133 | Stainless Steel | 1 | EA | X | $0.00 |
MISCELLANEOUS ROOFING WORK
| Remove existing expansion joints and replace |
| with new expansion joints. Include wood nailers, |
| bituminous base flashing, metal counterflashing |
| and metal joint cover |
| A0134 | Copper | 2 | SF | X | $0.00 |
| A0135 | Aluminum | 2 | SF | X | $0.00 |
| A0136 | Stainless Steel | 2 | SF | X | $0.00 |
| A0137 | Remove existing pipe vent flashing and | 1 | EA | X | $0.00 |
| replace with new lEA Xd pipe vent flashing |
| A0138 | Remove existing metal vent collars and replace with | 3 | EA | X | $0.00 |
| new vent collars and accessories |
A0139 Install caulking 5 LF X $0.00
| A0140 | Remove existing caulking and replace | 12 | LF | X | $0.00 |
| with new sealant/caulking |
| A0141 | Cut new reglet In masonry | 5 | LF | X | $0.00 |
| A0142 | Cut new reglet In concrete | 5 | LF | X | $0.00 |
A0143 Reserved
A0144 Reserved
A0145 Reserved
A0146 Reserved
A0147 Reserved
| A0148 | Reserved |
| A0149 | Reserved |
| A0150 | Remove existing fascia and replace with | 12 | BF | X | $0.00 |
| new fascia board |
A0151 Prime and paint fascia board 12 SF X $0.00
| A0152 | Cover existing fascia board with | 12 | SF | X | $0.00 |
| aluminum coil stock (various colors) |
| RESERVED | |
| A0153 | Reserved |
ASBESTOS ABATEMENT/REMOVAL
| A0154 | Min. costs incurred for asbestos | 1 | EA | X | $0.00 |
| abatement, for trailer (provide, set-up, | |||||
| & removal) |
| A0155 | Additional cost incurred for the removal and disposal | 100 | SF | X | $0.00 |
| of asbestos containing substances. | |||||
| Regular roofing only. |
| A0156 | Additional cost incurred for the removal and disposal | 100 | SF | X | $0.00 |
| of asbestos containing substance. (Flashings, | |||||
| Pitch pockets, etc.) |
| A0157 | Removal of lead based paint. 'Contractor removes loose | 150 | SF | X | $0.00 |
| paint from surface. The contractor furnishes container | |||||
| and the Government disposes |
NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK
A0158 Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN E0159. These material costs MUST BE NEGOTIATED BY KO. 1 LS X $0.00
A0159 Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. 500 HRS X $0.00
ADDITIONAL ROOFING WORK
| A0160 | COMMAND INTEREST WORK | 2 | EA | X | $0.00 |
| (One time cost per Task Order to respond within 48 hours and work diligently until all work is completed). |
A0161 Perform roof, drain, gutter and downspout cleaning SIX (6) times a year in accordance with Attachment A; provide monthly inspections in accordance with Attachment A. 1 LOT
| A0162 | Perform Emergency Service call. | 75 | EA | X | $0.00 |
| Contractor shall respond to service call within 2 working days of receipt of order, secure emergency and make any necessary repairs to roof and drain system. Service call is limited to a combined labor and material cost not to exceed $1,000.00. The total labor cost is based on the labor rate for ELIN E0159 times the hours worked. Contractor shall submit proposal to the Contracting Officer for any work beyond scope of the call. Contractor shall complete within 4 working days. |
A0163 Perform Roof Survey / Assessment up to 50,000 SF in accordance with Attachment B 5 EA X $0.00
A0164 Perform Roof Survey / Assessment over 50,000 SF and up to 100,000 SF in accordance with Attachment B. 5 EA X $0.00
| A0165 | Perform Roof Survey / Assessment over 100,000 SF in accordance with Attachment B. | 5 | EA | X | $0.00 | |
| . | ||||||
| Total Price for BASE OPTION YEAR (IQ) Price Work Items - CLIN 0001 | $0.00 | $0.00 | ||||
| (Sum of Exhibit Line Items A0001- A0165) |
1st Option Year
| ROOFING CONTRACT 20-D-XXXX ELINs | |
| INDEFINITE QUANTITY WORK ITEMS - CLIN 0002 | |
| SCHEDULE OF PRICES - 1ST OPTION YEAR |
| ELIN Number | Supplies/Services | Est. | Unit | Unit Price | Total |
| Quantity | |||||
| ROOF DECKS |
| B0001 | Remove existing metal roof decks (ALL OR PARTIAL) | 3 | SQ | X | $0.00 | $0.00 |
| and replace with new steel roof decking, shall include | ||||||
| all closures and accessories |
| Remove existing wood roof deck and replace with |
| new wood decking |
| B0002 | 1" nominal T & G (treated) | 40 | BF | X | $0.00 | $0.00 | |
| B0003 | 2" nominal T & G (treated) | 40 | BF | X | $0.00 | $0.00 | |
| B0004 | 3/4" plywood | 40 | SF | X | $0.00 | $0.00 | |
| B0005 | 1/2" plywood | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| $0.00 | |||||||
| ROOF INSULATION | $0.00 | ||||||
| $0.00 | |||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| B0006 | Reserved | $0.00 | |||||
| B0007 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| B0008 | Remove and replace polyisocyanurate tapered insulation panels | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0009 | Remove and replace tapered roof insulation | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0010 | Remove and replace vapor barrier in conjunction | 10 | SQ | X | $0.00 | $0.00 | |
| with built up roofing system | $0.00 | ||||||
| $0.00 | |||||||
| B0011 | Remove and replace resin sized building paper (5 lb) | 5 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0012 | Remove existing cants and replace | 10 | LF | X | $0.00 | $0.00 | |
| with new fiberboard cants 4 x 4 | $0.00 | ||||||
| $0.00 | |||||||
| B0013 | Remove existing cants and replace | 30 | LF | X | $0.00 | $0.00 | |
| with new treated wood cants 4 x 4 | $0.00 | ||||||
| $0.00 | |||||||
| B0014 | Remove existing nailers and replace | 100 | BF | X | $0.00 | $0.00 | |
| with new treated 2" x 6" wood | $0.00 | ||||||
| $0.00 | |||||||
| SHINGLED ROOF SYSTEMS | $0.00 | ||||||
| Remove existing composition shingles and replace | $0.00 | ||||||
| with new composition shingles, shall include starter | $0.00 | ||||||
| strips, ridges & hips | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| B0015 | Twenty Five Year (3 tab ) | 10 | SQ | X | $0.00 | $0.00 | |
| B0016 | Thirty Year (architectual) | 6 | SQ | X | $0.00 | $0.00 | |
| B0017 | Forty Year (architectual) | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0018 | Remove and dispose of existing composition shingles | $0.00 | |||||
| (all types)(where new shingles are not | 6 | SQ | X | $0.00 | $0.00 | ||
| going to be installed) | $0.00 | ||||||
| $0.00 | |||||||
| B0019 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0020 | Remove and re-install existing | 2 | SQ | X | $0.00 | $0.00 | |
| slate shingles (All or Partial) | $0.00 | ||||||
| $0.00 | |||||||
| B0021 | Install new slate shingles (Weathering | 3 | SQ | X | $0.00 | $0.00 | |
| green, Vermont)(All or Partial) | $0.00 | ||||||
| $0.00 | |||||||
| B0022 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing preformed metal (All or Partial) roofing | $0.00 | ||||||
| and replace with new preformed metal roofing | $0.00 | ||||||
| $0.00 | |||||||
| B0023 | Coated steel | 3 | SQ | X | $0.00 | $0.00 | |
| B0024 | Coated aluminum | 3 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| ROOF COATING (ALUMINUM PIGMENTED FIBERED | $0.00 | ||||||
| BITUMINOUS ROOF COATING) | $0.00 | ||||||
| $0.00 | |||||||
| B0025 | Coat roofing with aluminum pigmented | 6 | SQ | X | $0.00 | $0.00 | |
| fibered bitumen roof coating | $0.00 | ||||||
| $0.00 | |||||||
| Field paint roof mounted equipment | $0.00 | ||||||
| $0.00 | |||||||
| B0026 | Up to 25 SF X in surface area X | 12 | SF | X | $0.00 | $0.00 | |
| B0027 | Over 25 SF X in surface area X | 12 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| BUILT UP ROOF | $0.00 | ||||||
| $0.00 | |||||||
| Remove existing roof system and replace with new | $0.00 | ||||||
| aggregate surfaced BU roofing system | $0.00 | ||||||
| $0.00 | |||||||
| B0028 | System GAA (Gravel) | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and replace with new | $0.00 | ||||||
| smooth surfaced BU roofing system. | $0.00 | ||||||
| $0.00 | |||||||
| B0029 | System Gas | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and | $0.00 | ||||||
| replace with new single ply reinforced | $0.00 | ||||||
| modified bitumen sheet roofing system | $0.00 | ||||||
| $0.00 | |||||||
| B0030 | Torch Applied | 6 | SQ | X | $0.00 | $0.00 | |
| B0031 | Mop Applied | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0032 | Remove existing base flashing and replace with | 50 | SF | X | $0.00 | $0.00 | |
| new 2 ply glass felt base flashing | $0.00 | ||||||
| $0.00 | |||||||
| B0033 | Remove existing base flashing and replace with | 12 | SF | X | $0.00 | $0.00 | |
| new 3-ply bituminous base flashing | $0.00 | ||||||
| $0.00 | |||||||
| B0034 | Remove existing base flashing and | 12 | SF | X | $0.00 | $0.00 | |
| replace with new single ply reinforced | $0.00 | ||||||
| modified, bitumen sheet roofing | $0.00 | ||||||
| flashing | $0.00 | ||||||
| $0.00 | |||||||
| B0035 | Remove and Dispose of Second layer | 10 | SQ | X | $0.00 | $0.00 | |
| of Built up roof | $0.00 | ||||||
| $0.00 | |||||||
| B0036 | (1) Walkway/Asphalt Planks | 100 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| ROOF AND PARAPET WALL DAMPROOFING | $0.00 | ||||||
| $0.00 | |||||||
| B0037 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new | $0.00 | ||||||
| E.P.D.M. Roof System over Existing Built-up Roof) | $0.00 | ||||||
| $0.00 | |||||||
| B0038 | Ballasted System | 10 | SQ | X | $0.00 | $0.00 | |
| B0039 | Mechanically Fastened System | 10 | SQ | X | $0.00 | $0.00 | |
| B0040 | Full Adhered System | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and replace with new E.P.D.M. roof system | $0.00 | ||||||
| $0.00 | |||||||
| B0041 | Ballasted System | 10 | SQ | X | $0.00 | $0.00 | |
| B0042 | Mechanically Fastened System | 10 | SQ | X | $0.00 | $0.00 | |
| B0043 | Full Adhered System | 10 | SQ | X | $0.00 | $0.00 | |
| B0044 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $0.00 | $0.00 | |
| B0045 | Install Rubber Pipe Vents | 5 | EA | X | $0.00 | $0.00 | |
| B0046 | Install Termination Bars. Shall include caulking | 12 | LF | X | $0.00 | $0.00 | |
| B0047 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| B0048 | Install E.P.D.M Walk Pads | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and replace with new | $0.00 | ||||||
| Thermoplastic alloy roof system (TPA) | $0.00 | ||||||
| $0.00 | |||||||
| B0049 | Mechanically Fastened | 5 | SQ | X | $0.00 | $0.00 | |
| B0050 | Ballasted | 5 | SQ | X | $0.00 | $0.00 | |
| B0051 | Install new TPA wall/curb flashing | 25 | SF | X | $0.00 | $0.00 | |
| B0052 | Install new TPA pipe vent flashing | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal base flashing and replace | $0.00 | ||||||
| with new metal base flashing | $0.00 | ||||||
| $0.00 | |||||||
| B0053 | Copper | 25 | SF | X | $0.00 | $0.00 | |
| B0054 | Aluminum | 25 | SF | X | $0.00 | $0.00 | |
| B0055 | Aluminum/various colors | 25 | SF | X | $0.00 | $0.00 | |
| B0056 | Stainless Steel | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal step flashing and replace | $0.00 | ||||||
| with new metal step flashing | $0.00 | ||||||
| $0.00 | |||||||
| B0057 | Copper | 25 | SF | X | $0.00 | $0.00 | |
| B0058 | Aluminum | 25 | SF | X | $0.00 | $0.00 | |
| B0059 | Aluminum/various colors | 25 | SF | X | $0.00 | $0.00 | |
| B0060 | Stainless Steel | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal counter flashing | $0.00 | ||||||
| and replace with new metal counter | $0.00 | ||||||
| flashing, shall include caulking | $0.00 | ||||||
| $0.00 | |||||||
| B0061 | Copper | 6 | SF | X | $0.00 | $0.00 | |
| B0062 | Aluminum | 6 | SF | X | $0.00 | $0.00 | |
| B0063 | Aluminum/various colors | 6 | SF | X | $0.00 | $0.00 | |
| B0064 | Stainless Steel | 6 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal gravel stop and replace with | $0.00 | ||||||
| new metal gravel stop (up to 6" high) | $0.00 | ||||||
| $0.00 | |||||||
| B0065 | Copper | 6 | LF | X | $0.00 | $0.00 | |
| B0066 | Aluminum | 6 | LF | X | $0.00 | $0.00 | |
| B0067 | Aluminum/various colors | 6 | LF | X | $0.00 | $0.00 | |
| B0068 | Stainless Steel | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal gravel stop and replace with | $0.00 | ||||||
| new metal gravel stop (up to 12" high) | $0.00 | ||||||
| $0.00 | |||||||
| B0069 | Copper | 6 | LF | X | $0.00 | $0.00 | |
| B0070 | Aluminum | 6 | LF | X | $0.00 | $0.00 | |
| B0071 | Aluminum/various colors | 6 | LF | X | $0.00 | $0.00 | |
| B0072 | Stainless Steel | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing and install new metal coping. | $0.00 | ||||||
| Shall include caulking. | $0.00 | ||||||
| $0.00 | |||||||
| B0073 | Copper | 6 | SF | X | $0.00 | $0.00 | |
| B0074 | Aluminum | 6 | SF | X | $0.00 | $0.00 | |
| B0075 | Aluminum/various colors | 6 | SF | X | $0.00 | $0.00 | |
| B0076 | Stainless Steel | 6 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove metal drip edge and replace | $0.00 | ||||||
| with new metal drip edge | $0.00 | ||||||
| $0.00 | |||||||
| B0077 | Copper | 6 | LF | X | $0.00 | $0.00 | |
| B0078 | Aluminum | 6 | LF | X | $0.00 | $0.00 | |
| B0079 | Aluminum/various colors | 6 | LF | X | $0.00 | $0.00 | |
| B0080 | Stainless Steel | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| METAL GUTTERS AND DOWNSPOUTS | $0.00 | ||||||
| $0.00 | |||||||
| Install Metal Gutters | $0.00 | ||||||
| $0.00 | |||||||
| B0081 | Copper/5" ogee | 6 | LF | X | $0.00 | $0.00 | |
| B0082 | Copper/6" ogee | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0083 | Copper/6" half round | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0084 | Copper/6" box | 6 | LF | X | $0.00 | $0.00 | |
| B0085 | Copper/8" box | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0086 | Prefinish Alum/5" ogee | 6 | LF | X | $0.00 | $0.00 | |
| B0087 | Prefinish Alum/6" ogee | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0088 | Prefinish Alum/6" Box | 6 | LF | X | $0.00 | $0.00 | |
| B0089 | Prefinish Alum/8" Box | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0090 | Stainless steel/6" box | 6 | LF | X | $0.00 | $0.00 | |
| B0091 | Stainless steel/8" box | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Install Metal Downspouts | $0.00 | ||||||
| $0.00 | |||||||
| B0092 | Copper 2" x 3" | 6 | LF | X | $0.00 | $0.00 | |
| B0093 | Copper 3" x 4" | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0094 | Copper/3" round | 6 | LF | X | $0.00 | $0.00 | |
| B0095 | Copper/4" round | 6 | LF | X | $0.00 | $0.00 | |
| B0096 | Copper/6" round | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0097 | Prefinish alum 2" x 3" | 6 | LF | X | $0.00 | $0.00 | |
| B0098 | Prefinish alum 3" x 4" | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0099 | Stainless Steel 3" x 4" | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0100 | Provide and place new concrete splash block | 5 | EA | X | $0.00 | $0.00 | |
| (standard commercial size) | $0.00 | ||||||
| $0.00 | |||||||
| Remove Gutters and/or downspouts | $0.00 | ||||||
| $0.00 | |||||||
| B0101 | Remove and dispose of existing | 16 | LF | X | $0.00 | $0.00 | |
| gutters and/or downspouts | $0.00 | ||||||
| $0.00 | |||||||
| B0102 | Remove and reinstall existing gutters and/or | 10 | LF | X | $0.00 | $0.00 | |
| downspouts. Reseal all joints | $0.00 | ||||||
| $0.00 | |||||||
| B0103 | Realign and resecure existing gutters | 10 | LF | X | $0.00 | $0.00 | |
| and/or downspouts (Replace hangers, | $0.00 | ||||||
| fasteners and straps) as needed. | $0.00 | ||||||
| Reseal all joints. | $0.00 | ||||||
| $0.00 | |||||||
| B0104 | Resolder broken gutter joints | 3 | EA | X | $0.00 | $0.00 | |
| B0105 | Reseal, broken gutter joints | 3 | EA | X | $0.00 | $0.00 | |
| B0106 | Clean and dispose of debris in existing gutters | 75 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal open valley flashing and | $0.00 | ||||||
| replace with new metal valley flashing | $0.00 | ||||||
| $0.00 | |||||||
| B0107 | Copper | 25 | SF | X | $0.00 | $0.00 | |
| B0108 | Aluminum | 25 | SF | X | $0.00 | $0.00 | |
| B0109 | Aluminum/various colors | 25 | SF | X | $0.00 | $0.00 | |
| B0110 | Stainless Steel | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal flashing/miscellaneous | $0.00 | ||||||
| shapes and replace with new | $0.00 | ||||||
| $0.00 | |||||||
| B0111 | Copper | 15 | SF | X | $0.00 | $0.00 | |
| B0112 | Aluminum | 15 | SF | X | $0.00 | $0.00 | |
| B0113 | Aluminum/various colors | 15 | SF | X | $0.00 | $0.00 | |
| B0114 | Stainless Steel | 15 | SF | X | $0.00 | $0.00 | |
| B0115 | Compatible w/EPDM & CPE | 15 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing pitch pocket and 'replace with new | $0.00 | ||||||
| $0.00 | |||||||
| B0116 | Copper | 1 | SF | X | $0.00 | $0.00 | |
| B0117 | Aluminum | 1 | SF | X | $0.00 | $0.00 | |
| B0118 | Stainless steel | 1 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| $0.00 | |||||||
| DRAINS, STRAINERS, SCUPPERS, | $0.00 | ||||||
| CONDUCTOR HEADS & SPLASH HEADS | $0.00 | ||||||
| $0.00 | |||||||
| B0119 | Clean and clear roof drains | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof drain sumps and | $0.00 | ||||||
| replace with new roof drain sumps | $0.00 | ||||||
| $0.00 | |||||||
| B0120 | 6-Pound Lead | 1 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| TPA EPDM roof drain Sumps | $0.00 | ||||||
| $0.00 | |||||||
| B0121 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Provide and install TPA EPDM roof 'drain sumps | $0.00 | ||||||
| $0.00 | |||||||
| B0122 | TPA EPDM roof drain sumps (provide and install only) | 1 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| B0123 | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| Remove existing stainers | $0.00 | ||||||
| $0.00 | |||||||
| B0124 | Metal Strainers | 2 | EA | X | $0.00 | $0.00 | |
| B0125 | PVC Strainers | 2 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Furnish and Install New Strainers | $0.00 | ||||||
| $0.00 | |||||||
| B0126 | Metal Strainers | 2 | EA | X | $0.00 | $0.00 | |
| B0127 | PVC Strainers | 2 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal scupper lining and replace with | $0.00 | ||||||
| new metal scupper lining | $0.00 | ||||||
| $0.00 | |||||||
| B0128 | Copper | 2 | EA | X | $0.00 | $0.00 | |
| B0129 | Stainless Steel | 2 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal conductor heads | $0.00 | ||||||
| and replace with new metal conductor heads | $0.00 | ||||||
| $0.00 | |||||||
| B0130 | Copper | 1 | EA | X | $0.00 | $0.00 | |
| B0131 | Stainless Steel | 1 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Install new metal splash pans | $0.00 | ||||||
| $0.00 | |||||||
| B0132 | Copper | 1 | EA | X | $0.00 | $0.00 | |
| B0133 | Stainless Steel | 1 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| MISCELLANEOUS ROOFING WORK | $0.00 | ||||||
| $0.00 | |||||||
| Remove existing expansion joints and replace | $0.00 | ||||||
| with new expansion joints. Include wood nailers, | $0.00 | ||||||
| bituminous base flashing, metal counterflashing | $0.00 | ||||||
| and metal joint cover | $0.00 | ||||||
| $0.00 | |||||||
| B0134 | Copper | 2 | SF | X | $0.00 | $0.00 | |
| B0135 | Aluminum | 2 | SF | X | $0.00 | $0.00 | |
| B0136 | Stainless Steel | 2 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0137 | Remove existing pipe vent flashing and | 1 | EA | X | $0.00 | $0.00 | |
| replace with new lEA Xd pipe vent flashing | $0.00 | ||||||
| $0.00 | |||||||
| B0138 | Remove existing metal vent collars and replace with | 3 | EA | X | $0.00 | $0.00 | |
| new vent collars and accessories | $0.00 | ||||||
| $0.00 | |||||||
| B0139 | Install caulking | 5 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0140 | Remove existing caulking and replace | 12 | LF | X | $0.00 | $0.00 | |
| with new sealant/caulking | $0.00 | ||||||
| $0.00 | |||||||
| B0141 | Cut new reglet In masonry | 5 | LF | X | $0.00 | $0.00 | |
| B0142 | Cut new reglet In concrete | 5 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0143 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| B0144 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| B0145 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| B0146 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| B0147 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| B0148 | Reserved | $0.00 | |||||
| B0149 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| B0150 | Remove existing fascia and replace with | 12 | BF | X | $0.00 | $0.00 | |
| new fascia board | $0.00 | ||||||
| $0.00 | |||||||
| B0151 | Prime and paint fascia board | 12 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0152 | Cover existing fascia board with | 12 | SF | X | $0.00 | $0.00 | |
| aluminum coil stock (various colors) | $0.00 | ||||||
| $0.00 | |||||||
| RESERVED | $0.00 | ||||||
| B0153 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| ASBESTOS ABATEMENT/REMOVAL | $0.00 | ||||||
| $0.00 | |||||||
| B0154 | Min. costs incurred for asbestos | 1 | EA | X | $0.00 | $0.00 | |
| abatement, for trailer (provide, set-up, | $0.00 | ||||||
| & removal) | $0.00 | ||||||
| $0.00 | |||||||
| B0155 | Additional cost incurred for the removal and disposal | 100 | SF | X | $0.00 | $0.00 | |
| of asbestos containing substances. | $0.00 | ||||||
| Regular roofing only. | $0.00 | ||||||
| $0.00 | |||||||
| B0156 | Additional cost incurred for the removal and disposal | 100 | SF | X | $0.00 | $0.00 | |
| of asbestos containing substance. (Flashings, | $0.00 | ||||||
| Pitch pockets, etc.) | $0.00 | ||||||
| $0.00 | |||||||
| B0157 | Removal of lead based paint. 'Contractor removes loose | 150 | SF | X | $0.00 | $0.00 | |
| paint from surface. The contractor furnishes container | $0.00 | ||||||
| and the Government disposes | $0.00 | ||||||
| $0.00 | |||||||
| NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK | $0.00 | ||||||
| $0.00 | |||||||
| B0158 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN E0159. These material costs MUST BE NEGOTIATED BY KO. | 1 | LS | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0159 | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | 500 | HRS | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| ADDITIONAL ROOFING WORK | $0.00 | ||||||
| $0.00 | |||||||
| B0160 | COMMAND INTEREST WORK | 2 | EA | X | $0.00 | $0.00 | |
| (One time cost per Task Order to respond within 48 hours and work diligently until all work is completed). | $0.00 | ||||||
| $0.00 | |||||||
| B0161 | Perform roof, drain, gutter and downspout cleaning SIX (6) times a year in accordance with Attachment A; provide monthly inspections in accordance with Attachment A. | 1 | LOT | $0.00 | |||
| $0.00 | |||||||
| B0162 | Perform Emergency Service call. | 75 | EA | X | $0.00 | $0.00 | |
| Contractor shall respond to service call within 2 working days of receipt of order, secure emergency and make any necessary repairs to roof and drain system. Service call is limited to a combined labor and material cost not to exceed $1,000.00. The total labor cost is based on the labor rate for ELIN E0159 times the hours worked. Contractor shall submit proposal to the Contracting Officer for any work beyond scope of the call. Contractor shall complete within 4 working days. | $0.00 | ||||||
| $0.00 | |||||||
| B0163 | Perform Roof Survey / Assessment up to 50,000 SF in accordance with Attachment B. | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0164 | Perform Roof Survey / Assessment over 50,000 SF and up to 100,000 SF in accordance with Attachment B. | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| B0165 | Perform Roof Survey / Assessment over 100,000 SF in accordance with Attachment B. | 5 | EA | X | $0.00 | $0.00 | |
| . | |||||||
| Total Price for 1ST OPTION YEAR (IQ) Price Work Items - CLIN 0002 | $0.00 | $0.00 | |||||
| (Sum of Exhibit Line Items B0001- B0165) |
2nd Option Year
| ROOFING CONTRACT 20-D-XXXX ELINs | |
| INDEFINITE QUANTITY WORK ITEMS - CLIN 0003 | |
| SCHEDULE OF PRICES - 2nd OPTION YEAR |
| ELIN Number | Supplies/Services | Est. | Unit | Unit Price | Total |
| Quantity | |||||
| ROOF DECKS |
| C0001 | Remove existing metal roof decks (ALL OR PARTIAL) | 3 | SQ | X | $0.00 | $0.00 |
| and replace with new steel roof decking, shall include | ||||||
| all closures and accessories |
| Remove existing wood roof deck and replace with |
| new wood decking |
| C0002 | 1" nominal T & G (treated) | 40 | BF | X | $0.00 | $0.00 | |
| C0003 | 2" nominal T & G (treated) | 40 | BF | X | $0.00 | $0.00 | |
| C0004 | 3/4" plywood | 40 | SF | X | $0.00 | $0.00 | |
| C0005 | 1/2" plywood | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| $0.00 | |||||||
| ROOF INSULATION | $0.00 | ||||||
| $0.00 | |||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| C0006 | Reserved | $0.00 | |||||
| C0007 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| C0008 | Remove and replace polyisocyanurate tapered insulation panels | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0009 | Remove and replace tapered roof insulation | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0010 | Remove and replace vapor barrier in conjunction | 10 | SQ | X | $0.00 | $0.00 | |
| with built up roofing system | $0.00 | ||||||
| $0.00 | |||||||
| C0011 | Remove and replace resin sized building paper (5 lb) | 5 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0012 | Remove existing cants and replace | 10 | LF | X | $0.00 | $0.00 | |
| with new fiberboard cants 4 x 4 | $0.00 | ||||||
| $0.00 | |||||||
| C0013 | Remove existing cants and replace | 30 | LF | X | $0.00 | $0.00 | |
| with new treated wood cants 4 x 4 | $0.00 | ||||||
| $0.00 | |||||||
| C0014 | Remove existing nailers and replace | 100 | BF | X | $0.00 | $0.00 | |
| with new treated 2" x 6" wood | $0.00 | ||||||
| $0.00 | |||||||
| SHINGLED ROOF SYSTEMS | $0.00 | ||||||
| Remove existing composition shingles and replace | $0.00 | ||||||
| with new composition shingles, shall include starter | $0.00 | ||||||
| strips, ridges & hips | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| C0015 | Twenty Five Year (3 tab ) | 10 | SQ | X | $0.00 | $0.00 | |
| C0016 | Thirty Year (architectual) | 6 | SQ | X | $0.00 | $0.00 | |
| C0017 | Forty Year (architectual) | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0018 | Remove and dispose of existing composition shingles | $0.00 | |||||
| (all types)(where new shingles are not | 6 | SQ | X | $0.00 | $0.00 | ||
| going to be installed) | $0.00 | ||||||
| $0.00 | |||||||
| C0019 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0020 | Remove and re-install existing | 2 | SQ | X | $0.00 | $0.00 | |
| slate shingles (All or Partial) | $0.00 | ||||||
| $0.00 | |||||||
| C0021 | Install new slate shingles (Weathering | 3 | SQ | X | $0.00 | $0.00 | |
| green, Vermont)(All or Partial) | $0.00 | ||||||
| $0.00 | |||||||
| C0022 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing preformed metal (All or Partial) roofing | $0.00 | ||||||
| and replace with new preformed metal roofing | $0.00 | ||||||
| $0.00 | |||||||
| C0023 | Coated steel | 3 | SQ | X | $0.00 | $0.00 | |
| C0024 | Coated aluminum | 3 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| ROOF COATING (ALUMINUM PIGMENTED FIBERED | $0.00 | ||||||
| BITUMINOUS ROOF COATING) | $0.00 | ||||||
| $0.00 | |||||||
| C0025 | Coat roofing with aluminum pigmented | 6 | SQ | X | $0.00 | $0.00 | |
| fibered bitumen roof coating | $0.00 | ||||||
| $0.00 | |||||||
| Field paint roof mounted equipment | $0.00 | ||||||
| $0.00 | |||||||
| C0026 | Up to 25 SF X in surface area X | 12 | SF | X | $0.00 | $0.00 | |
| C0027 | Over 25 SF X in surface area X | 12 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| BUILT UP ROOF | $0.00 | ||||||
| $0.00 | |||||||
| Remove existing roof system and replace with new | $0.00 | ||||||
| aggregate surfaced BU roofing system | $0.00 | ||||||
| $0.00 | |||||||
| C0028 | System GAA (Gravel) | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and replace with new | $0.00 | ||||||
| smooth surfaced BU roofing system. | $0.00 | ||||||
| $0.00 | |||||||
| C0029 | System Gas | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and | $0.00 | ||||||
| replace with new single ply reinforced | $0.00 | ||||||
| modified bitumen sheet roofing system | $0.00 | ||||||
| $0.00 | |||||||
| C0030 | Torch Applied | 6 | SQ | X | $0.00 | $0.00 | |
| C0031 | Mop Applied | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0032 | Remove existing base flashing and replace with | 50 | SF | X | $0.00 | $0.00 | |
| new 2 ply glass felt base flashing | $0.00 | ||||||
| $0.00 | |||||||
| C0033 | Remove existing base flashing and replace with | 12 | SF | X | $0.00 | $0.00 | |
| new 3-ply bituminous base flashing | $0.00 | ||||||
| $0.00 | |||||||
| C0034 | Remove existing base flashing and | 12 | SF | X | $0.00 | $0.00 | |
| replace with new single ply reinforced | $0.00 | ||||||
| modified, bitumen sheet roofing | $0.00 | ||||||
| flashing | $0.00 | ||||||
| $0.00 | |||||||
| C0035 | Remove and Dispose of Second layer | 10 | SQ | X | $0.00 | $0.00 | |
| of Built up roof | $0.00 | ||||||
| $0.00 | |||||||
| C0036 | (1) Walkway/Asphalt Planks | 100 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| ROOF AND PARAPET WALL DAMPROOFING | $0.00 | ||||||
| $0.00 | |||||||
| C0037 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new | $0.00 | ||||||
| E.P.D.M. Roof System over Existing Built-up Roof) | $0.00 | ||||||
| $0.00 | |||||||
| C0038 | Ballasted System | 10 | SQ | X | $0.00 | $0.00 | |
| C0039 | Mechanically Fastened System | 10 | SQ | X | $0.00 | $0.00 | |
| C0040 | Full Adhered System | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and replace with new E.P.D.M. roof system | $0.00 | ||||||
| $0.00 | |||||||
| C0041 | Ballasted System | 10 | SQ | X | $0.00 | $0.00 | |
| C0042 | Mechanically Fastened System | 10 | SQ | X | $0.00 | $0.00 | |
| C0043 | Full Adhered System | 10 | SQ | X | $0.00 | $0.00 | |
| C0044 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $0.00 | $0.00 | |
| C0045 | Install Rubber Pipe Vents | 5 | EA | X | $0.00 | $0.00 | |
| C0046 | Install Termination Bars. Shall include caulking | 12 | LF | X | $0.00 | $0.00 | |
| C0047 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| C0048 | Install E.P.D.M Walk Pads | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and replace with new | $0.00 | ||||||
| Thermoplastic alloy roof system (TPA) | $0.00 | ||||||
| $0.00 | |||||||
| C0049 | Mechanically Fastened | 5 | SQ | X | $0.00 | $0.00 | |
| C0050 | Ballasted | 5 | SQ | X | $0.00 | $0.00 | |
| C0051 | Install new TPA wall/curb flashing | 25 | SF | X | $0.00 | $0.00 | |
| C0052 | Install new TPA pipe vent flashing | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal base flashing and replace | $0.00 | ||||||
| with new metal base flashing | $0.00 | ||||||
| $0.00 | |||||||
| C0053 | Copper | 25 | SF | X | $0.00 | $0.00 | |
| C0054 | Aluminum | 25 | SF | X | $0.00 | $0.00 | |
| C0055 | Aluminum/various colors | 25 | SF | X | $0.00 | $0.00 | |
| C0056 | Stainless Steel | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal step flashing and replace | $0.00 | ||||||
| with new metal step flashing | $0.00 | ||||||
| $0.00 | |||||||
| C0057 | Copper | 25 | SF | X | $0.00 | $0.00 | |
| C0058 | Aluminum | 25 | SF | X | $0.00 | $0.00 | |
| C0059 | Aluminum/various colors | 25 | SF | X | $0.00 | $0.00 | |
| C0060 | Stainless Steel | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal counter flashing | $0.00 | ||||||
| and replace with new metal counter | $0.00 | ||||||
| flashing, shall include caulking | $0.00 | ||||||
| $0.00 | |||||||
| C0061 | Copper | 6 | SF | X | $0.00 | $0.00 | |
| C0062 | Aluminum | 6 | SF | X | $0.00 | $0.00 | |
| C0063 | Aluminum/various colors | 6 | SF | X | $0.00 | $0.00 | |
| C0064 | Stainless Steel | 6 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal gravel stop and replace with | $0.00 | ||||||
| new metal gravel stop (up to 6" high) | $0.00 | ||||||
| $0.00 | |||||||
| C0065 | Copper | 6 | LF | X | $0.00 | $0.00 | |
| C0066 | Aluminum | 6 | LF | X | $0.00 | $0.00 | |
| C0067 | Aluminum/various colors | 6 | LF | X | $0.00 | $0.00 | |
| C0068 | Stainless Steel | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal gravel stop and replace with | $0.00 | ||||||
| new metal gravel stop (up to 12" high) | $0.00 | ||||||
| $0.00 | |||||||
| C0069 | Copper | 6 | LF | X | $0.00 | $0.00 | |
| C0070 | Aluminum | 6 | LF | X | $0.00 | $0.00 | |
| C0071 | Aluminum/various colors | 6 | LF | X | $0.00 | $0.00 | |
| C0072 | Stainless Steel | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing and install new metal coping. | $0.00 | ||||||
| Shall include caulking. | $0.00 | ||||||
| $0.00 | |||||||
| C0073 | Copper | 6 | SF | X | $0.00 | $0.00 | |
| C0074 | Aluminum | 6 | SF | X | $0.00 | $0.00 | |
| C0075 | Aluminum/various colors | 6 | SF | X | $0.00 | $0.00 | |
| C0076 | Stainless Steel | 6 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove metal drip edge and replace | $0.00 | ||||||
| with new metal drip edge | $0.00 | ||||||
| $0.00 | |||||||
| C0077 | Copper | 6 | LF | X | $0.00 | $0.00 | |
| C0078 | Aluminum | 6 | LF | X | $0.00 | $0.00 | |
| C0079 | Aluminum/various colors | 6 | LF | X | $0.00 | $0.00 | |
| C0080 | Stainless Steel | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| METAL GUTTERS AND DOWNSPOUTS | $0.00 | ||||||
| $0.00 | |||||||
| Install Metal Gutters | $0.00 | ||||||
| $0.00 | |||||||
| C0081 | Copper/5" ogee | 6 | LF | X | $0.00 | $0.00 | |
| C0082 | Copper/6" ogee | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0083 | Copper/6" half round | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0084 | Copper/6" box | 6 | LF | X | $0.00 | $0.00 | |
| C0085 | Copper/8" box | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0086 | Prefinish Alum/5" ogee | 6 | LF | X | $0.00 | $0.00 | |
| C0087 | Prefinish Alum/6" ogee | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0088 | Prefinish Alum/6" Box | 6 | LF | X | $0.00 | $0.00 | |
| C0089 | Prefinish Alum/8" Box | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0090 | Stainless steel/6" box | 6 | LF | X | $0.00 | $0.00 | |
| C0091 | Stainless steel/8" box | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Install Metal Downspouts | $0.00 | ||||||
| $0.00 | |||||||
| C0092 | Copper 2" x 3" | 6 | LF | X | $0.00 | $0.00 | |
| C0093 | Copper 3" x 4" | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0094 | Copper/3" round | 6 | LF | X | $0.00 | $0.00 | |
| C0095 | Copper/4" round | 6 | LF | X | $0.00 | $0.00 | |
| C0096 | Copper/6" round | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0097 | Prefinish alum 2" x 3" | 6 | LF | X | $0.00 | $0.00 | |
| C0098 | Prefinish alum 3" x 4" | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0099 | Stainless Steel 3" x 4" | 6 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0100 | Provide and place new concrete splash block | 5 | EA | X | $0.00 | $0.00 | |
| (standard commercial size) | $0.00 | ||||||
| $0.00 | |||||||
| Remove Gutters and/or downspouts | $0.00 | ||||||
| $0.00 | |||||||
| C0101 | Remove and dispose of existing | 16 | LF | X | $0.00 | $0.00 | |
| gutters and/or downspouts | $0.00 | ||||||
| $0.00 | |||||||
| C0102 | Remove and reinstall existing gutters and/or | 10 | LF | X | $0.00 | $0.00 | |
| downspouts. Reseal all joints | $0.00 | ||||||
| $0.00 | |||||||
| C0103 | Realign and resecure existing gutters | 10 | LF | X | $0.00 | $0.00 | |
| and/or downspouts (Replace hangers, | $0.00 | ||||||
| fasteners and straps) as needed. | $0.00 | ||||||
| Reseal all joints. | $0.00 | ||||||
| $0.00 | |||||||
| C0104 | Resolder broken gutter joints | 3 | EA | X | $0.00 | $0.00 | |
| C0105 | Reseal, broken gutter joints | 3 | EA | X | $0.00 | $0.00 | |
| C0106 | Clean and dispose of debris in existing gutters | 75 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal open valley flashing and | $0.00 | ||||||
| replace with new metal valley flashing | $0.00 | ||||||
| $0.00 | |||||||
| C0107 | Copper | 25 | SF | X | $0.00 | $0.00 | |
| C0108 | Aluminum | 25 | SF | X | $0.00 | $0.00 | |
| C0109 | Aluminum/various colors | 25 | SF | X | $0.00 | $0.00 | |
| C0110 | Stainless Steel | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal flashing/miscellaneous | $0.00 | ||||||
| shapes and replace with new | $0.00 | ||||||
| $0.00 | |||||||
| C0111 | Copper | 15 | SF | X | $0.00 | $0.00 | |
| C0112 | Aluminum | 15 | SF | X | $0.00 | $0.00 | |
| C0113 | Aluminum/various colors | 15 | SF | X | $0.00 | $0.00 | |
| C0114 | Stainless Steel | 15 | SF | X | $0.00 | $0.00 | |
| C0115 | Compatible w/EPDM & CPE | 15 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing pitch pocket and 'replace with new | $0.00 | ||||||
| $0.00 | |||||||
| C0116 | Copper | 1 | SF | X | $0.00 | $0.00 | |
| C0117 | Aluminum | 1 | SF | X | $0.00 | $0.00 | |
| C0118 | Stainless steel | 1 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| $0.00 | |||||||
| DRAINS, STRAINERS, SCUPPERS, | $0.00 | ||||||
| CONDUCTOR HEADS & SPLASH HEADS | $0.00 | ||||||
| $0.00 | |||||||
| C0119 | Clean and clear roof drains | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof drain sumps and | $0.00 | ||||||
| replace with new roof drain sumps | $0.00 | ||||||
| $0.00 | |||||||
| C0120 | 6-Pound Lead | 1 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| TPA EPDM roof drain Sumps | $0.00 | ||||||
| $0.00 | |||||||
| C0121 | TPA EPDM roof drain sumps (removal only) | 2 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Provide and install TPA EPDM roof 'drain sumps | $0.00 | ||||||
| $0.00 | |||||||
| C0122 | TPA EPDM roof drain sumps (provide and install only) | 1 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| C0123 | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| Remove existing stainers | $0.00 | ||||||
| $0.00 | |||||||
| C0124 | Metal Strainers | 2 | EA | X | $0.00 | $0.00 | |
| C0125 | PVC Strainers | 2 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Furnish and Install New Strainers | $0.00 | ||||||
| $0.00 | |||||||
| C0126 | Metal Strainers | 2 | EA | X | $0.00 | $0.00 | |
| C0127 | PVC Strainers | 2 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal scupper lining and replace with | $0.00 | ||||||
| new metal scupper lining | $0.00 | ||||||
| $0.00 | |||||||
| C0128 | Copper | 2 | EA | X | $0.00 | $0.00 | |
| C0129 | Stainless Steel | 2 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing metal conductor heads | $0.00 | ||||||
| and replace with new metal conductor heads | $0.00 | ||||||
| $0.00 | |||||||
| C0130 | Copper | 1 | EA | X | $0.00 | $0.00 | |
| C0131 | Stainless Steel | 1 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Install new metal splash pans | $0.00 | ||||||
| $0.00 | |||||||
| C0132 | Copper | 1 | EA | X | $0.00 | $0.00 | |
| C0133 | Stainless Steel | 1 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| MISCELLANEOUS ROOFING WORK | $0.00 | ||||||
| $0.00 | |||||||
| Remove existing expansion joints and replace | $0.00 | ||||||
| with new expansion joints. Include wood nailers, | $0.00 | ||||||
| bituminous base flashing, metal counterflashing | $0.00 | ||||||
| and metal joint cover | $0.00 | ||||||
| $0.00 | |||||||
| C0134 | Copper | 2 | SF | X | $0.00 | $0.00 | |
| C0135 | Aluminum | 2 | SF | X | $0.00 | $0.00 | |
| C0136 | Stainless Steel | 2 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0137 | Remove existing pipe vent flashing and | 1 | EA | X | $0.00 | $0.00 | |
| replace with new lEA Xd pipe vent flashing | $0.00 | ||||||
| $0.00 | |||||||
| C0138 | Remove existing metal vent collars and replace with | 3 | EA | X | $0.00 | $0.00 | |
| new vent collars and accessories | $0.00 | ||||||
| $0.00 | |||||||
| C0139 | Install caulking | 5 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0140 | Remove existing caulking and replace | 12 | LF | X | $0.00 | $0.00 | |
| with new sealant/caulking | $0.00 | ||||||
| $0.00 | |||||||
| C0141 | Cut new reglet In masonry | 5 | LF | X | $0.00 | $0.00 | |
| C0142 | Cut new reglet In concrete | 5 | LF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0143 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| C0144 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| C0145 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| C0146 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| C0147 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| $0.00 | |||||||
| C0148 | Reserved | $0.00 | |||||
| C0149 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| C0150 | Remove existing fascia and replace with | 12 | BF | X | $0.00 | $0.00 | |
| new fascia board | $0.00 | ||||||
| $0.00 | |||||||
| C0151 | Prime and paint fascia board | 12 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0152 | Cover existing fascia board with | 12 | SF | X | $0.00 | $0.00 | |
| aluminum coil stock (various colors) | $0.00 | ||||||
| $0.00 | |||||||
| RESERVED | $0.00 | ||||||
| C0153 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| ASBESTOS ABATEMENT/REMOVAL | $0.00 | ||||||
| $0.00 | |||||||
| C0154 | Min. costs incurred for asbestos | 1 | EA | X | $0.00 | $0.00 | |
| abatement, for trailer (provide, set-up, | $0.00 | ||||||
| & removal) | $0.00 | ||||||
| $0.00 | |||||||
| C0155 | Additional cost incurred for the removal and disposal | 100 | SF | X | $0.00 | $0.00 | |
| of asbestos containing substances. | $0.00 | ||||||
| Regular roofing only. | $0.00 | ||||||
| $0.00 | |||||||
| C0156 | Additional cost incurred for the removal and disposal | 100 | SF | X | $0.00 | $0.00 | |
| of asbestos containing substance. (Flashings, | $0.00 | ||||||
| Pitch pockets, etc.) | $0.00 | ||||||
| $0.00 | |||||||
| C0157 | Removal of lead based paint. 'Contractor removes loose | 150 | SF | X | $0.00 | $0.00 | |
| paint from surface. The contractor furnishes container | $0.00 | ||||||
| and the Government disposes | $0.00 | ||||||
| $0.00 | |||||||
| NON-PREPRICED LABOR, MATERIAL and COMMAND INTEREST WORK | $0.00 | ||||||
| $0.00 | |||||||
| C0158 | Provide all materials and equipment to perform Unit Priced Labor work per the scope and delivery schedule specified in the order. Use with ELIN E0159. These material costs MUST BE NEGOTIATED BY KO. | 1 | LS | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0159 | Provide labor to perform all Unit Priced Labor work per the scope and delivery schedule specified in the order. MUST BE NEGOTIATED BY KO. | 500 | HRS | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| ADDITIONAL ROOFING WORK | $0.00 | ||||||
| $0.00 | |||||||
| C0160 | COMMAND INTEREST WORK | 2 | EA | X | $0.00 | $0.00 | |
| (One time cost per Task Order to respond within 48 hours and work diligently until all work is completed). | $0.00 | ||||||
| $0.00 | |||||||
| C0161 | Perform roof, drain, gutter and downspout cleaning SIX (6) times a year in accordance with Attachment A; provide monthly inspections in accordance with Attachment A. | 1 | LOT | $0.00 | |||
| $0.00 | |||||||
| C0162 | Perform Emergency Service call. | 75 | EA | X | $0.00 | $0.00 | |
| Contractor shall respond to service call within 2 working days of receipt of order, secure emergency and make any necessary repairs to roof and drain system. Service call is limited to a combined labor and material cost not to exceed $1,000.00. The total labor cost is based on the labor rate for ELIN E0159 times the hours worked. Contractor shall submit proposal to the Contracting Officer for any work beyond scope of the call. Contractor shall complete within 4 working days. | $0.00 | ||||||
| $0.00 | |||||||
| C0163 | Perform Roof Survey / Assessment up to 50,000 SF in accordance with Attachment B. | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0164 | Perform Roof Survey / Assessment over 50,000 SF and up to 100,000 SF in accordance with Attachment B. | 5 | EA | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| C0165 | Perform Roof Survey / Assessment over 100,000 SF in accordance with Attachment B. | 5 | EA | X | $0.00 | $0.00 | |
| . | |||||||
| Total Price for 2nd OPTION YEAR (IQ) Price Work Items - CLIN 0003 | $0.00 | $0.00 | |||||
| (Sum of Exhibit Line Items C0001- C0165) |
3rd Option Year
| ROOFING CONTRACT 20-D-XXXX ELINs | |
| INDEFINITE QUANTITY WORK ITEMS - CLIN 0004 | |
| SCHEDULE OF PRICES - 3rd OPTION YEAR |
| ELIN Number | Supplies/Services | Est. | Unit | Unit Price | Total |
| Quantity | |||||
| ROOF DECKS |
| D0001 | Remove existing metal roof decks (ALL OR PARTIAL) | 3 | SQ | X | $0.00 | $0.00 |
| and replace with new steel roof decking, shall include | ||||||
| all closures and accessories |
| Remove existing wood roof deck and replace with |
| new wood decking |
| D0002 | 1" nominal T & G (treated) | 40 | BF | X | $0.00 | $0.00 | |
| D0003 | 2" nominal T & G (treated) | 40 | BF | X | $0.00 | $0.00 | |
| D0004 | 3/4" plywood | 40 | SF | X | $0.00 | $0.00 | |
| D0005 | 1/2" plywood | 25 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| $0.00 | |||||||
| ROOF INSULATION | $0.00 | ||||||
| $0.00 | |||||||
| Remove and replace rigid roof insulation in conjunction with roofing systems specified herein. | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| $0.00 | |||||||
| D0006 | Reserved | $0.00 | |||||
| D0007 | Reserved | $0.00 | |||||
| $0.00 | |||||||
| D0008 | Remove and replace polyisocyanurate tapered insulation panels | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| D0009 | Remove and replace tapered roof insulation | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| D0010 | Remove and replace vapor barrier in conjunction | 10 | SQ | X | $0.00 | $0.00 | |
| with built up roofing system | $0.00 | ||||||
| $0.00 | |||||||
| D0011 | Remove and replace resin sized building paper (5 lb) | 5 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| D0012 | Remove existing cants and replace | 10 | LF | X | $0.00 | $0.00 | |
| with new fiberboard cants 4 x 4 | $0.00 | ||||||
| $0.00 | |||||||
| D0013 | Remove existing cants and replace | 30 | LF | X | $0.00 | $0.00 | |
| with new treated wood cants 4 x 4 | $0.00 | ||||||
| $0.00 | |||||||
| D0014 | Remove existing nailers and replace | 100 | BF | X | $0.00 | $0.00 | |
| with new treated 2" x 6" wood | $0.00 | ||||||
| $0.00 | |||||||
| SHINGLED ROOF SYSTEMS | $0.00 | ||||||
| Remove existing composition shingles and replace | $0.00 | ||||||
| with new composition shingles, shall include starter | $0.00 | ||||||
| strips, ridges & hips | $0.00 | ||||||
| $0.00 | |||||||
| $0.00 | |||||||
| D0015 | Twenty Five Year (3 tab ) | 10 | SQ | X | $0.00 | $0.00 | |
| D0016 | Thirty Year (architectual) | 6 | SQ | X | $0.00 | $0.00 | |
| D0017 | Forty Year (architectual) | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| D0018 | Remove and dispose of existing composition shingles | $0.00 | |||||
| (all types)(where new shingles are not | 6 | SQ | X | $0.00 | $0.00 | ||
| going to be installed) | $0.00 | ||||||
| $0.00 | |||||||
| D0019 | Remove and dispose of existing slate shingles. | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| D0020 | Remove and re-install existing | 2 | SQ | X | $0.00 | $0.00 | |
| slate shingles (All or Partial) | $0.00 | ||||||
| $0.00 | |||||||
| D0021 | Install new slate shingles (Weathering | 3 | SQ | X | $0.00 | $0.00 | |
| green, Vermont)(All or Partial) | $0.00 | ||||||
| $0.00 | |||||||
| D0022 | Install new slate shingles (Buckingham)(All or Partial) | 3 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing preformed metal (All or Partial) roofing | $0.00 | ||||||
| and replace with new preformed metal roofing | $0.00 | ||||||
| $0.00 | |||||||
| D0023 | Coated steel | 3 | SQ | X | $0.00 | $0.00 | |
| D0024 | Coated aluminum | 3 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| ROOF COATING (ALUMINUM PIGMENTED FIBERED | $0.00 | ||||||
| BITUMINOUS ROOF COATING) | $0.00 | ||||||
| $0.00 | |||||||
| D0025 | Coat roofing with aluminum pigmented | 6 | SQ | X | $0.00 | $0.00 | |
| fibered bitumen roof coating | $0.00 | ||||||
| $0.00 | |||||||
| Field paint roof mounted equipment | $0.00 | ||||||
| $0.00 | |||||||
| D0026 | Up to 25 SF X in surface area X | 12 | SF | X | $0.00 | $0.00 | |
| D0027 | Over 25 SF X in surface area X | 12 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| BUILT UP ROOF | $0.00 | ||||||
| $0.00 | |||||||
| Remove existing roof system and replace with new | $0.00 | ||||||
| aggregate surfaced BU roofing system | $0.00 | ||||||
| $0.00 | |||||||
| D0028 | System GAA (Gravel) | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and replace with new | $0.00 | ||||||
| smooth surfaced BU roofing system. | $0.00 | ||||||
| $0.00 | |||||||
| D0029 | System Gas | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and | $0.00 | ||||||
| replace with new single ply reinforced | $0.00 | ||||||
| modified bitumen sheet roofing system | $0.00 | ||||||
| $0.00 | |||||||
| D0030 | Torch Applied | 6 | SQ | X | $0.00 | $0.00 | |
| D0031 | Mop Applied | 6 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| D0032 | Remove existing base flashing and replace with | 50 | SF | X | $0.00 | $0.00 | |
| new 2 ply glass felt base flashing | $0.00 | ||||||
| $0.00 | |||||||
| D0033 | Remove existing base flashing and replace with | 12 | SF | X | $0.00 | $0.00 | |
| new 3-ply bituminous base flashing | $0.00 | ||||||
| $0.00 | |||||||
| D0034 | Remove existing base flashing and | 12 | SF | X | $0.00 | $0.00 | |
| replace with new single ply reinforced | $0.00 | ||||||
| modified, bitumen sheet roofing | $0.00 | ||||||
| flashing | $0.00 | ||||||
| $0.00 | |||||||
| D0035 | Remove and Dispose of Second layer | 10 | SQ | X | $0.00 | $0.00 | |
| of Built up roof | $0.00 | ||||||
| $0.00 | |||||||
| D0036 | (1) Walkway/Asphalt Planks | 100 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| ROOF AND PARAPET WALL DAMPROOFING | $0.00 | ||||||
| $0.00 | |||||||
| D0037 | Coat Existing BU Roof or Parapet Wall | 50 | SF | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| E.P.D.M. (RUBBER ROOF SYSTEM) (Install new | $0.00 | ||||||
| E.P.D.M. Roof System over Existing Built-up Roof) | $0.00 | ||||||
| $0.00 | |||||||
| D0038 | Ballasted System | 10 | SQ | X | $0.00 | $0.00 | |
| D0039 | Mechanically Fastened System | 10 | SQ | X | $0.00 | $0.00 | |
| D0040 | Full Adhered System | 10 | SQ | X | $0.00 | $0.00 | |
| $0.00 | |||||||
| Remove existing roof system and replace with new E.P.D.M. roof system | $0.00 | ||||||
| $0.00 | |||||||
| D0041 | Ballasted System | 10 | SQ | X | $0.00 | $0.00 | |
| D0042 | Mechanically Fastened System | 10 | SQ | X | $0.00 | $0.00 | |
| D0043 | Full Adhered System | 10 | SQ | X | $0.00 | $0.00 | |
| D0044 | Install new E.P.D.M. Wall/Curb Flashings | 50 | SF | X | $0.00 | $0.00 |