Attachment A NSWC Phila Roofs.xls

XLS spreadsheet 36 KB Posted

Attached to
ROOFING IDIQ IN SUPPORT OF PWD PENNSYLVANIA
Solicitation number
N4008520R0082
Issued by

About this file

This document contains details for a roof cleaning and maintenance contract opportunity at the Naval Support Activity in Philadelphia, Pennsylvania. The contract requires cleaning gutters and drains on various rooftops at the facility six times per year, with monthly inspections, and submitting a report after each cleaning or inspection. The rooftops range in age from approximately 1980 to 2011, with various roof types including corrugated aluminum, asphalt, and thermoplastic polyolefin. Access to the rooftops for cleaning is noted as ladder, stairs, or elevator depending on location. Related to this is a federal contract solicitation for roofing repair and maintenance services at various Department of Navy sites in Philadelphia and Mechanicsburg, Pennsylvania. The contractor will be required to provide all labor, materials, and equipment to fulfill task orders for roof repairs and maintenance.

View the file

Other files

File Type Posted
AMENDMENT 0005 FOR ROOFING PROJECT.pdf PDF
Roofing site visit log-NSA-P.pdf PDF
AMENDMENT 0004 FOR ROOFING PROJECT.pdf PDF
ROOFING PROJECT SITE VISIT FOR PNBC LOCATION.pdf PDF
Pre-Proposal Inquiries LOG 03 for Roofing Project.pdf PDF
Pre-Proposal Inquiries LOG 02 for Roofin Project.pdf PDF
Roofing Specifications Contract.pdf PDF
REVISED J-020000-08_ELINs_BID schedule.xlsx XLSX spreadsheet
ATTACHMENT B Roofing Survey Check List.pdf PDF
UPDATED WAGE DETERMINATION DOCUMENT.pdf PDF
AMENDMENT 0003 FOR ROOFING PROJECT.pdf PDF
Attachment C PNBC Region Roofs.xlsx XLSX spreadsheet
Pre-Proposal Inquiries LOG 01 for Roofing Project.pdf PDF
AMENDMENT 0002 FOR ROOFING PROJECT.pdf PDF
AMENDMENT 0001 FOR ROOFING PROJECT.pdf PDF
Attachment PNBC SITE MAP.pdf PDF
ATTACHMENT F SEC-NAV 5512 Form.pdf PDF
Attachment_Roofing Contract Specification Table of Contents.pdf PDF
Attachment C Roof Survey Check List.doc DOC document
RFP N40085-20-R-0082 ROOFING PROJECT.pdf PDF
Attachment D Lessons Learn Roof Fire.pptx PPTX presentation
Attachment C- Past Performance Questionnaire.docx DOCX document
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
Attachment Table 07 61 14.00 20 Standing Seam Roof.pdf PDF
Attachment E - Small Business Subcontracting Plan.docx DOCX document
ATTACHMENT-D J-020000-08_ELINs_BID schedule.xlsx XLSX spreadsheet
Attachment NSA PHILA SITE MAP.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment_Roof Drawings.pdf PDF
Attachment B PNBC Region Roofs.xlsx XLSX spreadsheet
Attachment Table 07 60 00 Flashing Sheet Metal.pdf PDF
Attachment Table 07 62 13 Copper Sheet Metal.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roofs

Table 1. Roof / Gutter / Drain cleaning shall be conducted six times a year (cleanings to be done during the months of February, April, June, September, October, November, with the option to do 2 additional cleanings on an as-needed basis) with inspections conducted every month whether cleaning occurred or not. A report must be submitted following cleaning and or inspection each month.
BuildingRoof-typeApprox. SFPitchParapetDate of Roof ConstructionWarranty - ManufacturerRoof Access (See Note 2)Notes
29 (Roof A)Corrugated Alum.18,6027/12Approx. 1980Coating - MuleHide (Kalimex 2007)High reach / ladder
29 (Roof B-E)Asphalt Built-up8,686FlatYes2006 - MidAtlanticExt. stairway
29 (Roof F-H)Asphalt Built-up1,726FlatYes2006 - MidAtlanticExt. stairway
4 (Roofs A-I, K)Standing seam painted alum.33,8162/12 - 5/12Approx. 1985High reach / ladder
4 (J & L)Standing seam painted alum.14,5625/122009American Alliance/Merchant & EvansHigh reach / ladder
4 (Roofs M,O,Q)Mod. bit., 3-ply Built-up, w/ cap1,600FlatNo2004 - Eagle RoofingTremco 20-year warranty (2004)Int. Stairs / elevator
4 (Roofs N,R,P)4 ply modified with cap14,000FlatNo2007 - R.L. CampbellTremco 5-year TPW (2004)Int. Stairs / elevator
633 (Roof A & B)Modified Bitumen12,900FlatYes2011 Brown and GuarinoGAF 20 Year (2031)Penthouse/Ext Ladder
633 (Roof C)Asphalt Built-up w/insul.35,784FlatYes1997Tremco 5-year warranty (2001)Int. Stairs / Ladder
633 (Roof D1 & D2)Smooth-surface Asphalt Built-up13,040FlatPartial1997Tremco 5-year warranty (2001)Int. Stairs / Ladder
633 (Roof E)Smooth-surface Asphalt Built-up17,990FlatYesApprox. 1985Int. Stairs / Ladder
633 (Roof F)4-ply Asphalt BUR w/ syn cap sheet34,536FlatYes2007KalimexInt. Stairs / Ladder
670TPO 60 mil8,400FlatPartial2011 Johnson/Pro ComJohnson RoofingExt Ladder
745 (Roofs A-C)4-ply Asphalt Built-up - smooth4,177Approx. 2000Ext. ladder
756 (Roofs A-C)4-ply Asphalt BUR & corrugated11,2312007 - BenakaExt. Ladder
77H (Roofs A&E)Mod. bit., 3-ply Built-up, w/ cap70,000FlatPartial2004 - Eagle RoofingTremco 20-year warranty (2004)Int. / Ext. Ladders
77H (Roofs B,C,D)Standing seam painted alum.72,9307/12No2009Kalimex/Merchant & EvansInt. / Ext. Ladders
77H (Roof F)0.060 EPDM - fully adhered2,880FlatNo1987Int. / Ext. Ladders
77H East Locker RoomTPO 60 mil2,000FlatPartial2011 Johnson/Pro ComJohnson RoofingLadder/High Reach
77L (High roofs)EPDM - 0.090 mil (over SPUF)94,000FlatYes2005 MidAtlantic2001 Company Inc. 20-yearExt. Ladder
77L (Low roofs)Mod. bit., 3-ply Built-up, w/ cap48,000FlatNo2003 Boro Const.Johns Manville 20-yearExt. LadderInterior Roofs are bounded by walls
87 (Roofs A-I)Standing seam painted alum. Mod Bit Valleys106,150Yes2007 BenakaExt. Ladder
87 (Roof J)0.060 EDPM - fully adhered6,900FlatApprox. 2001Ext. Ladder
666Asphalt Built-up w/insul.2,000FlatYes
770FlatYes
771TPO 60 mil3,400FlatNo2011 Johnson/Pro ComJohnson RoofingExt. ladder
7760.060 EPDM2,268FlatApprox. 1998Ext. ladder
779
1000 (Roof H&J)Smooth-surface Asphalt Built-up484FlatNo2012 Persaud/BelcherJohns-ManvilleInt. Stairs / elevator
1000 (Roof I)4-ply Asphalt Built-up w/insul.3,800FlatNo2012 Persaud/BelcherJohns-ManvilleInt. Stairs / elevator
1000 (Roofs A-G)4-ply Asphalt Built-up w/insul.100,126FlatNo2012 Persaud/BelcherJohns-ManvilleInt. Stairs / elevator
519/520 (Roofs A)0.060 EPDM17,635FlatNoApprox. 2002Ext. ladder
519/520( B-H; L-O)Asphalt Built-up w/insul.UNKFlatNoApprox. 2002Ext. ladder
542 (Roofs A-C)4-ply Asphalt Built-up w/insul.107,730FlatNoApprox. 2000Tremco 20-year warranty (2004)Ext. ladder
Notes:
1. Deleted
2. If "Ladder" or "High reach / ladder" is noted, then contractor must provide a means of access during cleaning & inspection.
3. Inspection shall consist of visual examination of roof and drainage system for damage or excessive wear. Inspection report shall be submitted to
the Government within 7 calendar days of completion of each inspection. Contractor shall submit a written estimate for any repairs needed.
4. Cleaning shall include removal of all debris (leaves, silt, litter and other foreign matter) from roof drains, roof surface, gutters and downspouts. Contractor shall ensure that all downspouts are clear of debris and can drain properly.

&CAttachment 1 PNBC Gutter and Drain Cleaning &CPage &P of &N

File details come from the government source that posted it. Updated .