Attachment A NSWC Phila Roofs.xls
XLS spreadsheet 36 KB Posted
- Attached to
- ROOFING IDIQ IN SUPPORT OF PWD PENNSYLVANIA
- Solicitation number
- N4008520R0082
About this file
This document contains details for a roof cleaning and maintenance contract opportunity at the Naval Support Activity in Philadelphia, Pennsylvania. The contract requires cleaning gutters and drains on various rooftops at the facility six times per year, with monthly inspections, and submitting a report after each cleaning or inspection. The rooftops range in age from approximately 1980 to 2011, with various roof types including corrugated aluminum, asphalt, and thermoplastic polyolefin. Access to the rooftops for cleaning is noted as ladder, stairs, or elevator depending on location. Related to this is a federal contract solicitation for roofing repair and maintenance services at various Department of Navy sites in Philadelphia and Mechanicsburg, Pennsylvania. The contractor will be required to provide all labor, materials, and equipment to fulfill task orders for roof repairs and maintenance.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Roofs
| Table 1. Roof / Gutter / Drain cleaning shall be conducted six times a year (cleanings to be done during the months of February, April, June, September, October, November, with the option to do 2 additional cleanings on an as-needed basis) with inspections conducted every month whether cleaning occurred or not. A report must be submitted following cleaning and or inspection each month. | ||||||||
| Building | Roof-type | Approx. SF | Pitch | Parapet | Date of Roof Construction | Warranty - Manufacturer | Roof Access (See Note 2) | Notes |
| 29 (Roof A) | Corrugated Alum. | 18,602 | 7/12 | Approx. 1980 | Coating - MuleHide (Kalimex 2007) | High reach / ladder | ||
| 29 (Roof B-E) | Asphalt Built-up | 8,686 | Flat | Yes | 2006 - MidAtlantic | Ext. stairway | ||
| 29 (Roof F-H) | Asphalt Built-up | 1,726 | Flat | Yes | 2006 - MidAtlantic | Ext. stairway | ||
| 4 (Roofs A-I, K) | Standing seam painted alum. | 33,816 | 2/12 - 5/12 | Approx. 1985 | High reach / ladder | |||
| 4 (J & L) | Standing seam painted alum. | 14,562 | 5/12 | 2009 | American Alliance/Merchant & Evans | High reach / ladder | ||
| 4 (Roofs M,O,Q) | Mod. bit., 3-ply Built-up, w/ cap | 1,600 | Flat | No | 2004 - Eagle Roofing | Tremco 20-year warranty (2004) | Int. Stairs / elevator | |
| 4 (Roofs N,R,P) | 4 ply modified with cap | 14,000 | Flat | No | 2007 - R.L. Campbell | Tremco 5-year TPW (2004) | Int. Stairs / elevator | |
| 633 (Roof A & B) | Modified Bitumen | 12,900 | Flat | Yes | 2011 Brown and Guarino | GAF 20 Year (2031) | Penthouse/Ext Ladder | |
| 633 (Roof C) | Asphalt Built-up w/insul. | 35,784 | Flat | Yes | 1997 | Tremco 5-year warranty (2001) | Int. Stairs / Ladder | |
| 633 (Roof D1 & D2) | Smooth-surface Asphalt Built-up | 13,040 | Flat | Partial | 1997 | Tremco 5-year warranty (2001) | Int. Stairs / Ladder | |
| 633 (Roof E) | Smooth-surface Asphalt Built-up | 17,990 | Flat | Yes | Approx. 1985 | Int. Stairs / Ladder | ||
| 633 (Roof F) | 4-ply Asphalt BUR w/ syn cap sheet | 34,536 | Flat | Yes | 2007 | Kalimex | Int. Stairs / Ladder | |
| 670 | TPO 60 mil | 8,400 | Flat | Partial | 2011 Johnson/Pro Com | Johnson Roofing | Ext Ladder | |
| 745 (Roofs A-C) | 4-ply Asphalt Built-up - smooth | 4,177 | Approx. 2000 | Ext. ladder | ||||
| 756 (Roofs A-C) | 4-ply Asphalt BUR & corrugated | 11,231 | 2007 - Benaka | Ext. Ladder | ||||
| 77H (Roofs A&E) | Mod. bit., 3-ply Built-up, w/ cap | 70,000 | Flat | Partial | 2004 - Eagle Roofing | Tremco 20-year warranty (2004) | Int. / Ext. Ladders | |
| 77H (Roofs B,C,D) | Standing seam painted alum. | 72,930 | 7/12 | No | 2009 | Kalimex/Merchant & Evans | Int. / Ext. Ladders | |
| 77H (Roof F) | 0.060 EPDM - fully adhered | 2,880 | Flat | No | 1987 | Int. / Ext. Ladders | ||
| 77H East Locker Room | TPO 60 mil | 2,000 | Flat | Partial | 2011 Johnson/Pro Com | Johnson Roofing | Ladder/High Reach | |
| 77L (High roofs) | EPDM - 0.090 mil (over SPUF) | 94,000 | Flat | Yes | 2005 MidAtlantic | 2001 Company Inc. 20-year | Ext. Ladder | |
| 77L (Low roofs) | Mod. bit., 3-ply Built-up, w/ cap | 48,000 | Flat | No | 2003 Boro Const. | Johns Manville 20-year | Ext. Ladder | Interior Roofs are bounded by walls |
| 87 (Roofs A-I) | Standing seam painted alum. Mod Bit Valleys | 106,150 | Yes | 2007 Benaka | Ext. Ladder | |||
| 87 (Roof J) | 0.060 EDPM - fully adhered | 6,900 | Flat | Approx. 2001 | Ext. Ladder | |||
| 666 | Asphalt Built-up w/insul. | 2,000 | Flat | Yes | ||||
| 770 | Flat | Yes | ||||||
| 771 | TPO 60 mil | 3,400 | Flat | No | 2011 Johnson/Pro Com | Johnson Roofing | Ext. ladder | |
| 776 | 0.060 EPDM | 2,268 | Flat | Approx. 1998 | Ext. ladder | |||
| 779 | ||||||||
| 1000 (Roof H&J) | Smooth-surface Asphalt Built-up | 484 | Flat | No | 2012 Persaud/Belcher | Johns-Manville | Int. Stairs / elevator | |
| 1000 (Roof I) | 4-ply Asphalt Built-up w/insul. | 3,800 | Flat | No | 2012 Persaud/Belcher | Johns-Manville | Int. Stairs / elevator | |
| 1000 (Roofs A-G) | 4-ply Asphalt Built-up w/insul. | 100,126 | Flat | No | 2012 Persaud/Belcher | Johns-Manville | Int. Stairs / elevator | |
| 519/520 (Roofs A) | 0.060 EPDM | 17,635 | Flat | No | Approx. 2002 | Ext. ladder | ||
| 519/520( B-H; L-O) | Asphalt Built-up w/insul. | UNK | Flat | No | Approx. 2002 | Ext. ladder | ||
| 542 (Roofs A-C) | 4-ply Asphalt Built-up w/insul. | 107,730 | Flat | No | Approx. 2000 | Tremco 20-year warranty (2004) | Ext. ladder | |
| Notes: | ||||||||
| 1. Deleted | ||||||||
| 2. If "Ladder" or "High reach / ladder" is noted, then contractor must provide a means of access during cleaning & inspection. | ||||||||
| 3. Inspection shall consist of visual examination of roof and drainage system for damage or excessive wear. Inspection report shall be submitted to | ||||||||
| the Government within 7 calendar days of completion of each inspection. Contractor shall submit a written estimate for any repairs needed. | ||||||||
| 4. Cleaning shall include removal of all debris (leaves, silt, litter and other foreign matter) from roof drains, roof surface, gutters and downspouts. Contractor shall ensure that all downspouts are clear of debris and can drain properly. |
&CAttachment 1 PNBC Gutter and Drain Cleaning &CPage &P of &N
File details come from the government source that posted it. Updated .