This document contains pre-proposal inquiries and responses related to Solicitation Number N4008520R0082 for roofing repair and maintenance services at various Department of Navy sites in Pennsylvania. Key details include: the contractor must provide all labor, materials, equipment, and management to fulfill task orders for roof repairs at Naval Business Center Philadelphia, Naval Support Activity Philadelphia, and Naval Support Activity Mechanicsburg. Experience with various roofing systems listed in Attachment A will be considered relevant. Pricing must include overhead and profit. The number of required annual cleanings is six as specified in Attachment A. A roofing specifications contract is provided as a separate attachment. Electronic proposals are due by October 15, 2020 and hard copy proposals by October 21, 2020 due to an extension.

View the file

Other files

File Type Posted
AMENDMENT 0005 FOR ROOFING PROJECT.pdf PDF
Roofing site visit log-NSA-P.pdf PDF
AMENDMENT 0004 FOR ROOFING PROJECT.pdf PDF
ROOFING PROJECT SITE VISIT FOR PNBC LOCATION.pdf PDF
Pre-Proposal Inquiries LOG 03 for Roofing Project.pdf PDF
Roofing Specifications Contract.pdf PDF
REVISED J-020000-08_ELINs_BID schedule.xlsx XLSX spreadsheet
ATTACHMENT B Roofing Survey Check List.pdf PDF
UPDATED WAGE DETERMINATION DOCUMENT.pdf PDF
AMENDMENT 0003 FOR ROOFING PROJECT.pdf PDF
Attachment C PNBC Region Roofs.xlsx XLSX spreadsheet
Pre-Proposal Inquiries LOG 01 for Roofing Project.pdf PDF
AMENDMENT 0002 FOR ROOFING PROJECT.pdf PDF
AMENDMENT 0001 FOR ROOFING PROJECT.pdf PDF
Attachment PNBC SITE MAP.pdf PDF
ATTACHMENT F SEC-NAV 5512 Form.pdf PDF
Attachment_Roofing Contract Specification Table of Contents.pdf PDF
Attachment A NSWC Phila Roofs.xls XLS spreadsheet
Attachment C Roof Survey Check List.doc DOC document
RFP N40085-20-R-0082 ROOFING PROJECT.pdf PDF
Attachment D Lessons Learn Roof Fire.pptx PPTX presentation
Attachment C- Past Performance Questionnaire.docx DOCX document
Attachment A - Pre-Proposal Inquiries Form.xlsx XLSX spreadsheet
Attachment Table 07 61 14.00 20 Standing Seam Roof.pdf PDF
Attachment E - Small Business Subcontracting Plan.docx DOCX document
ATTACHMENT-D J-020000-08_ELINs_BID schedule.xlsx XLSX spreadsheet
Attachment NSA PHILA SITE MAP.pdf PDF
Attachment B - Construction Experience Project Data Sheet.docx DOCX document
Attachment_Roof Drawings.pdf PDF
Attachment B PNBC Region Roofs.xlsx XLSX spreadsheet
Attachment Table 07 60 00 Flashing Sheet Metal.pdf PDF
Attachment Table 07 62 13 Copper Sheet Metal.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page Section Para.

Factor 1 – Corporate

Experience:

(I) Solicitation Submittal

Requirement s:

The RFP states that a relatative experience is described as "A project demonstrating experience with removal, repair and replacement of one of the following type of roofing systems: (1) PVC, (2) E.P.D.M roofing systems, (3) asphalt shingles, (4) standing seam metal roofing, or (5) transite roof panels."

However, Attachment A NSWC Phila Roofs hardly contains any of those roof system types and Attachment D ELIN Bid Schedule contains multiple other roof system types. Will the Navy accept experience with systems listed within Attachment A and/or Attachment D as relative considering those are present onsite? Additionally, roof inspections and cleanings are an extensive task as outlined by the RFP, will the Navy require previous roof system survey and maintenance program experience to demonstrate the ability to perform the services?

Bid Per RFP

Factor 1 – Corporate

Experience:

(I) Solicitation Submittal

Requirement s:

The RFP states "Projects submitted for the offeror shall be completed within the past five (5) years of the date of issuance of this RFP. Projects must clearly state the construction completion date or may be considered Not Relevant. Also, projects completed outside of this window will be considered “Not Relevant.” as well as "Projects which are not complete as of the date of issuance of this RFP shall not be considered by the SSEB." With the current on-going covid-19 crisis impacting the ability to complete project over the course of the past 6+ months, will the Navy accept projects that are substantially complete as of the RFP closing date?

The projects submitted for the offerors SHALL be completed within the past five (5) years of the date of issuance of this RFP.

WAGE

DETERMINATI

ON

There has been a modification to the rates since the RFP publication. Will the newest rates be required, will the Navy provide them?

Please see Attached Wage Determination Document attached as a separate documents.

Attach. D Is profit and overhead to be included within the line item costs? YES, that is correct

Attach. D A0161

This line item description states "Perform roof, drain, gutter and downspout cleaning three times a year in accordance with Attachment A; provide monthly inspections in accordance with Attachment A." There are two Attachment A's, please confirm that it is in accordance with Attachment A NSWC Phila Roofs.

There is two Attachments As. First Attachment A, is for the Pre-Proposal Injury and the second Attachment A is for the NWSC Phila Roofs and Yes, it is in Accordance with attachment A NSWC Roofs

REFERENCE

QUESTION RESPONSE

Attach. D A0161

This line item description states "Perform roof, drain, gutter and downspout cleaning three times a year in accordance with Attachment A; provide monthly inspections in accordance with Attachment A." Attachment A - NSWC Phila Roofs dictates roof, drain, gutter and downspout cleaning six times a year with an option for two additional rounds. Please confirm that the six rounds are required, in the listed months. Additionally, should the two additional optional cleanings be included in the pricing?

The Correct number of cleanings per year is Six. This was an oversight and will be changed to coincide with Attachment A NSWC Roofs.

Do not include the 2 optional cleanings in the Unit Price

Attach. A NSWC Phila

Roofs

Note 2 states "If "Ladder" or "High reach / ladder" is noted, then contractor must provide a means of access during cleaning & inspection". Please provide the elevations for buildings 29 (Roof A), 4 (Roofs A-I, K), 4 (J & L) and 77H East Locker Room to estimate man lift reach.

Most buildings are accessible using provided wall mounted ladders or roof top door entry.

At most Plan to utilize a 40' high reach.

Attach. Specs Table of Contents

The RFP provides a table of contents for a full specification package but here are only three short documents provided. Will the remainder of the divisions / sections be provided?

Please see Roofing Specifications Contract attached as a separate document

Attach. D Option Years

The option years include a formula to increase the line item prices from one year to the next. Will we need to utilize future wage rates? If so, can we increase the % on a per year basis or should that be reflected in the base year pricing?

The contractor can utilize the current formulas or enter their own. There is zero restrictions when determining their pricing.

Will the Navy provide a due date extension to account for PPI responses and review of any new information?

Electronic Proposal due date has been extended to October 15, 2020 by 2:00 p.m.

(EST) through DoDSafe website and the Hard Copy Proposal will be due October 21, 2020 by 12:00 noon (via mail Courier Fedex, UPS, etc.)